BLand-use planning/zoning, early warning systems, public awareness, and building codes/enforcement
COnly earthquake-resistant construction techniques
DOnly slope stabilization works
Answer is hidden
Question 58 of 414Concept of Environmental Assessment
Effective disaster risk reduction generally requires:
AStructural measures alone, with no non-structural component
BNon-structural measures alone, with no structural component
CA combination of both structural and non-structural mitigation measures
DNo mitigation measures, relying solely on post-disaster response
Answer is hidden
Question 59 of 414Concept of Environmental Assessment
A Brief Environmental Study (BES) is typically applied to:
AThe largest, most environmentally significant national projects
BProjects with limited anticipated environmental impact, typically smaller-scale interventions
CProjects requiring the most detailed alternatives analysis available
DOnly projects located in protected areas
Answer is hidden
Question 60 of 414Concept of Environmental Assessment
The environmental assessment approval process in Nepal, under the governing Rules/Regulations, generally requires: implementation
ANo public consultation at any stage
BStudy preparation, public consultation, review, and approval by the competent authority before project
CApproval only after the project has already been completed
DNo review by any competent authority
Answer is hidden
Question 61 of 414Water Supply, Sanitation and Environment
Which of the following is a surface source of water?
AWells
BInfiltration wells
CStreams
DNone of the above
Answer is hidden
Question 62 of 414Water Supply, Sanitation and Environment
Most common surface water source is .............
Awell
Briver
Ctube well
Dinfiltration well
Answer is hidden
Question 63 of 414Water Supply, Sanitation and Environment
Which of the following source gives underground water?
Aspring
Briver
Cpond
Dlake
Answer is hidden
Question 64 of 414Water Supply, Sanitation and Environment
Which of the following is not a subsurface source of water?
AInfiltration galleries
BSprings
CStorage reservoirs
DTube wells
Answer is hidden
Question 65 of 414Water Supply, Sanitation and Environment
Infiltration wells are .............
Asurface sources
Bground sources
Crain water sources
Dall of the above
Answer is hidden
Question 66 of 414Water Supply, Sanitation and Environment
Shallow horizontal tunnels constructed along the river on its bank to intercept groundwater are called .............
Ainfiltration well
Binfiltration gallery
Ctube well
Dartesian well
Answer is hidden
Question 67 of 414Water Supply, Sanitation and Environment
Which is the following factors considered for the selection of a particular source of water?
AQuantity of water available
BElevation of the source
CDistance of the source of supply
DAll of the above
Answer is hidden
Question 68 of 414Water Supply, Sanitation and Environment
Which water has a less chance of contaminated by bacteria?
ARiver
BLake
CSea
DInfiltration wells
Answer is hidden
Question 69 of 414Water Supply, Sanitation and Environment
Water may not contain much impurities if its source is .............
Areservoirs
Bstream flowing in plains
Clake in lower regions
Dspring along hill slopes
Answer is hidden
Question 70 of 414Water Supply, Sanitation and Environment
Ground water is usually free from .............
Asuspended impurities
Bdissolved impurities
Cboth suspended and dissolved
Dneither suspended nor dissolved
Answer is hidden
Question 71 of 414Water Supply, Sanitation and Environment
The water which is not chemically pure but does not contain anything harmful to human being health is known as .............
Apure
Bwholesome
Cpolluted
Dcontaminated
Answer is hidden
Question 72 of 414Water Supply, Sanitation and Environment
The maximum permissible limit of turbidity in drinking water as per Nepal Standard is ............. NTU.
A5
B10
C15
D20
Answer is hidden
Question 73 of 414Water Supply, Sanitation and Environment
Department of water supply and sewerage (DWSS) was formally established in ............. AD.
A1945
B1952
C1962
D1972
Answer is hidden
Question 74 of 414Water Supply, Sanitation and Environment
The new National Drinking Water Quality Standard (NDWQS) came into effect in ............. AD.
A2003
B2015
C2005
D2022
Answer is hidden
Question 75 of 414Water Supply, Sanitation and Environment
Example of aquaclude is .............
Aunconsolidated gravel and sand
Bmud
Cgranite
Dall of the above
Answer is hidden
Question 76 of 414Water Supply, Sanitation and Environment
Which aquifer is called water table aquifer?
AUnconfined aquifer
BConfined aquifer
CGround aquifer
DConnate aquifer
Answer is hidden
Question 77 of 414Water Supply, Sanitation and Environment
Unconfined aquifer is known as .............
Aphreatic line
Bskyline
Cdrainage basin
Dall of the above
Answer is hidden
Question 78 of 414Water Supply, Sanitation and Environment
What is the upper surface of water in a confined aquifer called?
APrimary layer
BSecondary layer
CFirst layer
DPiezometric layer
Answer is hidden
Question 79 of 414Water Supply, Sanitation and Environment
A geological formation, which not only stores water but yields it in sufficient quantity is known as .............
Aaquifer
Baquifuge
Caquiclude
Daquitard
Answer is hidden
Question 80 of 414Water Supply, Sanitation and Environment
An aquifer confined at the bottom, and not at top is called ............. aquifer.
Aleaky
Bconfined
Cunconfined
Dperched
Answer is hidden
Question 81 of 414Water Supply, Sanitation and Environment
An artesian well is also known as ............. well.
Agravity
Bpressure
Ctube
Dshallow
Answer is hidden
Question 82 of 414Water Supply, Sanitation and Environment
The minimum quantity of water that can be supplied from spring during driest period is known as ............. yield.
Adesign
Bsecondary
Cspring
Dsafe
Answer is hidden
Question 83 of 414Water Supply, Sanitation and Environment
Storage capacity of a reservoir depends on .............
Aporosity of rocks
Binter-connections
Cquality of solidity of rocks
Dporosity and inter-connections
Answer is hidden
Question 84 of 414Water Supply, Sanitation and Environment
A city supply does not include .............
Alivestock demand
Bdomestic
Ccommercial
Dloss and damage
Answer is hidden
Question 85 of 414Water Supply, Sanitation and Environment
Which of the following statement is correct?
ARich class consumes less water
BIntermittent water supplies lead to less water consumption
CLoss of water is more if the pressure in the distribution system is less
DWater consumption is less in flush system
Answer is hidden
Question 86 of 414Water Supply, Sanitation and Environment
Which is the correct statement regarding per capita demand?
ADaily water required by an individual
BWater required for various purposes by a person
CWater required by an individual in a year
DAnnual average amount of daily water required by one person
Answer is hidden
Question 87 of 414Water Supply, Sanitation and Environment
Which of the following causes a decreases in per capita consumption?
ABetter standard of livings
BGood quality of water
CHotter climate
DMetering
Answer is hidden
Question 88 of 414Water Supply, Sanitation and Environment
Water lost in theft and waste contributes to how much % of total consumption?
A5
B10
C15
D20
Answer is hidden
Question 89 of 414Water Supply, Sanitation and Environment
The unit of per capita demand is .............
Aliters/head/day
Bhead/day
Cdays/head/liters
Dnone of the above
Answer is hidden
Question 90 of 414Water Supply, Sanitation and Environment
The per capita day demand of water is taken as an average value of over a period of .............
A1 day
B1 year
C1 month
D> 1 year
Answer is hidden
Question 91 of 414Water Supply, Sanitation and Environment
The domestic demand in rural areas of Nepal is ............. lpcd.
A10
B45
C65
D112
Answer is hidden
Question 92 of 414Water Supply, Sanitation and Environment
The livestock demand should not be more than ............. of domestic demand.
A10%
B20%
C40%
D100%
Answer is hidden
Question 93 of 414Water Supply, Sanitation and Environment
As per DWSS, fire demand in Nepal should not more than ............. lpcd.
A1 lpcd
B2 lpcd
C3 lpcd
D1.5 lpcd
Answer is hidden
Question 94 of 414Water Supply, Sanitation and Environment
As per DWSS guidelines, the fire demand in Nepal should not be more than ............. lpcd.
A1
B2
C3
D5
Answer is hidden
Question 95 of 414Water Supply, Sanitation and Environment
The reserve of water for breakdown period is generally not more than ............. of total storage.
A15%
B25%
C30%
D50%
Answer is hidden
Question 96 of 414Water Supply, Sanitation and Environment
According to Buston's formula, fire demand in liters per minute for a population of P thousands, is .............
A3182 √P
B11365 (P/10 + 10)
C4637 √P (1 - 0.01 √P)
D5663 √P
Answer is hidden
Question 97 of 414Water Supply, Sanitation and Environment
In water supply, the industrial demand should be .............
A10%
B10 to 15%
C15 to 20%
D20 to 25%
Answer is hidden
Question 98 of 414Water Supply, Sanitation and Environment
............. Is the water that does not form lather directly with the soap.
AHard water
BSoft water
CPartially hard water
DVery hard water
Answer is hidden
Question 99 of 414Water Supply, Sanitation and Environment
When total hardness is more than alkalinity .............
Acarbonate hardness = alkalinity
Bcarbonate hardness = 0
Ccarbonate hardness = non carbonate hardness
Dall of the above
Answer is hidden
Question 100 of 414Water Supply, Sanitation and Environment
Hardness of water is conventionally expressed in terms of equivalent amount of .............
AH₂CO₃
BMgCO₃
CCaCO₃
DNa₂CO₃
Answer is hidden
Question 101 of 414Water Supply, Sanitation and Environment
Select the incorrect statement from the following option.
AWater which does not form lather with soap and forms white scum is called hard water
BHard water contains dissolved calcium and magnesium salts in it
CIn hard water, cleansing quality of soap is depressed
DDue to the presence of dissolved hardness-producing salts, the boiling point of water is depressed
Answer is hidden
Question 102 of 414Water Supply, Sanitation and Environment
Select the incorrect statement from the following option.
AThe taste of hard water is better than soft water
BThe dissolved calcium in hard water can help to produce strong teeth
CHard water coats the lead piping with a layer of insoluble calcium carbonate which prevents poisonous lead dissolving in water
DBoiler feed water should also be hard in nature
Answer is hidden
Question 103 of 414Water Supply, Sanitation and Environment
Select the incorrect statement from the following option.
APermanent hardness is due to dissolved chlorides and sulphates of calcium and magnesium
Btemporary hardness can be removed by boiling of water
Ccarbonate hardness is also known as alkaline hardness
DThe difference between the total hardness and the alkaline hardness gives the non-alkaline hardness
Answer is hidden
Question 104 of 414Water Supply, Sanitation and Environment
Which of the following is not a unit of hardness?
AParts per million
BDegree centigrade
CDegree clarke
DDegree french
Answer is hidden
Question 105 of 414Water Supply, Sanitation and Environment
Temporary hardness in water is caused by ............. of Ca and Mg.
Abicarbonates
Bsulphates
Cchlorides
Dnitrates
Answer is hidden
Question 106 of 414Water Supply, Sanitation and Environment
Alkalinity in water is expressed as milligrams per liter in terms of equivalent .............
Acalcium carbonate
Bmagnesium carbonate
Csodium carbonate
Dcalcium hydroxide
Answer is hidden
Question 107 of 414Water Supply, Sanitation and Environment
If total hardness of water is greater than total alkalinity, the carbonate hardness will be equal to .............
Atotal alkalinity
Btotal hardness
Ctotal hardness - total alkalinity
Dtotal non-carbonate hardness
Answer is hidden
Question 108 of 414Water Supply, Sanitation and Environment
When temporary hard water is boiled, one of the substances formed is .............
Acalcium bicarbonate
Bcalcium sulfate
Chydrogen chloride
Dcarbon dioxide
Answer is hidden
Question 109 of 414Water Supply, Sanitation and Environment
If total alkalinity of water sample is 100 mg/l and its total hardness is 300 mg/l, then its carbonate and non-carbonate hardness are respectively .............
A100 mg/l and 200 mg/l
B200 mg/l and 100 mg/l
C300 mg/l and 0 mg/l
D100 mg/l and 0 mg/l
Answer is hidden
Question 110 of 414Water Supply, Sanitation and Environment
The pH value of water indicates .............
Aacidity
Balkalinity
Cboth (a) and (b)
Dnone of the above
Answer is hidden
Question 111 of 414Water Supply, Sanitation and Environment
Water borne disease are also known as .............
Awater quality disease
Bwater borne disease
Cwater based disease
Dnone of the above
Answer is hidden
Question 112 of 414Water Supply, Sanitation and Environment
Malaria, yellow fever are example of .............
Awater vector disease
Bwater borne disease
Cwater based disease
Dnone of the above
Answer is hidden
Question 113 of 414Water Supply, Sanitation and Environment
Worm and viruses are also known as ............. organism present water.
Awater quality
Bvector
Cliving
Dmustard peer organism
Answer is hidden
Question 114 of 414Water Supply, Sanitation and Environment
Which of the following is not a water borne disease?
ATyphoid
BMalaria
CCholera
DDysentery
Answer is hidden
Question 115 of 414Water Supply, Sanitation and Environment
Ascariasis is a ............. infection.
Abacterial
Bviral
Cworm
Dprotozoal
Answer is hidden
Question 116 of 414Water Supply, Sanitation and Environment
Psychrophilic bacteria survive in between the temperature of ............. degree Celsius.
A10-20
B20-30
C40-60
Dnone of the above
Answer is hidden
Question 117 of 414Water Supply, Sanitation and Environment
An organism that survives at a moderate temperature range between 20 to 45°C is .............
Amesophilic
Bthermophiles
Chyperthermophilic
Dpsychrophilic
Answer is hidden
Question 118 of 414Water Supply, Sanitation and Environment
The bacteria that more at high temperature 40° to 70° is called .............
Amesophilic
Bthermophilic
Chyper thermophilic
Dpsychrophilic
Answer is hidden
Question 119 of 414Water Supply, Sanitation and Environment
E-coli and coliform are known as .............
Awater quality disease
Bvector
Cindicator organism
Dmustard peer organism
Answer is hidden
Question 120 of 414Water Supply, Sanitation and Environment
Coliform bacteria present in the water is an indication of .............
Aradioactive wastes
Bchemical fertilizer
Cdecaying animals and plants
Dhuman feces
Answer is hidden
Question 121 of 414Water Supply, Sanitation and Environment
Which of the following can be designated as an intake structure?
ACulvert
BRiver
CDam
DReservoir
Answer is hidden
Question 122 of 414Water Supply, Sanitation and Environment
From high level water resource, the water supply system used in termed as .............
Apumping and storage system
Bpumping system
Cgravity system
Ddual system
Answer is hidden
Question 123 of 414Water Supply, Sanitation and Environment
Which of the following intake structure is widely used in small work?
ASluiceways
BSimple submerged intakes
CWet intake towers
DDry intake towers
Answer is hidden
Question 124 of 414Water Supply, Sanitation and Environment
The placement of intake is not optimal when it is placed in?
ANatural channel
BNavigation channel
CBoth (a) and (b)
DNone of the above
Answer is hidden
Question 125 of 414Water Supply, Sanitation and Environment
Intake in water supply system should not be located .............
Anear treatment plant
Bu/s of sewage disposal point
Cnavigation channel
Dmandering river
Answer is hidden
Question 126 of 414Water Supply, Sanitation and Environment
The type of water supply system generally used in hilly region is .............
Apressure flow system
Bgravity flow system
Cmixed flow system
Dall of the above
Answer is hidden
Question 127 of 414Water Supply, Sanitation and Environment
As compared to HDPE pipes, GI pipes are .............
Alighter
Bcheaper
Cstronger
Dsmoother
Answer is hidden
Question 128 of 414Water Supply, Sanitation and Environment
Which of the following is a disadvantage of Asbestos cement pipe?
AThey are light weight
BThey have smooth internal surface
CThey are anti corrosive
DThey are soft and brittle
Answer is hidden
Question 129 of 414Water Supply, Sanitation and Environment
The tensile strength of Asbestos cement pipes is .............
A200 kg/cm²
B300 kg/cm²
C400 kg/cm²
D600 kg/cm²
Answer is hidden
Question 130 of 414Water Supply, Sanitation and Environment
Which of the following is the advantage of cast iron pipes?
AThey are subjected to tuberculation in certain water
BThey are fragile
CThey are heavier
DThey are resistant to corrosion
Answer is hidden
Question 131 of 414Water Supply, Sanitation and Environment
Which of the following is incorrect regarding cast iron pipes?
AThey are non-corrosive
BThey are durable
CThey can be produced by centrifugal process
DTheir length varies from 80-100 cm
Answer is hidden
Question 132 of 414Water Supply, Sanitation and Environment
What is the quantity of lead required for a 15 cm diameter cast iron pipe?
A5 kg
B10 kg
C15 kg
D20 kg
Answer is hidden
Question 133 of 414Water Supply, Sanitation and Environment
Which grade of concrete is used in Reinforced concrete pipes?
AM10
BM15
CM20
DM25
Answer is hidden
Question 134 of 414Water Supply, Sanitation and Environment
Which of the following is correct regarding Cement concrete pipes?
AThey are corrosive
BThe maintenance cost is high
CUnreinforced pipes are liable to tensile crack
DIt is easy to repair them
Answer is hidden
Question 135 of 414Water Supply, Sanitation and Environment
The gate valves are made of ............. with brass mountings.
Acement concrete
Breinforced concrete
Ccast iron
Dgalvanized iron
Answer is hidden
Question 136 of 414Water Supply, Sanitation and Environment
Which type of joint is commonly used in cement concrete pipes for water supply and drainage systems?
AExpansion joint
BCollar joint
CLap joint
DWelded joint
Answer is hidden
Question 137 of 414Water Supply, Sanitation and Environment
To connect two lengths of pipe previously set in place, you should use a pipe .............
Anipple
Bunion
Ccoupling
Dtee
Answer is hidden
Question 138 of 414Water Supply, Sanitation and Environment
In which of the following joint, pipes do not have sockets or spigots?
ATyton joint
BCoupled joint
CSpigot and socket joint
DExpansion join
Answer is hidden
Question 139 of 414Water Supply, Sanitation and Environment
For cement concrete pipes with plain ends, the joint commonly used is .............
ACement collar joint
BScrewed socket joint
CSpigot socket joint
DExpansion joint
Answer is hidden
Question 140 of 414Water Supply, Sanitation and Environment
Which of the following joint is called run lead joint?
ATyton joint
BCoupled joint
CSpigot and socket joint
DFlanged joint
Answer is hidden
Question 141 of 414Water Supply, Sanitation and Environment
Which of the following joint is highly influenced by temperature?
ATyton joint
BCoupled joint
CSpigot and socket joint
DExpansion joint
Answer is hidden
Question 142 of 414Water Supply, Sanitation and Environment
The type of joints used in concrete pipes is .............
Acollar joint
Bspigot and socket joint
Cbandage joint
Dflush joint
Answer is hidden
Question 143 of 414Water Supply, Sanitation and Environment
Which of the following is also known as a check valve?
AScour valve
BPressure relief valve
CAltitude valve
DReflux valve
Answer is hidden
Question 144 of 414Water Supply, Sanitation and Environment
Which of the following is known as washout valve?
AScour valve
BSluice valve
CReflux valve
DAltitude valve
Answer is hidden
Question 145 of 414Water Supply, Sanitation and Environment
Which of the following is known as Shut off valve?
AAir relief valve
BSluice valve
CPressure relief valve
DAltitude valve
Answer is hidden
Question 146 of 414Water Supply, Sanitation and Environment
Air relief valves are provided in water supply mains at .............
Alow points
Bsummits
Cpipe junctions
Dall of the above
Answer is hidden
Question 147 of 414Water Supply, Sanitation and Environment
Float valve fitted in .............
Aoverhead tank
Bflushing cistern
Cboth (a) and (b)
Dnone of the above
Answer is hidden
Question 148 of 414Water Supply, Sanitation and Environment
Foot valve is at bottom of .............
Adelivery pipe
Bsuction pipe
Cboth (a) and (b)
Dnone of the above
Answer is hidden
Question 149 of 414Water Supply, Sanitation and Environment
This cock fitted before nylon connection of wash basin and flushing cistern .............
Abib cock
Bangle cock
Cstop cock
Dnone of the above
Answer is hidden
Question 150 of 414Water Supply, Sanitation and Environment
Cock used in wash basin is .............
Apillar cock
Bbib cock
Cstop cock
Dnone of the above
Answer is hidden
Question 151 of 414Water Supply, Sanitation and Environment
The spacing between the Sluice valves is .............
A10 m
B30 m
C80 m
D180 m
Answer is hidden
Question 152 of 414Water Supply, Sanitation and Environment
This valve protect the pipe line from bursting due to excess pressure .............
Asafety valve
Bair relief valve
Ccheck valve
Ddrain valve
Answer is hidden
Question 153 of 414Water Supply, Sanitation and Environment
Pressure relief valves may help in .............
Areleasing the hydrostatic pressure
Bholding the hydrostatic pressure
Cincreasing the hydrostatic pressure
Dmay increase or decrease the hydrostatic pressure
Answer is hidden
Question 154 of 414Water Supply, Sanitation and Environment
Scour valves are provided .............
Aat street corners to control the flow of water
Bat every depression and dead ends to drain out the waste water that may collect there
Cat the foot of rising main along the slope to prevent back running of water
Dat every summit of rising mains
Answer is hidden
Question 155 of 414Water Supply, Sanitation and Environment
A scour valve, in a water distribution system, is provided at .............
Alow points
Bhigh points
Cjunction points
Dall of the above
Answer is hidden
Question 156 of 414Water Supply, Sanitation and Environment
The types of valves used in distribution system when two or more pipes joins at each other is .............
Areflux value
Bpressure relief value
Csluice valve
Dair valve
Answer is hidden
Question 157 of 414Water Supply, Sanitation and Environment
............. valves are used to discharge air from the water pipelines.
AAir relief valve
BSluice valve
CPressure relief valve
DAltitude valve
Answer is hidden
Question 158 of 414Water Supply, Sanitation and Environment
In distribution system, the drain valves is provided at .............
Alow point
Bat junction
Ccenter
Dhigh point
Answer is hidden
Question 159 of 414Water Supply, Sanitation and Environment
What type of fitting is used to connect pipe of different diameter?
AReducer
BUnion
CNipple
DSpigot
Answer is hidden
Question 160 of 414Water Supply, Sanitation and Environment
The purpose of providing a balancing reservoir in a water supply distribution system is .............
Aequalize pressure in the distribution system
Bstore adequate quantity of water to meet requirement in case of breakdown of inflow
Cstore adequate firefighting reserve
Dtake care of fluctuations in the rate of consumption
Answer is hidden
Question 161 of 414Water Supply, Sanitation and Environment
The appropriate diameter of a water main for supplying 1800 cu.m/hour with velocity of 1 m/s is .............
A0.4 m
B0.8 m
C1.2 m
D1.6 m
Answer is hidden
Question 162 of 414Water Supply, Sanitation and Environment
The four major water supply distribution systems are .............
Adead end, trees, grid iron and reticulation
Bdead end, trees, grid iron and circular
Ctrees, grid iron, ring and radial
Dtree, reticulation, circular and ring
Answer is hidden
Question 163 of 414Water Supply, Sanitation and Environment
The layout of the distribution system in which the water flows towards the periphery is ............. system.
Adead end
Bgrid iron
Cradial
Dring
Answer is hidden
Question 164 of 414Water Supply, Sanitation and Environment
The suitable layout for a water supply distribution system, for a city of roads of rectangular pattern is .............
Adead end system
Bgrid iron system
Cring system
Dradial system
Answer is hidden
Question 165 of 414Water Supply, Sanitation and Environment
The suitable layout for a water supply distribution system for an irregularly grown town is .............
Agrid iron system
Bdead end system
Cring system
Dradial system
Answer is hidden
Question 166 of 414Water Supply, Sanitation and Environment
When in the completely opened position, which of the listed types of valve will offer the least resistance to flow?
Agate valve
Bglobe valve
Cdouble-seat poppet valve
Dreed valve
Answer is hidden
Question 167 of 414Water Supply, Sanitation and Environment
Which method of population forecast combines both arithmetical increase and geometrical increase method?
AArithmetical increase method
BGeometrical increase method
CIncremental increase method
DDecreased rate of growth method
Answer is hidden
Question 168 of 414Water Supply, Sanitation and Environment
The layout of water distribution system generally found in an old city is .............
Aring system
Bradial system
Cgrid iron system
Ddead end system
Answer is hidden
Question 169 of 414Water Supply, Sanitation and Environment
The best system for distribution of water in a randomly planned city is .............
Adead end system
Bgrid iron system
Cring system
Dradial system
Answer is hidden
Question 170 of 414Water Supply, Sanitation and Environment
Which method is accurate for forecasting population for sound and rapidly increasing city?
AArithmetical increase method
BGeometrical increase method
CIncremental increase method
DGraphical method
Answer is hidden
Question 171 of 414Water Supply, Sanitation and Environment
Sewerage system is designed for .............
Amaximum flow only
Bminimum flow only
Caverage flow only
Dmaximum and minimum flow
Answer is hidden
Question 172 of 414Water Supply, Sanitation and Environment
Grit particle is .............
Ainert matter of specific gravity 2.65
Bcolloidal matter of heavy specific gravity
Corganic matter of specific gravity nearer to 1
Dorganic and inert matter combined
Answer is hidden
Question 173 of 414Water Supply, Sanitation and Environment
The minimum size of grit particles that can be removed in grit chamber is .............
A0.05 mm
B0.50 mm
C0.20 mm
D0.10 mm
Answer is hidden
Question 174 of 414Water Supply, Sanitation and Environment
Which of the following is not generated in waste treatment processes?
ASludge
BAsh
COrganic solvents
DNoise
Answer is hidden
Question 175 of 414Water Supply, Sanitation and Environment
Usually while designing what is the range of length of the aerated grit chamber assumed?
A7.5-20
B4-6 m
C25 m
D2-5 m
Answer is hidden
Question 176 of 414Water Supply, Sanitation and Environment
The process of passing the water through beds of granular material is known as .............
Ascreening
Bsedimentation
Cfiltration
Daeration
Answer is hidden
Question 177 of 414Water Supply, Sanitation and Environment
Which of the following processes are necessary for removing suspended solids from water?
ACoagulation
BFlocculation
CSedimentation
DAll of the above
Answer is hidden
Question 178 of 414Water Supply, Sanitation and Environment
What is the opening spacing of bars in case of coarse screen?
A30 mm
B50 mm
C70 mm
D90 mm
Answer is hidden
Question 179 of 414Water Supply, Sanitation and Environment
What is the typical size and spacing of a coarse screen inclined at 45° to 60°, generally used for filtration?
ABars of size 10-25 mm, with spacing of 20-100 mm
BBars of size 5-15 mm, with spacing of 15-50 mm
CBars of size 20-30 mm, with spacing of 25-75 mm
DBars of size 30-50 mm, with spacing of 50-150 mm
Answer is hidden
Question 180 of 414Water Supply, Sanitation and Environment
When impurities are separated by the gravitation of settling particles, the operation is called .............
Asedimentation with coagulant
Bplain sedimentation
Csecondary sedimentation
Ddisinfection
Answer is hidden
Question 181 of 414Water Supply, Sanitation and Environment
For plain sedimentation tank, the detention period is usually ............. hours.
A2-4
B4-8
C8-12
D12-24
Answer is hidden
Question 182 of 414Water Supply, Sanitation and Environment
A sedimentation tank of 20 m × 5 m × 3 m receives a flow of 1200 cu.m/day continuously, the detention time will be ............. hours.
A8
B6
C4
D2
Answer is hidden
Question 183 of 414Water Supply, Sanitation and Environment
The time period for which the water is stored in a sedimentation tank is called .............
Atime of flow
Bfrequency of flow
Csettling time
Ddetention period
Answer is hidden
Question 184 of 414Water Supply, Sanitation and Environment
The ratio of discharge to plan area in continuous flow sedimentation tank is known as .............
Aoverflow rate
Bsurface loading
Csurface overflow rate
Dall of the above
Answer is hidden
Question 185 of 414Water Supply, Sanitation and Environment
What is the time period for which the water is stored in fill and draw type of sedimentation tank?
A48 hours
B24 hours
C52 hours
D76 hours
Answer is hidden
Question 186 of 414Water Supply, Sanitation and Environment
What is the maximum permissible velocity in horizontal flow type sedimentation tank?
A0.2 m/s
B0.3 m/s
C0.5 m/s
D1 m/s
Answer is hidden
Question 187 of 414Water Supply, Sanitation and Environment
The overflow rate of plain sedimentation tank is about ............. cu.m/day/ sq. m.
A15-20
B30-40
C40-50
D50-60
Answer is hidden
Question 188 of 414Water Supply, Sanitation and Environment
The tanks built with mechanical means for continuous removal of solids being deposited by sedimentation are called .............
Aclarifiers
Bsettling basins
Csedimentation tanks
Deco-ponds
Answer is hidden
Question 189 of 414Water Supply, Sanitation and Environment
In which type of settling, sedimentation of discrete particles takes place?
AZone settling
BCompression settling
CHindered settling
DDiscrete settling
Answer is hidden
Question 190 of 414Water Supply, Sanitation and Environment
What is formed when coagulant is added to water?
AScum
BSoap
CBubbles
DFloc
Answer is hidden
Question 191 of 414Water Supply, Sanitation and Environment
The amount of coagulant needed for coagulation of water increases with .............
Aincrease in turbidity as well as increase in temperature of water
Bincrease in turbidity but decrease in temperature of water
Cdecrease in turbidity as well as decrease in temperature of water
Ddecrease in turbidity but increase in temperature of water
Answer is hidden
Question 192 of 414Water Supply, Sanitation and Environment
The most commonly used coagulant is .............
Achlorine
Balum
Cferrous oxide
Dferric oxide
Answer is hidden
Question 193 of 414Water Supply, Sanitation and Environment
Why alum is preferred over other coagulants?
AIt is easy to dewater the sludge formed
BIt imparts corrosiveness to water
CIt reduces taste and odor in addition to turbidity
DThe time required for floc formation is less
Answer is hidden
Question 194 of 414Water Supply, Sanitation and Environment
Alum acts as .............
Acoagulant
Bflocculent
Ccatalyst
Ddisinfectant
Answer is hidden
Question 195 of 414Water Supply, Sanitation and Environment
The chemical composition of Alum is .............
AAl₂(SO₄)₃ · 18H₂O
BAl₂(SO₄)₃ · 8H₂O
CAl₂(SO₄)₃ · 10H₂O
DAl₂(SO₄)₃ · 12H₂O
Answer is hidden
Question 196 of 414Water Supply, Sanitation and Environment
The optimum dosage of alum is determined by .............
Ahardness test
BpH test
Cjar test
Dturbidity test
Answer is hidden
Question 197 of 414Water Supply, Sanitation and Environment
In a water treatment, the optimum time of flocculation is usually given as 30 minutes. In case the time of flocculation is increased beyond this value, the flocs will .............
Abecome larger
Bsettle faster
Cbreak up
Dremain unchanged
Answer is hidden
Question 198 of 414Water Supply, Sanitation and Environment
Particle of around 1 micron is removed by .............
Afiltration
Bplain sedimentation
Cdisinfection
Dchemical coagulation
Answer is hidden
Question 199 of 414Water Supply, Sanitation and Environment
The effective size of the sand particles used in the top layer of slow sand filter is in the range of .............
A0.45 to 0.70 mm
B0.40 to 0.60 mm
C0.20 to 0.30 mm
D0.35 to 0.55 mm
Answer is hidden
Question 200 of 414Water Supply, Sanitation and Environment
During treatment of water, sedimentation is done .............
Abefore filtration
Bafter filtration
Csimultaneously with filtration
Dalong with chlorination
Answer is hidden
Question 201 of 414Water Supply, Sanitation and Environment
Which of the following is not commonly used as a filter material in the treatment of water?
ASand
BAnthracite
CCrushed rock
DGarnet sand
Answer is hidden
Question 202 of 414Water Supply, Sanitation and Environment
The uniformity characteristics of sand expressed in terms of .............
Aeffective size
Beffective size and uniformity coefficient
Cuniformity coefficient
Dmean velocity
Answer is hidden
Question 203 of 414Water Supply, Sanitation and Environment
The slow sand filter can remove bacteria as much as ............. %
A70-80
B80-90
C90-98
D98-99
Answer is hidden
Question 204 of 414Water Supply, Sanitation and Environment
Consider the following statements regarding sand as filter material. i. It should be free from clay or silt ii. Organic matter should be present in the sand iii. It should be uniform. Which of the above statement is/are correct?
Ai, ii
Bi only
Cii, iii
Di, iii
Answer is hidden
Question 205 of 414Water Supply, Sanitation and Environment
The cleaning of slow sand filter is done by .............
Abackwashing
Bpassing air
Cpassing solution of alum and lime
Dscraping off the top layers of sand and admitting water
Answer is hidden
Question 206 of 414Water Supply, Sanitation and Environment
The organic impurities are converted into simple and harmless compounds in filtration due to .............
Amechanical action
Bsedimentation
Cbiological action
Delectrolytic action
Answer is hidden
Question 207 of 414Water Supply, Sanitation and Environment
In slow sand filters, the turbidity of raw water can be removed only up to .............
A60 mg/l
B75 mg/l
C100 mg/l
D150 mg/l
Answer is hidden
Question 208 of 414Water Supply, Sanitation and Environment
The rate of filtration in slow sand filter is of the order of ............. liters per hour per m².
A40 to 80
B100 to 200
C400 to 200
D3000 to 6000
Answer is hidden
Question 209 of 414Water Supply, Sanitation and Environment
In rapid sand filter, the rate of filtration ranges from .............
A100 to 200 liter/hr/m²
B3000 to 6000 liter/hr/m²
C8000 to 15000 liter/hr/m²
D180 to 360 liter/hr/m²
Answer is hidden
Question 210 of 414Water Supply, Sanitation and Environment
The hydraulic loading for a high rate trickling filter varies between ............. per hectare per day.
A110 to 330 ML
B50 to 60 ML
C500 to 600 ML
D11 to 33 ML
Answer is hidden
Question 211 of 414Water Supply, Sanitation and Environment
Which of the following is not used as a media for trickling filters?
ASand
BGeotextiles
CGravel
DPaper
Answer is hidden
Question 212 of 414Water Supply, Sanitation and Environment
The thickness of filter media of slow sand filter is .............
A90 to 110 cm
B80 to 90 cm
C70 to 80 cm
D60 to 80 cm
Answer is hidden
Question 213 of 414Water Supply, Sanitation and Environment
Zeolites can be regenerated by passing a solution of .............
Asugar
Bsalt
Clime
Dsoda ash
Answer is hidden
Question 214 of 414Water Supply, Sanitation and Environment
Zeolite softening process removes .............
Aonly temporary hardness of water
Bonly permanent hardness of water
Cboth temporary and permanent hardness of water
Dthe dissolved gases in permanent hard water
Answer is hidden
Question 215 of 414Water Supply, Sanitation and Environment
The chemical formula for zeolite is .............
ASiO₂·Al₂O₃·Na₂O
BSi₂O₃·Al₂O₃·Na₂O
CSiO₂·Al₂O₃·3Na₂O
DSiO₂·Al₂O₃·N₂O
Answer is hidden
Question 216 of 414Water Supply, Sanitation and Environment
The treatment of water with bleaching powder is known as .............
Apre-chlorination
Bde-chlorination
Chypo-chlorination
Dsuper-chlorination
Answer is hidden
Question 217 of 414Water Supply, Sanitation and Environment
Sterilization of water helps in killing of .............
Aonly pathogenic bacteria
Bonly non-pathogenic bacteria
Conly certain kind of microorganisms
Dall kinds of bacteria and micro-organisms
Answer is hidden
Question 218 of 414Water Supply, Sanitation and Environment
Disinfection of water helps in .............
Aremoving hardness
Bremoving turbidity
Ckilling pathogenic bacteria
Dcomplete sterilization
Answer is hidden
Question 219 of 414Water Supply, Sanitation and Environment
Chlorination of water does not remove .............
Aammonia
Binorganic materials
Corganic matter
Ddissolved oxygen
Answer is hidden
Question 220 of 414Water Supply, Sanitation and Environment
The common methods used for disinfection in waste water treatment plants are .............
Achlorination
BUV light
Cboth (a) and (b)
Dphenolic solvent
Answer is hidden
Question 221 of 414Water Supply, Sanitation and Environment
Infiltration, the amount of dissolved solid passing through the filters is .............
Adifference between total solid and suspended solid
Bsum of total solids and suspended solids
Cfree from suspended solids
Dnone of the above
Answer is hidden
Question 222 of 414Water Supply, Sanitation and Environment
At the break point chlorination, the residual chlorine is .............
Azero
Bmaximum
Cminimum
Dnone of the above
Answer is hidden
Question 223 of 414Water Supply, Sanitation and Environment
Break-point chlorination of water involves addition of chlorine in and amount sufficient to .............
Akill giardia cysts
Breact with any ammonia and oxidisable organic matter
Creduce bacterial growth
Dreact with inorganic matter
Answer is hidden
Question 224 of 414Water Supply, Sanitation and Environment
Chlorine demand of water is equal to .............
Aapplied chlorine
Bresidual chlorine
Csum of (a) and (b)
Ddifference of (a) and (b)
Answer is hidden
Question 225 of 414Water Supply, Sanitation and Environment
The process in which chlorination is done beyond break point is known as .............
Apre-chlorination
Bpost-chlorination
Csuper-chlorination
Dde-chlorination
Answer is hidden
Question 226 of 414Water Supply, Sanitation and Environment
Chlorine usage in the treatment of 30000 cubic meter of water per day is 15 kg/day. The chlorine dose is .............
A0.2
B0.3
C0.5
D1
Answer is hidden
Question 227 of 414Water Supply, Sanitation and Environment
Which chemical is used for dechlorination of water?
ASodium sulphite
BSodium bicarbonate
CCalcium carbonate
DHydrogen peroxide
Answer is hidden
Question 228 of 414Water Supply, Sanitation and Environment
Use of chlorine in water does not reduce .............
Aammonia
Borganic matter
Ciron
Ddissolved oxygen
Answer is hidden
Question 229 of 414Water Supply, Sanitation and Environment
The chlorine, which serves as a disinfectant is .............
Achlorine
Bfree residual chlorine
Cchlorine demand
Dresidual demand
Answer is hidden
Question 230 of 414Water Supply, Sanitation and Environment
When adding a chlorine in a water it reduces the .............
Aammonia
Biron
Corganic matter
Dnone of the above
Answer is hidden
Question 231 of 414Water Supply, Sanitation and Environment
The efficiency of disinfection by chlorine in water treatment, .............
Aincreased with pH
Bneither increases nor decreases
Cdecreases with pH
Dremains constant
Answer is hidden
Question 232 of 414Water Supply, Sanitation and Environment
The permissible limit of free residual chlorine is .............
A0.02 ppm
B0.2 ppm
C1 ppm
D2 ppm
Answer is hidden
Question 233 of 414Water Supply, Sanitation and Environment
Which of the following is not significantly affected by chlorination in water?
APathogenic bacteria
BOrganic matters
CAlgae
DDissolved oxygen
Answer is hidden
Question 234 of 414Water Supply, Sanitation and Environment
Which of the following statement is wrong regarding iron salt?
AIron salt produces less floc than alum
BDetention time for sedimentation by using Iron salt as coagulant is less
CHandling of Iron salt requires some skills
DIron removes H₂S taste and odor
Answer is hidden
Question 235 of 414Water Supply, Sanitation and Environment
A method that is not used to remove iron and manganese from water is .............
Aoxidation with chlorine followed by filtration
Baeration
Csequestration
Dfiltration with manganese - greensand
Answer is hidden
Question 236 of 414Water Supply, Sanitation and Environment
Which chemical is not effective for removal of iron and manganese?
AChloramine
BChlorine dioxides
COzone
DPotassiumpermanganate
Answer is hidden
Question 237 of 414Water Supply, Sanitation and Environment
Aeration of water is done to remove .............
Aodor
Bcolor
Cbacteria
Dturbidity
Answer is hidden
Question 238 of 414Water Supply, Sanitation and Environment
NTU is unit .............
Acolor
Bodor
Cturbidity
Dtaste
Answer is hidden
Question 239 of 414Water Supply, Sanitation and Environment
Degree hazen is a unit of .............
Acolour
Bodour
Cturbidity
Dtaste
Answer is hidden
Question 240 of 414Water Supply, Sanitation and Environment
Foul odor and bad taste of water is removed by treating with .............
Aalum
Bactivated carbon
Cbleaching powder
Dammonium sulphate
Answer is hidden
Question 241 of 414Water Supply, Sanitation and Environment
In most cases, oxidation is best method suitable for .............
Adisinfection
Bremoving hardness
Cremoving odor
Daeration
Answer is hidden
Question 242 of 414Water Supply, Sanitation and Environment
Activated carbon is used in water treatment for .............
Adisinfection
Bremoving hardness
Cremoving color
Dremoving corrosiveness
Answer is hidden
Question 243 of 414Water Supply, Sanitation and Environment
Activated carbon removes from water .............
Aorganic matter
Biron
Cmanganese
Dall of the above
Answer is hidden
Question 244 of 414Water Supply, Sanitation and Environment
Which of the following is the most toxic metal found in water?
ACalcium
BIron
CMagnesium
DArsenic
Answer is hidden
Question 245 of 414Water Supply, Sanitation and Environment
Which method is used to measure the color of water?
AGravimetric analysis
BChromatography
CTintometer method
DHydrometer analysis
Answer is hidden
Question 246 of 414Water Supply, Sanitation and Environment
Storm water flow or run off is given by .............
ACIA/360
BCIA/3600
CCA/360
DCIA/36
Answer is hidden
Question 247 of 414Water Supply, Sanitation and Environment
Factor affecting sanitary sewage are .............
Arate of water supply
Bpopulation
Cunauthorized connection
Dall of the above
Answer is hidden
Question 248 of 414Water Supply, Sanitation and Environment
The value of coefficient of runoff for paved areas is of the order of .............
A0
B0.5
C0.9
Dgreater than 1
Answer is hidden
Question 249 of 414Water Supply, Sanitation and Environment
The water carried sewerage system removes .............
Aindustrial sewage
Bdomestic sewage
Cstorm sewage
Dall the above
Answer is hidden
Question 250 of 414Water Supply, Sanitation and Environment
............. is required to transport storm water runoff from roofs, parking lots, streets, and highways to a point of discharge.
ASanitary sewers
BStorm sewers
CWastewater sewers
DWater sewers
Answer is hidden
Question 251 of 414Water Supply, Sanitation and Environment
............. is additional flow through sewers available during rainy season?
ADry weather flow
BStorm water flow
CRapidly varied flow
DGradually varied flow
Answer is hidden
Question 252 of 414Water Supply, Sanitation and Environment
Sanitary sewage is independent of .............
Arate of water supply
Bpopulation growth
Cinfiltration of groundwater
Drainfall
Answer is hidden
Question 253 of 414Water Supply, Sanitation and Environment
The type of wastewater that originates from the bathroom, kitchen, washing places and wash basins is called .............
Asullage
Bsewerage
Cgarbage
Drubbish
Answer is hidden
Question 254 of 414Water Supply, Sanitation and Environment
The most suitable sewer in combined sewerage system is .............
Acircular
Brectangular
Cparabolic
Degg shaped
Answer is hidden
Question 255 of 414Water Supply, Sanitation and Environment
In which kind of cities are combined systems used?
ALess population
BHigh population
CHigh residences
DHigh storm
Answer is hidden
Question 256 of 414Water Supply, Sanitation and Environment
When only one set of sewers are used to carry both sanitary sewage and storm water, it is called as ............. system.
Apartial
Bdirect
Ccombined
Dseparate
Answer is hidden
Question 257 of 414Water Supply, Sanitation and Environment
When rainy season is confined to a few months, like in Nepal, the preferred sewerage system would be .............
Acombined system
Bseparate system
Cpartially separate system
Dnone of the above
Answer is hidden
Question 258 of 414Water Supply, Sanitation and Environment
The suitable system for an area having uniformly distributed mild rains throughout the year, like in England is .............
Aseparate
Bcombined
Cpartially separate
Dpartially combined
Answer is hidden
Question 259 of 414Water Supply, Sanitation and Environment
Two sets of sewers are laid in ............. system.
Apartial
Bseparate
Ccombined
Dpartially combined
Answer is hidden
Question 260 of 414Water Supply, Sanitation and Environment
The treatment is costly in which of the following systems?
ACombined
BSeparate
CDirect
DPartial
Answer is hidden
Question 261 of 414Water Supply, Sanitation and Environment
Which of the following is an advantage of separate sewers?
ARivers are polluted
BSize of the sewers are small
CIt proves economical
DNuisance potential is reduced
Answer is hidden
Question 262 of 414Water Supply, Sanitation and Environment
Which one of the following options is true for combined system of sewerage system?
ASewage and rain water
BDry weather flow and rain water
CSewage and industrial waste
DIndustrial waste and rain water
Answer is hidden
Question 263 of 414Water Supply, Sanitation and Environment
Sewerage system is usually designed for .............
A7 years
B5 years
C100 years
D25 years
Answer is hidden
Question 264 of 414Water Supply, Sanitation and Environment
What is the name of the sewer that collects water from a number of other large sewers or outlets?
AIntercepting sewer
BForce main
CBranch sewer
DCollecting sewer
Answer is hidden
Question 265 of 414Water Supply, Sanitation and Environment
Which one of the following options is true for combined system of sewerage system?
ASewage and rain water
BDry weather flow and rain water
CSewage and industrial waste
DIndustrial waste and rain water
Answer is hidden
Question 266 of 414Water Supply, Sanitation and Environment
The egg shaped sewer is best preferred on .............
Acombined
Bseparate
Cboth (a) and (b)
Dnone of the above
Answer is hidden
Question 267 of 414Water Supply, Sanitation and Environment
The sewer that carries sewage to a treatment plant or final disposal point is called .............
Aoutfall sewer
Bbranch sewer
Chouse sewer
Dlateral sewer
Answer is hidden
Question 268 of 414Water Supply, Sanitation and Environment
Inverted syphon sewer is also called .............
Alateral sewer
Boutfall sewer
Cdepressed sewer
Dnormal sewer
Answer is hidden
Question 269 of 414Water Supply, Sanitation and Environment
The sewer used to convey wastewater form one or more lateral sewer is .............
Amain sewer
Bintercepting sewer
Cbranch sewer
Doutfall sewer
Answer is hidden
Question 270 of 414Water Supply, Sanitation and Environment
The equipment used for checking the levels of the sewer invert is .............
Aboning rod
Btheodolite
Cdumpy level
Dall of the above
Answer is hidden
Question 271 of 414Water Supply, Sanitation and Environment
Laying of sewers is usually done with the help of .............
Atheodolite
Bcompass
Cplane table
Dsight rules and boning rods
Answer is hidden
Question 272 of 414Water Supply, Sanitation and Environment
1/4 to 1/3 space is left vacant in the design of sewer pipes at maximum discharge due to .............
Apossible low estimates of maximum and average flows
Blarge scale possible infiltration of storm water
Cunexpected increase in population
Dall of the above
Answer is hidden
Question 273 of 414Water Supply, Sanitation and Environment
In a circular sewer of diameter D, if the depth of the flow is D/4, the wetted perimeter will be .............
AπD/4
BπD/2
CπD/3
DπD/5
Answer is hidden
Question 274 of 414Water Supply, Sanitation and Environment
The internal diameter of the sewer should not be less than .............
A15 cm
B25 cm
C50 cm
D75 cm
Answer is hidden
Question 275 of 414Water Supply, Sanitation and Environment
Minimum size of public sewer should not be less than .............
A10 cm
B20 cm
C13 cm
D15 cm
Answer is hidden
Question 276 of 414Water Supply, Sanitation and Environment
If sizes of the sewers are ............. choking problems are less.
Alarge
Bsmall
Cbig
Dminute
Answer is hidden
Question 277 of 414Water Supply, Sanitation and Environment
An egg shaped sewer in comparison to circular sewer is .............
Aeconomical
Bmore stable
Ceasier to construct
Dprovides better self-cleansing velocity at low discharges
Answer is hidden
Question 278 of 414Water Supply, Sanitation and Environment
Which of the following test of the sewer is done by placing a mirror at one end?
AMirror test
BStraightness test
CAir test
DWater test
Answer is hidden
Question 279 of 414Water Supply, Sanitation and Environment
Testing of sewer pipes may involve .............
Awater test
Bmirror test
Cball test
Dall of the above
Answer is hidden
Question 280 of 414Water Supply, Sanitation and Environment
Testing of sewer is done by which of the following methods .............
Astraightness test
Bobstruction test
Cair test
Dall of the above
Answer is hidden
Question 281 of 414Water Supply, Sanitation and Environment
Why is air gap left at the top of sewers?
ATo meet the fluctuation of sewage inflow
BTo maintain open channel flow condition
CTo provide space over sewage for ventilation
DAll of the above
Answer is hidden
Question 282 of 414Water Supply, Sanitation and Environment
The minimum diameter of sewer pipe is .............
A15 cm
B20 cm
C25 cm
D30 cm
Answer is hidden
Question 283 of 414Water Supply, Sanitation and Environment
Sewers are designed for .............
Asum of peak factors × dry weather flow (DWF)
Bproduct of peak factors × dry weather flow (DWF)
Cwater supply and peak factors
Daverage daily flow only
Answer is hidden
Question 284 of 414Water Supply, Sanitation and Environment
The slope of a sewer will be .............
Agiven in the direction of natural slope of ground
Bgiven in the direction opposite to natural slope of ground
Czero
Dsteeper than 1
Answer is hidden
Question 285 of 414Water Supply, Sanitation and Environment
To design sewer pipes of diameters 0.4 m to 0.9 m at maximum flow, the flow in sewer is running at .............
Afull depth
Bhalf full
Ctwo third full
Dthree fourth full
Answer is hidden
Question 286 of 414Water Supply, Sanitation and Environment
The best sewer material to resist hydrogen sulphide corrosion is .............
ARCC
Bbrick masonry
Cglazed stoneware
Dasbestos cement
Answer is hidden
Question 287 of 414Water Supply, Sanitation and Environment
A masonry or RCC chamber constructed at suitable intervals along the sewer lines, for providing access into them is called .............
Ainverted siphons
Bmanhole
Cflushing tanks
Dclean-outs
Answer is hidden
Question 288 of 414Water Supply, Sanitation and Environment
The manhole covers are generally made circular .............
Afor architectural reason
Bto strengthen the cover
Cto prevent falling of cover into the manhole
Dto make the entry convinent
Answer is hidden
Question 289 of 414Water Supply, Sanitation and Environment
The means of access for inspection and cleaning of sewer line is known as .............
Ainlet
Bmanhole
Ccatch basin
Ddrop manhole
Answer is hidden
Question 290 of 414Water Supply, Sanitation and Environment
Manholes on sewer lines are provided for .............
Aperiodic cleaning
Bproviding air for oxidation
Cremoval of part of sewerage
Dall of the above
Answer is hidden
Question 291 of 414Water Supply, Sanitation and Environment
A drop manhole is provided if .............
Aa sewer drops from a height
Ba branch sewer discharges into the main sewer at a higher level
Cboth (a) and (b)
Dnone of the above
Answer is hidden
Question 292 of 414Water Supply, Sanitation and Environment
Manholes are generally located .............
Aat all changes of direction of sewer
Bat all changes of gradient of sewer
Cat all junctions of different of sewer
Dall
Answer is hidden
Question 293 of 414Water Supply, Sanitation and Environment
The drop manholes are provided in sewerage system when there is .............
Achange in alignment of sewer line
Bchange in size of sewers
Cchange in the elevation of ground level
Dchange from gravity system to pressure system
Answer is hidden
Question 294 of 414Water Supply, Sanitation and Environment
For very small sewers, the maximum manhole spacing, specified by Indian standards, is .............
A30 m
B45 m
C75 m
D100 m
Answer is hidden
Question 295 of 414Water Supply, Sanitation and Environment
What is the spacing of manholes for pipe diameter of greater than 2 m?
A90-150 m
B150-200 m
C300 m
D45-90 m
Answer is hidden
Question 296 of 414Water Supply, Sanitation and Environment
The minimum diameter of a manhole cover should be .............
A25 cm
B50 cm
C75 cm
D100 cm
Answer is hidden
Question 297 of 414Water Supply, Sanitation and Environment
For large sewers, the maximum distance between manholes should be .............
A75 m
B150 m
C200 m
D300 m
Answer is hidden
Question 298 of 414Water Supply, Sanitation and Environment
What are the manholes having a depth greater than 1.5 m called?
ANormal manholes
BDeep manholes
CShallow manholes
DStraight manholes
Answer is hidden
Question 299 of 414Water Supply, Sanitation and Environment
The manhole is termed as shallow manhole if its depth is about .............
A0.7 to 0.9 m
B0.9 to 1.2 m
C1.2 to 1.5 m
D1.5 to 2.1 m
Answer is hidden
Question 300 of 414Water Supply, Sanitation and Environment
The minimum depth of septic tank as per design consideration is .............
A1.8 m
B1 m
C1.2 m
D1.5 m
Answer is hidden
Question 301 of 414Water Supply, Sanitation and Environment
When two pipes are connected to a manhole, how should their levels be arranged?
AThe inlet pipe should be at a higher level than the outlet pipe
BThe outlet pipe should be at a higher level than the inlet pipe
CBoth pipes should be at the same level
DLevels do not matter
Answer is hidden
Question 302 of 414Water Supply, Sanitation and Environment
What are the structures that are constructed at suitable intervals along the sewerage system called?
AManholes
BCatch basins
CPumps
DSewer appurtenances
Answer is hidden
Question 303 of 414Water Supply, Sanitation and Environment
A pipe used to carry discharge from sanitary fittings like bathrooms, kitchens, etc. is called .............
Awaste pipe
Bvent pipe
Csoil pipe
Dall of the above
Answer is hidden
Question 304 of 414Water Supply, Sanitation and Environment
The pipe through which liquid waste carrying human excreta flows, is called .............
Awaste pipe
Bvent pipe
Csoil pipe
Dall of the above
Answer is hidden
Question 305 of 414Water Supply, Sanitation and Environment
The sewage which transports the sewage to the point of treatment, is called .............
Ahouse sewer
Bmain sewer
Coutfall sewer
Dnone of the above
Answer is hidden
Question 306 of 414Water Supply, Sanitation and Environment
Specific gravity of the sewage is generally .............
A1
B2
C1.001
D0.1
Answer is hidden
Question 307 of 414Water Supply, Sanitation and Environment
The approximate % of water in sewage is .............
A0.9
B0.99
C0.999
D0.9999
Answer is hidden
Question 308 of 414Water Supply, Sanitation and Environment
The specific gravity of sewage is .............
Azero
Bslightly less than 1
Cequal to 1
Dslightly more than 1
Answer is hidden
Question 309 of 414Water Supply, Sanitation and Environment
In the process of finding fixed inorganic solid in a sludge sample, the temp is .............
A550° ± 50 for 15 minutes
B550° ± 50 for 1 hr
C105° ± 50 for 15 minutes
D105° ± 50 for 1 hr
Answer is hidden
Question 310 of 414Water Supply, Sanitation and Environment
The process of finding fixed organic solid in sludge temp is .............
A550 ± 50°C for 1 hr
B550 ± 50°C for 15 minutes
C105 ± 50°C for 1 hrs
D105 ± 50°C for 15 minutes
Answer is hidden
Question 311 of 414Water Supply, Sanitation and Environment
The value of ratio of BOD/COD of domestic wastewater before treatment is .............
A0.1 to 0.2
B0.2 to 0.5
C0.3 to 0.8
D0.8 to 1.5
Answer is hidden
Question 312 of 414Water Supply, Sanitation and Environment
The ratio of COD to BOD of untreated sewage is .............
A1.25-2.5
B2.5-5
C5-10
Dnone of the above
Answer is hidden
Question 313 of 414Water Supply, Sanitation and Environment
The standard BOD is taken as .............
A10 days BOD at 20 degree celsius
B20 days BOD at 20 degree celsius
C5 days BOD at 20 degree celsius
Dnone of the above
Answer is hidden
Question 314 of 414Water Supply, Sanitation and Environment
The maximum efficiency of BOD removal is achieved in .............
Aaerated lagoons
Btrickling filters
Cdigestion tank
Doxidation ditch
Answer is hidden
Question 315 of 414Water Supply, Sanitation and Environment
A BOD removal efficiency of 95% can be expected from .............
Aseptic tank
Bimhoff tank
Cstandard filter
Dactivated sludge plant
Answer is hidden
Question 316 of 414Water Supply, Sanitation and Environment
Between BOD and COD, the greater will be .............
ABOD
BCOD
Cboth are same
Ddepends on the characteristic of sewage
Answer is hidden
Question 317 of 414Water Supply, Sanitation and Environment
The BOD of drinking water should not be more than .............
A0
B5
C10
D20
Answer is hidden
Question 318 of 414Water Supply, Sanitation and Environment
The standard 5-days BOD at 20 degree Celsius, when compared to ultimate BOD, is about .............
A58%
B68%
C98%
D100%
Answer is hidden
Question 319 of 414Water Supply, Sanitation and Environment
The efficiency of biochemical oxygen demand (BOD) removal in trickling filter is .............
A98%
B65%
C56%
D85%
Answer is hidden
Question 320 of 414Water Supply, Sanitation and Environment
If 2% solution of a sewage sample is incubated for 5 days at 20°C and depletion of oxygen was found to be 5 ppm, BOD of the sewage is .............
A200 ppm
B225 ppm
C250 ppm
Dnone of the above
Answer is hidden
Question 321 of 414Water Supply, Sanitation and Environment
Which of the following has minimum detention period?
AGrit chamber
BSedimentation tank
COxidation ditch
DOxidation pond
Answer is hidden
Question 322 of 414Water Supply, Sanitation and Environment
Grit chambers of a sewage plant are usually cleaned after .............
A1 week
B1 day
C4 weeks
D2 weeks
Answer is hidden
Question 323 of 414Water Supply, Sanitation and Environment
For plain sedimentation tank, the detention period is usually .............
A2-4 hrs
B4-8 hrs
C18-24 hrs
D1-3 days
Answer is hidden
Question 324 of 414Water Supply, Sanitation and Environment
The overflow rate of plain sedimentation tank is about ............. cu.m/day/ sq. m.
A15-20
B30-40
C40-50
D50-60
Answer is hidden
Question 325 of 414Water Supply, Sanitation and Environment
If sewage contains greases and fatty oils, they are removed in .............
Agrit chambers
Bsedimentation tanks
Cskimming tanks
Daeration tanks
Answer is hidden
Question 326 of 414Water Supply, Sanitation and Environment
The discharge per unit plan area of a sedimentation tank, is generally called .............
Aover flow rate
Bsurface loading
Cover flow velocity
Dall of the above
Answer is hidden
Question 327 of 414Water Supply, Sanitation and Environment
The organic loading in a trickling filter is measured in .............
Am³/day
Bgm/m²/day
Ckg/hectare-meter/day
Dkg/hectare/day
Answer is hidden
Question 328 of 414Water Supply, Sanitation and Environment
A trickling filter is primarily a .............
Astraining process to remove suspended solids from sewage
Bbiological oxidation process to remove BOD from sewage
Cstraining process to remove turbidity from water
Dstraining process to remove bacteria from water
Answer is hidden
Question 329 of 414Water Supply, Sanitation and Environment
In trickling filter, what is the phenomenon of losing slime layer called .............
Asloughing
Bslugging
Csliming
Dslashing
Answer is hidden
Question 330 of 414Water Supply, Sanitation and Environment
When a recirculation ratio in a high rate trickling filter is unity, then the recirculation factor is .............
A1
Bmore than 1
Cless than 1
Dzero
Answer is hidden
Question 331 of 414Water Supply, Sanitation and Environment
Activated sludge is the .............
Aaerated sludge in the aeration unit
Bsludge settled in the humus tank
Csludge in the secondary tank after aeration and rich in microbial mass
Dsludge in secondary tank after aeration and rich in nutrients
Answer is hidden
Question 332 of 414Water Supply, Sanitation and Environment
The dominating microorganisms in an activated sludge process reactor are .............
Aaerobic heterotrophs
Banaerobic heterotrophs
Cautotrophs
Dphototrophs
Answer is hidden
Question 333 of 414Water Supply, Sanitation and Environment
Chlorine is sometimes used in sewage treatment .............
Ato avoid flocculation
Bto increase biological activated sludge
Cto avoid bulking of activated sludge
Dto help in grease separation
Answer is hidden
Question 334 of 414Water Supply, Sanitation and Environment
In the activated sludge process .............
Aaeration is continued till stability
Baeration is done with an admixture of previously aerated sludge
Csludge is activated by constant stirring
Dwater is removed by centrifugal action
Answer is hidden
Question 335 of 414Water Supply, Sanitation and Environment
In the oxidation ditch, the excess sludge is taken to .............
Aanaerobic digester
Baerobic digester
Cdrying beds
Dincinerator
Answer is hidden
Question 336 of 414Water Supply, Sanitation and Environment
In an oxidation pond, the sewage is treated by .............
Aaerobic bacteria
Banaerobic bacteria
Cdual action of aerobic bacteria and algae
Dsedimentation
Answer is hidden
Question 337 of 414Water Supply, Sanitation and Environment
From amongst the following sewage treatment option, largest land requirements for a given discharge will be needed for .............
Aoxidation ditch
Boxidation pond
Caerobic pond
Danaerobic pond
Answer is hidden
Question 338 of 414Water Supply, Sanitation and Environment
The minimum design depth of oxidation pond is ............. m.
A0.3
B0.5
C1
D1.5
Answer is hidden
Question 339 of 414Water Supply, Sanitation and Environment
The detention period for oxidation ponds is usually kept as .............
A24 hours
B48 hours
C10-15 days
D3 months
Answer is hidden
Question 340 of 414Water Supply, Sanitation and Environment
Factor affecting self-purifications are .............
Adilutions
Bcurrent
Caction of sunlight
Dall of the above
Answer is hidden
Question 341 of 414Water Supply, Sanitation and Environment
Sewage that has received no purification treatment is called .............
Araw sewage
Buntreated sewage
Ccrude sewage
Dfresh sewage
Answer is hidden
Question 342 of 414Water Supply, Sanitation and Environment
When wastewater is disposed off into a running stream, 4 zones are formed. In which of the following zones will the minimum level of dissolved oxygen be found?
Azone of degradation
Bzone of active decomposition
Czone of recovery
Dzone of clear water
Answer is hidden
Question 343 of 414Water Supply, Sanitation and Environment
If DO concentration falls down to zero in any natural drainage, it indicates the zone of .............
Adegradation
Bactive decomposition
Crecovery
Dcleaner water
Answer is hidden
Question 344 of 414Water Supply, Sanitation and Environment
The DO level in natural unpolluted waters at normal temperature is found to be of the order of .............
A1
B10
C100
D1000
Answer is hidden
Question 345 of 414Water Supply, Sanitation and Environment
DO test is done by .............
Awinkers test
BHoffman test
Cwinkers David test
Dnone of the above
Answer is hidden
Question 346 of 414Water Supply, Sanitation and Environment
The minimum DO in water bodies should be ............. to have aquatic life possible or survive.
A5 ppm
B4 ppm
C10 ppm
D3 ppm
Answer is hidden
Question 347 of 414Water Supply, Sanitation and Environment
Winkler's method is used to determine .............
AMethane content of waste water
BBiological Oxygen Demand (BOD) of waste water
CChemical Oxygen Demand (COD) of waste water
DDissolved Oxygen (DO) content of waste water
Answer is hidden
Question 348 of 414Water Supply, Sanitation and Environment
Anaerobic reaction depends upon .............
ADO content
BCO₂ content
Cboth (a) and (b)
Dnone of the above
Answer is hidden
Question 349 of 414Water Supply, Sanitation and Environment
Anaerobic decomposition of sewage is carried out .............
Ain presence of oxygen
Babsence of oxygen
Cboth (a) and (b)
Dnone of the above
Answer is hidden
Question 350 of 414Water Supply, Sanitation and Environment
Aerobic bacteria's .............
Aflourish in the presence of free oxygen
Bconsume organic matter as their food
Coxidize organic matter in sewage
Dall of the above
Answer is hidden
Question 351 of 414Water Supply, Sanitation and Environment
Identify the waste water treatment unit which use both aerobic and anaerobic mechanism for the removal of organic matter?
ATrickling filter
BActivated sludge process
COxidation ditch
DStabilization ponds
Answer is hidden
Question 352 of 414Water Supply, Sanitation and Environment
If a sewer drain carrying a discharge of 2 cumecs, outfalls into a river carrying a discharge of 10 cumecs, and having DO equal to 8.4 mg/l, the resultant DO of the mix will be equal to .............
A5 mg/l
B7 mg/l
C10.5 mg/l
D12 mg/l
Answer is hidden
Question 353 of 414Water Supply, Sanitation and Environment
The gas, which is evolved in a sludge digestion tank, is mainly composed of .............
Anitrogen
Bammonia
Chydrogen sulphide
Dmethane
Answer is hidden
Question 354 of 414Water Supply, Sanitation and Environment
The color of digested sludge is .............
Ablue
Bblack
Cbrown
Dgray
Answer is hidden
Question 355 of 414Water Supply, Sanitation and Environment
Composting and lagooning are methods of .............
Afiltration
Bsedimentation
Csludge digestion
Dsewage disposal
Answer is hidden
Question 356 of 414Water Supply, Sanitation and Environment
Leachate is the colored liquid, that comes out of .............
Aseptic tanks
Bsanitary landfills
Ccompost plants
Daerated lagoons
Answer is hidden
Question 357 of 414Water Supply, Sanitation and Environment
The method of refuse disposal, involving burial in trenches, is called .............
Aincineration
Bpulverisation
Ccomposting
Dnone of the above
Answer is hidden
Question 358 of 414Water Supply, Sanitation and Environment
Imhoff cone is used to measure ............. in sewage.
Atotal solids
Btotal organic solids
Ctotal inorganic solids
Dsettleable solids
Answer is hidden
Question 359 of 414Water Supply, Sanitation and Environment
The diameter of vent pipe used in VIP latrine is .............
A70 mm
B90 mm
C60 mm
D50 mm
Answer is hidden
Question 360 of 414Water Supply, Sanitation and Environment
Septic tank is provided for .............
Asettling of incoming sewage
Bsettle sludge digestion
Cstorage of digested sludge
Dall these factors
Answer is hidden
Question 361 of 414Water Supply, Sanitation and Environment
The minimum depth of septic tank as per design criteria is .............
A1.8 m
B1 m
C1.2 m
D1.5 m
Answer is hidden
Question 362 of 414Water Supply, Sanitation and Environment
Out of the following sewage treatment units, which work on the anaerobic decomposition of organic matter .............
Aoxidation pond
Bseptic tank
Cactivated sludge plants
Dboth (b) and (c)
Answer is hidden
Question 363 of 414Water Supply, Sanitation and Environment
The disposal of hazardous waste should not be done directly at .............
Alandfill
Bincineration
Cchemical oxidizer
Ddumping
Answer is hidden
Question 364 of 414Water Supply, Sanitation and Environment
Sewage sickness occurs when .............
Asewage contains pathogenic bacteria
Bsewers get clogged due to accumulate of solid
Cvoids of soil get clogged due to continuous application of sewage on a piece of land
Dsewers enters the water supply system
Answer is hidden
Question 365 of 414Water Supply, Sanitation and Environment
The phenomenon by virtue of which a soil is clogged with sewage matter, is called .............
Asewage farming
Bsewage sickness
Csewage bulking
Dall of the above
Answer is hidden
Question 366 of 414Water Supply, Sanitation and Environment
What is EIA?
AEnvironmental Impact Assessment (EIA) is a method for promoting rapid project development without considering its potential impact on the environment.
BEIA stands for Economic Investment Appraisal, focusing on financial considerations rather than environmental effects.
CEnvironmental Impact Assessment (EIA) is a process that intentionally overlooks potential negative effects of a project on the surrounding ecosystem.
DEIA is a systematic process used to evaluate the environmental consequences of a proposed project or development, aiming to identify and mitigate potential adverse effects on the environment.
Answer is hidden
Question 367 of 414Water Supply, Sanitation and Environment
EIA is necessary because .............
Adevelopment is bad for the environment
Bthere is growing interest in sustainability
Cenvironmental impacts of developments are of public interest
Dnone of the above
Answer is hidden
Question 368 of 414Water Supply, Sanitation and Environment
Which one among the following is the correct order of steps taken during the process of Environmental Impact Assessment (EIA)?
AScoping, Screening, Public Hearing, EIA, Issue of Environmental Clearance
BScreening, Public Hearing, Scoping, EIA, Issue of Environmental Clearance
CScreening, Scoping, EIA, Public Hearing, Issue of Environmental Clearance
DPublic Hearing, Screening, Scoping, EIA, Issue of Environmental Clearance
Answer is hidden
Question 369 of 414Water Supply, Sanitation and Environment
The full form of EIA is .............
Aenvironmental impact assessment
Benvironment impact assessment
Cenvironmental impact algorithm
Dinitial environmental impact assessment
Answer is hidden
Question 370 of 414Water Supply, Sanitation and Environment
The EIA requires .............
Ascoping
Bpublic hearing
Cboth of above
Dany one of the above but doesn't require both
Answer is hidden
Question 371 of 414Water Supply, Sanitation and Environment
The first step involving in EIA is .............
Ascoping
Bpublic hearing
CTOR
Dissue of environmental clearance
Answer is hidden
Question 372 of 414Water Supply, Sanitation and Environment
Once EIA is complete .............
Athe EIA is submitted to competent authority
Bthe EIA is not submitted to competent authority
Cthe EIA is submitted to municipality chief
Dthe EIA is submitted to municipal administrative chief
Answer is hidden
Question 373 of 414Water Supply, Sanitation and Environment
How many stages are there in EIA?
A5
B3
C2
D4
Answer is hidden
Question 374 of 414Water Supply, Sanitation and Environment
Scoping is important to the EIA process because .............
Ait decides from all the possible impacts which are the potentially significant ones
Bit saves the developer money
Cit ensures the environmental effects of the project are all considered in detail
Dit identifies all possible alternatives
Answer is hidden
Question 375 of 414Water Supply, Sanitation and Environment
Why aren't all projects subject to EIA?
AIf all projects were subject to EIA, costs would be higher and overall benefits of EIA relatively lower
BIf all projects were subject to EIA, costs would be lower and overall benefits of EIA relatively higher
CIf all projects were subject to EIA, consultants and practitioners would not be able to cope with demand
DIf all projects were subject to EIA, wrong decisions would be made about a proportion of these projects
Answer is hidden
Question 376 of 414Water Supply, Sanitation and Environment
Where a preliminary EIA is carried out during screening, which of the following should not be included?
AA description of the proposal
BReview of the degree of public concern and interest about the proposal
CA plan for mitigation measures
DReview of the potential impacts of the proposal and their likely significance
Answer is hidden
Question 377 of 414Water Supply, Sanitation and Environment
The full form of BES is in environment study is .............
Abachelor of environmental science
Bbrief environment studies
Cbase environmental study
Dbureau of environmental study
Answer is hidden
Question 378 of 414Water Supply, Sanitation and Environment
IEE is done to .............
Aminimize the overall environmental impact and cost of the project
Bmaximize the overall environmental impact and cost of the project
Cminimize the overall positive environmental impact and cost of the project
Dmaximize the overall environmental impact and cost of the house
Answer is hidden
Question 379 of 414Water Supply, Sanitation and Environment
Which of the following is the difference between EIA and IEE?
AEIA requires both scoping and ToR
BEIA requires public hearings
CEIA requires recommendation from local bodies
DAll of the above
Answer is hidden
Question 380 of 414Water Supply, Sanitation and Environment
Which of the following environmental study is to be carried out for the roads of length less than 25 km?
ABES
BIEE
CEIA
DAny of the above
Answer is hidden
Question 381 of 414Water Supply, Sanitation and Environment
If BES is required for a project of national pride, then the approval should be taken from .............
ABody prescribed by GoN
BTo the ministry of forest and environment
CThe body prescribed by the concerned local law
DTo the body of the provincial government prescribed by the provincial government
Answer is hidden
Question 382 of 414Water Supply, Sanitation and Environment
A short-term environmental impact assessment EIA has a time period of .............
A2-5 years
B10-15 years
C5-10 years
D5-7 years
Answer is hidden
Question 383 of 414Water Supply, Sanitation and Environment
For a hydropower project of capacity > 50 MW ............. is required.
ABES
BIEE
CEIA
Dnone of the above
Answer is hidden
Question 384 of 414Water Supply, Sanitation and Environment
The EIA report should be approved within ............. by the ministry.
A15 days
B25 days
C35 days
D45 days
Answer is hidden
Question 385 of 414Water Supply, Sanitation and Environment
The BES and IEE report should be approved within ............. by the ministry.
A15 days
B25 days
C35 days
D45 days
Answer is hidden
Question 386 of 414Water Supply, Sanitation and Environment
Which of the elements of the EIA process does the following expression describe? Narrowing the application of EIA to those projects that may have significant environmental impacts .............
Ascreening
Bscoping
Cbaseline description
Dmitigation
Answer is hidden
Question 387 of 414Water Supply, Sanitation and Environment
Which of the elements of the EIA process does the following expression describe? Identifying at an early stage, from all a project's possible impacts, those that are the crucial, significant ones .............
Ascreening
Bscoping
Cbaseline description
Dmitigation
Answer is hidden
Question 388 of 414Water Supply, Sanitation and Environment
Which of the elements of the EIA process does the following expression describe? Establishing the present and future states of the environment in the absence of the project .............
Ascreening
Bscoping
Cbaseline description
Dmitigation
Answer is hidden
Question 389 of 414Water Supply, Sanitation and Environment
Process for IEE and EIA is provided by ............. for development activities in Nepal.
ANepal environmental assessment guideline 1993
BNational environmental assessment guideline 1992
CNational environmental assessment guideline 1993
DNatural environmental assessment guideline 1993
Answer is hidden
Question 390 of 414Water Supply, Sanitation and Environment
Administrative process for IEE and EIA is provided by ............. for approval, preparation and implementation.
AEPA 2077 and EPR 2078
BEPA 2076 and EPR 2077
CEPA 2076 and EPA 2077
DEPA 2076 and EPR 2078
Answer is hidden
Question 391 of 414Water Supply, Sanitation and Environment
Which schedule of the environment protection rules-2077 mentions about the projects that require EIA?
ASchedule 1
BSchedule 2
CSchedule 3
DSchedule 4
Answer is hidden
Question 392 of 414Water Supply, Sanitation and Environment
Which environmental principle best reflects the intent of EIA?
Apolluter pays
Bprevention is better than cure
Creduce reuse recycle
Dnone of the above
Answer is hidden
Question 393 of 414Water Supply, Sanitation and Environment
Which of the following is never an acceptable outcome of the screening process?
AA full and comprehensive EIA is required
BEIA consideration is not required
CNo further level of EIA is required
DA more limited EIA is required
Answer is hidden
Question 394 of 414Water Supply, Sanitation and Environment
The primary reason for environmental impact assessment is to .............
Amitigate existing environmental impacts of development
Bpredict the size of impacts of developments
Cdescribe proposed developments
Didentify the environmental consequences of development in advance
Answer is hidden
Question 395 of 414Water Supply, Sanitation and Environment
Which of the following best describes why public involvement is necessary and integral to EIA?
AWithout incorporating stakeholder views EIA cannot be expected to accurately record the impact significance of the project
BPublic acceptability is important to ensure that political proponents of the project are re-elected
CThe law requires that the public are notified of developments
DThe developer who does not undertake public consultation will be able to undertake the project more quickly
Answer is hidden
Question 396 of 414Water Supply, Sanitation and Environment
What are the key factors which must be taken into account when determining whether a project requires EIA or not?
ASize of the project
BSize of the project and sensitivity of the surrounding environment
CSize of the project, sensitivity of the surrounding environment and effect on local communities
DSize of the project, sensitivity of the surrounding environment, effect on local communities and opinion of the developer
Answer is hidden
Question 397 of 414Water Supply, Sanitation and Environment
What is the amount of fine to be paid by any individual if a proposal is executed without approval of IEE report?
AUpto 5 lakhs rupees
BUpto 10 lakhs rupees
CUpto 50 lakhs rupees
DUpto 1 crore rupees
Answer is hidden
Question 398 of 414Water Supply, Sanitation and Environment
In the case of a proposal relating to development, construction work or project pertaining to a matter falling under the jurisdiction of the Local Government, the EIA is approved by .............
Athe body prescribed by the concerned local law
Bto the body of the provincial government prescribed by the provincial government
Cto the ministry of forest and environment
Dto the office of the chief minister of the respective province
Answer is hidden
Question 399 of 414Water Supply, Sanitation and Environment
For a highway project passing through the national conservation area, which of the following is required?
ASocial impact evaluation
BPolitical impact assessment
CEnvironmental impact assessment
DInitial Environment examination
Answer is hidden
Question 400 of 414Water Supply, Sanitation and Environment
Environmental impacts can of types .............
A3
B5
C4
D2
Answer is hidden
Question 401 of 414Water Supply, Sanitation and Environment
An Environmental Statement should examine the potential impacts of a development and present them from .............
Athe regulator's perspective
Bthe developer's view
Can unbiased view, minimizing subjectivity
Dthe environmental
Answer is hidden
Question 402 of 414Water Supply, Sanitation and Environment
Which of the following are indirect impacts?
AVisual impact of a chimney in a power station project
BImpact of mining raw materials for building a new power station
CPredicted noise impact of a new road in operation
DImpact on air quality from trucking supplies of wood to a construction site
Answer is hidden
Question 403 of 414Water Supply, Sanitation and Environment
Nepal ranks ............. in terms of flood risk.
A4th
B7th
C5th
D30th
Answer is hidden
Question 404 of 414Water Supply, Sanitation and Environment
Nepal ranks ............. In terms of earthquake risk.
A4th
B11th
C20th
D6th
Answer is hidden
Question 405 of 414Water Supply, Sanitation and Environment
Among the following types of hazard which one is more common?
ABiological
BPhysical
CErgonomic
DMechanical
Answer is hidden
Question 406 of 414Water Supply, Sanitation and Environment
Slow occurrences and multi casual among the following natural disaster .............
Aconflict
Bearth quake
Cvolcano eruption
Doutbreak
Answer is hidden
Question 407 of 414Water Supply, Sanitation and Environment
Natural disasters generally involve which of the following?
AEvents with a single clear-cut cause
BEvents that involve overlapping natural causes
CEvents wholly caused by the activities of man
DEvents that are unaffected by the activities of man
Answer is hidden
Question 408 of 414Water Supply, Sanitation and Environment
More frequent type of disaster in Nepal among the following:
ADrought
BOutbreak
CFlood
DAll of the above
Answer is hidden
Question 409 of 414Water Supply, Sanitation and Environment
A disease which is widespread and can reach globally is termed as .............
Aepidemic
Bendemic
Cpandemic
Dhyper-endemic
Answer is hidden
Question 410 of 414Water Supply, Sanitation and Environment
Construction of retaining walls comes under which of the following measures of mitigation of disasters?
AStructural measures
BNon-structural measures
CBoth (a) and (b)
DNone of the above
Answer is hidden
Question 411 of 414Water Supply, Sanitation and Environment
Commonly used type of epidemiological study design for disaster among the following:
ACohort
BExperimental
CCase control
DCross-sectional
Answer is hidden
Question 412 of 414Water Supply, Sanitation and Environment
Common cause of tsunami .............
Aundersea earthquake
Bfunnel-shaped air spirals
Cstrong winds accompanied by rain, snow and thunder
Dvolcanic eruption through magma
Answer is hidden
Question 413 of 414Water Supply, Sanitation and Environment
What should a man do after an earthquake if he is near the coastal area to be safe from tsunami?
AMove to the basement of house
BMove to the higher ground away from sea
CMove to the open space
DMove to the roof of the house
Answer is hidden
Question 414 of 414Water Supply, Sanitation and Environment
All the primarily concerned and other categories' indirect impact of hazard among the following: