Question 1 of 78Introduction to Engineering Survey
The survey stage whose purpose is to transfer the designed centre line, levels and grades onto the ground is the:
AReconnaissance survey
BAs-built survey
CConstruction (setting-out) survey
DPreliminary survey
Answer is hidden
Question 2 of 78Introduction to Engineering Survey
The fundamental principle that control should be established over the whole area before any detail is surveyed is stated as:
AWork from the part to the whole
BAlways use the shortest sight
CMeasure twice, plot once
DWork from the whole to the part
Answer is hidden
Question 3 of 78Introduction to Engineering Survey
Balancing the backsight and foresight distances in differential levelling principally eliminates:
AStaff graduation error
BCollimation error, and most of curvature and refraction
CSettlement of the tripod
DParallax
Answer is hidden
Question 4 of 78Introduction to Engineering Survey
A permissible misclosure of 12 root K millimetres, with K in kilometres, applies to:
AA GNSS baseline
BA closed levelling circuit
CA linear traverse misclosure
DAn angular traverse misclosure
Answer is hidden
Question 5 of 78Introduction to Engineering Survey
Which type of traverse should never be used as a control framework for an engineering project?
AA closed-link traverse between two known points
BA closed-loop traverse
CAn open traverse with no closure
DA traverse adjusted by least squares
Answer is hidden
Question 6 of 78Introduction to Engineering Survey
The feasibility (detailed) survey of a road project is primarily intended to provide:
AThe as-built record of the completed road
BDaily checks during construction
CThe data for design, quantities and the decision to proceed
DA rapid comparison of possible corridors
Answer is hidden
Question 7 of 78Introduction to Engineering Survey
Benchmarks for a construction project should be located:
AOn temporary timber stakes
BOutside the zone likely to be disturbed by construction
CInside the excavation for convenience
DOnly at the two ends of the site
Answer is hidden
Question 8 of 78Introduction to Engineering Survey
A project grid is sometimes defined with a scale factor of unity at the mean project height in order to:
AAvoid applying projection and height corrections during setting out
BAllow the use of magnetic bearings
CReduce the cost of monumentation
DEliminate the need for benchmarks
Answer is hidden
Question 9 of 78Introduction to Engineering Survey
In Nepal, plane coordinates for engineering projects are traditionally referred to:
AThe Indian grid on WGS84
BThe Lambert conformal conic on GRS80
CA purely arbitrary assumed datum
DThe Modified UTM projection on the Everest 1830 datum
Answer is hidden
Question 10 of 78Introduction to Engineering Survey
Which of the following is NOT an objective of engineering survey?
AMeasuring quantities for payment
BDetermining the legal ownership of land parcels
CSetting out the works
DProviding a control framework
Answer is hidden
Question 11 of 78Introduction to Engineering Survey
An angular misclosure limit expressed as c root n seconds in a traverse depends on:
AThe area enclosed
BThe number of angle stations
CThe number of benchmarks
DThe length of the traverse in kilometres
Answer is hidden
Question 12 of 78Introduction to Engineering Survey
The survey stage that compares alternative alignments before a final route is chosen is the:
AQuantity survey
BPreliminary survey
CConstruction survey
DDeformation monitoring survey
Answer is hidden
Question 13 of 78Introduction to Engineering Survey
For a control traverse serving a major bridge, a relative precision of 1:25,000 rather than 1:10,000 is specified because:
AThe traverse is longer
BFewer instruments are available
CThe tolerance on setting out the structure is much tighter
DThe site is at high altitude
Answer is hidden
Question 14 of 78Hydrographic, Hydropower and Irrigation Survey
An echo sounder records a two-way travel time of 0.02 s in water where the speed of sound is 1,500 m/s. The depth is:
A7.5 m
B300 m
C15 m
D30 m
Answer is hidden
Question 15 of 78Hydrographic, Hydropower and Irrigation Survey
In the two-point method of current-meter gauging, velocity observations are taken at depths of:
A0.2 and 0.8 of the total depth
B0.6 depth only
C0.5 depth only
D0.1 and 0.9 of the total depth
Answer is hidden
Question 16 of 78Hydrographic, Hydropower and Irrigation Survey
Which instrument measures a profile of water velocity using the Doppler shift of sound backscattered from particles in the flow?
AStaff gauge
BSingle-beam echo sounder
CSide-scan sonar
DADCP
Answer is hidden
Question 17 of 78Hydrographic, Hydropower and Irrigation Survey
River cross-sections for design purposes must be taken:
AParallel to the bank at fixed offsets
BPerpendicular to the direction of flow and beyond the high-flood level
COnly where the river is shallow
DAlong the thalweg
Answer is hidden
Question 18 of 78Hydrographic, Hydropower and Irrigation Survey
The relationship between gauge height and discharge at a gauging station is called the:
AMass haul curve
BHypsometric curve
CRating curve
DElevation-capacity curve
Answer is hidden
Question 19 of 78Hydrographic, Hydropower and Irrigation Survey
Which project component fixes the net head of a hydropower scheme at its lower end?
AThe intake sill
BThe surge tank
CThe tailrace water level
DThe gravel trap
Answer is hidden
Question 20 of 78Hydrographic, Hydropower and Irrigation Survey
The essential difference between a dam and a weir is that a weir:
ARaises and diverts the water level without providing significant storage
BIs constructed only on canals
CGenerates power directly
DIs always built of concrete
Answer is hidden
Question 21 of 78Hydrographic, Hydropower and Irrigation Survey
Setting out a bridge pier standing in deep water is best done by:
AUsing a sounding rod
BOffsetting from the water surface
CChaining from the nearer bank
DIntersection from two or more shore control points, or RTK GNSS, with an independent check
Answer is hidden
Question 22 of 78Hydrographic, Hydropower and Irrigation Survey
Soundings taken over several hours in a river must be reduced to a common datum by using:
AThe water-level record at a nearby gauge for the same times
BThe speed of sound in water
CThe average of the deepest and shallowest sounding
DThe boat's draft only
Answer is hidden
Question 23 of 78Hydrographic, Hydropower and Irrigation Survey
The float method of discharge measurement is regarded as approximate mainly because:
AIt requires an expensive current meter
BSurface velocity must be converted to mean velocity by an assumed coefficient
CIt can only be used in canals
DFloats cannot be seen in muddy water
Answer is hidden
Question 24 of 78Hydrographic, Hydropower and Irrigation Survey
Dilution (salt-tracer) gauging is particularly suitable for:
AStill reservoirs
BSteep, turbulent mountain streams where a current meter cannot be used
CWide, slow lowland rivers
DPipe flow under pressure
Answer is hidden
Question 25 of 78Hydrographic, Hydropower and Irrigation Survey
The elevation-area-capacity curve of a reservoir is derived from:
AThe rating curve of the river
BThe mass haul diagram
CContours of the reservoir area obtained by survey
DThe longitudinal profile of the penstock
Answer is hidden
Question 26 of 78Hydrographic, Hydropower and Irrigation Survey
In the formula P = rho g Q H eta, the two quantities supplied directly by survey work are:
Aeta and g
Brho and g
CQ from gauging and H from precise levelling
Drho and eta
Answer is hidden
Question 27 of 78Underground Surveying
Which instrument is used underground to determine true north independently of the surface network?
AGyro-theodolite
BGNSS receiver
CMagnetic compass
DDigital level
Answer is hidden
Question 28 of 78Underground Surveying
The Weisbach triangle is used in underground surveying to:
ASet out a transition curve
BCompute overbreak volumes
CTransfer azimuth from the surface into a tunnel through a shaft
DMeasure the convergence of tunnel walls
Answer is hidden
Question 29 of 78Underground Surveying
Survey stations in a tunnel are normally fixed in the roof rather than on the floor because:
AThe floor is constantly disturbed by excavation and haulage
BThe roof is always drier
CLevels cannot be read from the floor
DRoof stations are cheaper
Answer is hidden
Question 30 of 78Underground Surveying
Excavation beyond the designed tunnel profile is termed:
AConvergence
BOverbreak
CSubsidence
DUnderbreak
Answer is hidden
Question 31 of 78Underground Surveying
When transferring level down a shaft with a suspended steel tape, which correction is specific to this operation?
AThe correction for collimation
BThe correction for parallax
CThe correction for curvature and refraction
DThe correction for the weight of the hanging tape itself
Answer is hidden
Question 32 of 78Underground Surveying
In a long tunnel driven from both ends, the breakthrough error component that is most critical and is governed chiefly by azimuth error is the:
AVertical component
BLateral (transverse) component
CLongitudinal component
DRadial component
Answer is hidden
Question 33 of 78Underground Surveying
Convergence measurement in a tunnel is used principally to:
AAssess the behaviour of the rock mass and the adequacy of the support
BSet out the drill pattern
CCompute the excavated volume
DCheck the tunnel gradient
Answer is hidden
Question 34 of 78Underground Surveying
Convergence readings that decelerate and level off with time indicate that:
AThe tunnel section is stabilising
BThe support is failing
CThe readings are erroneous
DOverbreak is increasing
Answer is hidden
Question 35 of 78Underground Surveying
In electrical resistivity tomography, apparent resistivity is computed as:
AThe geometric factor multiplied by the ratio of measured voltage to injected current
BThe injected current divided by the electrode spacing
CThe depth divided by the electrode spacing
DThe voltage multiplied by the current
Answer is hidden
Question 36 of 78Underground Surveying
Increasing the separation of the electrodes in a resistivity survey results in:
AA stronger measured signal
BBetter horizontal resolution near the surface
CInvestigation of greater depth
DMeasurement of seismic velocity
Answer is hidden
Question 37 of 78Underground Surveying
A zone of markedly low resistivity detected along a proposed tunnel alignment most likely indicates:
AAn air-filled cavity
BDry sand and gravel
CClay, or a saturated fractured shear zone
DDry massive granite
Answer is hidden
Question 38 of 78Underground Surveying
Which array is generally preferred when good lateral resolution of vertical structures such as fracture zones is required?
ASchlumberger
BPole-pole
CWenner
DDipole-dipole
Answer is hidden
Question 39 of 78Underground Surveying
The accuracy of the breakthrough between two tunnel headings depends most strongly on:
AThe colour of the targets
BThe strength of the surface control network linking the portals
CThe ventilation system
DThe type of explosive used
Answer is hidden
Question 40 of 78Route Surveying
For a simple circular curve, the tangent length is given by:
AT = R tan(delta/2)
BT = R sin(delta/2)
CT = 2R sin(delta/2)
DT = R (sec(delta/2) - 1)
Answer is hidden
Question 41 of 78Route Surveying
A circular curve of radius 300 m has a deflection angle of 60 degrees. Its length is:
A346.41 m
B157.08 m
C314.16 m
D300.00 m
Answer is hidden
Question 42 of 78Route Surveying
If the chainage of the point of intersection is 1,250 m and the tangent length is 80 m with a curve length of 150 m, the chainage of the point of tangency (T2) is:
A1,320 m
B1,330 m
C1,170 m
D1,480 m
Answer is hidden
Question 43 of 78Route Surveying
In Rankine's method of setting out a curve by deflection angles, the arithmetic check at the end is that:
AThe total deflection angle equals half the deflection angle of the curve
BThe sum of the chords equals the long chord
CThe total deflection angle equals the full deflection angle
DThe last offset equals the mid-ordinate
Answer is hidden
Question 44 of 78Route Surveying
The degree of a curve on a 30 m arc basis is 4 degrees. Its radius is approximately:
A430 m
B215 m
C300 m
D860 m
Answer is hidden
Question 45 of 78Route Surveying
The principal purpose of a transition curve is to:
AReplace the need for a vertical curve
BIntroduce the centrifugal force and superelevation gradually
CShorten the length of the alignment
DReduce the earthwork quantity
Answer is hidden
Question 46 of 78Route Surveying
In a clothoid transition curve, the product of radius and length along the curve is:
AProportional to the deflection angle
BConstant
CZero at the start
DEqual to the shift
Answer is hidden
Question 47 of 78Route Surveying
The shift of a circular curve to accommodate a transition of length Ls is:
ALs squared divided by 2R
BLs divided by 2R
CLs squared divided by 6R
DLs squared divided by 24R
Answer is hidden
Question 48 of 78Route Surveying
Superelevation for highways is computed from the relation:
Ae + f = V squared / (127 R)
Be + f = V squared / (225 R)
Ce + f = 127 V squared / R
De = V / (127 R)
Answer is hidden
Question 49 of 78Route Surveying
Full superelevation on a road curve provided with transitions should be attained:
AAt the middle of the circular curve
BOnly at the end of the circular curve
CAt the beginning of the circular curve, having been introduced along the transition
DAt the point of intersection
Answer is hidden
Question 50 of 78Route Surveying
Vertical curves used on roads and railways are normally:
AClothoid spirals
BSimple parabolas
CLemniscates
DCircular arcs
Answer is hidden
Question 51 of 78Route Surveying
A summit vertical curve joins a grade of +3 % to a grade of -2 %. The algebraic grade difference A is:
A1 %
B5 %
C-5 %
D6 %
Answer is hidden
Question 52 of 78Route Surveying
The length of a sag vertical curve at night is usually governed by:
AThe permissible superelevation
BStopping sight distance over the crest
CHeadlight sight distance
DOvertaking sight distance
Answer is hidden
Question 53 of 78Basic Civil Engineering
The part of a building that transfers the load to the soil is the:
ASuperstructure
BParapet
CSubstructure
DLintel
Answer is hidden
Question 54 of 78Basic Civil Engineering
Which foundation type would be adopted where the good bearing stratum lies at a considerable depth?
APile foundation
BIsolated footing
CRaft on the surface
DStrip footing
Answer is hidden
Question 55 of 78Basic Civil Engineering
The essential functional difference between a dam and a weir is that a weir:
AIs used only for power generation
BRequires no spillway or energy dissipation
CRaises and diverts water without creating significant storage
DIs always higher than a dam
Answer is hidden
Question 56 of 78Basic Civil Engineering
The most critical element for the safety of a dam during a flood is the:
AParapet wall
BSpillway
CGallery
DGrout curtain
Answer is hidden
Question 57 of 78Basic Civil Engineering
In a flexible road pavement the layer immediately below the surface course is the:
ABase course
BSub-base
CWearing coat
DSubgrade
Answer is hidden
Question 58 of 78Basic Civil Engineering
Setting out (stakeout) differs from ordinary surveying in that it:
ADetermines the position of existing features
BPlaces designed positions and levels on the ground
CIs always done with a tape only
DRequires no control framework
Answer is hidden
Question 59 of 78Basic Civil Engineering
The squareness of a rectangular building set out on the ground is most simply checked by:
ALevelling the four corners
BMeasuring the perimeter
CChecking with a magnetic compass
DMeasuring and comparing the two diagonals
Answer is hidden
Question 60 of 78Basic Civil Engineering
A sight rail used with a boning rod in trench excavation provides:
AA line of sight at a fixed height above the required invert level
BThe bearing of the pipeline
CThe bearing capacity of the soil
DThe horizontal alignment of the trench
Answer is hidden
Question 61 of 78Basic Civil Engineering
Piers of a bridge standing in a wide river are best set out by:
AOffsets from the water's edge
BTaping from the abutment
CThe 3-4-5 rule
DAngular intersection from shore control, or RTK GNSS
Answer is hidden
Question 62 of 78Basic Civil Engineering
Slope (batter) stakes are set to mark the:
ACatch point where the design side slope meets the natural ground
BCentre line of the road
CPosition of the kerb
DLevel of the wearing course
Answer is hidden
Question 63 of 78Basic Civil Engineering
Which principle should always be observed when setting out a structure?
ASet out each point from the previously set out point
BSet out detail before the control framework
CSet out from established control and check every point independently
DUse only a tape to avoid instrument error
Answer is hidden
Question 64 of 78Basic Civil Engineering
Neglecting the scale factor between grid and ground distances during setting out on a national projection will cause:
AAn error in level but not in position
BNo error at all
CA systematic error in the lengths laid out on the ground
DA random error only
Answer is hidden
Question 65 of 78Basic Civil Engineering
Nepal's hydropower projects are predominantly of which type?
ALarge storage reservoir with an arch dam
BRun-of-river with a weir and side intake
CTidal
DPumped storage
Answer is hidden
Question 66 of 78Quantity Survey
Simpson's one-third rule for the area of a figure bounded by offsets can be applied only when:
AThere is an even number of offsets
BThe boundary is a straight line
CThere is an odd number of offsets, that is an even number of intervals
DThe offsets are unequally spaced
Answer is hidden
Question 67 of 78Quantity Survey
Compared with the prismoidal formula, the average end-area formula generally:
AUnderestimates the volume
BOverestimates the volume
CCannot be used for earthwork
DGives exactly the same volume always
Answer is hidden
Question 68 of 78Quantity Survey
In the prismoidal formula V = (L/6)(A1 + 4Am + A2), the mid-area Am is:
AThe arithmetic mean of A1 and A2
BThe larger of A1 and A2
CAlways zero for a cutting
DThe area computed from the mean dimensions of the two end sections
Answer is hidden
Question 69 of 78Quantity Survey
On a mass haul diagram, a portion of the curve that is rising indicates that the section is in:
AFill
BBorrow
CNeither cut nor fill
DCut
Answer is hidden
Question 70 of 78Quantity Survey
A maximum (peak) on a mass haul curve corresponds on the ground to:
AThe point of greatest fill
BA change from cut to fill
CThe end of the project
DA change from fill to cut
Answer is hidden
Question 71 of 78Quantity Survey
The area enclosed between the mass haul curve and a balancing line represents:
AThe shrinkage of the fill
BThe volume of borrow required
CThe haul, that is volume multiplied by distance
DThe free-haul distance
Answer is hidden
Question 72 of 78Quantity Survey
If the mass haul curve lies above the balancing line, the direction of haul is:
AIndeterminate
BVertical
CForward, from left to right
DBackward, from right to left
Answer is hidden
Question 73 of 78Quantity Survey
The volume of material transported beyond the free-haul distance is called:
ABorrow
BBulking
COverhaul
DWaste
Answer is hidden
Question 74 of 78Quantity Survey
Excavated soil occupying a greater volume in the loose state than in situ is described as:
ABulking or swell
BConsolidation
COverhaul
DShrinkage
Answer is hidden
Question 75 of 78Quantity Survey
The unit weight of a 16 mm reinforcement bar, using the standard formula, is approximately:
A3.85 kg/m
B2.47 kg/m
C0.99 kg/m
D1.58 kg/m
Answer is hidden
Question 76 of 78Quantity Survey
To compute the area of a closed traverse from the coordinates of its corners, the appropriate method is:
ASimpson's rule
BThe shoelace (cross-multiplication) rule
CThe grid method of spot levels
DThe average end-area formula
Answer is hidden
Question 77 of 78Quantity Survey
For one cubic metre of 1:2:4 nominal mix concrete, the quantity of cement is about:
A10 bags
B4.5 bags
C8.6 bags
D6.3 bags
Answer is hidden
Question 78 of 78Quantity Survey
The estimate prepared item by item from the drawings and priced at analysed rates, forming the basis of the bill of quantities, is the: