AInE/Chapter 7/Read MCQs
๐Ÿ“– Back to Study Notes
7

Chapter 7 ยท MCQ Read Mode

Decision Making

AINE07ยท78 Total MCQs
Question 1 of 78Economics for Decision Making

If the price of a good rises by 10% and quantity demanded falls by 20%, demand is:

APerfectly inelastic
BElastic
CInelastic
DUnitary elastic
Answer is hidden
Question 2 of 78Economics for Decision Making

An increase in consumer income for a normal good causes:

ANo change at all
BA movement along the demand curve
CA rightward shift of the demand curve
DA leftward shift of the supply curve
Answer is hidden
Question 3 of 78Economics for Decision Making

A consumer is in equilibrium when the marginal utility per rupee spent on each good is:

AEqual for all goods
BZero for all goods
CMaximum for one good only
DEqual to the price
Answer is hidden
Question 4 of 78Economics for Decision Making

The marginal cost curve cuts the average total cost curve at:

AThe origin
BThe minimum point of the ATC curve
CThe point of zero output
DIts maximum point
Answer is hidden
Question 5 of 78Economics for Decision Making

Which cost is irrelevant to a future decision?

AMarginal cost
BVariable cost
COpportunity cost
DSunk cost
Answer is hidden
Question 6 of 78Economics for Decision Making

A firm in perfect competition is a:

APrice taker with P = MR
BMonopolist
CCartel leader
DPrice maker with MR < P
Answer is hidden
Question 7 of 78Economics for Decision Making

Excess capacity in the long run is a characteristic of:

AMonopolistic competition
BMonopoly
CDuopoly with collusion
DPerfect competition
Answer is hidden
Question 8 of 78Economics for Decision Making

The kinked demand curve model explains:

AConsumer surplus
BPerfect competition equilibrium
CDiminishing marginal utility
DPrice rigidity in oligopoly
Answer is hidden
Question 9 of 78Economics for Decision Making

A situation in which no player can improve their payoff by unilaterally changing strategy is:

ANash equilibrium
BPareto optimum
CDominant strategy
DSaddle point of a zero-sum game only
Answer is hidden
Question 10 of 78Economics for Decision Making

Demand for labour by a firm is called derived demand because it depends on:

AThe demand for the product that labour produces
BThe interest rate
CThe minimum wage
DThe number of workers available
Answer is hidden
Question 11 of 78Economics for Decision Making

Unemployment caused by a mismatch between workers' skills and available jobs is:

AFrictional unemployment
BSeasonal unemployment
CStructural unemployment
DCyclical unemployment
Answer is hidden
Question 12 of 78Economics for Decision Making

Inflation caused by a rise in imported fuel prices is an example of:

ADeflation
BCost-push inflation
CDisinflation
DDemand-pull inflation
Answer is hidden
Question 13 of 78Economics for Decision Making

Raising the cash reserve ratio by the central bank is an instrument of:

AContractionary monetary policy
BContractionary fiscal policy
CExchange-rate policy only
DExpansionary fiscal policy
Answer is hidden
Question 14 of 78Concurrent Engineering

Concurrent engineering means:

AOutsourcing the design work
BDesigning the product first and the process later
CManufacturing two products at once
DDesigning the product and its manufacturing and support processes in parallel
Answer is hidden
Question 15 of 78Concurrent Engineering

The traditional approach in which design is completed and then 'thrown over the wall' to manufacturing is called:

ASequential engineering
BConcurrent engineering
CReverse engineering
DValue engineering
Answer is hidden
Question 16 of 78Concurrent Engineering

A major measurable benefit of concurrent engineering is:

ALonger development cycles
BMore departmental isolation
CReduced time to market and fewer late engineering changes
DHigher number of prototypes
Answer is hidden
Question 17 of 78Concurrent Engineering

Designing a product so that it has fewer parts and is easy to assemble is:

ADesign of experiments
BDesign for manufacture and assembly (DFMA)
CStatistical process control
DBusiness process re-engineering
Answer is hidden
Question 18 of 78Concurrent Engineering

The technique that converts the voice of the customer into engineering characteristics is:

AQFD (house of quality)
BTRIZ
CFMEA
DSPC
Answer is hidden
Question 19 of 78Concurrent Engineering

The technique that identifies potential failure modes and ranks them by a risk priority number is:

AQFD
BFMEA
CValue analysis
DMonte Carlo simulation
Answer is hidden
Question 20 of 78Concurrent Engineering

Making product performance insensitive to uncontrollable (noise) factors is the aim of:

ABPR
BKanban
CMRP
DTaguchi's robust design
Answer is hidden
Question 21 of 78Concurrent Engineering

Business process re-engineering is defined as:

ASmall continuous improvements by workers
BFundamental rethinking and radical redesign of processes for dramatic improvement
CStatistical control of a process
DRoutine maintenance of machines
Answer is hidden
Question 22 of 78Concurrent Engineering

The main enabler of business process re-engineering is:

AInformation technology
BLonger lead times
CHigher inventories
DIncreased manpower
Answer is hidden
Question 23 of 78Concurrent Engineering

Improving one department's performance at the expense of the whole organisation is called:

AStandardisation
BSynergy
CSub-optimisation
DIntegration
Answer is hidden
Question 24 of 78Concurrent Engineering

Linking shop-floor sensors, PLCs, SCADA, MES and ERP is an example of:

AVertical integration of systems
BHorizontal integration
CSequential engineering
DProduct differentiation
Answer is hidden
Question 25 of 78Concurrent Engineering

A cooperative concurrent-engineering team is typically:

AComposed only of top managers
BComposed only of design engineers
CA single project manager
DMultidisciplinary, including design, manufacturing, quality, purchasing and suppliers
Answer is hidden
Question 26 of 78Concurrent Engineering

Spending more effort in the early design phase because changes are cheapest then is known as:

AExpediting
BBatch processing
CFront-loading the development process
DBack-loading
Answer is hidden
Question 27 of 78Value Engineering

Value in value engineering is defined as:

ACost divided by function
BFunction divided by cost
CQuality multiplied by cost
DPrice minus cost
Answer is hidden
Question 28 of 78Value Engineering

Value engineering is applied mainly at the:

AStage of final inspection
BTime of dispatch
CDesign and development stage of a new product
DEnd of the product's life only
Answer is hidden
Question 29 of 78Value Engineering

The value-engineering technique was originated by:

ALawrence D. Miles at General Electric
BHenry Ford
CTaiichi Ohno at Toyota
DW. E. Deming at Ford
Answer is hidden
Question 30 of 78Value Engineering

In function analysis, a function is expressed by:

AA drawing number
BA long descriptive sentence
CA cost figure only
DAn active verb and a measurable noun
Answer is hidden
Question 31 of 78Value Engineering

A FAST diagram is used to:

ABalance an assembly line
BSchedule the project activities
CCalculate the break-even point
DShow how and why functions are performed and their logical relationship
Answer is hidden
Question 32 of 78Value Engineering

The phase of the value-engineering job plan in which ideas are generated without criticism is the:

AEvaluation phase
BCreativity (speculation) phase
CInformation phase
DImplementation phase
Answer is hidden
Question 33 of 78Value Engineering

The correct order of the value-engineering job plan is: implementation

AEvaluation โ†’ creativity โ†’ information โ†’ presentation
BCreativity โ†’ information โ†’ implementation โ†’ evaluation
CImplementation โ†’ information โ†’ creativity โ†’ evaluation
DInformation โ†’ function analysis โ†’ creativity โ†’ evaluation โ†’ development โ†’ presentation โ†’
Answer is hidden
Question 34 of 78Value Engineering

'Worth' in value engineering means:

AThe lowest cost of reliably performing the required function
BThe total manufacturing cost
CThe cost of raw material only
DThe selling price of the product
Answer is hidden
Question 35 of 78Value Engineering

Which of the following is NOT a type of value?

AEsteem value
BStatistical value
CExchange value
DUse value
Answer is hidden
Question 36 of 78Value Engineering

Unnecessary cost in value engineering is cost that:

AProvides neither use nor esteem value to the customer
BIs incurred in the machine shop
CAppears in the balance sheet
DIs incurred on raw material
Answer is hidden
Question 37 of 78Value Engineering

Value engineering differs from simple cost cutting because it:

AAlways reduces the quality
BApplies only to overhead expenses
CIgnores customer requirements
DMaintains or improves the required function and quality
Answer is hidden
Question 38 of 78Value Engineering

A value-engineering study should preferably be applied first to items that:

AAccount for a large share of total cost (the vital few)
BCost the least
CAre easiest to change
DAre purchased locally
Answer is hidden
Question 39 of 78Value Engineering

Replacing a machined component with a moulded one after a VE study, keeping the same function, results in:

AUnchanged value
BLoss of function
CLower value
DHigher value
Answer is hidden
Question 40 of 78Operations Research

In linear programming, the optimal solution always occurs at:

AThe centre of the feasible region
BThe origin always
CA point outside the feasible region
DA corner (extreme) point of the feasible region
Answer is hidden
Question 41 of 78Operations Research

Which of the following is NOT an assumption of linear programming?

ARandomness of the coefficients
BDivisibility
CLinearity
DCertainty
Answer is hidden
Question 42 of 78Operations Research

If a maximisation LP has an objective function parallel to a binding constraint, the problem has:

AMultiple optimal solutions
BA degenerate basis only
CNo feasible solution
DAn unbounded solution
Answer is hidden
Question 43 of 78Operations Research

The shadow price of a resource that is not fully used in the optimal solution is:

AAlways positive
BZero
CEqual to its market price
DNegative
Answer is hidden
Question 44 of 78Operations Research

In duality, the optimal objective values of the primal and dual problems are:

AEqual
BOpposite in sign
CUnrelated
DAlways different
Answer is hidden
Question 45 of 78Operations Research

Sensitivity analysis of an LP solution determines:

AThe correlation coefficient
BThe number of constraints
CThe random error of the data
DHow much the data can change before the optimal solution changes
Answer is hidden
Question 46 of 78Operations Research

The coefficient of determination Rยฒ of a regression indicates:

AThe slope of the line
BThe number of observations
CThe proportion of variation in y explained by the model
DThe intercept
Answer is hidden
Question 47 of 78Operations Research

In exponential smoothing, increasing the value of ฮฑ:

AIgnores recent data
BMakes the forecast respond faster to recent demand
CSmooths the forecast more heavily
DHas no effect
Answer is hidden
Question 48 of 78Operations Research

A four-period moving average forecast for demands 40, 44, 48 and 52 is:

A44
B46
C52
D184
Answer is hidden
Question 49 of 78Operations Research

The mean absolute deviation (MAD) of forecast errors is:

AThe average of the absolute errors
BThe square root of the mean squared error
CThe cumulative error
DAlways negative
Answer is hidden
Question 50 of 78Operations Research

In a two-person zero-sum game, a saddle point exists when:

AMaximin equals minimax
BAll payoffs are zero
CBoth players use mixed strategies
DMaximin exceeds minimax
Answer is hidden
Question 51 of 78Operations Research

In Monte Carlo simulation, random-number intervals are assigned to outcomes in proportion to their:

ASerial numbers
BCosts
CProbabilities
DStandard deviations
Answer is hidden
Question 52 of 78Operations Research

The distribution most commonly used to model the number of customer arrivals per hour is the:

ANormal distribution
BPoisson distribution
CUniform distribution
DBinomial distribution
Answer is hidden
Question 53 of 78Work Study and Productivity

Productivity is defined as the ratio of:

AOutput to input
BInput to output
COutput to time only
DProfit to sales
Answer is hidden
Question 54 of 78Work Study and Productivity

Work study consists of:

AJob evaluation and merit rating
BMethod study and quality control
CTime study and cost accounting
DMethod study and work measurement
Answer is hidden
Question 55 of 78Work Study and Productivity

In a flow process chart, a triangle symbol represents:

ADelay
BStorage
COperation
DTransport
Answer is hidden
Question 56 of 78Work Study and Productivity

The chart used to study the idle time of a worker and machine together is the:

ATwo-handed process chart
BOperation process chart
CMultiple activity chart
DSIMO chart
Answer is hidden
Question 57 of 78Work Study and Productivity

A string diagram is used mainly to:

AMeasure and reduce the distance travelled by workers or material
BRate the operator's performance
CRecord hand motions of an operator
DShow the sequence of inspections
Answer is hidden
Question 58 of 78Work Study and Productivity

Therbligs are:

ASymbols used in flow process charts
BFundamental hand motions used in micro-motion study
CTypes of control charts
DAllowances given in time study
Answer is hidden
Question 59 of 78Work Study and Productivity

Which statement is a principle of motion economy?

AOne hand should always remain idle
BTools should be placed randomly
CBoth hands should begin and end their motions at the same time
DMotions should be zig-zag and sudden
Answer is hidden
Question 60 of 78Work Study and Productivity

If the observed time for an element is 0.5 min and the operator is rated at 120%, the basic time is:

A0.42 min
B0.50 min
C0.60 min
D1.20 min
Answer is hidden
Question 61 of 78Work Study and Productivity

Standard time is equal to:

ABasic time minus rating
BObserved time minus allowances
CObserved time only
DBasic time plus allowances
Answer is hidden
Question 62 of 78Work Study and Productivity

A basic time of 4 minutes with a total allowance of 15% gives a standard time of:

A4.15 minutes
B6.0 minutes
C4.6 minutes
D3.4 minutes
Answer is hidden
Question 63 of 78Work Study and Productivity

The personal-needs allowance in time study is usually about:

A5% of the basic time
B0.5%
C25%
D50%
Answer is hidden
Question 64 of 78Work Study and Productivity

Work sampling is most suitable for:

ARating an operator's skill
BLong-cycle, non-repetitive activities and idle-time studies
CMeasuring machine vibration
DVery short repetitive cycles only
Answer is hidden
Question 65 of 78Work Study and Productivity

For 95% confidence, the number of observations in work sampling is given by:

An = 100/p
Bn = p(1 โˆ’ p)/L
Cn = 2pLยฒ
Dn = 4p(1 โˆ’ p)/Lยฒ
Answer is hidden
Question 66 of 78Ergonomics

The basic aim of ergonomics is to:

AFit the job and workplace to the worker
BFit the worker to the job
CReduce the number of workers
DIncrease machine speed only
Answer is hidden
Question 67 of 78Ergonomics

According to the allocation of functions, humans are superior to machines in:

AContinuous heavy power output
BJudgement in unexpected situations and pattern recognition
CLong computations
DRepetitive precise operations
Answer is hidden
Question 68 of 78Ergonomics

For reading an exact numerical value, the most suitable display is a:

AWarning lamp
BQualitative coloured band
CDigital (counter) display
DMoving-pointer fixed-scale dial
Answer is hidden
Question 69 of 78Ergonomics

An auditory warning signal is preferred when the message:

AContains detailed numerical data
BIs long and complex
CIs short, urgent and requires immediate action
DMust be referred to repeatedly
Answer is hidden
Question 70 of 78Ergonomics

Shape coding of aircraft or machine controls is used mainly to:

AImprove appearance
BReduce manufacturing cost
CAllow identification by touch and prevent wrong operation
DIncrease control force
Answer is hidden
Question 71 of 78Ergonomics

Turning a knob clockwise is expected to increase the output. This is an example of:

AA population stereotype (movement compatibility)
BWork sampling
CAnthropometry
DA control-display ratio
Answer is hidden
Question 72 of 78Ergonomics

Clearance dimensions such as doorway height and legroom should be designed for the:

A95th percentile of the user population
B50th percentile
C5th percentile
DMinimum value recorded
Answer is hidden
Question 73 of 78Ergonomics

The recommended working height for precision bench work is:

AAt knee height
BSlightly above elbow height with elbow support
CAt shoulder height
DWell below elbow height
Answer is hidden
Question 74 of 78Ergonomics

The occupational noise exposure limit widely used for an 8-hour shift is:

A85 dB(A)
B40 dB(A)
C120 dB(A)
D150 dB(A)
Answer is hidden
Question 75 of 78Ergonomics

The load constant used in the NIOSH lifting equation is:

A5 kg
B50 kg
C10 kg
D23 kg
Answer is hidden
Question 76 of 78Ergonomics

A lifting index (LI) greater than 1 indicates that the task:

AIs perfectly safe
BHas zero load
CPoses an increased risk of low-back injury
DNeeds no further study
Answer is hidden
Question 77 of 78Ergonomics

RULA and REBA are tools used to assess:

ALighting levels
BMachine vibration levels
CWorking postures and musculoskeletal risk
DNoise exposure
Answer is hidden
Question 78 of 78Ergonomics

In a computer workstation, the top of the monitor should be placed:

AAt or slightly below eye level, about 50โ€“70 cm away
BDirectly in front of a bright window
CWell above eye level
DAt knee level
Answer is hidden
โ† PREVIOUS CHAPTERCh 6: Industrial ManagementNEXT CHAPTER โ†’Ch 8: Industrial Systems