AGeE/All MCQs
← Back to AGeE
🎯

All Chapters · MCQ Read Mode

Geomatic Engineering

10 Chapters·1100 Total MCQs
Question 1 of 1100Ch 1 · Introduction to Surveying

The principle 'work from the whole to the part' is followed in surveying mainly to:

APrevent the accumulation of errors
BAvoid the use of control points
CReduce the cost of instruments
DSpeed up plotting only
Answer is hidden
Question 2 of 1100Ch 1 · Introduction to Surveying

Plane surveying is generally considered suitable for areas up to about:

A2 500 km²
B250 km²
C25 000 km²
D5 km²
Answer is hidden
Question 3 of 1100Ch 1 · Introduction to Surveying

On a map of scale 1:1 000, one square centimetre represents a ground area of:

A10 m²
B1 000 m²
C1 ha
D100 m²
Answer is hidden
Question 4 of 1100Ch 1 · Introduction to Surveying

A map of scale 1:250 000 is described as a:

ACadastral map
BSmall-scale map
CPlan
DLarge-scale map
Answer is hidden
Question 5 of 1100Ch 1 · Introduction to Surveying

The fore bearing of a line is 48° 30′. Its back bearing, free from local attraction, is:

A228° 30′
B318° 30′
C131° 30′
D48° 30′
Answer is hidden
Question 6 of 1100Ch 1 · Introduction to Surveying

A prismatic compass reads bearings:

AAs vertical angles
BOnly in grads
CAs quadrantal bearings from 0° to 90°
DAs whole-circle bearings from 0° to 360°
Answer is hidden
Question 7 of 1100Ch 1 · Introduction to Surveying

One radian is equal to approximately:

A400 grads
B57 300 seconds
C206 265 seconds of arc
D3 600 seconds
Answer is hidden
Question 8 of 1100Ch 1 · Introduction to Surveying

The number of grads in a full circle is:

A360
B100
C400
D180
Answer is hidden
Question 9 of 1100Ch 1 · Introduction to Surveying

One ropani is equal to:

A6 772.63 m²
B338.63 m²
C1 000 m²
D508.72 m²
Answer is hidden
Question 10 of 1100Ch 1 · Introduction to Surveying

One bigha is equal to:

A20 dhur
B10 ropani
C20 kattha
D16 aana
Answer is hidden
Question 11 of 1100Ch 1 · Introduction to Surveying

The length of Gunter's chain is:

A100 ft with 100 links
B30 m with 150 links
C20.117 m (66 ft) with 100 links
D20 m with 100 links
Answer is hidden
Question 12 of 1100Ch 1 · Introduction to Surveying

A graphical (bar) scale drawn on a map is useful because it:

AIndicates the projection used
BGives the contour interval
CRemains valid even if the paper shrinks or the map is reduced
DShows the north direction
Answer is hidden
Question 13 of 1100Ch 1 · Introduction to Surveying

The angle between true north and magnetic north at a place is called the:

ADip
BAzimuth
CMagnetic declination
DLocal attraction
Answer is hidden
Question 14 of 1100Ch 1 · Traditional Methods of Surveying

Invar tapes are used for precise base-line measurement because invar has a very low:

ACoefficient of thermal expansion
BDensity
CCost
DTensile strength
Answer is hidden
Question 15 of 1100Ch 1 · Traditional Methods of Surveying

The correction for sag of a suspended tape is:

AAlways negative
BAlways positive
CPositive at high temperature
DZero
Answer is hidden
Question 16 of 1100Ch 1 · Traditional Methods of Surveying

If a 20 m chain is found to be 20.05 m long, the distance measured with it will be:

ALonger than the true distance
BExactly correct
CDoubled
DShorter than the true distance
Answer is hidden
Question 17 of 1100Ch 1 · Traditional Methods of Surveying

The correction for reducing a measured length to mean sea level is:

A+LH/R
B−h²/2L
C−W²L/24P²
D−LH/R
Answer is hidden
Question 18 of 1100Ch 1 · Traditional Methods of Surveying

The temperature correction to a taped length is positive when:

AThe field temperature is higher than the standardisation temperature
BThe pull is greater than standard
CThe field temperature is lower
DThe tape sags
Answer is hidden
Question 19 of 1100Ch 1 · Traditional Methods of Surveying

The plane-table method used to fix an inaccessible point by drawing rays from two stations is:

ATraversing
BIntersection
CResection
DRadiation
Answer is hidden
Question 20 of 1100Ch 1 · Traditional Methods of Surveying

Lehmann's rules are used in plane tabling for solving the:

AComputation of area
BTwo-point problem only
CSetting out of right angles
DThree-point problem
Answer is hidden
Question 21 of 1100Ch 1 · Traditional Methods of Surveying

In a prismatic compass, the graduated card is attached to the:

ASight vane
BPrism
CBox of the compass
DMagnetic needle
Answer is hidden
Question 22 of 1100Ch 1 · Traditional Methods of Surveying

Local attraction at a station is detected when the difference between the fore bearing and back bearing of a line is:

AExactly 180°
BExactly 90°
CZero
DNot equal to 180°
Answer is hidden
Question 23 of 1100Ch 1 · Traditional Methods of Surveying

The least count of a vernier theodolite whose main scale division is 20′ and which has 60 vernier divisions is:

A1′
B10″
C20″
D60″
Answer is hidden
Question 24 of 1100Ch 1 · Traditional Methods of Surveying

Taking observations on both faces of a theodolite eliminates:

AErrors of centring
BErrors due to poor levelling
CCollimation, trunnion and vertical index errors
DGraduation errors of the circle only
Answer is hidden
Question 25 of 1100Ch 1 · Traditional Methods of Surveying

The method of repetition in theodolite work is used mainly to:

ASet out a right angle
BObserve many directions from one station
CMeasure vertical angles
DIncrease the precision of a single angle
Answer is hidden
Question 26 of 1100Ch 1 · Traditional Methods of Surveying

In stadia tacheometry with a horizontal sight, a staff intercept of 0.85 m with K = 100 and C = 0 gives a distance of:

A100 m
B8.5 m
C85 m
D850 m
Answer is hidden
Question 27 of 1100Ch 1 · Horizontal Control — Triangulation, Trilateration and Traversing

In triangulation, the lengths of the sides are computed from:

AOne measured base line and the observed angles
BLevelling observations
CThe measured deflection angles only
DAll sides measured by EDM
Answer is hidden
Question 28 of 1100Ch 1 · Horizontal Control — Triangulation, Trilateration and Traversing

The strongest figure used in triangulation is the:

AOpen traverse
BChain of simple triangles
CSingle triangle
DBraced quadrilateral
Answer is hidden
Question 29 of 1100Ch 1 · Horizontal Control — Triangulation, Trilateration and Traversing

A well-conditioned triangle in triangulation has angles:

AAs small as possible
BOne angle close to 180°
CBetween about 30° and 120°, ideally near 60°
DAll equal to 90°
Answer is hidden
Question 30 of 1100Ch 1 · Horizontal Control — Triangulation, Trilateration and Traversing

In the strength-of-figure computation, a smaller value of R means the figure is:

AWeaker
BUnusable
CUnchanged in strength
DStronger
Answer is hidden
Question 31 of 1100Ch 1 · Horizontal Control — Triangulation, Trilateration and Traversing

In trilateration:

AOnly one side and one angle are measured
BAll the angles are measured and the sides computed
CLevelling replaces angle measurement
DAll the sides are measured and the angles are computed
Answer is hidden
Question 32 of 1100Ch 1 · Horizontal Control — Triangulation, Trilateration and Traversing

The sum of the interior angles of a closed traverse with 6 stations should be:

A1 080°
B540°
C720°
D360°
Answer is hidden
Question 33 of 1100Ch 1 · Horizontal Control — Triangulation, Trilateration and Traversing

The algebraic sum of the deflection angles of a closed traverse is:

A360°
B180°
CZero
D(2n − 4) × 90°
Answer is hidden
Question 34 of 1100Ch 1 · Horizontal Control — Triangulation, Trilateration and Traversing

The latitude of a traverse line of length 100 m with a whole-circle bearing of 60° is:

A0 m
B100 m
C86.6 m
D50 m
Answer is hidden
Question 35 of 1100Ch 1 · Horizontal Control — Triangulation, Trilateration and Traversing

The closing error of a closed traverse is computed as:

APerimeter ÷ number of lines
BΣΔN − ΣΔE
CΣΔN + ΣΔE
D√[(ΣΔN)² + (ΣΔE)²]
Answer is hidden
Question 36 of 1100Ch 1 · Horizontal Control — Triangulation, Trilateration and Traversing

According to Bowditch's rule, the correction to the latitude of a traverse line is proportional to:

AThe area enclosed
BThe latitude of that line
CThe number of stations
DThe length of that line
Answer is hidden
Question 37 of 1100Ch 1 · Horizontal Control — Triangulation, Trilateration and Traversing

The transit rule of traverse adjustment is preferred when:

AThe distances are more accurate than the angles
BThe angles are measured more accurately than the distances
CBoth are equally accurate
DNo angles were measured
Answer is hidden
Question 38 of 1100Ch 1 · Horizontal Control — Triangulation, Trilateration and Traversing

A traverse that starts and ends on two different known control points is called a:

ARadiation traverse
BLink (connecting) traverse
COpen traverse
DLoop traverse
Answer is hidden
Question 39 of 1100Ch 1 · Horizontal Control — Triangulation, Trilateration and Traversing

The clearance required for intervisibility between two triangulation stations 20 km apart, allowing for curvature and refraction, is about:

A27 m
B6.7 m
C270 m
D2.7 m
Answer is hidden
Question 40 of 1100Ch 1 · Vertical Control — Levelling

The reading taken on a point of known elevation immediately after setting up the level is the:

ABack sight
BIntermediate sight
CFore sight
DChange point reading only
Answer is hidden
Question 41 of 1100Ch 1 · Vertical Control — Levelling

In the height-of-instrument method of reduction, the arithmetic check is:

AΣRise = ΣFall always
BΣBS − ΣFS = last RL − first RL
CΣIS = ΣFS
DΣBS + ΣFS = last RL
Answer is hidden
Question 42 of 1100Ch 1 · Vertical Control — Levelling

The rise-and-fall method of reduction is preferred to the height-of-instrument method because it:

AIs faster for many intermediate sights
BNeeds no arithmetic
CProvides a check on every reading including intermediate sights
DEliminates collimation error
Answer is hidden
Question 43 of 1100Ch 1 · Vertical Control — Levelling

The combined correction for curvature and refraction for a sight distance of 1 km is about:

A−6.7 mm
B−67 mm
C+11 mm
D−78 mm
Answer is hidden
Question 44 of 1100Ch 1 · Vertical Control — Levelling

The effect of the earth's curvature on a staff reading is to make it:

AUnchanged
BToo small
CNegative
DToo large
Answer is hidden
Question 45 of 1100Ch 1 · Vertical Control — Levelling

Keeping the back-sight and fore-sight distances equal eliminates the errors due to:

ASettlement of the change point
BCollimation, curvature and refraction
CStaff not being vertical
DWrong booking
Answer is hidden
Question 46 of 1100Ch 1 · Vertical Control — Levelling

Reciprocal levelling is used when:

AIntermediate sights are many
BOnly one benchmark is available
CThe instrument cannot be set up midway, as across a river
DThe ground is perfectly flat
Answer is hidden
Question 47 of 1100Ch 1 · Vertical Control — Levelling

The two-peg test is carried out to check the:

AFocus of the eyepiece
BCollimation adjustment of a level
CSensitivity of the bubble only
DVerticality of the staff
Answer is hidden
Question 48 of 1100Ch 1 · Vertical Control — Levelling

Parallax in a levelling telescope is eliminated by:

AChanging the staff
BLevelling the instrument accurately
CUsing a shorter sight distance
DFocusing the eyepiece on the cross-hairs and the objective on the staff
Answer is hidden
Question 49 of 1100Ch 1 · Vertical Control — Levelling

An automatic (self-levelling) level maintains a horizontal line of sight by means of a:

AMicrometer
BCompensator
CTilting screw
DVertical circle
Answer is hidden
Question 50 of 1100Ch 1 · Vertical Control — Levelling

In trigonometric levelling, the difference of elevation for a horizontal distance D and vertical angle θ is:

AD tan θ (plus corrections for long sights)
BD cos θ
CD sin θ only
DD/tan θ
Answer is hidden
Question 51 of 1100Ch 1 · Vertical Control — Levelling

The permissible closing error in first-order precise levelling is of the order of:

A±4√K mm, K in kilometres
B±40 K mm
C±1 m per km
D±4 K cm
Answer is hidden
Question 52 of 1100Ch 1 · Vertical Control — Levelling

A point on which both a fore sight and a back sight are taken is called a:

AChange (turning) point
BStation point
CIntermediate point
DBenchmark
Answer is hidden
Question 53 of 1100Ch 1 · Topographical Surveying

A contour is a line joining points of equal:

ASlope
BHorizontal distance
CElevation
DMagnetic bearing
Answer is hidden
Question 54 of 1100Ch 1 · Topographical Surveying

Contours that are closely spaced on a map indicate:

AA vertical cliff only
BA gentle slope
CA flat area
DA steep slope
Answer is hidden
Question 55 of 1100Ch 1 · Topographical Surveying

Two contour lines can cross each other only in the case of:

AA saddle
BA vertical cliff
CA valley
DAn overhanging cliff
Answer is hidden
Question 56 of 1100Ch 1 · Topographical Surveying

The V-shaped contours in a valley point:

ATowards the sea only
BUpstream (towards higher ground)
CDownstream
DIn the direction of flow
Answer is hidden
Question 57 of 1100Ch 1 · Topographical Surveying

A closed contour with lower values inside represents a:

AHill
BSaddle
CRidge
DDepression
Answer is hidden
Question 58 of 1100Ch 1 · Topographical Surveying

The contour interval for a map of hilly terrain at small scale is generally:

AZero
BVery small
CEqual to the scale denominator
DLarge
Answer is hidden
Question 59 of 1100Ch 1 · Topographical Surveying

In the direct method of contouring:

APoints lying on each contour are located in the field
BSpot levels are taken on a grid and contours interpolated
CContours are drawn from a photograph only
DOnly cross-sections are levelled
Answer is hidden
Question 60 of 1100Ch 1 · Topographical Surveying

Contouring by taking levels at the corners of a grid of squares is an example of:

AThe indirect method
BRadiation
CTrigonometric levelling
DThe direct method
Answer is hidden
Question 61 of 1100Ch 1 · Topographical Surveying

Intervisibility between two points can be checked from:

AA contour map along the line joining them
BThe area of the plot
CThe magnetic bearing
DThe scale of the map
Answer is hidden
Question 62 of 1100Ch 1 · Topographical Surveying

Permanent station marks in a topographic survey are established during:

ADrafting
BDetailing
CInterpolation
DMonumentation
Answer is hidden
Question 63 of 1100Ch 1 · Topographical Surveying

The most common method of picking up detail in modern topographic surveys is:

APlane tabling only
BChain and offset only
CBarometric levelling
DRadiation with a total station or GNSS-RTK
Answer is hidden
Question 64 of 1100Ch 1 · Topographical Surveying

Standard topographic map series of Nepal are published at scales of:

A1:1 000 000 only
B1:25 000 and 1:50 000
C1:500 and 1:1 000
D1:100 and 1:200
Answer is hidden
Question 65 of 1100Ch 1 · Topographical Surveying

The horizontal distance between two successive contours is called the:

AGradient
BHorizontal equivalent
COffset
DContour interval
Answer is hidden
Question 66 of 1100Ch 1 · Adjustment of Observations

The difference between an observed value and the most probable value is called the:

ATrue error
BBlunder
CDiscrepancy
DResidual
Answer is hidden
Question 67 of 1100Ch 1 · Adjustment of Observations

Errors that always have the same sign and follow a definite law are:

AMistakes
BCompensating errors
CRandom errors
DSystematic (cumulative) errors
Answer is hidden
Question 68 of 1100Ch 1 · Adjustment of Observations

Random (accidental) errors are treated by:

ARepeating the blunder
BIgnoring them completely
CThe theory of probability and least squares
DApplying a fixed correction
Answer is hidden
Question 69 of 1100Ch 1 · Adjustment of Observations

A survey that is precise but not accurate suffers mainly from:

ALarge random scatter
BSystematic errors or blunders
CPoor repeatability
DNo errors at all
Answer is hidden
Question 70 of 1100Ch 1 · Adjustment of Observations

If the standard deviation of a single observation is 10 mm, the standard error of the mean of 25 such observations is:

A10 mm
B0.4 mm
C50 mm
D2 mm
Answer is hidden
Question 71 of 1100Ch 1 · Adjustment of Observations

The probable error of a single observation is equal to:

A0.5 σ
B3 σ
C1.96 σ
D0.6745 σ
Answer is hidden
Question 72 of 1100Ch 1 · Adjustment of Observations

In levelling, the weight of an observed height difference is usually taken as inversely proportional to:

AThe square of the height difference
BThe number of benchmarks
CThe elevation of the point
DThe length of the levelling route
Answer is hidden
Question 73 of 1100Ch 1 · Adjustment of Observations

Two independent distances each with a standard error of 3 mm are added. The standard error of the sum is:

A3 mm
B9 mm
C4.24 mm
D6 mm
Answer is hidden
Question 74 of 1100Ch 1 · Adjustment of Observations

The principle of least squares requires that:

AAll residuals be equal
BThe sum of the weighted squares of the residuals be a minimum
CThe largest residual be zero
DThe sum of the residuals be a maximum
Answer is hidden
Question 75 of 1100Ch 1 · Adjustment of Observations

The redundancy of an adjustment with 12 observations and 5 unknown parameters is:

A17
B5
C12
D7
Answer is hidden
Question 76 of 1100Ch 1 · Adjustment of Observations

In the method of observation equations, the normal equations are:

Av = Pl
BBv = w
Cx̂ = A⁻¹l
DAᵀPA x̂ = AᵀPl
Answer is hidden
Question 77 of 1100Ch 1 · Adjustment of Observations

Adjusting the observed angles of a triangle so that their sum is exactly 180° is an example of the:

AMethod of condition equations (correlates)
BTransit rule
CMethod of observation equations
DBowditch rule
Answer is hidden
Question 78 of 1100Ch 1 · Adjustment of Observations

Non-linear observation equations in a least-squares adjustment are handled by:

AUsing the transit rule
BIgnoring the non-linear terms permanently
CLinearisation with a Taylor series about approximate values and iteration
DConverting angles to grads
Answer is hidden
Question 79 of 1100Ch 2 · Fundamentals of Photogrammetry

Photogrammetry is best defined as obtaining reliable information about objects by:

AAnalysing soil samples
BLevelling between benchmarks
CMeasuring angles in the field only
DRecording, measuring and interpreting images
Answer is hidden
Question 80 of 1100Ch 2 · Fundamentals of Photogrammetry

A photograph is a:

AOrthogonal projection
BCentral (perspective) projection
CConical projection like a map
DCylindrical projection
Answer is hidden
Question 81 of 1100Ch 2 · Fundamentals of Photogrammetry

The condition that the image point, the perspective centre and the object point lie on one straight line is called:

AThe collinearity condition
BSnell's law
CThe coplanarity condition
DThe parallax equation
Answer is hidden
Question 82 of 1100Ch 2 · Fundamentals of Photogrammetry

Three-dimensional information is obtained in photogrammetry from:

AA single vertical photograph
BTwo overlapping photographs taken from different camera stations
CA single oblique photograph
DA photo mosaic
Answer is hidden
Question 83 of 1100Ch 2 · Fundamentals of Photogrammetry

Close-range photogrammetry with the camera on the ground is called:

AAerial photogrammetry
BAnalytical photogrammetry
CTerrestrial photogrammetry
DSpace photogrammetry
Answer is hidden
Question 84 of 1100Ch 2 · Fundamentals of Photogrammetry

Photogrammetry that deals with identification of objects rather than measurement is called:

AMetric photogrammetry
BDigital photogrammetry
CAnalytical photogrammetry
DInterpretative photogrammetry
Answer is hidden
Question 85 of 1100Ch 2 · Fundamentals of Photogrammetry

The 'father of photogrammetry' is considered to be:

AAimé Laussedat
BU. V. Helava
CLouis Daguerre
DCarl Pulfrich
Answer is hidden
Question 86 of 1100Ch 2 · Fundamentals of Photogrammetry

The analytical plotter, which linked a computer to the measuring system, was introduced by:

APulfrich (1901)
BLaussedat (1859)
CNadar (1858)
DHelava (1957)
Answer is hidden
Question 87 of 1100Ch 2 · Fundamentals of Photogrammetry

Which of the following is an advantage of photogrammetric mapping?

AIt needs no ground control at all
BIt works equally well under thick cloud
CIt provides a permanent record that can be re-measured later
DIt maps features hidden under tree canopy
Answer is hidden
Question 88 of 1100Ch 2 · Fundamentals of Photogrammetry

A serious limitation of aerial photogrammetry is that:

AFeatures hidden under canopy, shadow or buildings cannot be mapped
BIt cannot cover large areas
CIt gives no three-dimensional information
DIt cannot be used for volume computation
Answer is hidden
Question 89 of 1100Ch 2 · Fundamentals of Photogrammetry

Structure from motion (SfM) is associated mainly with:

AAnalogue stereo plotters
BBarometric levelling
CPlane tabling
DUAV/close-range digital photogrammetry
Answer is hidden
Question 90 of 1100Ch 2 · Fundamentals of Photogrammetry

Photogrammetric measurement of stockpile or quarry volumes is an example of:

AMetric photogrammetry in engineering application
BImage classification
CRadiometric correction
DInterpretative photogrammetry
Answer is hidden
Question 91 of 1100Ch 2 · Fundamentals of Photogrammetry

In Nepal, UAV photogrammetric flights additionally require:

APermission from the civil aviation authority and local authorities
BOnly a GNSS receiver
CA theodolite survey first
DNo permission of any kind
Answer is hidden
Question 92 of 1100Ch 2 · Aerial Photogrammetry

An aerial photograph is classified as vertical when the tilt of the camera axis is less than about:

A3°
B10°
C45°
D30°
Answer is hidden
Question 93 of 1100Ch 2 · Aerial Photogrammetry

A high oblique aerial photograph is one in which:

AThe horizon is not visible
BTwo cameras are used
CThe horizon is visible
DThe camera axis is exactly vertical
Answer is hidden
Question 94 of 1100Ch 2 · Aerial Photogrammetry

The scale of a vertical photograph taken with f = 150 mm from a height of 1 500 m above the ground is:

A1:1 000
B1:15 000
C1:10 000
D1:100 000
Answer is hidden
Question 95 of 1100Ch 2 · Aerial Photogrammetry

The scale of a single vertical photograph over undulating ground:

ADepends only on the focal length
BIs constant everywhere
CVaries from point to point with the terrain height
DIs the same as the map scale
Answer is hidden
Question 96 of 1100Ch 2 · Aerial Photogrammetry

The usual forward (end) overlap in aerial photography for mapping is:

AAbout 20%
BAbout 10%
CAbout 60%
DAbout 90%
Answer is hidden
Question 97 of 1100Ch 2 · Aerial Photogrammetry

Relief displacement on a vertical photograph is radial from the:

AIsocentre
BEdge of the photograph
CFiducial mark
DNadir point
Answer is hidden
Question 98 of 1100Ch 2 · Aerial Photogrammetry

The relief displacement of a point is given by:

Ad = h/r
Bd = H·r/h
Cd = r·h/H
Dd = f·h/H
Answer is hidden
Question 99 of 1100Ch 2 · Aerial Photogrammetry

Removing y-parallax from a stereo pair is the purpose of:

ARelative orientation
BInterior orientation
CRectification
DAbsolute orientation
Answer is hidden
Question 100 of 1100Ch 2 · Aerial Photogrammetry

Absolute orientation of a stereo model involves:

ARemoving lens distortion
BScaling and levelling the model onto the ground coordinate system
CProducing a photo mosaic
DMeasuring the fiducial marks
Answer is hidden
Question 101 of 1100Ch 2 · Aerial Photogrammetry

The number of elements of exterior orientation of a photograph is:

ASix
BSeven
CThree
DFive
Answer is hidden
Question 102 of 1100Ch 2 · Aerial Photogrammetry

Aerial triangulation is carried out mainly to:

AReduce the amount of ground control needed for a block of photographs
BRemove lens distortion
CImprove the photo contrast
DIncrease the flying height
Answer is hidden
Question 103 of 1100Ch 2 · Aerial Photogrammetry

An orthophoto differs from a rectified photograph because it also removes:

AColour imbalance
BCloud cover
CLens distortion only
DRelief displacement, using a DEM
Answer is hidden
Question 104 of 1100Ch 2 · Aerial Photogrammetry

Marking ground control points with targets before the photographic flight is called:

ARectification
BPost-pointing
CMosaicking
DPre-pointing (pre-marking)
Answer is hidden
Question 105 of 1100Ch 2 · Binocular Vision and Digital Photogrammetry

The average eye base (interpupillary distance) of an adult is about:

A150 mm
B25 mm
C10 mm
D65 mm
Answer is hidden
Question 106 of 1100Ch 2 · Binocular Vision and Digital Photogrammetry

Stereoscopic depth perception is possible because the two eyes:

AFocus at different distances
BBlink alternately
CSee the object from slightly different positions, giving different parallactic angles
DHave different colours of iris
Answer is hidden
Question 107 of 1100Ch 2 · Binocular Vision and Digital Photogrammetry

Reversed relief, in which hills appear as valleys, is called:

ABinocular vision
BStereoscopic vision
CPseudoscopic vision
DAnaglyph vision
Answer is hidden
Question 108 of 1100Ch 2 · Binocular Vision and Digital Photogrammetry

Anaglyph viewing of a stereo model uses:

AA polarising filter on the objective only
BTwo mirrors only
CRed and cyan filters/glasses
DA parallax bar
Answer is hidden
Question 109 of 1100Ch 2 · Binocular Vision and Digital Photogrammetry

The x-parallax of a point on a stereo pair:

AIncreases as the height of the point increases
BIs zero for all points
CDecreases as the height increases
DDepends only on the focal length
Answer is hidden
Question 110 of 1100Ch 2 · Binocular Vision and Digital Photogrammetry

The presence of y-parallax in a stereo model indicates:

AGood image matching
BA perfectly vertical photograph
CFaulty relative orientation
DCorrect absolute orientation
Answer is hidden
Question 111 of 1100Ch 2 · Binocular Vision and Digital Photogrammetry

The instrument used with a mirror stereoscope to measure parallax differences is the:

AParallax bar (stereometer)
BPantograph
CPlanimeter
DClinometer
Answer is hidden
Question 112 of 1100Ch 2 · Binocular Vision and Digital Photogrammetry

For a vertical stereo pair, the height of a point is given by:

Ah = Bp/f
Bh = pH/B
Ch = H − Bf/p
Dh = fH/p
Answer is hidden
Question 113 of 1100Ch 2 · Binocular Vision and Digital Photogrammetry

Vertical exaggeration in a stereo model means that:

AColours appear brighter
BThe model appears flat
CDistances appear longer horizontally
DHeights appear greater than they really are
Answer is hidden
Question 114 of 1100Ch 2 · Binocular Vision and Digital Photogrammetry

In digital photogrammetry, image pyramids are used to:

ACorrect atmospheric haze
BStore camera calibration data
CMatch images in a coarse-to-fine strategy
DPrint the orthophoto
Answer is hidden
Question 115 of 1100Ch 2 · Binocular Vision and Digital Photogrammetry

Area-based image matching typically fails on:

ARegions with many corners
BWell-textured urban areas
CAreas with good contrast
DWater, shadow and uniform untextured surfaces
Answer is hidden
Question 116 of 1100Ch 2 · Binocular Vision and Digital Photogrammetry

SIFT, Harris and Förstner operators are used in:

AAccuracy assessment
BFeature-based image matching
CRadiometric correction
DContrast stretching
Answer is hidden
Question 117 of 1100Ch 2 · Binocular Vision and Digital Photogrammetry

The epipolar constraint is useful in image matching because it:

AEliminates the need for ground control
BIncreases the image resolution
CRemoves atmospheric effects
DReduces the search for the conjugate point to one dimension
Answer is hidden
Question 118 of 1100Ch 2 · Fundamentals of Remote Sensing

Remote sensing is defined as acquiring information about an object:

AOnly from a satellite
BOnly by touching it with a sensor
CWithout being in physical contact with it
DOnly in the visible spectrum
Answer is hidden
Question 119 of 1100Ch 2 · Fundamentals of Remote Sensing

The first civilian earth-resources satellite, launched in 1972, was:

ASPOT-1
BSentinel-2
CLandsat-1 (ERTS-1)
DIKONOS
Answer is hidden
Question 120 of 1100Ch 2 · Fundamentals of Remote Sensing

The visible portion of the electromagnetic spectrum lies between:

A0.7 and 1.3 μm
B3 and 5 μm
C8 and 14 μm
D0.4 and 0.7 μm
Answer is hidden
Question 121 of 1100Ch 2 · Fundamentals of Remote Sensing

Rayleigh scattering is inversely proportional to:

AThe fourth power of the wavelength
BThe square of the wavelength
CThe temperature
DThe wavelength
Answer is hidden
Question 122 of 1100Ch 2 · Fundamentals of Remote Sensing

Clouds appear white in optical imagery because of:

AMie scattering only
BRayleigh scattering
CNon-selective scattering
DAbsorption by ozone
Answer is hidden
Question 123 of 1100Ch 2 · Fundamentals of Remote Sensing

Wavelength regions in which the atmosphere transmits radiation well are called:

APath radiance
BBlackbody regions
CAtmospheric windows
DSpectral signatures
Answer is hidden
Question 124 of 1100Ch 2 · Fundamentals of Remote Sensing

Healthy green vegetation shows very high reflectance in the:

ARed band
BNear infrared
CThermal infrared
DBlue band
Answer is hidden
Question 125 of 1100Ch 2 · Fundamentals of Remote Sensing

Clear water bodies are easiest to delineate using the:

ABlue band
BNear-infrared band, where water is nearly black
CMicrowave band only
DThermal band only
Answer is hidden
Question 126 of 1100Ch 2 · Fundamentals of Remote Sensing

NDVI is computed as:

A(NIR + Red)/2
BNIR/Green
C(NIR − Red)/(NIR + Red)
D(Red − NIR)/(Red + NIR)
Answer is hidden
Question 127 of 1100Ch 2 · Fundamentals of Remote Sensing

A sensor that supplies its own energy, such as radar, is called:

AA hyperspectral sensor
BAn active sensor
CA pushbroom sensor
DA passive sensor
Answer is hidden
Question 128 of 1100Ch 2 · Fundamentals of Remote Sensing

Meteorological satellites that remain over the same point on the equator are in a:

AElliptical orbit at 300 km
BGeostationary orbit at about 36 000 km
CPolar orbit at 900 km
DSun-synchronous orbit at 700 km
Answer is hidden
Question 129 of 1100Ch 2 · Fundamentals of Remote Sensing

The number of brightness levels that a sensor can record is its:

ASpatial resolution
BSpectral resolution
CRadiometric resolution
DTemporal resolution
Answer is hidden
Question 130 of 1100Ch 2 · Fundamentals of Remote Sensing

A sensor recording hundreds of narrow contiguous bands is called:

AHyperspectral
BThermal
CMultispectral
DPanchromatic
Answer is hidden
Question 131 of 1100Ch 2 · Image Processing and Interpretation

Dark-object subtraction is a simple method of:

AAtmospheric correction
BAccuracy assessment
CGeometric correction
DImage classification
Answer is hidden
Question 132 of 1100Ch 2 · Image Processing and Interpretation

Which resampling method preserves the original digital numbers of an image?

AHistogram equalisation
BCubic convolution
CNearest neighbour
DBilinear interpolation
Answer is hidden
Question 133 of 1100Ch 2 · Image Processing and Interpretation

Geometric correction of a satellite image using ground control points requires the RMSE to be, typically:

AExactly zero always
BGreater than 2 pixels
CLess than about half a pixel
DLess than 10 pixels
Answer is hidden
Question 134 of 1100Ch 2 · Image Processing and Interpretation

Ortho-rectification differs from simple geometric correction because it also removes:

ACloud cover
BAtmospheric haze
CRelief displacement using a DEM
DSensor noise
Answer is hidden
Question 135 of 1100Ch 2 · Image Processing and Interpretation

Histogram equalisation is used to:

ACompute NDVI
BRemove geometric distortion
CClassify land cover
DImprove contrast by assigning more display levels to frequently occurring DNs
Answer is hidden
Question 136 of 1100Ch 2 · Image Processing and Interpretation

A median filter is most useful for removing:

ASalt-and-pepper noise
BTopographic shadow
CAtmospheric absorption
DGeometric distortion
Answer is hidden
Question 137 of 1100Ch 2 · Image Processing and Interpretation

High-pass filtering of an image enhances:

AAtmospheric haze
BEdges and linear features
CBroad homogeneous areas
DRadiometric calibration
Answer is hidden
Question 138 of 1100Ch 2 · Image Processing and Interpretation

In a standard false-colour composite, healthy vegetation appears:

ABlue
BGreen
CBlack
DRed
Answer is hidden
Question 139 of 1100Ch 2 · Image Processing and Interpretation

Principal component analysis of a multispectral image is used mainly to:

ACorrect the geometry
BIncrease the spatial resolution
CReduce redundancy between correlated bands
DAssess classification accuracy
Answer is hidden
Question 140 of 1100Ch 2 · Image Processing and Interpretation

K-means and ISODATA are algorithms of:

AImage fusion
BGeometric correction
CUnsupervised classification
DSupervised classification
Answer is hidden
Question 141 of 1100Ch 2 · Image Processing and Interpretation

The most commonly used statistical decision rule in supervised classification is:

AMaximum likelihood
BMinimum distance
CNearest neighbour resampling
DParallelepiped
Answer is hidden
Question 142 of 1100Ch 2 · Image Processing and Interpretation

In an error matrix, the user's accuracy of a class is related to the error of:

AOmission
BCommission
CQuantisation
DRegistration
Answer is hidden
Question 143 of 1100Ch 2 · Image Processing and Interpretation

The kappa coefficient of a classification measures:

AOnly the overall accuracy
BThe radiometric resolution
CThe positional accuracy
DAgreement corrected for chance agreement
Answer is hidden
Question 144 of 1100Ch 2 · Terrain Model Generation and Ortho Products

A digital surface model (DSM) represents:

AThe top surface including buildings and vegetation
BThe bare earth only
COnly the contour lines
DOnly the drainage network
Answer is hidden
Question 145 of 1100Ch 2 · Terrain Model Generation and Ortho Products

Subtracting a DTM from a DSM gives:

AThe heights of buildings and vegetation (nDSM)
BThe contour interval
CThe orthophoto
DThe slope map
Answer is hidden
Question 146 of 1100Ch 2 · Terrain Model Generation and Ortho Products

The advantage of a TIN over a regular grid DEM is that it:

AIs always smaller in file size for flat terrain
BAdapts the point density to terrain complexity and honours break lines
CCannot represent ridges
DNeeds no elevation data
Answer is hidden
Question 147 of 1100Ch 2 · Terrain Model Generation and Ortho Products

Airborne LiDAR can produce a bare-earth DTM under forest because:

AIt measures only the first return
BSome laser pulses reach the ground through gaps in the canopy and are recorded as later returns
CThe laser penetrates solid tree trunks
DIt uses microwave energy
Answer is hidden
Question 148 of 1100Ch 2 · Terrain Model Generation and Ortho Products

The typical vertical accuracy of airborne LiDAR is of the order of:

A1–2 mm
B50–100 cm
C5–15 m
D5–15 cm
Answer is hidden
Question 149 of 1100Ch 2 · Terrain Model Generation and Ortho Products

The horizontal accuracy achievable by UAV photogrammetry with good ground control is usually about:

ATen times the GSD
BIndependent of the GSD
CEqual to the flying height
DTwo to three times the GSD
Answer is hidden
Question 150 of 1100Ch 2 · Terrain Model Generation and Ortho Products

Radar remote sensing is valuable in the monsoon season because it:

ANeeds sunlight
BMeasures temperature directly
CWorks through cloud and rain, day or night
DHas a higher spatial resolution than optical sensors
Answer is hidden
Question 151 of 1100Ch 2 · Terrain Model Generation and Ortho Products

In SAR imagery, steep slopes facing the sensor that appear compressed exhibit:

ASpeckle
BShadow
CForeshortening
DLayover only
Answer is hidden
Question 152 of 1100Ch 2 · Terrain Model Generation and Ortho Products

Speckle in radar images is:

AA geometric distortion
BCaused by cloud cover
CRemoved by atmospheric correction
DGrainy noise inherent in coherent imaging, reduced by multi-looking or filtering
Answer is hidden
Question 153 of 1100Ch 2 · Terrain Model Generation and Ortho Products

Radar backscatter from a smooth water surface is:

AVery low, so water appears dark
BUnaffected by surface roughness
CThe same as from a city
DVery high, so water appears bright
Answer is hidden
Question 154 of 1100Ch 2 · Terrain Model Generation and Ortho Products

InSAR generates a DEM from:

AThe phase difference between two SAR images
BThe amplitude of a single image
CStereo optical images
DLaser pulse timing
Answer is hidden
Question 155 of 1100Ch 2 · Terrain Model Generation and Ortho Products

Differential InSAR (DInSAR) is used mainly to measure:

ALand cover classes
BSea surface colour
CVegetation indices
DGround deformation such as earthquake displacement or subsidence
Answer is hidden
Question 156 of 1100Ch 2 · Terrain Model Generation and Ortho Products

A true orthophoto differs from an ordinary orthophoto because it:

AUses no ground control
BIs printed in colour
CHas no map projection
DAlso corrects the lean of buildings using a DSM
Answer is hidden
Question 157 of 1100Ch 3 · Basic Geodesy

The geoid is best defined as:

AThe actual topographic surface
BA sphere of radius 6 371 km
CA mathematically defined ellipsoid of revolution
DAn equipotential surface of the earth's gravity field approximating mean sea level
Answer is hidden
Question 158 of 1100Ch 3 · Basic Geodesy

The surface used for the mathematical computation of geodetic positions is the:

AGeoid
BTopographic surface
CReference ellipsoid
DLevel surface through the station
Answer is hidden
Question 159 of 1100Ch 3 · Basic Geodesy

The flattening of the WGS84 ellipsoid is approximately:

A1/150
B1/500
C1/298.257
D1/1 000
Answer is hidden
Question 160 of 1100Ch 3 · Basic Geodesy

The height obtained directly from GNSS observations is:

AOrthometric height
BEllipsoidal height
CNormal-orthometric height
DDynamic height
Answer is hidden
Question 161 of 1100Ch 3 · Basic Geodesy

The relation between ellipsoidal height h, orthometric height H and geoid undulation N is:

Ah = H − 2N
BH = h + N
Ch = H + N
DN = h + H
Answer is hidden
Question 162 of 1100Ch 3 · Basic Geodesy

The angle between the plumb line and the ellipsoidal normal at a point is called the:

ADeflection of the vertical
BParallax
CGeoid undulation
DConvergence of meridians
Answer is hidden
Question 163 of 1100Ch 3 · Basic Geodesy

The meridian component of the deflection of the vertical is given by:

Aξ = Φ − φ
BN = h − H
Cη = Λ − λ
DA − α = η tan φ
Answer is hidden
Question 164 of 1100Ch 3 · Basic Geodesy

The Laplace condition relates the astronomical and geodetic azimuths by:

AA = α always
BA − α = ξ tan φ
CA + α = N/R
DA − α = η tan φ
Answer is hidden
Question 165 of 1100Ch 3 · Basic Geodesy

Orthometric height is measured from the:

AEllipsoid, along the normal
BGeoid, along the plumb line
CTopographic surface
DCentre of the earth
Answer is hidden
Question 166 of 1100Ch 3 · Basic Geodesy

The geoid undulation over the earth varies roughly within:

A±1 m
B±100 m
C±1 000 m
D±10 km
Answer is hidden
Question 167 of 1100Ch 3 · Basic Geodesy

Geocentric Cartesian (ECEF) coordinates have their origin at the:

AStation of observation
BCentre of the local ellipsoid only
CCentre of mass of the earth
DGreenwich observatory
Answer is hidden
Question 168 of 1100Ch 3 · Basic Geodesy

Satellite geodesy includes techniques such as:

AGNSS, VLBI, SLR and satellite altimetry
BSpirit levelling only
CPlane tabling and chaining
DCompass traversing
Answer is hidden
Question 169 of 1100Ch 3 · Basic Geodesy

The deflection of the vertical is largest:

AAt the equator only
BOver the open ocean
CWhere the geoid coincides with the ellipsoid
DIn mountainous regions with strong density and topographic variation
Answer is hidden
Question 170 of 1100Ch 3 · Mathematical and Geometrical Concepts of Geodesy

The flattening of an ellipsoid is defined as:

A(a + b)/a
B(a − b)/b
C(a − b)/a
Da/b
Answer is hidden
Question 171 of 1100Ch 3 · Mathematical and Geometrical Concepts of Geodesy

The first eccentricity squared of an ellipsoid is related to the flattening by:

Ae² = 2f − f²
Be² = f²
Ce² = 1 − f
De² = f/2
Answer is hidden
Question 172 of 1100Ch 3 · Mathematical and Geometrical Concepts of Geodesy

The radius of curvature in the prime vertical N compared with that in the meridian M is:

AEqual to M at the equator
BIndependent of latitude
CAlways greater than or equal to M
DAlways less than M
Answer is hidden
Question 173 of 1100Ch 3 · Mathematical and Geometrical Concepts of Geodesy

The radius of the parallel of latitude φ on an ellipsoid is:

AM cos φ
BN cos φ
CN sin φ
Da cos φ only
Answer is hidden
Question 174 of 1100Ch 3 · Mathematical and Geometrical Concepts of Geodesy

A short arc along a meridian is given by:

AN cos φ dλ
Ba dλ
CN dφ
DM dφ
Answer is hidden
Question 175 of 1100Ch 3 · Mathematical and Geometrical Concepts of Geodesy

The length of one degree of longitude at the equator is approximately:

A110.6 km
B60 km
C111.7 km
D111.3 km
Answer is hidden
Question 176 of 1100Ch 3 · Mathematical and Geometrical Concepts of Geodesy

The classical ellipsoid used for the geodetic system of Nepal and India is:

ABessel 1841
BEverest 1830
CClarke 1866
DGRS80
Answer is hidden
Question 177 of 1100Ch 3 · Mathematical and Geometrical Concepts of Geodesy

The shortest line between two points on the ellipsoid is called the:

ANormal section
BRhumb line
CGeodesic
DGreat circle
Answer is hidden
Question 178 of 1100Ch 3 · Mathematical and Geometrical Concepts of Geodesy

The two reciprocal normal sections between two points differ because:

AThe points are at the same latitude
BThe earth is a perfect sphere
CThe normals at the two points generally do not intersect
DOf atmospheric refraction
Answer is hidden
Question 179 of 1100Ch 3 · Mathematical and Geometrical Concepts of Geodesy

Computing the coordinates of a second point from a known point, an azimuth and a distance on the ellipsoid is called the:

ADatum transformation
BDirect (forward) geodetic problem
CInverse geodetic problem
DResection
Answer is hidden
Question 180 of 1100Ch 3 · Mathematical and Geometrical Concepts of Geodesy

Vincenty's formulae are used for:

AAccurate solution of geodetic problems on the ellipsoid over long distances
BLevelling computations
CMap projection of small areas
DGravity reduction
Answer is hidden
Question 181 of 1100Ch 3 · Mathematical and Geometrical Concepts of Geodesy

A local (non-geocentric) ellipsoid is selected so that it:

AIs a perfect sphere
BFits the geoid closely over the region concerned
CGives the largest deflections of the vertical
DHas its centre at the earth's centre of mass
Answer is hidden
Question 182 of 1100Ch 3 · Mathematical and Geometrical Concepts of Geodesy

GRS80 and WGS84 differ mainly in their:

AUnits of measurement
BFlattening, by a negligible amount
CSemi-major axis, by several kilometres
DOrigin, by hundreds of metres
Answer is hidden
Question 183 of 1100Ch 3 · Datum, Coordinate Systems and Projections

A geodetic datum is defined by:

AThe scale of the map
BOnly the semi-major axis
COnly the map projection used
DAn ellipsoid together with its position and orientation relative to the earth
Answer is hidden
Question 184 of 1100Ch 3 · Datum, Coordinate Systems and Projections

ITRF2014 is an example of a:

AMap projection
BGeoid model
CReference frame (realisation of a system)
DReference system definition
Answer is hidden
Question 185 of 1100Ch 3 · Datum, Coordinate Systems and Projections

Coordinates in ITRF are always quoted with an epoch because:

AThe projection changes
BGPS satellites change orbit
CThe tectonic plates and hence the stations move with time
DThe ellipsoid changes every year
Answer is hidden
Question 186 of 1100Ch 3 · Datum, Coordinate Systems and Projections

A seven-parameter Helmert transformation consists of:

AThree translations only
BThree rotations only
CThree translations, three rotations and one scale factor
DSeven translations
Answer is hidden
Question 187 of 1100Ch 3 · Datum, Coordinate Systems and Projections

A rotation matrix used in coordinate transformation has a determinant of:

A0
B−1
CAny value
D+1
Answer is hidden
Question 188 of 1100Ch 3 · Datum, Coordinate Systems and Projections

A reflection matrix is required when:

AThe rotation angles are small
BOnly a translation is needed
CThe scale factor is unity
DThe handedness of the coordinate system is reversed
Answer is hidden
Question 189 of 1100Ch 3 · Datum, Coordinate Systems and Projections

A projection that preserves angles and the shape of small features is called:

AEquidistant
BAzimuthal
CEqual-area
DConformal
Answer is hidden
Question 190 of 1100Ch 3 · Datum, Coordinate Systems and Projections

The width of each UTM zone is:

A15°
B6° of longitude
C3°
D10°
Answer is hidden
Question 191 of 1100Ch 3 · Datum, Coordinate Systems and Projections

The scale factor at the central meridian of a UTM zone is:

A0.9999
B1.0004
C1.0000
D0.9996
Answer is hidden
Question 192 of 1100Ch 3 · Datum, Coordinate Systems and Projections

The false easting assigned to the central meridian in UTM is:

A10 000 000 m
B1 000 000 m
C0 m
D500 000 m
Answer is hidden
Question 193 of 1100Ch 3 · Datum, Coordinate Systems and Projections

Nepal's Modified UTM (MUTM) uses zones of width:

A10° centred on Kathmandu
B1° with any central meridian
C6° with central meridians at 81° and 87° E
D3° with central meridians at 81°, 84° and 87° E
Answer is hidden
Question 194 of 1100Ch 3 · Datum, Coordinate Systems and Projections

The ellipsoid used with Nepal's classical MUTM system is:

AEverest 1830
BWGS84
CClarke 1866
DGRS80
Answer is hidden
Question 195 of 1100Ch 3 · Datum, Coordinate Systems and Projections

The angle between grid north and true north at a point is called the:

AMagnetic declination
BGrid convergence
CDeflection of the vertical
DScale factor
Answer is hidden
Question 196 of 1100Ch 3 · Physical Geodesy

Gravity at a point on the earth is the resultant of:

AGravitational attraction only
BGravitational attraction and centrifugal acceleration
CMagnetic and gravitational forces
DCentrifugal acceleration only
Answer is hidden
Question 197 of 1100Ch 3 · Physical Geodesy

The value of gravity is greatest:

AOn high mountains
BAt the poles
CAt 45° latitude
DAt the equator
Answer is hidden
Question 198 of 1100Ch 3 · Physical Geodesy

One milligal (mGal) equals:

A10⁻³ m/s²
B10⁻⁵ m/s²
C10⁻⁸ m/s²
D1 cm/s²
Answer is hidden
Question 199 of 1100Ch 3 · Physical Geodesy

Level surfaces of the earth's gravity field are:

AStraight planes
BExactly parallel everywhere
CPerpendicular to the ellipsoid normal
DNot parallel to one another
Answer is hidden
Question 200 of 1100Ch 3 · Physical Geodesy

A plumb line is:

AThe line of sight of a level
BA straight line to the earth's centre
CA curved line orthogonal to all level surfaces
DParallel to the ellipsoidal normal everywhere
Answer is hidden
Question 201 of 1100Ch 3 · Physical Geodesy

Normal gravity is the gravity of:

AThe geoid at the equator
BThe actual topographic surface
CThe normal (level) ellipsoid of the same mass and rotation as the earth
DA homogeneous sphere of radius 6 371 km
Answer is hidden
Question 202 of 1100Ch 3 · Physical Geodesy

The free-air correction to observed gravity is about:

A0.1119 mGal per metre
B0.3086 mGal per metre of height
C3.086 mGal per metre
D0.0419 mGal per metre
Answer is hidden
Question 203 of 1100Ch 3 · Physical Geodesy

The Bouguer correction accounts for the:

AHeight of the station only
BTidal attraction of the moon
CAttraction of the mass of rock between the station and the geoid
DRotation of the earth
Answer is hidden
Question 204 of 1100Ch 3 · Physical Geodesy

The terrain correction applied to gravity observations is:

AAlways positive
BNegative in valleys only
CZero on a hill
DAlways negative
Answer is hidden
Question 205 of 1100Ch 3 · Physical Geodesy

Bruns' formula relates the geoid undulation to the:

ADisturbing potential divided by normal gravity
BFree-air anomaly divided by height
CTerrain correction
DBouguer anomaly
Answer is hidden
Question 206 of 1100Ch 3 · Physical Geodesy

Stokes' integral is used to compute the:

ANormal gravity from latitude
BOrthometric height from GNSS alone
CDeflection of the vertical from levelling
DGeoid undulation from gravity anomalies
Answer is hidden
Question 207 of 1100Ch 3 · Physical Geodesy

A good national geoid model is important because it allows:

AMap projections to be avoided
BGNSS ellipsoidal heights to be converted into orthometric heights
CGravity to be ignored
DLevelling to be abandoned in all cases
Answer is hidden
Question 208 of 1100Ch 3 · Physical Geodesy

Isostatic gravity anomalies are close to zero where:

AGravity has not been measured
BThe station is at sea level
CThe terrain correction is large
DThe topography is isostatically compensated
Answer is hidden
Question 209 of 1100Ch 3 · Gravimetry and the Gravity Field of the Earth

Outside the attracting masses, the gravitational potential satisfies:

ALaplace's equation ∇²V = 0
BThe wave equation
CPoisson's equation ∇²V = −4πGρ
DClairaut's theorem
Answer is hidden
Question 210 of 1100Ch 3 · Gravimetry and the Gravity Field of the Earth

The earth's external gravity field is conveniently represented by a series of:

ASpherical harmonics
BLegendre transforms of pressure
CFourier series in time
DTaylor polynomials in height
Answer is hidden
Question 211 of 1100Ch 3 · Gravimetry and the Gravity Field of the Earth

Spherical harmonics with order m = 0 are called:

ANormal harmonics
BTesseral harmonics
CSectorial harmonics
DZonal harmonics
Answer is hidden
Question 212 of 1100Ch 3 · Gravimetry and the Gravity Field of the Earth

The coefficient C̄₂₀ of the spherical harmonic expansion is closely related to the earth's:

ARotation period
BMean density only
CMagnetic field
DFlattening (dynamic form factor J₂)
Answer is hidden
Question 213 of 1100Ch 3 · Gravimetry and the Gravity Field of the Earth

Clairaut's theorem allows the determination of the earth's flattening from:

AAstronomical time observations only
BLevelling networks
CGravity measurements
DMagnetic surveys
Answer is hidden
Question 214 of 1100Ch 3 · Gravimetry and the Gravity Field of the Earth

A free-fall (ballistic) instrument that determines the value of g directly is an:

AGradiometer only
BInclinometer
CAbsolute gravimeter
DRelative gravimeter
Answer is hidden
Question 215 of 1100Ch 3 · Gravimetry and the Gravity Field of the Earth

A spring-type LaCoste-Romberg or Scintrex instrument measures:

AGeoid undulation
BDifferences of gravity between stations
CThe deflection of the vertical
DAbsolute gravity directly
Answer is hidden
Question 216 of 1100Ch 3 · Gravimetry and the Gravity Field of the Earth

Readings of a relative gravimeter are repeated at a base station during a survey in order to:

ADetermine and remove the instrument drift
BDetermine the latitude
CMeasure the terrain correction
DCalibrate the GPS receiver
Answer is hidden
Question 217 of 1100Ch 3 · Gravimetry and the Gravity Field of the Earth

The GRACE and GRACE-FO satellite missions are used mainly to observe:

ASea surface colour
BIonospheric delay
CTime variations of the earth's gravity field
DThe static field at very high resolution only
Answer is hidden
Question 218 of 1100Ch 3 · Gravimetry and the Gravity Field of the Earth

In the Airy-Heiskanen model of isostasy:

AMountains have roots proportional to their height, with constant crustal density
BThe depth of compensation is constant and density varies
CCompensation is purely regional and elastic
DThere is no compensation at all
Answer is hidden
Question 219 of 1100Ch 3 · Gravimetry and the Gravity Field of the Earth

The isostatic gravity anomaly in a region that is fully compensated is:

AStrongly positive
BClose to zero
CEqual to the free-air anomaly
DStrongly negative
Answer is hidden
Question 220 of 1100Ch 3 · Gravimetry and the Gravity Field of the Earth

Complete Bouguer anomalies over high mountain ranges are typically:

AStrongly negative
BEqual to the free-air anomaly
CExactly zero
DStrongly positive
Answer is hidden
Question 221 of 1100Ch 3 · Gravimetry and the Gravity Field of the Earth

The crustal root beneath the Himalaya is of the order of:

A2 km
B7 km
C700 km
D70 km
Answer is hidden
Question 222 of 1100Ch 3 · Field Astronomy and Time Systems

The obliquity of the ecliptic is approximately:

A23.44°
B90°
C66.5°
D45°
Answer is hidden
Question 223 of 1100Ch 3 · Field Astronomy and Time Systems

The point where the sun crosses the celestial equator moving northwards is the:

AVernal equinox (First Point of Aries)
BZenith
CSummer solstice
DAutumnal equinox
Answer is hidden
Question 224 of 1100Ch 3 · Field Astronomy and Time Systems

Which pair of celestial coordinates is independent of both the observer's position and time?

AAltitude and azimuth
BHour angle and declination
CZenith distance and azimuth
DRight ascension and declination
Answer is hidden
Question 225 of 1100Ch 3 · Field Astronomy and Time Systems

In the astronomical (PZS) triangle, the side from the pole to the star is:

AThe co-latitude (90° − φ)
BThe zenith distance
CThe polar distance (90° − δ)
DThe hour angle
Answer is hidden
Question 226 of 1100Ch 3 · Field Astronomy and Time Systems

Napier's rules of circular parts apply to:

AOnly equilateral triangles
BAny spherical triangle
CAny plane triangle
DRight-angled spherical triangles
Answer is hidden
Question 227 of 1100Ch 3 · Field Astronomy and Time Systems

The length of a sidereal day is:

A23 h 00 m
B24 h exactly
C23 h 56 m 04 s of mean solar time
D24 h 04 m
Answer is hidden
Question 228 of 1100Ch 3 · Field Astronomy and Time Systems

The local sidereal time is equal to the:

AHour angle of the sun
BLongitude of the observer
CRight ascension of the sun
DHour angle of the vernal equinox
Answer is hidden
Question 229 of 1100Ch 3 · Field Astronomy and Time Systems

The difference between apparent solar time and mean solar time is called the:

ASidereal correction
BAberration
CNutation
DEquation of time
Answer is hidden
Question 230 of 1100Ch 3 · Field Astronomy and Time Systems

UTC differs from TAI and from GPS time because UTC:

ARuns faster than atomic time
BHas no relation to the earth's rotation
CIncludes leap seconds to stay close to UT1
DIs not based on atomic clocks
Answer is hidden
Question 231 of 1100Ch 3 · Field Astronomy and Time Systems

Nepal standard time is based on the meridian:

A90° E, giving UTC + 6:00
B0°, giving UTC
C86° 15′ E, giving UTC + 5:45
D82° 30′ E, giving UTC + 5:30
Answer is hidden
Question 232 of 1100Ch 3 · Field Astronomy and Time Systems

The slow conical motion of the earth's axis with a period of about 26 000 years is called:

AAberration
BNutation
CPolar motion
DPrecession
Answer is hidden
Question 233 of 1100Ch 3 · Field Astronomy and Time Systems

The Chandler wobble, with a period of about 435 days, is a component of:

APrecession
BNutation
CRefraction
DPolar motion
Answer is hidden
Question 234 of 1100Ch 3 · Field Astronomy and Time Systems

Atmospheric refraction makes a celestial body appear:

ADisplaced only in azimuth
BLower than its true position
CUnchanged in altitude
DHigher than its true position, by about 34′ at the horizon
Answer is hidden
Question 235 of 1100Ch 4 · Introduction to Cadastre

A cadastre is best described as:

AA topographic map series
BA parcel-based, up-to-date land information system recording interests in land
CA register of buildings only
DA list of taxpayers without maps
Answer is hidden
Question 236 of 1100Ch 4 · Introduction to Cadastre

The basic unit of a cadastre is the:

ALand parcel
BSurvey sheet
CVillage
DDistrict
Answer is hidden
Question 237 of 1100Ch 4 · Introduction to Cadastre

Which of the following is NOT a component of a cadastral system?

AThe cadastral register/record
BThe cadastral map
CThe national topographic map series
DThe legal and institutional framework
Answer is hidden
Question 238 of 1100Ch 4 · Introduction to Cadastre

The modern parcel-based cadastre originated with the:

ARoman groma survey
BTorrens system (1858)
CDomesday Book
DNapoleonic cadastre of France (1807)
Answer is hidden
Question 239 of 1100Ch 4 · Introduction to Cadastre

In Nepal, the ownership certificate issued to a land owner is called the:

AKitta number
BField book
CLalpurja
DTrace map
Answer is hidden
Question 240 of 1100Ch 4 · Introduction to Cadastre

The parcel number used in Nepali cadastral records is known as the:

ARopani number
BWard number
CKitta number
DSheet number
Answer is hidden
Question 241 of 1100Ch 4 · Introduction to Cadastre

Transfer of ownership recorded in Nepali land records after a sale or inheritance is called:

ASubdivision (kitta kat)
BConsolidation
CMutation (namsari)
DAcquisition
Answer is hidden
Question 242 of 1100Ch 4 · Introduction to Cadastre

Cadastral survey and mapping in Nepal is carried out by the:

ASurvey Department and its survey offices
BLand Revenue (Malpot) Offices
CNepal Rastra Bank
DDepartment of Roads
Answer is hidden
Question 243 of 1100Ch 4 · Introduction to Cadastre

A general boundary, as opposed to a fixed boundary, is one that:

ACan never be changed
BIs precisely surveyed and legally guaranteed
CIs defined by physical features and shown approximately on the map
DHas no legal meaning at all
Answer is hidden
Question 244 of 1100Ch 4 · Introduction to Cadastre

The international standard data model for land administration is:

ALADAR
BWGS84
CISO 9001
DLADM (ISO 19152)
Answer is hidden
Question 245 of 1100Ch 4 · Introduction to Cadastre

Fit-for-purpose land administration emphasises: quickly

AAbandoning all legal frameworks
BFlexible, affordable and participatory methods such as orthophoto-based mapping to record rights
CMapping at 1:50 000 scale
DOnly high-precision fixed-boundary surveys
Answer is hidden
Question 246 of 1100Ch 4 · Introduction to Cadastre

Public display of the cadastral map and field book with a hearing of objections is carried out:

AOnly for government land
BOnly after ten years of use
CNever, to avoid disputes
DBefore the records are finalised and certificates issued
Answer is hidden
Question 247 of 1100Ch 4 · Introduction to Cadastre

A typical scale for cadastral mapping in dense urban areas is:

A1:25 000
B1:500
C1:50 000
D1:250 000
Answer is hidden
Question 248 of 1100Ch 4 · Land Administration

Land administration is defined as the processes of recording and disseminating information about:

AOnly the value of buildings
BThe ownership, value and use of land
COnly the ownership of land
DThe topography of the country
Answer is hidden
Question 249 of 1100Ch 4 · Land Administration

Which of the following is NOT one of the four functions of land administration?

AVehicle registration
BLand use
CLand value
DLand tenure
Answer is hidden
Question 250 of 1100Ch 4 · Land Administration

The main objective of land reform is to:

AImprove equity, tenure security and productivity in the use of land
BAbolish all private ownership
CIncrease the number of survey sheets
DRaise map accuracy
Answer is hidden
Question 251 of 1100Ch 4 · Land Administration

The Land Act of Nepal that introduced ceilings on land holdings and tenancy rights was enacted in:

A2019 B.S. (1963)
B2034 B.S. (1977)
C2021 B.S. (1964)
D2076 B.S. (2019)
Answer is hidden
Question 252 of 1100Ch 4 · Land Administration

The Birta system in Nepal was:

AIntroduced in 2021 B.S.
BAbolished as part of land reform
CA modern land information system
DA method of cadastral survey
Answer is hidden
Question 253 of 1100Ch 4 · Land Administration

Dual ownership in Nepali land reform refers to the situation where:

ALand is owned by a Guthi
BBoth the landowner and the registered tenant hold rights in the same parcel
CTwo people buy a plot together
DA parcel is mapped on two sheets
Answer is hidden
Question 254 of 1100Ch 4 · Land Administration

Land is considered a good base for taxation mainly because it is:

AEasily hidden
BImmovable and visible, so the tax is hard to evade
COf constant value everywhere
DNot owned by anyone
Answer is hidden
Question 255 of 1100Ch 4 · Land Administration

The tax paid at the time of registering the transfer of a land parcel is the:

ARegistration fee (stamp duty)
BAnnual land revenue
CCapital gains tax only
DBetterment levy
Answer is hidden
Question 256 of 1100Ch 4 · Land Administration

A common practical problem of land taxation in developing countries is:

AAssessed values far below market values
BValues far above market value
CAbsence of any land
DToo frequent revaluation
Answer is hidden
Question 257 of 1100Ch 4 · Land Administration

Informal land markets arise mainly where:

AAll land is owned by the state
BRights are unregistered and transfer procedures are costly or slow
CLand records are complete and cheap to use
DValuation is accurate
Answer is hidden
Question 258 of 1100Ch 4 · Land Administration

Which factor most strongly influences the price of urban land?

ALocation and accessibility with available services
BThe colour of the soil
CThe direction of the survey
DThe age of the cadastral sheet
Answer is hidden
Question 259 of 1100Ch 4 · Land Administration

Conversion of agricultural land into residential plots on the fringes of Kathmandu is mainly driven by:

AA shortage of surveyors
BSpeculation and demand for urban housing
CGovernment prohibition of building
DFalling land prices
Answer is hidden
Question 260 of 1100Ch 4 · Land Administration

A well-functioning formal land market requires above all:

AHigh transfer taxes
BProhibition of mortgages
CSecure, transferable rights and reliable public land information
DSecret land records
Answer is hidden
Question 261 of 1100Ch 4 · Land Tenure and Land Registration

Land tenure refers to:

AThe physical quality of the soil
BThe area of a parcel
CThe relationship among people with respect to land and the rules governing rights in it
DThe method of cadastral survey
Answer is hidden
Question 262 of 1100Ch 4 · Land Tenure and Land Registration

Guthi land in Nepal is:

AGovernment forest land
BLand held by foreign nationals
CLand owned by tenants
DLand endowed to a religious or philanthropic trust
Answer is hidden
Question 263 of 1100Ch 4 · Land Tenure and Land Registration

The communal tenure historically held by certain ethnic communities in Nepal, later converted to Raikar, was:

AGuthi
BKipat
CJagir
DBirta
Answer is hidden
Question 264 of 1100Ch 4 · Land Tenure and Land Registration

Registered tenancy rights in Nepali land law are known as:

AGuthi rights
BMohiyani (mohi) rights
CBirta rights
DKitta rights
Answer is hidden
Question 265 of 1100Ch 4 · Land Tenure and Land Registration

Tenure security is important mainly because it:

AEncourages investment and allows land to be used as collateral
BEliminates the need for registration
CIncreases the number of parcels
DReduces the accuracy required in survey
Answer is hidden
Question 266 of 1100Ch 4 · Land Tenure and Land Registration

In a deed registration system, what is recorded is:

AOnly the map of the parcel
BThe right itself, guaranteed by the state
COnly the tax paid
DThe transaction document, without a state guarantee of the right
Answer is hidden
Question 267 of 1100Ch 4 · Land Tenure and Land Registration

The Torrens system is an example of:

ALand consolidation
BInformal tenure
CDeed registration
DTitle registration
Answer is hidden
Question 268 of 1100Ch 4 · Land Tenure and Land Registration

The 'mirror principle' of title registration means that the register:

AIs a photographic copy of the map
BHides earlier transactions
CProvides compensation for errors
DReflects accurately and completely the current facts about the title
Answer is hidden
Question 269 of 1100Ch 4 · Land Tenure and Land Registration

The 'curtain principle' implies that a purchaser:

AMust search the whole chain of deeds
BMust obtain a court order
CNeed not investigate transactions behind the register
DCannot inspect the register
Answer is hidden
Question 270 of 1100Ch 4 · Land Tenure and Land Registration

Compensation to a person who suffers loss because the register was wrong is provided under the:

ACurtain principle
BMutation principle
CMirror principle
DInsurance (guarantee) principle
Answer is hidden
Question 271 of 1100Ch 4 · Land Tenure and Land Registration

A major demerit of title registration is that it:

AGives no certainty of ownership
BCannot support mortgages
CRequires a chain of title searches
DIs expensive and slow to establish, needing systematic survey and adjudication
Answer is hidden
Question 272 of 1100Ch 4 · Land Tenure and Land Registration

In Nepal, transactions in land are registered at the:

AMunicipality only
BLand Revenue (Malpot) Office
CDistrict Court only
DSurvey Office
Answer is hidden
Question 273 of 1100Ch 4 · Land Tenure and Land Registration

The greatest practical danger to any land registration system is that:

ABoundaries are surveyed too accurately
BRegistration is compulsory
CThe register is not kept up to date with reality
DToo many people consult it
Answer is hidden
Question 274 of 1100Ch 4 · Land Information System

A land information system differs from a general GIS mainly because it is:

AOnly used for topography
BParcel-based and legally oriented
CRestricted to raster data
DUnable to handle maps
Answer is hidden
Question 275 of 1100Ch 4 · Land Information System

The most valuable and expensive component of a land information system is usually the:

AHardware
BSoftware
CData
DOffice furniture
Answer is hidden
Question 276 of 1100Ch 4 · Land Information System

The element that links spatial and attribute records in an LIS is the:

AUnique parcel identifier
BSheet size
CName of the surveyor
DScale of the map
Answer is hidden
Question 277 of 1100Ch 4 · Land Information System

Which of the following is a measure of data quality in an LIS?

ACurrency (up-to-dateness)
BThe number of computers
CThe colour of the map
DThe size of the office
Answer is hidden
Question 278 of 1100Ch 4 · Land Information System

Information describing the content, quality and lineage of a dataset is called:

AAttribute data
BMetadata
CA parcel identifier
DRaster data
Answer is hidden
Question 279 of 1100Ch 4 · Land Information System

Converting existing paper cadastral sheets into the LIS involves:

AScanning, digitising and georeferencing
BOnly typing owner names
CDeleting the old records
DOnly new field surveys
Answer is hidden
Question 280 of 1100Ch 4 · Land Information System

Maintenance of an LIS should be:

ALimited to the attribute database
BTransaction-driven, updating spatial and textual records together
CLeft to the land owners
DCarried out once every twenty years
Answer is hidden
Question 281 of 1100Ch 4 · Land Information System

An LIS that is not regularly updated:

ANeeds no legal framework
BIs preferred by banks
CBecomes more accurate with time
DQuickly loses its value and can mislead users
Answer is hidden
Question 282 of 1100Ch 4 · Land Information System

Which stakeholder uses land information mainly to assess collateral?

AUtility companies
BThe judiciary
CBanks and financial institutions
DSchools
Answer is hidden
Question 283 of 1100Ch 4 · Land Information System

Online search of parcel information and application for mutation are examples of:

AQuality control
BAdjudication
CDissemination through e-services
DData capture
Answer is hidden
Question 284 of 1100Ch 4 · Land Information System

A policy issue in disseminating land information is the balance between:

AScale and projection
BMetres and feet
CRaster and vector formats
DTransparency and the privacy of personal data
Answer is hidden
Question 285 of 1100Ch 4 · Land Information System

A pilot project is normally carried out before full LIS implementation in order to:

ADelay the project
BTest the design, workflows and costs on a limited area
CAvoid training staff
DReplace the legal framework
Answer is hidden
Question 286 of 1100Ch 4 · Land Information System

The major institutional challenge for land records in Nepal is:

AExcessive accuracy of old maps
BToo few land transactions
CCoordination between the survey offices and the land revenue offices
DLack of any land parcels
Answer is hidden
Question 287 of 1100Ch 4 · Land Use and Land Valuation

The difference between land cover and land use is that land use describes:

AThe elevation of the land
BThe purpose for which people use the land
CThe soil type only
DThe physical material covering the ground
Answer is hidden
Question 288 of 1100Ch 4 · Land Use and Land Valuation

Land use planning is best described as:

ASurveying boundaries
BSystematic assessment of land potential and alternatives to select the best land use
CPreparing a cadastral map
DValuing land for taxation
Answer is hidden
Question 289 of 1100Ch 4 · Land Use and Land Valuation

The Act that requires classification of land into land use zones in Nepal is the:

ALand Revenue Act, 2034
BLand Use Act, 2076
CLand Act, 2021
DLand Acquisition Act, 2034
Answer is hidden
Question 290 of 1100Ch 4 · Land Use and Land Valuation

Land consolidation is mainly applied to:

AForest land only
BPublic buildings
CUrban unserviced land
DFragmented agricultural holdings in rural areas
Answer is hidden
Question 291 of 1100Ch 4 · Land Use and Land Valuation

In land pooling (land readjustment), the land owners:

AReceive smaller but serviced and more valuable plots after contributing land for infrastructure
BMust sell their land to the government
CRetain exactly the same plot
DAre paid full cash compensation and lose their land
Answer is hidden
Question 292 of 1100Ch 4 · Land Use and Land Valuation

A major advantage of land pooling over compulsory acquisition is that it:

ANeeds no planning
BRequires little or no cash compensation and keeps owners in the project
CAvoids the need for survey
DIs always faster
Answer is hidden
Question 293 of 1100Ch 4 · Land Use and Land Valuation

The FAO Voluntary Guidelines (VGGT) of 2012 deal with:

ABuilding materials
BMap projections
CResponsible governance of tenure of land, fisheries and forests
DSatellite orbits
Answer is hidden
Question 294 of 1100Ch 4 · Land Use and Land Valuation

Which is the commonest cause of land disputes between neighbours?

ABoundary and encroachment disagreements
BMap projection differences
CSoil fertility
DDistance from the highway
Answer is hidden
Question 295 of 1100Ch 4 · Land Use and Land Valuation

The preferred first approach to resolving a land conflict is usually:

AImmediate court action
BEviction without notice
CNegotiation or mediation before going to court
DRe-survey of the whole district
Answer is hidden
Question 296 of 1100Ch 4 · Land Use and Land Valuation

The most widely used method of valuing residential land is the:

AComparative (sales comparison) method
BResidual method
CIncome capitalisation method
DProfit method
Answer is hidden
Question 297 of 1100Ch 4 · Land Use and Land Valuation

The income capitalisation method computes value as:

AArea multiplied by a fixed rate
BNet annual income divided by the capitalisation rate
CSale price minus development cost
DCost of construction plus land
Answer is hidden
Question 298 of 1100Ch 4 · Land Use and Land Valuation

Mass appraisal (CAMA) is used mainly for:

AValuing a single heritage building
BLand pooling design
CValuing large numbers of properties for taxation
DCadastral survey
Answer is hidden
Question 299 of 1100Ch 4 · Land Use and Land Valuation

Compensation for land acquired for a public purpose in Nepal is determined under the:

ALand Acquisition Act, 2034
BGuthi Corporation Act, 2033
CCivil Code, 2074 only
DLand Use Act, 2076
Answer is hidden
Question 300 of 1100Ch 4 · Land Related Policies, Acts, Rules and Regulations

The legal basis for cadastral survey in Nepal is the:

ALand (Survey and Measurement) Act, 2019
BLand Act, 2021
CLand Revenue Act, 2034
DLand Use Act, 2076
Answer is hidden
Question 301 of 1100Ch 4 · Land Related Policies, Acts, Rules and Regulations

Ceilings on land holdings and tenancy rights are provided by the:

ALand Use Act, 2076
BGuthi Corporation Act, 2033
CCivil Code, 2074
DLand Act, 2021
Answer is hidden
Question 302 of 1100Ch 4 · Land Related Policies, Acts, Rules and Regulations

Registration of land transactions and collection of land revenue are governed by the:

ALand Use Act, 2076
BPublic Roads Act
CLand Revenue Act, 2034
DLand Acquisition Act, 2034
Answer is hidden
Question 303 of 1100Ch 4 · Land Related Policies, Acts, Rules and Regulations

Acquisition of private land for a public purpose with compensation is governed by the:

ALand Acquisition Act, 2034
BLand Use Act, 2076
CLand Act, 2021
DLand (Survey and Measurement) Act, 2019
Answer is hidden
Question 304 of 1100Ch 4 · Land Related Policies, Acts, Rules and Regulations

Restrictions on plotting agricultural land and on changing land use are contained in the:

ALand Use Act, 2076 and its Regulation
BBuilding Act
CGuthi Corporation Act, 2033
DLand Revenue Act, 2034
Answer is hidden
Question 305 of 1100Ch 4 · Land Related Policies, Acts, Rules and Regulations

Management and protection of trust land in Nepal comes under the:

ALand Act, 2021
BGuthi Corporation Act, 2033
CForest Act
DCivil Code
Answer is hidden
Question 306 of 1100Ch 4 · Land Related Policies, Acts, Rules and Regulations

The right to property in Nepal is guaranteed by the:

ALocal Government Operation Act, 2074
BConstitution of Nepal, 2072
CLand Revenue Act, 2034
DLand Use Policy, 2072
Answer is hidden
Question 307 of 1100Ch 4 · Land Related Policies, Acts, Rules and Regulations

Damaging or removing a cadastral boundary mark is:

AA punishable offence under the survey law
BPermitted with the owner's consent
CNot covered by any law
DAllowed during ploughing
Answer is hidden
Question 308 of 1100Ch 4 · Land Related Policies, Acts, Rules and Regulations

Public display of the cadastral records and an objection period are required because they:

AGive owners the opportunity to check and correct the records before finalisation
BDelay the survey deliberately
CReplace the need for demarcation
DRaise revenue
Answer is hidden
Question 309 of 1100Ch 4 · Land Related Policies, Acts, Rules and Regulations

Property tax and building permits in Nepal are mainly the responsibility of:

AThe Survey Department
BNepal Rastra Bank
CLocal governments (municipalities and rural municipalities)
DThe Ministry of Foreign Affairs
Answer is hidden
Question 310 of 1100Ch 4 · Land Related Policies, Acts, Rules and Regulations

The umbrella policy dealing with tenure security, land records modernisation and the landless is the:

AMonetary Policy
BNational Land Policy, 2075
CNational Building Code
DIndustrial Policy
Answer is hidden
Question 311 of 1100Ch 4 · Land Related Policies, Acts, Rules and Regulations

A land development project may additionally require:

ANo approval of any kind
BOnly a survey certificate
CApproval of the Survey Department alone
DEnvironmental assessment (IEE/EIA) under the Environment Protection Act
Answer is hidden
Question 312 of 1100Ch 4 · Land Related Policies, Acts, Rules and Regulations

When quoting provisions of Nepali land law in practice, an engineer should:

AAssume the law never changes
BRely on an old textbook
CUse Indian law instead
DCheck the latest amendments of the Act and Rules
Answer is hidden
Question 313 of 1100Ch 5 · Fundamentals and Principles of GNSS

The minimum number of satellites required for a three-dimensional GNSS position fix is:

AFive
BThree
CSix
DFour
Answer is hidden
Question 314 of 1100Ch 5 · Fundamentals and Principles of GNSS

The measured distance to a GNSS satellite is called a pseudorange because it contains:

ANo errors at all
BThe receiver clock error
COnly atmospheric delay
DThe satellite orbit only
Answer is hidden
Question 315 of 1100Ch 5 · Fundamentals and Principles of GNSS

The orbital altitude of GPS satellites is approximately:

A20 200 km
B1 000 km
C36 000 km
D800 km
Answer is hidden
Question 316 of 1100Ch 5 · Fundamentals and Principles of GNSS

The reference system used by GPS is:

AWGS84
BCGCS2000
CPZ-90
DGTRF
Answer is hidden
Question 317 of 1100Ch 5 · Fundamentals and Principles of GNSS

Which system is a satellite-based augmentation system serving the South Asian region?

AGAGAN
BMSAS
CWAAS
DEGNOS
Answer is hidden
Question 318 of 1100Ch 5 · Fundamentals and Principles of GNSS

The measurement noise of the carrier-phase observable is of the order of:

A1–2 mm
B30 cm
C10 m
D3 m
Answer is hidden
Question 319 of 1100Ch 5 · Fundamentals and Principles of GNSS

The main difficulty in using the carrier phase observable is:

AIts very high noise
BIts inability to be tracked
CThe unknown integer ambiguity and cycle slips
DIts low data rate
Answer is hidden
Question 320 of 1100Ch 5 · Fundamentals and Principles of GNSS

The ionospheric effect on the GPS signal:

ADelays the code but advances the carrier phase
BHas no effect on either
CAdvances both equally
DDelays both equally
Answer is hidden
Question 321 of 1100Ch 5 · Fundamentals and Principles of GNSS

Doppler observations in GNSS are used mainly to determine:

AInteger ambiguities
BVelocity and receiver clock drift
CGeoid undulation
DAntenna phase-centre offsets
Answer is hidden
Question 322 of 1100Ch 5 · Fundamentals and Principles of GNSS

GNSS signals are transmitted with:

AVertical linear polarisation
BNo polarisation
CHorizontal linear polarisation
DRight-hand circular polarisation
Answer is hidden
Question 323 of 1100Ch 5 · Fundamentals and Principles of GNSS

A choke-ring antenna is used mainly to:

AEliminate the ionospheric delay
BReduce the cost of the receiver
CIncrease the transmitted power
DSuppress multipath from reflecting surfaces below the antenna
Answer is hidden
Question 324 of 1100Ch 5 · Fundamentals and Principles of GNSS

The point to which GNSS measurements physically refer on the antenna is the:

ATop of the tripod
BAntenna reference point (ARP), corrected by phase-centre offsets
CCentre of the ground plane cable
DBattery terminal
Answer is hidden
Question 325 of 1100Ch 5 · Fundamentals and Principles of GNSS

The standard format for exchanging raw GNSS observations for post-processing is:

ASP3 only
BRINEX
CNMEA
DRTCM
Answer is hidden
Question 326 of 1100Ch 5 · Mathematical Models of GNSS Positioning

In single-point positioning, the unknowns solved for are:

AThree coordinates only
BThe satellite clock errors
CFour coordinates
DThree coordinates and the receiver clock error
Answer is hidden
Question 327 of 1100Ch 5 · Mathematical Models of GNSS Positioning

Typical accuracy of single-point (autonomous) code positioning is:

A1–3 cm
B3–10 m
C1 mm
D100 m
Answer is hidden
Question 328 of 1100Ch 5 · Mathematical Models of GNSS Positioning

Precise Point Positioning (PPP) achieves centimetre accuracy with one receiver by using:

AA nearby base station
BCode observations only
CThe almanac only
DDual-frequency carrier phase with precise orbits and clocks
Answer is hidden
Question 329 of 1100Ch 5 · Mathematical Models of GNSS Positioning

In relative positioning, the quantity determined directly is the:

AGeoid undulation
BSatellite orbit
CBaseline vector between the two receivers
DAbsolute position of the rover only
Answer is hidden
Question 330 of 1100Ch 5 · Mathematical Models of GNSS Positioning

Differencing between two receivers observing the same satellite eliminates the:

AMultipath at both stations
BReceiver clock error
CSatellite clock error
DInteger ambiguity
Answer is hidden
Question 331 of 1100Ch 5 · Mathematical Models of GNSS Positioning

The accuracy specification '5 mm + 1 ppm' means that the error grows with:

AThe observation time
BThe length of the baseline
CThe number of satellites
DThe antenna height
Answer is hidden
Question 332 of 1100Ch 5 · Mathematical Models of GNSS Positioning

The six Keplerian elements describing a satellite orbit include:

ASemi-major axis, eccentricity, inclination, node, argument of perigee and mean anomaly
BThe three coordinates and three velocities only
CThe DOP values
DLatitude, longitude, height, time, clock and drift
Answer is hidden
Question 333 of 1100Ch 5 · Mathematical Models of GNSS Positioning

The largest perturbation of a GNSS satellite orbit is caused by:

AOcean tides
BThe earth's oblateness (J₂)
CAtmospheric drag
DSolar radiation pressure
Answer is hidden
Question 334 of 1100Ch 5 · Mathematical Models of GNSS Positioning

The accuracy of the broadcast ephemeris is of the order of:

A1 mm
B2–3 cm
C1–2 m
D100 m
Answer is hidden
Question 335 of 1100Ch 5 · Mathematical Models of GNSS Positioning

Precise IGS orbits are distributed in which format?

ARINEX
BRTCM
CNMEA
DSP3
Answer is hidden
Question 336 of 1100Ch 5 · Mathematical Models of GNSS Positioning

The almanac transmitted by GNSS satellites is used mainly for:

ASatellite acquisition and mission planning
BIonospheric correction
CAmbiguity resolution
DPrecise baseline processing
Answer is hidden
Question 337 of 1100Ch 5 · Mathematical Models of GNSS Positioning

Converting a GNSS ellipsoidal height into an orthometric height requires a:

ADatum transformation only
BGeoid model
CMap projection
DClock correction
Answer is hidden
Question 338 of 1100Ch 5 · Mathematical Models of GNSS Positioning

Precise GNSS coordinates must be quoted with an epoch because:

AThe ellipsoid changes
BStations move with the tectonic plates
CReceivers drift in temperature
DSatellites change their orbits daily
Answer is hidden
Question 339 of 1100Ch 5 · GNSS Signals, Combinations and Error Sources

The GPS L1 carrier frequency is:

A1 176.45 MHz
B1 575.42 MHz
C10.23 MHz
D1 227.60 MHz
Answer is hidden
Question 340 of 1100Ch 5 · GNSS Signals, Combinations and Error Sources

The chipping rate of the GPS C/A code is:

A1 575.42 MHz
B10.23 Mchips per second
C50 bits per second
D1.023 Mchips per second
Answer is hidden
Question 341 of 1100Ch 5 · GNSS Signals, Combinations and Error Sources

The GPS navigation message is transmitted at a rate of:

A500 bps
B50 bits per second
C1.023 Mbps
D10.23 Mbps
Answer is hidden
Question 342 of 1100Ch 5 · GNSS Signals, Combinations and Error Sources

Double differencing of carrier-phase observations eliminates:

AMultipath at both stations
BBoth the satellite and the receiver clock errors
CThe tropospheric delay completely
DOnly the satellite clock error
Answer is hidden
Question 343 of 1100Ch 5 · GNSS Signals, Combinations and Error Sources

Triple differencing is mainly useful for:

AResolving integer ambiguities precisely
BRemoving multipath
CImproving the orbit
DDetecting and repairing cycle slips
Answer is hidden
Question 344 of 1100Ch 5 · GNSS Signals, Combinations and Error Sources

The ionosphere-free linear combination of L1 and L2:

AReduces the noise level
BRemoves the tropospheric delay
CEliminates multipath
DRemoves almost all of the first-order ionospheric delay but loses the integer ambiguity
Answer is hidden
Question 345 of 1100Ch 5 · GNSS Signals, Combinations and Error Sources

The wide-lane combination is used because its long wavelength (≈ 86 cm):

ARemoves multipath
BEliminates the troposphere
CIncreases the data rate
DMakes integer ambiguity resolution easier
Answer is hidden
Question 346 of 1100Ch 5 · GNSS Signals, Combinations and Error Sources

Carrier smoothing of the code (Hatch filter) is used to:

AModel the troposphere
BReduce code noise and multipath using the precise carrier phase
CResolve integer ambiguities
DCorrect the satellite orbit
Answer is hidden
Question 347 of 1100Ch 5 · GNSS Signals, Combinations and Error Sources

The tropospheric delay in GNSS:

AIs dispersive like the ionosphere
BIs always negligible
CAffects only the L5 signal
DIs non-dispersive and cannot be removed by dual-frequency observations
Answer is hidden
Question 348 of 1100Ch 5 · GNSS Signals, Combinations and Error Sources

The zenith hydrostatic (dry) tropospheric delay is approximately:

A0.1 m
B10 m
C50 m
D2.3 m
Answer is hidden
Question 349 of 1100Ch 5 · GNSS Signals, Combinations and Error Sources

Multipath error in GNSS:

AIs the same at all stations and cancels
BOnly affects the navigation message
CIs removed by the ionosphere-free combination
DDepends on the site and does not cancel by differencing
Answer is hidden
Question 350 of 1100Ch 5 · GNSS Signals, Combinations and Error Sources

The ionospheric delay is proportional to:

AThe temperature only
BTEC divided by the square of the frequency
CThe square of the frequency
DThe satellite elevation only
Answer is hidden
Question 351 of 1100Ch 5 · GNSS Signals, Combinations and Error Sources

Selective Availability, the deliberate degradation of GPS accuracy, was switched off in:

A2005
B2010
CMay 2000
D1995
Answer is hidden
Question 352 of 1100Ch 5 · Satellite Geometry, DOP and Survey Quality Assurance

Dilution of precision (DOP) in GNSS describes the effect of:

AAtmospheric delay
BAntenna cable length
CSatellite geometry on positioning accuracy
DReceiver clock stability
Answer is hidden
Question 353 of 1100Ch 5 · Satellite Geometry, DOP and Survey Quality Assurance

A low value of PDOP indicates that the satellites are:

AFewer than four
BWidely spread across the sky
CAll at low elevation
DClustered in one part of the sky
Answer is hidden
Question 354 of 1100Ch 5 · Satellite Geometry, DOP and Survey Quality Assurance

Which PDOP value would be regarded as good for a survey?

ABelow 4
BExactly 10
CAny value
DAbove 8
Answer is hidden
Question 355 of 1100Ch 5 · Satellite Geometry, DOP and Survey Quality Assurance

VDOP is generally larger than HDOP because:

AThe geoid is unknown
BHeights use a different frequency
CAll satellites are above the horizon, weakening the vertical geometry
DThe vertical coordinate is measured last
Answer is hidden
Question 356 of 1100Ch 5 · Satellite Geometry, DOP and Survey Quality Assurance

The relation between the DOP values is:

ATDOP = PDOP − GDOP
BPDOP = HDOP + VDOP
CGDOP = HDOP × VDOP
DPDOP² = HDOP² + VDOP²
Answer is hidden
Question 357 of 1100Ch 5 · Satellite Geometry, DOP and Survey Quality Assurance

An elevation mask of 10°–15° is applied in GNSS surveys to:

AReduce the DOP to zero
BExclude low satellites with high atmospheric delay and multipath
CIncrease the number of satellites
DSave battery power only
Answer is hidden
Question 358 of 1100Ch 5 · Satellite Geometry, DOP and Survey Quality Assurance

Mission planning for a GNSS survey is carried out using:

AThe RINEX observation file
BThe precise ephemeris only
CThe geoid model
DA current almanac and the station's obstruction diagram
Answer is hidden
Question 359 of 1100Ch 5 · Satellite Geometry, DOP and Survey Quality Assurance

The antenna height in a GNSS survey should be:

AIgnored for RTK
BMeasured twice, with the measuring method recorded
CMeasured only at the end
DEstimated from the tripod type
Answer is hidden
Question 360 of 1100Ch 5 · Satellite Geometry, DOP and Survey Quality Assurance

A 'float' solution in RTK or baseline processing means that:

AThe solution is the most accurate possible
BThe base station is unknown
CThe antenna is not level
DThe integer ambiguities have not been resolved
Answer is hidden
Question 361 of 1100Ch 5 · Satellite Geometry, DOP and Survey Quality Assurance

Repeat observation of a baseline in a different session is done mainly to:

ASave time in the field
BReduce the number of control points
CProvide an independent check with a different satellite geometry
DAvoid the need for adjustment
Answer is hidden
Question 362 of 1100Ch 5 · Satellite Geometry, DOP and Survey Quality Assurance

Loop misclosures of independent baselines are used to:

ACompute the geoid undulation
BResolve integer ambiguities
CAssess the internal consistency and detect blunders
DSet the elevation mask
Answer is hidden
Question 363 of 1100Ch 5 · Satellite Geometry, DOP and Survey Quality Assurance

A GNSS control network is finally processed by:

ABowditch rule only
BGraphical plotting
CLeast-squares network adjustment with statistical testing
DSimple averaging of the coordinates
Answer is hidden
Question 364 of 1100Ch 5 · Satellite Geometry, DOP and Survey Quality Assurance

A GNSS survey report should state the datum, epoch and:

AThe weather forecast
BOnly the coordinates
CGeoid model, antenna calibration and processing parameters
DThe cost of the survey
Answer is hidden
Question 365 of 1100Ch 5 · Static and Kinematic Positioning

The most accurate GNSS positioning mode for establishing a geodetic control network is:

ADGNSS
BKinematic positioning
CSingle-point positioning
DStatic positioning
Answer is hidden
Question 366 of 1100Ch 5 · Static and Kinematic Positioning

Typical accuracy of static GNSS baseline determination is:

A10 cm + 50 ppm
B5 m
C1 m + 10 ppm
D3–5 mm + 0.5–1 ppm
Answer is hidden
Question 367 of 1100Ch 5 · Static and Kinematic Positioning

Rapid static positioning normally requires an occupation of:

AOne epoch only
B5–20 minutes on short baselines with dual-frequency receivers
CA few seconds
DSeveral hours
Answer is hidden
Question 368 of 1100Ch 5 · Static and Kinematic Positioning

In stop-and-go (semi-kinematic) surveying, the receiver must:

AObserve for 30 minutes at each point
BMaintain lock on the satellites while moving between points
CRe-initialise at every point
DBe switched off between points
Answer is hidden
Question 369 of 1100Ch 5 · Static and Kinematic Positioning

Pseudo-kinematic positioning improves the solution by:

ARemoving the troposphere
BUsing code observations only
CUsing two antennas at once
DRe-occupying each point after about an hour so that the satellite geometry changes
Answer is hidden
Question 370 of 1100Ch 5 · Static and Kinematic Positioning

Kinematic GNSS positioning typically achieves an accuracy of:

A1–5 mm over any distance
B10–50 m
C1–5 m
D1–5 cm
Answer is hidden
Question 371 of 1100Ch 5 · Static and Kinematic Positioning

Real-time kinematic (RTK) positioning provides horizontal accuracy of about:

A1 mm
B10 cm
C1–3 cm
D1 m
Answer is hidden
Question 372 of 1100Ch 5 · Static and Kinematic Positioning

Code-based differential GNSS (DGNSS) gives accuracy of about:

ASub-metre to a few metres
B1 cm
C50 m
D1 mm
Answer is hidden
Question 373 of 1100Ch 5 · Static and Kinematic Positioning

Corrections for RTK are commonly delivered over the internet using:

ARINEX
BNMEA
CNTRIP
DSP3
Answer is hidden
Question 374 of 1100Ch 5 · Static and Kinematic Positioning

Network RTK using several reference stations is valuable because it:

AEliminates the need for satellites
BWorks without communication
CModels the distance-dependent errors and extends the working range
DRemoves the need for any base data
Answer is hidden
Question 375 of 1100Ch 5 · Static and Kinematic Positioning

A continuously operating reference station (CORS) does NOT normally provide:

ARTK corrections
BReference frame realisation
CRINEX data for post-processing
DGround control marks for photogrammetry at every project site
Answer is hidden
Question 376 of 1100Ch 5 · Static and Kinematic Positioning

A CORS installation requires above all:

ADaily relocation
BA stable monument, calibrated geodetic antenna, continuous power and communication
CA moving platform
DA single-frequency receiver
Answer is hidden
Question 377 of 1100Ch 5 · Static and Kinematic Positioning

Continuous GNSS stations in Nepal are particularly valuable for:

AMonitoring crustal deformation and earthquake displacement
BMeasuring air temperature only
CReplacing cadastral records
DMapping land use classes
Answer is hidden
Question 378 of 1100Ch 5 · Positioning by Inertial Navigation System (INS)

An inertial measurement unit consists of:

AThree GNSS antennas
BA barometer and a compass
CTwo cameras and a laser
DThree accelerometers and three gyroscopes
Answer is hidden
Question 379 of 1100Ch 5 · Positioning by Inertial Navigation System (INS)

In an inertial navigation system, position is obtained from acceleration by:

ATrilateration
BDouble integration with respect to time
CDirect measurement
DSingle differentiation
Answer is hidden
Question 380 of 1100Ch 5 · Positioning by Inertial Navigation System (INS)

A strapdown INS differs from a gimballed system because the sensors are:

ALocated outside the vehicle
BReplaced by GNSS antennas
CMounted on a mechanically stabilised platform
DFixed to the vehicle body, with the rotations computed in software
Answer is hidden
Question 381 of 1100Ch 5 · Positioning by Inertial Navigation System (INS)

The fundamental limitation of an inertial navigation system is that its errors:

AAre constant forever
BDepend only on satellite geometry
CGrow with time (drift)
DDecrease with time
Answer is hidden
Question 382 of 1100Ch 5 · Positioning by Inertial Navigation System (INS)

Which is an advantage of INS over GNSS?

ANo need for initialisation
BLower cost in all cases
CBounded long-term accuracy
DHigh data rate, attitude output and immunity to signal blockage
Answer is hidden
Question 383 of 1100Ch 5 · Positioning by Inertial Navigation System (INS)

Attitude in a strapdown INS is commonly propagated using:

AA magnetic compass only
BPseudorange residuals
CQuaternions or a direction-cosine matrix
DThe geoid model
Answer is hidden
Question 384 of 1100Ch 5 · Positioning by Inertial Navigation System (INS)

A typical GNSS/INS error-state Kalman filter estimates:

AOnly the ionospheric delay
BPosition, velocity and attitude errors plus sensor biases
COnly the satellite orbits
DOnly the position
Answer is hidden
Question 385 of 1100Ch 5 · Positioning by Inertial Navigation System (INS)

In a Kalman filter, the matrix Q represents the:

AMeasurement noise covariance
BKalman gain
CProcess (system) noise covariance
DState transition matrix
Answer is hidden
Question 386 of 1100Ch 5 · Positioning by Inertial Navigation System (INS)

The Kalman gain determines:

AThe sampling rate of the IMU
BHow much weight is given to the new measurement relative to the prediction
CThe lever-arm offset
DThe number of satellites tracked
Answer is hidden
Question 387 of 1100Ch 5 · Positioning by Inertial Navigation System (INS)

The extended Kalman filter (EKF) is used when:

AThe system or measurement model is non-linear
BThere are no measurements
CThe state is constant
DThe noise is zero
Answer is hidden
Question 388 of 1100Ch 5 · Positioning by Inertial Navigation System (INS)

In loosely coupled GNSS/INS integration:

AThe GNSS position and velocity solutions update the INS
BRaw pseudoranges are used in the filter
CThe INS aids the receiver tracking loops
DNo filter is needed
Answer is hidden
Question 389 of 1100Ch 5 · Positioning by Inertial Navigation System (INS)

Tightly coupled integration is advantageous because it:

AEliminates multipath
BNeeds no Kalman filter
CRequires no IMU
DCan use raw measurements even when fewer than four satellites are visible
Answer is hidden
Question 390 of 1100Ch 5 · Positioning by Inertial Navigation System (INS)

Direct georeferencing of airborne LiDAR and photogrammetric sensors is achieved by:

AStar observation
BGNSS/INS integration providing position and attitude
CGround control points alone
DMagnetic compass and altimeter
Answer is hidden
Question 391 of 1100Ch 6 · Fundamentals of Cartography and Visualization

Cartography is defined by the ICA as the:

AStudy of place names only
BTechnique of aerial photography
CArt, science and technology of making and using maps
DScience of measuring the earth's gravity field
Answer is hidden
Question 392 of 1100Ch 6 · Fundamentals of Cartography and Visualization

A representation of a small area at large scale in which the curvature of the earth is neglected is called a:

AGlobe
BAtlas
CChart
DPlan
Answer is hidden
Question 393 of 1100Ch 6 · Fundamentals of Cartography and Visualization

The projection introduced in 1569 that made navigation by constant compass bearing possible is the:

AAlbers equal-area
BLambert conformal conic
CPolyconic
DMercator projection
Answer is hidden
Question 394 of 1100Ch 6 · Fundamentals of Cartography and Visualization

Which of the following is a thematic map?

AA topographic map sheet
BA cadastral plan
CA road atlas index
DA population density map
Answer is hidden
Question 395 of 1100Ch 6 · Fundamentals of Cartography and Visualization

A map at 1:5 000 compared with one at 1:250 000 is:

AAlways less accurate
BOf the same scale
CLarger scale with more detail over a smaller area
DSmaller scale with less detail
Answer is hidden
Question 396 of 1100Ch 6 · Fundamentals of Cartography and Visualization

If a map is enlarged so that its linear dimensions are doubled, its area becomes:

AUnchanged
BFour times
CEight times
DTwice
Answer is hidden
Question 397 of 1100Ch 6 · Fundamentals of Cartography and Visualization

Which scale representation remains correct after a map has been photographically reduced?

AThe graphical (bar) scale
BThe verbal scale
CThe representative fraction
DThe grid interval
Answer is hidden
Question 398 of 1100Ch 6 · Fundamentals of Cartography and Visualization

When a map is reduced in scale, the cartographer must:

AChange the datum
BGeneralize the content and redesign symbols and lettering
CKeep all symbols the same size
DAdd more detail
Answer is hidden
Question 399 of 1100Ch 6 · Fundamentals of Cartography and Visualization

Enlarging a 1:50 000 map to 1:10 000:

ADoes not increase its accuracy or detail
BChanges the projection
CImproves the positional accuracy
DCreates new detail automatically
Answer is hidden
Question 400 of 1100Ch 6 · Fundamentals of Cartography and Visualization

The stage of cartographic abstraction in which only certain features are retained is:

ASymbolisation
BSelection
CPrinting
DClassification
Answer is hidden
Question 401 of 1100Ch 6 · Fundamentals of Cartography and Visualization

Geovisualization is distinguished from traditional cartographic communication mainly by its:

AFixed symbolisation
BHigh interactivity and use for exploring unknown patterns
CAbsence of spatial data
DUse of paper only
Answer is hidden
Question 402 of 1100Ch 6 · Fundamentals of Cartography and Visualization

Nepal's national topographic base map series were produced at scales of:

A1:250 000 and 1:1 000 000
B1:100 and 1:200
C1:500 and 1:1 000
D1:25 000 and 1:50 000
Answer is hidden
Question 403 of 1100Ch 6 · Fundamentals of Cartography and Visualization

A cadastral map is used primarily as:

AA thematic map of soils
BA legal record of property boundaries
CA navigation chart
DA relief model
Answer is hidden
Question 404 of 1100Ch 6 · Map Projection and Map Sheet Numbering

Every map projection necessarily distorts:

ANothing, if carefully chosen
BOnly the colour of the map
COnly the sheet size
DAt least one of shape, area, distance and direction
Answer is hidden
Question 405 of 1100Ch 6 · Map Projection and Map Sheet Numbering

A projection that preserves angles and local shapes is called:

AConformal (orthomorphic)
BEquidistant
CAzimuthal
DEqual-area
Answer is hidden
Question 406 of 1100Ch 6 · Map Projection and Map Sheet Numbering

For a statistical map comparing areas of districts, the most appropriate projection is:

AConformal
BAzimuthal equidistant
CMercator
DEqual-area
Answer is hidden
Question 407 of 1100Ch 6 · Map Projection and Map Sheet Numbering

The scale factor of a projection is defined as:

ALocal scale divided by nominal scale
BArea of the map divided by area of the ground
CNominal scale divided by map size
DGrid convergence
Answer is hidden
Question 408 of 1100Ch 6 · Map Projection and Map Sheet Numbering

On Tissot's indicatrix for a conformal projection, an infinitesimal circle on the earth appears as:

AA square
BAn ellipse of constant area
CA circle of varying size
DA straight line
Answer is hidden
Question 409 of 1100Ch 6 · Map Projection and Map Sheet Numbering

The scale factor at the central meridian of a UTM zone is:

A0.9999
B0.9996
C1.0010
D1.0000
Answer is hidden
Question 410 of 1100Ch 6 · Map Projection and Map Sheet Numbering

Nepal's MUTM projection uses a central-meridian scale factor of:

A0.9996 with 6° zones
B1.0000 with 1° zones
C0.9999 with 3° zones
D0.9990 with 10° zones
Answer is hidden
Question 411 of 1100Ch 6 · Map Projection and Map Sheet Numbering

Areas of large north-south extent are best mapped with a:

APolar azimuthal projection
BNormal cylindrical projection
CNormal conical projection
DTransverse cylindrical projection
Answer is hidden
Question 412 of 1100Ch 6 · Map Projection and Map Sheet Numbering

Polar regions are normally mapped using:

APseudo-cylindrical projections
BConical projections
CNormal cylindrical projections
DAzimuthal (planar) projections
Answer is hidden
Question 413 of 1100Ch 6 · Map Projection and Map Sheet Numbering

The angle between grid north and true north on a projected map is the:

AScale factor
BDeflection of the vertical
CMagnetic declination
DGrid convergence
Answer is hidden
Question 414 of 1100Ch 6 · Map Projection and Map Sheet Numbering

An IMW 1:1 000 000 sheet covers:

A1° by 1°
B15′ by 15′
C4° by 4°
D6° of longitude by 4° of latitude
Answer is hidden
Question 415 of 1100Ch 6 · Map Projection and Map Sheet Numbering

In the sheet designation NH-45, the letter H indicates the:

AScale
BLongitude column
CHemisphere only
DLatitude band
Answer is hidden
Question 416 of 1100Ch 6 · Map Projection and Map Sheet Numbering

Web map tiles on the internet are commonly served in the:

ALambert conformal conic
BPolyconic
CAlbers equal-area
DWeb Mercator projection (EPSG:3857)
Answer is hidden
Question 417 of 1100Ch 6 · Cartographic Visualization

The first consideration in map design is the:

APrinting press available
BNumber of sheets
CPurpose of the map and its intended user
DColour of the paper
Answer is hidden
Question 418 of 1100Ch 6 · Cartographic Visualization

Figure-ground organisation in map design refers to:

AUsing only black and white
BDrawing the grid first
CMaking the area of interest stand out clearly from its surroundings
DPlacing the title at the top
Answer is hidden
Question 419 of 1100Ch 6 · Cartographic Visualization

Visual hierarchy in a map is created mainly by varying:

AProjection
BMap sheet number
CPaper thickness
DSize, lightness contrast, colour and detail
Answer is hidden
Question 420 of 1100Ch 6 · Cartographic Visualization

Data such as land-use categories with no inherent order are measured on a:

AInterval scale
BNominal scale
COrdinal scale
DRatio scale
Answer is hidden
Question 421 of 1100Ch 6 · Cartographic Visualization

Temperature in degrees Celsius is an example of data on a(n):

AOrdinal scale
BRatio scale
CInterval scale
DNominal scale
Answer is hidden
Question 422 of 1100Ch 6 · Cartographic Visualization

Which visual variable is best suited to showing quantitative differences?

AOrientation
BSize
CHue
DShape
Answer is hidden
Question 423 of 1100Ch 6 · Cartographic Visualization

Colour hue should not be used alone to show magnitude because hue:

AIs too expensive
BIs invisible on screens
CCannot be printed
DHas no inherent order
Answer is hidden
Question 424 of 1100Ch 6 · Cartographic Visualization

A choropleth map must be based on:

ARaw totals such as population counts
BStandardised data such as rates or densities
CElevation data only
DPoint observations only
Answer is hidden
Question 425 of 1100Ch 6 · Cartographic Visualization

The most appropriate map type for showing total population of towns is a:

AIsoline map
BProportional (graduated) symbol map
CChoropleth map
DCartogram of districts
Answer is hidden
Question 426 of 1100Ch 6 · Cartographic Visualization

Isolines such as contours or isohyets are used to represent:

ADiscrete nominal categories
BFlows between places
CA continuous surface
DAdministrative boundaries
Answer is hidden
Question 427 of 1100Ch 6 · Cartographic Visualization

A dasymetric map improves on a choropleth map by:

AShowing raw counts
BRemoving the legend
CUsing larger enumeration units
DUsing ancillary data so that boundaries follow the real distribution
Answer is hidden
Question 428 of 1100Ch 6 · Cartographic Visualization

A map in which the area of each unit is drawn proportional to a data value is a:

ACartogram
BFlow map
CChoropleth
DDot map
Answer is hidden
Question 429 of 1100Ch 6 · Cartographic Visualization

In a dot density map, the cartographer must always state the:

AProjection scale factor
BNumber of classes
CPrinting plate type
DValue represented by one dot
Answer is hidden
Question 430 of 1100Ch 6 · Generalization, Typography and Colour Theory

Cartographic generalization is necessary mainly because:

ASurveys are inaccurate
BPrinters cannot handle detail
CProjections distort areas
DThe space available shrinks faster than the features as scale is reduced
Answer is hidden
Question 431 of 1100Ch 6 · Generalization, Typography and Colour Theory

Representing a town by a single dot instead of its built-up outline is the generalization operator called:

ASmoothing
BDisplacement
CExaggeration
DCollapse
Answer is hidden
Question 432 of 1100Ch 6 · Generalization, Typography and Colour Theory

Drawing a road wider than its true scale width so that it remains visible is:

ASelection
BSimplification
CAggregation
DExaggeration
Answer is hidden
Question 433 of 1100Ch 6 · Generalization, Typography and Colour Theory

Moving two symbols slightly apart so that they do not overlap is:

AClassification
BCollapse
CTypification
DDisplacement
Answer is hidden
Question 434 of 1100Ch 6 · Generalization, Typography and Colour Theory

Töpfer's radical law is used to estimate the:

AScale factor of the projection
BNumber of features to be retained when the scale is reduced
CNumber of colours to use
DSize of the map sheet
Answer is hidden
Question 435 of 1100Ch 6 · Generalization, Typography and Colour Theory

On topographic maps, the names of rivers and lakes are conventionally shown in:

ARed upright type
BItalics
CBold upright capitals
DUnderlined text
Answer is hidden
Question 436 of 1100Ch 6 · Generalization, Typography and Colour Theory

According to Imhof's rules, the preferred position for the name of a point feature is:

ADirectly beneath the symbol always
BUpper right of the symbol
CUpper left only
DAcross the symbol
Answer is hidden
Question 437 of 1100Ch 6 · Generalization, Typography and Colour Theory

A halo or mask is applied to map lettering in order to:

AKeep the text legible over busy background detail
BIncrease the printing cost
CShow the scale
DIndicate a water feature
Answer is hidden
Question 438 of 1100Ch 6 · Generalization, Typography and Colour Theory

Toponymy is concerned with:

AThe standardisation and correct treatment of place names
BThe theory of projections
CPrinting plate preparation
DThe design of map symbols
Answer is hidden
Question 439 of 1100Ch 6 · Generalization, Typography and Colour Theory

The colour model used for displaying maps on a computer screen is:

ACIELAB
BRGB (additive)
CMunsell
DCMYK (subtractive)
Answer is hidden
Question 440 of 1100Ch 6 · Generalization, Typography and Colour Theory

For data that increase steadily from low to high, the appropriate colour scheme is:

AQualitative — distinct hues
BRandom colours
CSequential — one hue from light to dark
DDiverging — two hues about a midpoint
Answer is hidden
Question 441 of 1100Ch 6 · Generalization, Typography and Colour Theory

A diverging colour scheme is appropriate when the data:

AHave no order
BDepart from a critical midpoint such as zero or the mean
CAre purely nominal categories
DAre all positive and increasing
Answer is hidden
Question 442 of 1100Ch 6 · Generalization, Typography and Colour Theory

Designing a map for users with red-green colour deficiency requires:

AIncreasing the number of classes
BDifferences in lightness or pattern, not hue alone
CAvoiding all colour
DUsing only red and green
Answer is hidden
Question 443 of 1100Ch 6 · Digital Cartography and Web Cartography

In the raster data model, the location of a value is:

ANot recorded at all
BStored as a list of coordinates
CImplicit in the row and column of the cell
DDefined by topology
Answer is hidden
Question 444 of 1100Ch 6 · Digital Cartography and Web Cartography

Which data model is best suited to representing a continuous surface such as elevation?

ARaster
BVector
CTopological network
DRelational table only
Answer is hidden
Question 445 of 1100Ch 6 · Digital Cartography and Web Cartography

Cadastral parcel boundaries are best stored in:

ARaster form at 30 m resolution
BA scanned image only
CVector form with topology
DA point cloud
Answer is hidden
Question 446 of 1100Ch 6 · Digital Cartography and Web Cartography

Converting a scanned paper map into lines and polygons is called:

AGeoreferencing
BVectorisation
CRasterisation
DGeneralization
Answer is hidden
Question 447 of 1100Ch 6 · Digital Cartography and Web Cartography

Building topology during digital map production ensures that:

AThe map has a title
BPolygons close and lines connect correctly, without slivers or overshoots
CThe colours are correct
DThe projection is conformal
Answer is hidden
Question 448 of 1100Ch 6 · Digital Cartography and Web Cartography

A Digital Landscape Model (DLM) stores:

AThe geometry, topology and semantics of real-world features, independent of graphics
BOnly the printing plates
CThe symbolised graphic map for one scale
DOnly raster images
Answer is hidden
Question 449 of 1100Ch 6 · Digital Cartography and Web Cartography

Adapting a DLM graphically for a particular map product is called:

ARasterisation
BGeoreferencing
CCartographic generalization (DLM → DCM)
DModel generalization (DLM → DLM)
Answer is hidden
Question 450 of 1100Ch 6 · Digital Cartography and Web Cartography

In a thin-client web mapping architecture:

AThe server renders the map and the client only displays it
BData are never transmitted
CNo server is required
DThe client performs all the analysis
Answer is hidden
Question 451 of 1100Ch 6 · Digital Cartography and Web Cartography

The OGC service that delivers rendered map images is:

AWFS
BWMS
CCSW
DWCS
Answer is hidden
Question 452 of 1100Ch 6 · Digital Cartography and Web Cartography

The OGC service that delivers the actual vector features for client-side use is:

AWMTS
BSLD
CWFS
DWMS
Answer is hidden
Question 453 of 1100Ch 6 · Digital Cartography and Web Cartography

Metadata catalogues for spatial data are searched through the OGC:

AWPS
BKML
CCSW (Catalogue Service for the Web)
DWCS
Answer is hidden
Question 454 of 1100Ch 6 · Digital Cartography and Web Cartography

Which of the following is a dynamic visual variable?

AOrientation
BShape
CHue
DDuration
Answer is hidden
Question 455 of 1100Ch 6 · Digital Cartography and Web Cartography

Interactive functions such as zoom, query and linked views change the map from:

AA vector model into a raster model
BA DCM into a DLM
CA finished statement into a tool for exploration
DA projection into a datum
Answer is hidden
Question 456 of 1100Ch 6 · Map Elements and Reproduction Techniques

A classification method in which each class contains the same number of observations is:

AQuantile
BStandard deviation
CEqual interval
DNatural breaks
Answer is hidden
Question 457 of 1100Ch 6 · Map Elements and Reproduction Techniques

The Jenks optimisation method sets class limits so as to:

AMinimise the variance within classes and maximise it between them
BMake all classes equally wide
CFollow the standard deviation
DPut equal numbers in each class
Answer is hidden
Question 458 of 1100Ch 6 · Map Elements and Reproduction Techniques

The recommended number of classes on a choropleth map is usually:

AAs many as there are units
B1 or 2
CAbout 4 to 7
D15 to 20
Answer is hidden
Question 459 of 1100Ch 6 · Map Elements and Reproduction Techniques

Which of the following is NOT a normal map layout element?

AThe printing press serial number
BNorth arrow
CScale bar
DLegend
Answer is hidden
Question 460 of 1100Ch 6 · Map Elements and Reproduction Techniques

The visual centre of a map sheet lies:

ASlightly above the geometric centre
BExactly at the geometric centre
COutside the neatline
DAt the lower left corner
Answer is hidden
Question 461 of 1100Ch 6 · Map Elements and Reproduction Techniques

Colour separation in traditional map reproduction produced:

AA plotted proof
BOne film for each printing colour
CA single colour photograph
DA digital PDF
Answer is hidden
Question 462 of 1100Ch 6 · Map Elements and Reproduction Techniques

Contact photography differs from camera photography because the film is:

AExposed in direct contact with the original, giving a same-size copy
BPrinted on paper only
CDeveloped without light
DExposed through a lens at a reduced scale
Answer is hidden
Question 463 of 1100Ch 6 · Map Elements and Reproduction Techniques

Thickening and thinning (spreads and chokes) in map reproduction are used to:

AChange the projection
BGeoreference the map
CClassify the data
DAdjust line weight and provide trapping between adjacent colours
Answer is hidden
Question 464 of 1100Ch 6 · Map Elements and Reproduction Techniques

An offset lithographic printing plate works on the principle that:

AInk is forced through a mesh
BThe image is engraved below the surface
CThe image area accepts ink and repels water while the non-image area does the opposite
DHeat fuses toner to paper
Answer is hidden
Question 465 of 1100Ch 6 · Map Elements and Reproduction Techniques

In offset printing, the inked image is transferred from the plate to the paper via the:

APlate cylinder directly
BDamping rollers
CRubber blanket cylinder
DPaper feeder
Answer is hidden
Question 466 of 1100Ch 6 · Map Elements and Reproduction Techniques

Computer-to-plate (CTP) technology eliminates the need for:

APrinting plates
BFilm in the plate-making process
CPaper
DColour separation
Answer is hidden
Question 467 of 1100Ch 6 · Map Elements and Reproduction Techniques

Rotary offset printing is preferred over flat-bed printing for:

ALarge print runs at high speed
BPlotting a single map
CSingle proof copies
DPrinting on wood
Answer is hidden
Question 468 of 1100Ch 6 · Map Elements and Reproduction Techniques

For a short run of updated map sheets on demand, the most economical modern method is:

AGravure
BDigital printing
CScreen printing
DRotary offset with new plates
Answer is hidden
Question 469 of 1100Ch 7 · Fundamentals of Spatial Database Management Systems

A database is best defined as:

AA map sheet index
BAn organised, shared collection of logically related data with minimum redundancy
CAny collection of files on a disk
DA single spreadsheet
Answer is hidden
Question 470 of 1100Ch 7 · Fundamentals of Spatial Database Management Systems

Which of the following is NOT an advantage of the database approach over file processing?

ABackup and recovery
BControlled redundancy
CLower initial cost and simpler software
DData sharing and concurrency
Answer is hidden
Question 471 of 1100Ch 7 · Fundamentals of Spatial Database Management Systems

The property of a transaction that guarantees it is completed entirely or not at all is:

AAtomicity
BIsolation
CConsistency
DDurability
Answer is hidden
Question 472 of 1100Ch 7 · Fundamentals of Spatial Database Management Systems

The ANSI/SPARC architecture consists of:

ARaster, vector and TIN
BExternal, conceptual and internal schemas
CDDL, DML and DCL
DInput, process and output
Answer is hidden
Question 473 of 1100Ch 7 · Fundamentals of Spatial Database Management Systems

The ability to change the physical storage without altering application programs is called:

ALogical data independence
BNormalization
CConcurrency
DPhysical data independence
Answer is hidden
Question 474 of 1100Ch 7 · Fundamentals of Spatial Database Management Systems

CREATE TABLE and ALTER TABLE belong to which group of SQL statements?

ADDL
BDCL
CTCL
DDML
Answer is hidden
Question 475 of 1100Ch 7 · Fundamentals of Spatial Database Management Systems

GRANT and REVOKE statements belong to:

ADCL
BDML
CTCL
DDDL
Answer is hidden
Question 476 of 1100Ch 7 · Fundamentals of Spatial Database Management Systems

The component of a DBMS that prevents two users from corrupting the same record simultaneously provides:

AData definition
BQuery optimisation
CMetadata
DConcurrency control
Answer is hidden
Question 477 of 1100Ch 7 · Fundamentals of Spatial Database Management Systems

Metadata describing the tables, columns and constraints of a database is held in the:

AData dictionary (system catalogue)
BTransaction log
CBackup tape
DIndex file
Answer is hidden
Question 478 of 1100Ch 7 · Fundamentals of Spatial Database Management Systems

A spatial DBMS differs from an ordinary DBMS mainly by providing:

AGeometry data types, spatial indexes and spatial functions
BOnly raster storage
CLarger disks
DFaster hardware
Answer is hidden
Question 479 of 1100Ch 7 · Fundamentals of Spatial Database Management Systems

A view in a database is:

AA physical copy of a table
BA backup file
CA virtual table defined by a stored query
DAn index structure
Answer is hidden
Question 480 of 1100Ch 7 · Fundamentals of Spatial Database Management Systems

The person responsible for the security, backup and performance of a database is the:

AApplication programmer
BDatabase administrator
CData entry operator
DEnd user
Answer is hidden
Question 481 of 1100Ch 7 · Fundamentals of Spatial Database Management Systems

The spatial extension of SQL defining geometry types and ST_ functions is standardised by:

AOGC Simple Feature Access and ISO SQL/MM Spatial
BW3C HTML
CIEEE 802
DISO 9001
Answer is hidden
Question 482 of 1100Ch 7 · Spatial Data Infrastructure

A spatial data infrastructure consists of:

AA set of paper maps
BOnly the hardware and software of a GIS
CA single national database
DTechnologies, policies, standards, institutions and people enabling access to spatial data
Answer is hidden
Question 483 of 1100Ch 7 · Spatial Data Infrastructure

The SDI principle 'collect once, use many times' means that data should be:

AMaintained where it can be done most effectively and shared with all users
BCollected separately by each agency
CKept confidential
DCollected annually by every office
Answer is hidden
Question 484 of 1100Ch 7 · Spatial Data Infrastructure

Which of the following is a framework (fundamental) dataset of an SDI?

AWeekly market prices
BStaff attendance records
CGeodetic control and administrative boundaries
DHotel occupancy statistics
Answer is hidden
Question 485 of 1100Ch 7 · Spatial Data Infrastructure

The international standard for geographic metadata is:

AISO 9001
BISO 19115
CISO 19110 only
DISO 14001
Answer is hidden
Question 486 of 1100Ch 7 · Spatial Data Infrastructure

Metadata is best described as:

AData about data
BThe coordinate system only
CA backup copy of the data
DA map legend
Answer is hidden
Question 487 of 1100Ch 7 · Spatial Data Infrastructure

Metadata that allows a user to judge whether a dataset is fit for a particular purpose is called:

ADiscovery metadata
BExploration metadata
CExploitation metadata
DSystem metadata
Answer is hidden
Question 488 of 1100Ch 7 · Spatial Data Infrastructure

A catalogue of datasets in an SDI is searched using the OGC service:

AWFS
BWMS
CSLD
DCSW
Answer is hidden
Question 489 of 1100Ch 7 · Spatial Data Infrastructure

Agreement on the meaning of terms and classifications between different datasets is:

ASyntactic interoperability
BSemantic interoperability
CHardware compatibility
DStructural interoperability
Answer is hidden
Question 490 of 1100Ch 7 · Spatial Data Infrastructure

Delivering data in a common format such as GML over a standard service provides:

ASyntactic interoperability
BData quality
CInstitutional coordination
DSemantic interoperability
Answer is hidden
Question 491 of 1100Ch 7 · Spatial Data Infrastructure

Open data in an SDI context means data that are:

ASold at high cost
BAvailable only to government offices
CFreely available in machine-readable form under an open licence
DFree but only on paper
Answer is hidden
Question 492 of 1100Ch 7 · Spatial Data Infrastructure

Which component of an SDI is usually the most difficult to establish?

AThe institutional framework and cooperation between agencies
BThe server hardware
CThe internet connection
DThe GIS software
Answer is hidden
Question 493 of 1100Ch 7 · Spatial Data Infrastructure

A dataset without metadata is problematic mainly because:

AIt cannot be projected
BIt occupies more storage
CIt has no coordinate values
DUsers cannot find it or judge its quality and fitness for use
Answer is hidden
Question 494 of 1100Ch 7 · Spatial Data Infrastructure

The ISO standard that defines the XML encoding for transporting geographic features is:

AISO 19110
BISO 19157
CISO 19136 (GML)
DISO 19115
Answer is hidden
Question 495 of 1100Ch 7 · Data Models

The three components of a data model are:

AHardware, software and people
BStructure, operations and integrity rules
CInput, process and output
DPoints, lines and polygons
Answer is hidden
Question 496 of 1100Ch 7 · Data Models

In the hierarchical data model, records are organised as a:

AGraph with many-to-many links
BCollection of objects with methods
CTree with parent-child relationships
DSet of tables linked by keys
Answer is hidden
Question 497 of 1100Ch 7 · Data Models

The data model that represents data as tables related by primary and foreign keys is the:

ARelational model
BObject-oriented model
CHierarchical model
DNetwork model
Answer is hidden
Question 498 of 1100Ch 7 · Data Models

Spatial databases such as PostGIS are based on the:

ANetwork (CODASYL) model
BPure hierarchical model
CFlat file model
DObject-relational model
Answer is hidden
Question 499 of 1100Ch 7 · Data Models

In an ER diagram, a many-to-many relationship between two entities is implemented in tables by:

AUsing a hierarchical pointer
BAdding a foreign key to one table
CMerging the two entities
DCreating an associative (junction) table with two foreign keys
Answer is hidden
Question 500 of 1100Ch 7 · Data Models

A foreign key is used to:

AUniquely identify each row of its own table
BReference the primary key of another table and enforce referential integrity
CEncrypt the data
DIndex the geometry column
Answer is hidden
Question 501 of 1100Ch 7 · Data Models

Which diagram type from UML is most used for conceptual data modelling in ISO 19100 standards?

AUse-case diagram
BSequence diagram
CState diagram
DClass diagram
Answer is hidden
Question 502 of 1100Ch 7 · Data Models

A table is in first normal form when:

AAll attribute values are atomic, with no repeating groups
BEvery determinant is a candidate key
CIt has no foreign keys
DThere are no transitive dependencies
Answer is hidden
Question 503 of 1100Ch 7 · Data Models

Removing a transitive dependency of a non-key attribute on another non-key attribute produces:

ASecond normal form
BThird normal form
CBoyce-Codd normal form
DFirst normal form
Answer is hidden
Question 504 of 1100Ch 7 · Data Models

The main aim of normalization is to:

AReduce redundancy and avoid update anomalies
BSpeed up every query
CRemove all keys
DIncrease the number of rows
Answer is hidden
Question 505 of 1100Ch 7 · Data Models

An entity that cannot be identified without reference to another entity is called a:

AStrong entity
BDerived attribute
CComposite attribute
DWeak entity
Answer is hidden
Question 506 of 1100Ch 7 · Data Models

Multiplicity '0..*' on a UML association means:

AZero or more instances may participate
BExactly one instance
CAt least one instance
DAt most one instance
Answer is hidden
Question 507 of 1100Ch 7 · Data Models

Denormalization of a database is sometimes accepted in order to:

ASatisfy first normal form
BEliminate primary keys
CIncrease redundancy for its own sake
DImprove query performance by reducing joins
Answer is hidden
Question 508 of 1100Ch 7 · Structured Query Language (SQL)

SQL is described as a declarative language because the user specifies:

AThe exact disk blocks to read
BThe index to use in every case
CThe order of physical operations
DWhat data are required, not how to retrieve them
Answer is hidden
Question 509 of 1100Ch 7 · Structured Query Language (SQL)

Entity integrity in a relational database requires that:

AThe primary key is unique and never null
BAll attributes are text
CEvery foreign key is null
DTables are never indexed
Answer is hidden
Question 510 of 1100Ch 7 · Structured Query Language (SQL)

Which SQL constraint enforces referential integrity?

AFOREIGN KEY
BNOT NULL
CCHECK
DUNIQUE
Answer is hidden
Question 511 of 1100Ch 7 · Structured Query Language (SQL)

In the statement SELECT … FROM … WHERE … GROUP BY … HAVING …, the HAVING clause:

ASorts the result
BFilters the groups after aggregation
CFilters individual rows before grouping
DJoins two tables
Answer is hidden
Question 512 of 1100Ch 7 · Structured Query Language (SQL)

Which is the correct logical order of evaluation?

AFROM → WHERE → GROUP BY → HAVING → SELECT → ORDER BY
BWHERE → FROM → SELECT → GROUP BY
CORDER BY → SELECT → FROM
DSELECT → FROM → WHERE → ORDER BY
Answer is hidden
Question 513 of 1100Ch 7 · Structured Query Language (SQL)

An INNER JOIN between two tables returns:

AThe Cartesian product
BAll rows of both tables
CAll rows of the left table
DOnly the rows that match in both tables
Answer is hidden
Question 514 of 1100Ch 7 · Structured Query Language (SQL)

To keep all rows of the first table even when there is no match in the second, use a:

AINNER JOIN
BUNION
CLEFT OUTER JOIN
DCROSS JOIN
Answer is hidden
Question 515 of 1100Ch 7 · Structured Query Language (SQL)

Which aggregate function returns the number of rows in a group?

AAVG
BCOUNT
CSUM
DMAX
Answer is hidden
Question 516 of 1100Ch 7 · Structured Query Language (SQL)

To find rows where a text column begins with 'Kath', the correct predicate is:

AIN ('Kath')
BLIKE 'Kath%'
C= 'Kath'
DBETWEEN 'Kath' AND 'Kath'
Answer is hidden
Question 517 of 1100Ch 7 · Structured Query Language (SQL)

A null value in SQL must be tested with:

AIS NULL
B= NULL
C== NULL
DLIKE NULL
Answer is hidden
Question 518 of 1100Ch 7 · Structured Query Language (SQL)

Executing DELETE FROM parcel; without a WHERE clause will:

ADelete every row of the table
BDelete only the first row
CHave no effect
DDelete the table structure
Answer is hidden
Question 519 of 1100Ch 7 · Structured Query Language (SQL)

CREATE INDEX on a frequently searched column is used to:

AEncrypt the data
BEnforce referential integrity
CSpeed up retrieval at the cost of slower updates and more storage
DNormalize the table
Answer is hidden
Question 520 of 1100Ch 7 · Structured Query Language (SQL)

Which data type should be used for an area value requiring exact decimal storage?

AREAL
BNUMERIC (DECIMAL)
CBOOLEAN
DVARCHAR
Answer is hidden
Question 521 of 1100Ch 7 · Spatial Database Technology

Modern spatial databases such as PostGIS are implemented as:

AObject-relational systems with user-defined spatial types
BHierarchical systems
CFlat file systems
DPure object-oriented systems
Answer is hidden
Question 522 of 1100Ch 7 · Spatial Database Technology

Which is NOT one of the basic OGC simple feature geometry types?

APolygon
BLineString
CPoint
DPyramid
Answer is hidden
Question 523 of 1100Ch 7 · Spatial Database Technology

The SRID stored with a geometry identifies its:

AOwner
BCoordinate reference system
CStorage format
DIndex type
Answer is hidden
Question 524 of 1100Ch 7 · Spatial Database Technology

The well-known text (WKT) representation POINT(85.32 27.71) specifies a:

APolygon with one vertex
BRaster cell
CPoint geometry with its coordinates
DProjection definition
Answer is hidden
Question 525 of 1100Ch 7 · Spatial Database Technology

A continuous phenomenon such as elevation is best represented by the:

AField (coverage/raster) view
BNetwork model
CObject (feature) view
DTopological model only
Answer is hidden
Question 526 of 1100Ch 7 · Spatial Database Technology

The formal framework defining spatial predicates such as contains and touches is the:

AACID model
BDE-9IM model
CUML model
DER model
Answer is hidden
Question 527 of 1100Ch 7 · Spatial Database Technology

A spatial join differs from an ordinary join because it matches rows using:

AA common primary key
BThe row number
CA spatial relationship such as containment or intersection
DAlphabetical order
Answer is hidden
Question 528 of 1100Ch 7 · Spatial Database Technology

Spatial indexes in PostGIS are usually created as:

AB-tree indexes
BHash indexes
CGiST indexes implementing an R-tree
DBitmap indexes
Answer is hidden
Question 529 of 1100Ch 7 · Spatial Database Technology

The filter step of a spatial query uses:

AThe attribute table only
BThe exact geometry of every feature
CThe metadata record
DThe minimum bounding rectangles of the geometries
Answer is hidden
Question 530 of 1100Ch 7 · Spatial Database Technology

Tobler's first law of geography states that:

ADistance has no effect on similarity
BSpatial data cannot be analysed statistically
CNear things are more related than distant things
DAll places are equally related
Answer is hidden
Question 531 of 1100Ch 7 · Spatial Database Technology

Moran's I is a measure of:

ASpatial autocorrelation
BIndex efficiency
CPositional accuracy
DProjection distortion
Answer is hidden
Question 532 of 1100Ch 7 · Spatial Database Technology

DBSCAN is an algorithm used for:

AImage classification only
BDensity-based spatial clustering that can find arbitrary shapes and noise
CNormalization of tables
DCoordinate transformation
Answer is hidden
Question 533 of 1100Ch 7 · Spatial Database Technology

The PostGIS function that changes the coordinate reference system of a geometry is:

ASTArea
BSTBuffer
CSTUnion
DSTTransform
Answer is hidden
Question 534 of 1100Ch 7 · National Spatial Data Infrastructure (NSDI)

An NSDI is best described as the:

ANational framework of institutions, policies, standards, data and technology for sharing geospatial data
BNational topographic map series
CThe national GPS network
DA single government database
Answer is hidden
Question 535 of 1100Ch 7 · National Spatial Data Infrastructure (NSDI)

The lead agency for the national spatial data infrastructure of a country is usually the:

ANational airline
BNational mapping/survey organisation
CCentral bank
DMinistry of Finance
Answer is hidden
Question 536 of 1100Ch 7 · National Spatial Data Infrastructure (NSDI)

A custodian in an NSDI is the organisation responsible for:

APrinting all maps
BAuditing other agencies
CCollecting, maintaining, documenting and publishing a particular dataset
DBuying all the software
Answer is hidden
Question 537 of 1100Ch 7 · National Spatial Data Infrastructure (NSDI)

The most common reason for an NSDI to fail is:

AToo many standards
BLack of satellite imagery
CWeak policy, coordination and willingness to share data
DAbsence of computers
Answer is hidden
Question 538 of 1100Ch 7 · National Spatial Data Infrastructure (NSDI)

Metadata in an NSDI should be created:

ABy the user after downloading
BOnce every ten years
CBy the data custodian at the time the data are produced
DOnly for printed maps
Answer is hidden
Question 539 of 1100Ch 7 · National Spatial Data Infrastructure (NSDI)

The clearinghouse of an NSDI provides mainly:

ADiscovery, evaluation and access to distributed datasets and services
BLegal advice
CStorage of all national data in one computer
DPrinting services
Answer is hidden
Question 540 of 1100Ch 7 · National Spatial Data Infrastructure (NSDI)

In the NSDI architecture, data physically remain:

AWith the custodian agency, published through services
BOnly on paper
CCopied to a single central server
DWith the end users
Answer is hidden
Question 541 of 1100Ch 7 · National Spatial Data Infrastructure (NSDI)

Which OGC service would a geoportal use to let users search for datasets?

AWCS
BCSW
CWFS
DWMS
Answer is hidden
Question 542 of 1100Ch 7 · National Spatial Data Infrastructure (NSDI)

A user who needs the actual vector features for analysis, not just a picture, should use:

AWFS
BWMS
CWMTS
DCSW
Answer is hidden
Question 543 of 1100Ch 7 · National Spatial Data Infrastructure (NSDI)

Open data policies in an NSDI aim to:

AAvoid publishing metadata
BIncrease revenue from map sales
CRestrict data to government offices
DMaximise use and value by removing barriers to access
Answer is hidden
Question 544 of 1100Ch 7 · National Spatial Data Infrastructure (NSDI)

Which application of the NSDI is of particular importance in Nepal?

ADeep-sea navigation
BPolar research
CDisaster risk reduction and emergency response
DDesert irrigation planning
Answer is hidden
Question 545 of 1100Ch 7 · National Spatial Data Infrastructure (NSDI)

A benefit of an NSDI to government is that it:

AGuarantees free software
BEliminates the need for field survey entirely
CAvoids duplicated data collection and gives consistent information across agencies
DRemoves the need for standards
Answer is hidden
Question 546 of 1100Ch 7 · National Spatial Data Infrastructure (NSDI)

Sustainability of an NSDI depends most on:

AContinued funding, institutional mandate and maintenance of data and portal
BPublishing one geoportal once
CA single large project grant
DBuying the newest software
Answer is hidden
Question 547 of 1100Ch 8 · Fundamentals of GIS

Which component of a GIS usually consumes the largest share of the total project cost?

ATraining of people
BHardware
CData
DSoftware
Answer is hidden
Question 548 of 1100Ch 8 · Fundamentals of GIS

The first operational geographic information system is generally taken to be:

AThe Canada Geographic Information System developed by Roger Tomlinson
BSYMAP at Harvard
CThe US Census TIGER file
DARC/INFO by ESRI
Answer is hidden
Question 549 of 1100Ch 8 · Fundamentals of GIS

Topology in GIS is best defined as the study of spatial properties that:

ADepend on the map projection used
BDescribe the appearance of symbols
CAre measured as distances and areas
DRemain unchanged when the map is stretched or bent
Answer is hidden
Question 550 of 1100Ch 8 · Fundamentals of GIS

A short line segment left projecting beyond the intersection with another line after digitising is called a:

ANode
BOvershoot (a dangling arc)
CUndershoot
DSliver
Answer is hidden
Question 551 of 1100Ch 8 · Fundamentals of GIS

Which is NOT a limitation of the ESRI shapefile format?

AIt stores no topology
BIt cannot store attribute data
CIt has a 2 GB file-size limit
DField names are limited to 10 characters
Answer is hidden
Question 552 of 1100Ch 8 · Fundamentals of GIS

The closeness of a measured coordinate to its true position on the ground is:

ALogical consistency
BCompleteness
CPrecision
DPositional accuracy
Answer is hidden
Question 553 of 1100Ch 8 · Fundamentals of GIS

Very thin unwanted polygons produced along the common boundary when two layers digitised separately are overlaid are known as:

ANodes
BDangles
CPseudo-nodes
DSlivers
Answer is hidden
Question 554 of 1100Ch 8 · Fundamentals of GIS

Which statement about the relationship between topology and the shapefile is correct?

AThe shapefile stores adjacency but not connectivity
BTopology is stored in the .prj file
CThe shapefile is non-topological and stores each feature independently
DThe shapefile stores full arc-node topology
Answer is hidden
Question 555 of 1100Ch 8 · Fundamentals of GIS

Which of the following is a topological spatial relationship rather than a metric one?

AThe town lies north of the river
BParcel A touches parcel B
CThe plot area is 0.2 hectare
DThe school is 400 m from the road
Answer is hidden
Question 556 of 1100Ch 8 · Fundamentals of GIS

The nine-intersection model used to formalise binary topological relations between two geometries is abbreviated:

ADE-9IM
BMBR
CTIN
DDE-4IM
Answer is hidden
Question 557 of 1100Ch 8 · Fundamentals of GIS

Georeferencing of a scanned topographic sheet is normally assessed by:

AThe RMSE of the residuals at the ground control points
BThe scanning resolution in dpi
CThe number of layers in the map
DThe file size of the image
Answer is hidden
Question 558 of 1100Ch 8 · Fundamentals of GIS

Which quality element is concerned with whether features that should be in the dataset are actually present?

ATemporal accuracy
BLineage
CLogical consistency
DCompleteness
Answer is hidden
Question 559 of 1100Ch 8 · Fundamentals of GIS

A line drawn with a pen width of 0.25 mm on a 1:25,000 map represents a ground width of approximately:

A250 m
B0.25 m
C6 m
D25 m
Answer is hidden
Question 560 of 1100Ch 8 · Data Source and Spatial Data Model

Data obtained by digitising an existing printed topographic map are classified as:

AVolunteered data
BMetadata
CSecondary data
DPrimary data
Answer is hidden
Question 561 of 1100Ch 8 · Data Source and Spatial Data Model

The international standard for geographic metadata is:

AISO 19111
BISO 9001
CISO 19115
DISO 14001
Answer is hidden
Question 562 of 1100Ch 8 · Data Source and Spatial Data Model

Elevation, temperature and rainfall are most naturally represented by which view of geographic space?

AThe network view
BThe field (continuous) view
CThe topological view
DThe object (discrete) view
Answer is hidden
Question 563 of 1100Ch 8 · Data Source and Spatial Data Model

If the cell size of a raster is reduced from 30 m to 15 m over the same area, the number of cells:

ADoubles
BIncreases four times
CStays the same
DHalves
Answer is hidden
Question 564 of 1100Ch 8 · Data Source and Spatial Data Model

Which raster compression structure recursively divides the grid into four quadrants until each block is homogeneous?

AR-tree
BChain code
CRun-length encoding
DQuadtree
Answer is hidden
Question 565 of 1100Ch 8 · Data Source and Spatial Data Model

The triangulation normally used to build a TIN, which maximises the minimum interior angle of the triangles, is:

ARadial triangulation
BThiessen triangulation
CBowditch triangulation
DDelaunay triangulation
Answer is hidden
Question 566 of 1100Ch 8 · Data Source and Spatial Data Model

A major advantage of the raster model over the vector model is:

AExplicit storage of topology
BSimple structure allowing fast overlay and map algebra
CPrecise representation of boundaries
DCompact storage for large homogeneous areas
Answer is hidden
Question 567 of 1100Ch 8 · Data Source and Spatial Data Model

The stepped or 'staircase' appearance of a linear feature stored in raster form is a direct consequence of:

AThe NoData value
BThe finite cell size of the grid
CRun-length encoding
DThe map projection
Answer is hidden
Question 568 of 1100Ch 8 · Data Source and Spatial Data Model

A breakline representing a ridge or a stream channel can be enforced directly in:

AA shapefile attribute table
BA contour map only
CA TIN, as a triangle edge
DA regular grid DEM, as a row of cells
Answer is hidden
Question 569 of 1100Ch 8 · Data Source and Spatial Data Model

In the arc-node topological vector structure, each arc stores:

AIts symbol and colour
BIts from-node and to-node and its left and right polygons
COnly its coordinate string
DIts centroid and area
Answer is hidden
Question 570 of 1100Ch 8 · Data Source and Spatial Data Model

A pixel of a 30 m land-cover raster that contains both forest and water is an example of:

AA NoData cell
BA mixed pixel
CA dangle
DA sliver
Answer is hidden
Question 571 of 1100Ch 8 · Data Source and Spatial Data Model

Metadata used to decide whether a discovered dataset is fit for the intended purpose serve at which level?

AExploitation
BExploration
CPublication
DDiscovery
Answer is hidden
Question 572 of 1100Ch 8 · Data Source and Spatial Data Model

Which of the following is the OGC single-file container format intended as a modern replacement for the shapefile?

ARINEX
BDXF
CGeoPackage
DGeoTIFF
Answer is hidden
Question 573 of 1100Ch 8 · Geometric Transformation and Geospatial Analysis

Which overlay operation keeps only the area common to both input layers together with the attributes of both?

AErase
BUnion
CIdentity
DIntersect
Answer is hidden
Question 574 of 1100Ch 8 · Geometric Transformation and Geospatial Analysis

The minimum number of well-distributed ground control points required for a six-parameter affine transformation is:

A4
B3
C2
D6
Answer is hidden
Question 575 of 1100Ch 8 · Geometric Transformation and Geospatial Analysis

Which resampling method must be used when transforming a land-cover classification raster?

ACubic convolution
BBilinear interpolation
CNearest neighbour
DKriging
Answer is hidden
Question 576 of 1100Ch 8 · Geometric Transformation and Geospatial Analysis

Computing a new raster by adding two coincident grids cell by cell is an example of which map-algebra operation?

AFocal
BLocal
CZonal
DGlobal
Answer is hidden
Question 577 of 1100Ch 8 · Geometric Transformation and Geospatial Analysis

The shortest-path problem on a road network with travel time as impedance is classically solved by:

AThe Jenks algorithm
BThe Douglas-Peucker algorithm
CDelaunay triangulation
DDijkstra's algorithm
Answer is hidden
Question 578 of 1100Ch 8 · Geometric Transformation and Geospatial Analysis

A choropleth map should be used to portray:

ATotal population by ward
BPopulation density by ward
CThe location of individual wells
DThe course of a river
Answer is hidden
Question 579 of 1100Ch 8 · Geometric Transformation and Geospatial Analysis

Which classification method places class breaks where the data show natural groupings by minimising within-class variance?

ANatural breaks (Jenks)
BStandard deviation
CEqual interval
DQuantile
Answer is hidden
Question 580 of 1100Ch 8 · Geometric Transformation and Geospatial Analysis

The Styled Layer Descriptor is an OGC standard that defines:

AHow coordinate systems are defined
BHow layers of a map service are to be symbolised
CHow metadata are catalogued
DHow features are encoded for transfer
Answer is hidden
Question 581 of 1100Ch 8 · Geometric Transformation and Geospatial Analysis

Within an SLD document, the element that may contain a Filter and a scale range together with its symbolizers is the:

AStyledLayerDescriptor
BNamedLayer
CFeatureTypeStyle
DRule
Answer is hidden
Question 582 of 1100Ch 8 · Geometric Transformation and Geospatial Analysis

A nearest-neighbour index R of 0.4 computed for a set of points indicates a pattern that is:

ADispersed
BUniform
CRandom
DClustered
Answer is hidden
Question 583 of 1100Ch 8 · Geometric Transformation and Geospatial Analysis

The fact that results of an analysis change when the same data are aggregated into different zoning schemes is known as:

AThe coastline paradox
BEdge effect
CEcological fallacy
DThe modifiable areal unit problem
Answer is hidden
Question 584 of 1100Ch 8 · Geometric Transformation and Geospatial Analysis

Selecting all the schools that fall inside flood-hazard polygons is an example of:

AAn attribute query
BA spatial query
CA geometric transformation
DA resampling operation
Answer is hidden
Question 585 of 1100Ch 8 · Geometric Transformation and Geospatial Analysis

In a WMS request, the parameter used to send an inline user-defined style document is:

ALAYERS
BSTYLES
CSLDBODY
DCRS
Answer is hidden
Question 586 of 1100Ch 8 · Surface Modelling

A slope of 45 degrees expressed as a percentage is:

A90 %
B100 %
C45 %
D50 %
Answer is hidden
Question 587 of 1100Ch 8 · Surface Modelling

Aspect derived from a DEM is measured:

AAs a percentage of the slope
BFrom the vertical, 0 to 90 degrees
CAnticlockwise from east, 0 to 360 degrees
DClockwise from north, 0 to 360 degrees
Answer is hidden
Question 588 of 1100Ch 8 · Surface Modelling

The default illumination azimuth and altitude used for a hillshade are:

A180 degrees and 45 degrees
B45 degrees and 315 degrees
C315 degrees and 45 degrees
D0 degrees and 90 degrees
Answer is hidden
Question 589 of 1100Ch 8 · Surface Modelling

Surface curvature is derived from the DEM as the:

AFirst derivative of elevation
BSecond derivative of elevation
CStandard deviation of elevation
DIntegral of elevation
Answer is hidden
Question 590 of 1100Ch 8 · Surface Modelling

In the standard workflow for watershed delineation, the step that must precede the computation of flow direction is:

AFilling the sinks in the DEM
BComputing flow accumulation
CSnapping the pour point
DDeriving the stream order
Answer is hidden
Question 591 of 1100Ch 8 · Surface Modelling

In the D8 flow-direction algorithm, flow from a cell is assigned to:

AThe four cardinal neighbours only
BAll eight neighbours in proportion to slope
CThe neighbour with the lowest elevation regardless of distance
DThe single neighbour of the eight with the steepest descent
Answer is hidden
Question 592 of 1100Ch 8 · Surface Modelling

Which surface derivative would you map to locate convergent hollows where water and material concentrate?

AAspect
BProfile curvature
CHillshade
DPlan (contour) curvature
Answer is hidden
Question 593 of 1100Ch 8 · Surface Modelling

A viewshed computed from a bare-earth DEM will typically overestimate visibility because it ignores:

AThe search radius
BEarth curvature, which can be corrected
CThe observer offset
DBuildings and vegetation, which appear only in a DSM
Answer is hidden
Question 594 of 1100Ch 8 · Surface Modelling

The line where a proposed design surface meets the existing ground surface, marking the boundary between cut and fill, is known as the:

AContour line
BCatch (daylight) line
CBreakline
DDivide
Answer is hidden
Question 595 of 1100Ch 8 · Surface Modelling

Compared with a 5 m DEM, slope values computed from a 90 m DEM of the same rugged area will generally be:

AUnpredictable, with no systematic trend
BHigher, because of the larger cell size
CIdentical, because slope is scale independent
DLower, because coarse cells smooth the terrain
Answer is hidden
Question 596 of 1100Ch 8 · Surface Modelling

In a 3 x 3 window on a DEM, flow accumulation of a cell represents:

AThe number of upstream cells draining into it
BIts slope in percent
CThe volume of water stored in it
DThe elevation difference to its lowest neighbour
Answer is hidden
Question 597 of 1100Ch 8 · Surface Modelling

Why must a z-factor be applied when computing slope from a DEM whose coordinates are in degrees but whose elevations are in metres?

ABecause slope must be reported in percent
BBecause aspect is circular data
CBecause the DEM contains sinks
DBecause horizontal and vertical units differ and must be made consistent
Answer is hidden
Question 598 of 1100Ch 8 · Surface Modelling

Every raster derived by a 3 x 3 moving window, such as slope or aspect, has:

AOne more row and column than the input
BThe same extent but twice the cell size
CA one-cell border of NoData around its edge
DNo NoData values at all
Answer is hidden
Question 599 of 1100Ch 8 · Spatial Interpolation and Application of DTM

The principle that near things are more related than distant things, on which interpolation depends, is:

ATobler's First Law of Geography
BThe central limit theorem
CThe law of superposition
DMoran's law
Answer is hidden
Question 600 of 1100Ch 8 · Spatial Interpolation and Application of DTM

Which interpolation method produces a surface that always passes exactly through the sample points and never predicts a value outside the range of the data?

AUniversal kriging
BTrend surface analysis
CInverse distance weighting
DThin-plate spline
Answer is hidden
Question 601 of 1100Ch 8 · Spatial Interpolation and Application of DTM

In the semivariogram, the value of semivariance at zero lag distance that arises from measurement error and micro-scale variation is the:

ASill
BPartial sill
CNugget
DRange
Answer is hidden
Question 602 of 1100Ch 8 · Spatial Interpolation and Application of DTM

Beyond the range of a fitted semivariogram model, pairs of points are:

ACorrelated but with zero variance
BNo longer spatially correlated
CCorrelated only in one direction
DMore strongly correlated than within the range
Answer is hidden
Question 603 of 1100Ch 8 · Spatial Interpolation and Application of DTM

Kriging is described as the best linear unbiased estimator because it:

ARequires no semivariogram
BAlways fits a straight line to the data
CUses the largest possible number of sample points
DMinimises the estimation variance while keeping the weights summing to one
Answer is hidden
Question 604 of 1100Ch 8 · Spatial Interpolation and Application of DTM

Which form of kriging should be chosen when the variable shows a clear regional trend, such as temperature decreasing steadily with altitude across the study area?

AUniversal kriging
BSimple kriging
COrdinary kriging
DIndicator kriging
Answer is hidden
Question 605 of 1100Ch 8 · Spatial Interpolation and Application of DTM

The main practical advantage of kriging over inverse distance weighting is that kriging:

ADoes not need a coordinate system
BProvides a map of the estimation error as well as the prediction
CRequires fewer sample points
DIs faster to compute
Answer is hidden
Question 606 of 1100Ch 8 · Spatial Interpolation and Application of DTM

A surface model that includes the tops of buildings and the tree canopy is a:

ADTM
BTIN
CDSM
DDEM
Answer is hidden
Question 607 of 1100Ch 8 · Spatial Interpolation and Application of DTM

Subtracting a DEM from a DSM over an urban area produces a raster whose values represent:

ASlope in degrees
BThe cut-and-fill volume
CGround elevations above mean sea level
DThe heights of buildings and vegetation above the ground
Answer is hidden
Question 608 of 1100Ch 8 · Spatial Interpolation and Application of DTM

Hard breaklines are introduced into a terrain model in order to:

ASmooth the surface
BForce a break of slope along features such as ridges and road edges
CIncrease the number of sample points
DDefine the coordinate system
Answer is hidden
Question 609 of 1100Ch 8 · Spatial Interpolation and Application of DTM

Which resampling method should be used when a DEM is reprojected and the smoothest continuous surface is required?

AThiessen polygons
BNearest neighbour
CBilinear or cubic convolution
DMajority (mode)
Answer is hidden
Question 610 of 1100Ch 8 · Spatial Interpolation and Application of DTM

Leave-one-out cross-validation of an interpolated surface reports a mean error close to zero and a small RMSE. This indicates that the model is:

AUnusable
BBiased but precise
COver-smoothed by definition
DEssentially unbiased and reasonably accurate
Answer is hidden
Question 611 of 1100Ch 8 · Spatial Interpolation and Application of DTM

A nugget-to-sill ratio of 0.15 for a soil property indicates that the spatial dependence is:

AWeak
BAbsent
CStrong
DPurely anisotropic
Answer is hidden
Question 612 of 1100Ch 8 · Open GIS

Which OGC web service returns a rendered map image rather than the data themselves?

AWMS
BCSW
CWFS
DWCS
Answer is hidden
Question 613 of 1100Ch 8 · Open GIS

To download vector features so that they can be queried and edited in a desktop GIS, the appropriate service is:

AWMTS
BWFS
CWPS
DWMS
Answer is hidden
Question 614 of 1100Ch 8 · Open GIS

The operation that must be issued first to discover the layers, coordinate systems and formats offered by any OGC service is:

ADescribeCoverage
BGetFeature
CGetCapabilities
DGetMap
Answer is hidden
Question 615 of 1100Ch 8 · Open GIS

Which service should be used when the actual pixel values of a satellite image are required for further analysis?

AWCS
BWMTS
CWMS
DWFS
Answer is hidden
Question 616 of 1100Ch 8 · Open GIS

Editing features stored on a remote server over the web requires:

AWMTS with GetTile
BWCS with GetCoverage
CWFS-T with the Transaction operation
DWMS with GetFeatureInfo
Answer is hidden
Question 617 of 1100Ch 8 · Open GIS

Which statement about 'open' in the term Open GIS is correct?

AIt means the software must be free of charge
BIt means the source code must be published
CIt refers to open, vendor-neutral specifications, which proprietary software may also implement
DIt means the data must be in the public domain
Answer is hidden
Question 618 of 1100Ch 8 · Open GIS

GeoServer is best described as:

AA desktop GIS for editing and cartography
BA Java server that publishes spatial data as OGC web services
CA spatial database management system
DA JavaScript web-mapping client library
Answer is hidden
Question 619 of 1100Ch 8 · Open GIS

In GeoServer, layers are organised within a:

AMapfile
BWorkspace, which contains stores and layers
CSchema, which contains tables only
DTile matrix set
Answer is hidden
Question 620 of 1100Ch 8 · Open GIS

The library used by almost every GIS package for reading, writing and converting raster and vector formats is:

AGEOS
BGDAL/OGR
CPROJ
DJTS
Answer is hidden
Question 621 of 1100Ch 8 · Open GIS

A WMS layer added to a desktop GIS cannot be:

AQueried with GetFeatureInfo
BMade partially transparent
CEdited or analysed attribute by attribute locally
DDisplayed over a base map
Answer is hidden
Question 622 of 1100Ch 8 · Open GIS

A WMS 1.3.0 request in EPSG:4326 returns a blank or wrongly located map although the same request works in version 1.1.1. The most likely cause is:

AThe BBOX axis order, which follows the CRS definition in 1.3.0 (latitude first)
BA missing SLD document
CThe absence of GetCapabilities
DAn unsupported image format
Answer is hidden
Question 623 of 1100Ch 8 · Open GIS

OpenStreetMap data are an example of:

AA raster coverage standard
BProprietary commercial data
COpen data produced by volunteered geographic information
DAn OGC service specification
Answer is hidden
Question 624 of 1100Ch 8 · Open GIS

Which OGC service delivers pre-rendered tiles from a fixed tile matrix for fast web display?

AWMS
BWPS
CWMTS
DWFS
Answer is hidden
Question 625 of 1100Ch 9 · Introduction to Engineering Survey

The survey stage whose purpose is to transfer the designed centre line, levels and grades onto the ground is the:

AReconnaissance survey
BAs-built survey
CConstruction (setting-out) survey
DPreliminary survey
Answer is hidden
Question 626 of 1100Ch 9 · Introduction to Engineering Survey

The fundamental principle that control should be established over the whole area before any detail is surveyed is stated as:

AWork from the part to the whole
BAlways use the shortest sight
CMeasure twice, plot once
DWork from the whole to the part
Answer is hidden
Question 627 of 1100Ch 9 · Introduction to Engineering Survey

Balancing the backsight and foresight distances in differential levelling principally eliminates:

AStaff graduation error
BCollimation error, and most of curvature and refraction
CSettlement of the tripod
DParallax
Answer is hidden
Question 628 of 1100Ch 9 · Introduction to Engineering Survey

A permissible misclosure of 12 root K millimetres, with K in kilometres, applies to:

AA GNSS baseline
BA closed levelling circuit
CA linear traverse misclosure
DAn angular traverse misclosure
Answer is hidden
Question 629 of 1100Ch 9 · Introduction to Engineering Survey

Which type of traverse should never be used as a control framework for an engineering project?

AA closed-link traverse between two known points
BA closed-loop traverse
CAn open traverse with no closure
DA traverse adjusted by least squares
Answer is hidden
Question 630 of 1100Ch 9 · Introduction to Engineering Survey

The feasibility (detailed) survey of a road project is primarily intended to provide:

AThe as-built record of the completed road
BDaily checks during construction
CThe data for design, quantities and the decision to proceed
DA rapid comparison of possible corridors
Answer is hidden
Question 631 of 1100Ch 9 · Introduction to Engineering Survey

Benchmarks for a construction project should be located:

AOn temporary timber stakes
BOutside the zone likely to be disturbed by construction
CInside the excavation for convenience
DOnly at the two ends of the site
Answer is hidden
Question 632 of 1100Ch 9 · Introduction to Engineering Survey

A project grid is sometimes defined with a scale factor of unity at the mean project height in order to:

AAvoid applying projection and height corrections during setting out
BAllow the use of magnetic bearings
CReduce the cost of monumentation
DEliminate the need for benchmarks
Answer is hidden
Question 633 of 1100Ch 9 · Introduction to Engineering Survey

In Nepal, plane coordinates for engineering projects are traditionally referred to:

AThe Indian grid on WGS84
BThe Lambert conformal conic on GRS80
CA purely arbitrary assumed datum
DThe Modified UTM projection on the Everest 1830 datum
Answer is hidden
Question 634 of 1100Ch 9 · Introduction to Engineering Survey

Which of the following is NOT an objective of engineering survey?

AMeasuring quantities for payment
BDetermining the legal ownership of land parcels
CSetting out the works
DProviding a control framework
Answer is hidden
Question 635 of 1100Ch 9 · Introduction to Engineering Survey

An angular misclosure limit expressed as c root n seconds in a traverse depends on:

AThe area enclosed
BThe number of angle stations
CThe number of benchmarks
DThe length of the traverse in kilometres
Answer is hidden
Question 636 of 1100Ch 9 · Introduction to Engineering Survey

The survey stage that compares alternative alignments before a final route is chosen is the:

AQuantity survey
BPreliminary survey
CConstruction survey
DDeformation monitoring survey
Answer is hidden
Question 637 of 1100Ch 9 · Introduction to Engineering Survey

For a control traverse serving a major bridge, a relative precision of 1:25,000 rather than 1:10,000 is specified because:

AThe traverse is longer
BFewer instruments are available
CThe tolerance on setting out the structure is much tighter
DThe site is at high altitude
Answer is hidden
Question 638 of 1100Ch 9 · Hydrographic, Hydropower and Irrigation Survey

An echo sounder records a two-way travel time of 0.02 s in water where the speed of sound is 1,500 m/s. The depth is:

A7.5 m
B300 m
C15 m
D30 m
Answer is hidden
Question 639 of 1100Ch 9 · Hydrographic, Hydropower and Irrigation Survey

In the two-point method of current-meter gauging, velocity observations are taken at depths of:

A0.2 and 0.8 of the total depth
B0.6 depth only
C0.5 depth only
D0.1 and 0.9 of the total depth
Answer is hidden
Question 640 of 1100Ch 9 · Hydrographic, Hydropower and Irrigation Survey

Which instrument measures a profile of water velocity using the Doppler shift of sound backscattered from particles in the flow?

AStaff gauge
BSingle-beam echo sounder
CSide-scan sonar
DADCP
Answer is hidden
Question 641 of 1100Ch 9 · Hydrographic, Hydropower and Irrigation Survey

River cross-sections for design purposes must be taken:

AParallel to the bank at fixed offsets
BPerpendicular to the direction of flow and beyond the high-flood level
COnly where the river is shallow
DAlong the thalweg
Answer is hidden
Question 642 of 1100Ch 9 · Hydrographic, Hydropower and Irrigation Survey

The relationship between gauge height and discharge at a gauging station is called the:

AMass haul curve
BHypsometric curve
CRating curve
DElevation-capacity curve
Answer is hidden
Question 643 of 1100Ch 9 · Hydrographic, Hydropower and Irrigation Survey

Which project component fixes the net head of a hydropower scheme at its lower end?

AThe intake sill
BThe surge tank
CThe tailrace water level
DThe gravel trap
Answer is hidden
Question 644 of 1100Ch 9 · Hydrographic, Hydropower and Irrigation Survey

The essential difference between a dam and a weir is that a weir:

ARaises and diverts the water level without providing significant storage
BIs constructed only on canals
CGenerates power directly
DIs always built of concrete
Answer is hidden
Question 645 of 1100Ch 9 · Hydrographic, Hydropower and Irrigation Survey

Setting out a bridge pier standing in deep water is best done by:

AUsing a sounding rod
BOffsetting from the water surface
CChaining from the nearer bank
DIntersection from two or more shore control points, or RTK GNSS, with an independent check
Answer is hidden
Question 646 of 1100Ch 9 · Hydrographic, Hydropower and Irrigation Survey

Soundings taken over several hours in a river must be reduced to a common datum by using:

AThe water-level record at a nearby gauge for the same times
BThe speed of sound in water
CThe average of the deepest and shallowest sounding
DThe boat's draft only
Answer is hidden
Question 647 of 1100Ch 9 · Hydrographic, Hydropower and Irrigation Survey

The float method of discharge measurement is regarded as approximate mainly because:

AIt requires an expensive current meter
BSurface velocity must be converted to mean velocity by an assumed coefficient
CIt can only be used in canals
DFloats cannot be seen in muddy water
Answer is hidden
Question 648 of 1100Ch 9 · Hydrographic, Hydropower and Irrigation Survey

Dilution (salt-tracer) gauging is particularly suitable for:

AStill reservoirs
BSteep, turbulent mountain streams where a current meter cannot be used
CWide, slow lowland rivers
DPipe flow under pressure
Answer is hidden
Question 649 of 1100Ch 9 · Hydrographic, Hydropower and Irrigation Survey

The elevation-area-capacity curve of a reservoir is derived from:

AThe rating curve of the river
BThe mass haul diagram
CContours of the reservoir area obtained by survey
DThe longitudinal profile of the penstock
Answer is hidden
Question 650 of 1100Ch 9 · Hydrographic, Hydropower and Irrigation Survey

In the formula P = rho g Q H eta, the two quantities supplied directly by survey work are:

Aeta and g
Brho and g
CQ from gauging and H from precise levelling
Drho and eta
Answer is hidden
Question 651 of 1100Ch 9 · Underground Surveying

Which instrument is used underground to determine true north independently of the surface network?

AGyro-theodolite
BGNSS receiver
CMagnetic compass
DDigital level
Answer is hidden
Question 652 of 1100Ch 9 · Underground Surveying

The Weisbach triangle is used in underground surveying to:

ASet out a transition curve
BCompute overbreak volumes
CTransfer azimuth from the surface into a tunnel through a shaft
DMeasure the convergence of tunnel walls
Answer is hidden
Question 653 of 1100Ch 9 · Underground Surveying

Survey stations in a tunnel are normally fixed in the roof rather than on the floor because:

AThe floor is constantly disturbed by excavation and haulage
BThe roof is always drier
CLevels cannot be read from the floor
DRoof stations are cheaper
Answer is hidden
Question 654 of 1100Ch 9 · Underground Surveying

Excavation beyond the designed tunnel profile is termed:

AConvergence
BOverbreak
CSubsidence
DUnderbreak
Answer is hidden
Question 655 of 1100Ch 9 · Underground Surveying

When transferring level down a shaft with a suspended steel tape, which correction is specific to this operation?

AThe correction for collimation
BThe correction for parallax
CThe correction for curvature and refraction
DThe correction for the weight of the hanging tape itself
Answer is hidden
Question 656 of 1100Ch 9 · Underground Surveying

In a long tunnel driven from both ends, the breakthrough error component that is most critical and is governed chiefly by azimuth error is the:

AVertical component
BLateral (transverse) component
CLongitudinal component
DRadial component
Answer is hidden
Question 657 of 1100Ch 9 · Underground Surveying

Convergence measurement in a tunnel is used principally to:

AAssess the behaviour of the rock mass and the adequacy of the support
BSet out the drill pattern
CCompute the excavated volume
DCheck the tunnel gradient
Answer is hidden
Question 658 of 1100Ch 9 · Underground Surveying

Convergence readings that decelerate and level off with time indicate that:

AThe tunnel section is stabilising
BThe support is failing
CThe readings are erroneous
DOverbreak is increasing
Answer is hidden
Question 659 of 1100Ch 9 · Underground Surveying

In electrical resistivity tomography, apparent resistivity is computed as:

AThe geometric factor multiplied by the ratio of measured voltage to injected current
BThe injected current divided by the electrode spacing
CThe depth divided by the electrode spacing
DThe voltage multiplied by the current
Answer is hidden
Question 660 of 1100Ch 9 · Underground Surveying

Increasing the separation of the electrodes in a resistivity survey results in:

AA stronger measured signal
BBetter horizontal resolution near the surface
CInvestigation of greater depth
DMeasurement of seismic velocity
Answer is hidden
Question 661 of 1100Ch 9 · Underground Surveying

A zone of markedly low resistivity detected along a proposed tunnel alignment most likely indicates:

AAn air-filled cavity
BDry sand and gravel
CClay, or a saturated fractured shear zone
DDry massive granite
Answer is hidden
Question 662 of 1100Ch 9 · Underground Surveying

Which array is generally preferred when good lateral resolution of vertical structures such as fracture zones is required?

ASchlumberger
BPole-pole
CWenner
DDipole-dipole
Answer is hidden
Question 663 of 1100Ch 9 · Underground Surveying

The accuracy of the breakthrough between two tunnel headings depends most strongly on:

AThe colour of the targets
BThe strength of the surface control network linking the portals
CThe ventilation system
DThe type of explosive used
Answer is hidden
Question 664 of 1100Ch 9 · Route Surveying

For a simple circular curve, the tangent length is given by:

AT = R tan(delta/2)
BT = R sin(delta/2)
CT = 2R sin(delta/2)
DT = R (sec(delta/2) - 1)
Answer is hidden
Question 665 of 1100Ch 9 · Route Surveying

A circular curve of radius 300 m has a deflection angle of 60 degrees. Its length is:

A346.41 m
B157.08 m
C314.16 m
D300.00 m
Answer is hidden
Question 666 of 1100Ch 9 · Route Surveying

If the chainage of the point of intersection is 1,250 m and the tangent length is 80 m with a curve length of 150 m, the chainage of the point of tangency (T2) is:

A1,320 m
B1,330 m
C1,170 m
D1,480 m
Answer is hidden
Question 667 of 1100Ch 9 · Route Surveying

In Rankine's method of setting out a curve by deflection angles, the arithmetic check at the end is that:

AThe total deflection angle equals half the deflection angle of the curve
BThe sum of the chords equals the long chord
CThe total deflection angle equals the full deflection angle
DThe last offset equals the mid-ordinate
Answer is hidden
Question 668 of 1100Ch 9 · Route Surveying

The degree of a curve on a 30 m arc basis is 4 degrees. Its radius is approximately:

A430 m
B215 m
C300 m
D860 m
Answer is hidden
Question 669 of 1100Ch 9 · Route Surveying

The principal purpose of a transition curve is to:

AReplace the need for a vertical curve
BIntroduce the centrifugal force and superelevation gradually
CShorten the length of the alignment
DReduce the earthwork quantity
Answer is hidden
Question 670 of 1100Ch 9 · Route Surveying

In a clothoid transition curve, the product of radius and length along the curve is:

AProportional to the deflection angle
BConstant
CZero at the start
DEqual to the shift
Answer is hidden
Question 671 of 1100Ch 9 · Route Surveying

The shift of a circular curve to accommodate a transition of length Ls is:

ALs squared divided by 2R
BLs divided by 2R
CLs squared divided by 6R
DLs squared divided by 24R
Answer is hidden
Question 672 of 1100Ch 9 · Route Surveying

Superelevation for highways is computed from the relation:

Ae + f = V squared / (127 R)
Be + f = V squared / (225 R)
Ce + f = 127 V squared / R
De = V / (127 R)
Answer is hidden
Question 673 of 1100Ch 9 · Route Surveying

Full superelevation on a road curve provided with transitions should be attained:

AAt the middle of the circular curve
BOnly at the end of the circular curve
CAt the beginning of the circular curve, having been introduced along the transition
DAt the point of intersection
Answer is hidden
Question 674 of 1100Ch 9 · Route Surveying

Vertical curves used on roads and railways are normally:

AClothoid spirals
BSimple parabolas
CLemniscates
DCircular arcs
Answer is hidden
Question 675 of 1100Ch 9 · Route Surveying

A summit vertical curve joins a grade of +3 % to a grade of -2 %. The algebraic grade difference A is:

A1 %
B5 %
C-5 %
D6 %
Answer is hidden
Question 676 of 1100Ch 9 · Route Surveying

The length of a sag vertical curve at night is usually governed by:

AThe permissible superelevation
BStopping sight distance over the crest
CHeadlight sight distance
DOvertaking sight distance
Answer is hidden
Question 677 of 1100Ch 9 · Basic Civil Engineering

The part of a building that transfers the load to the soil is the:

ASuperstructure
BParapet
CSubstructure
DLintel
Answer is hidden
Question 678 of 1100Ch 9 · Basic Civil Engineering

Which foundation type would be adopted where the good bearing stratum lies at a considerable depth?

APile foundation
BIsolated footing
CRaft on the surface
DStrip footing
Answer is hidden
Question 679 of 1100Ch 9 · Basic Civil Engineering

The essential functional difference between a dam and a weir is that a weir:

AIs used only for power generation
BRequires no spillway or energy dissipation
CRaises and diverts water without creating significant storage
DIs always higher than a dam
Answer is hidden
Question 680 of 1100Ch 9 · Basic Civil Engineering

The most critical element for the safety of a dam during a flood is the:

AParapet wall
BSpillway
CGallery
DGrout curtain
Answer is hidden
Question 681 of 1100Ch 9 · Basic Civil Engineering

In a flexible road pavement the layer immediately below the surface course is the:

ABase course
BSub-base
CWearing coat
DSubgrade
Answer is hidden
Question 682 of 1100Ch 9 · Basic Civil Engineering

Setting out (stakeout) differs from ordinary surveying in that it:

ADetermines the position of existing features
BPlaces designed positions and levels on the ground
CIs always done with a tape only
DRequires no control framework
Answer is hidden
Question 683 of 1100Ch 9 · Basic Civil Engineering

The squareness of a rectangular building set out on the ground is most simply checked by:

ALevelling the four corners
BMeasuring the perimeter
CChecking with a magnetic compass
DMeasuring and comparing the two diagonals
Answer is hidden
Question 684 of 1100Ch 9 · Basic Civil Engineering

A sight rail used with a boning rod in trench excavation provides:

AA line of sight at a fixed height above the required invert level
BThe bearing of the pipeline
CThe bearing capacity of the soil
DThe horizontal alignment of the trench
Answer is hidden
Question 685 of 1100Ch 9 · Basic Civil Engineering

Piers of a bridge standing in a wide river are best set out by:

AOffsets from the water's edge
BTaping from the abutment
CThe 3-4-5 rule
DAngular intersection from shore control, or RTK GNSS
Answer is hidden
Question 686 of 1100Ch 9 · Basic Civil Engineering

Slope (batter) stakes are set to mark the:

ACatch point where the design side slope meets the natural ground
BCentre line of the road
CPosition of the kerb
DLevel of the wearing course
Answer is hidden
Question 687 of 1100Ch 9 · Basic Civil Engineering

Which principle should always be observed when setting out a structure?

ASet out each point from the previously set out point
BSet out detail before the control framework
CSet out from established control and check every point independently
DUse only a tape to avoid instrument error
Answer is hidden
Question 688 of 1100Ch 9 · Basic Civil Engineering

Neglecting the scale factor between grid and ground distances during setting out on a national projection will cause:

AAn error in level but not in position
BNo error at all
CA systematic error in the lengths laid out on the ground
DA random error only
Answer is hidden
Question 689 of 1100Ch 9 · Basic Civil Engineering

Nepal's hydropower projects are predominantly of which type?

ALarge storage reservoir with an arch dam
BRun-of-river with a weir and side intake
CTidal
DPumped storage
Answer is hidden
Question 690 of 1100Ch 9 · Quantity Survey

Simpson's one-third rule for the area of a figure bounded by offsets can be applied only when:

AThere is an even number of offsets
BThe boundary is a straight line
CThere is an odd number of offsets, that is an even number of intervals
DThe offsets are unequally spaced
Answer is hidden
Question 691 of 1100Ch 9 · Quantity Survey

Compared with the prismoidal formula, the average end-area formula generally:

AUnderestimates the volume
BOverestimates the volume
CCannot be used for earthwork
DGives exactly the same volume always
Answer is hidden
Question 692 of 1100Ch 9 · Quantity Survey

In the prismoidal formula V = (L/6)(A1 + 4Am + A2), the mid-area Am is:

AThe arithmetic mean of A1 and A2
BThe larger of A1 and A2
CAlways zero for a cutting
DThe area computed from the mean dimensions of the two end sections
Answer is hidden
Question 693 of 1100Ch 9 · Quantity Survey

On a mass haul diagram, a portion of the curve that is rising indicates that the section is in:

AFill
BBorrow
CNeither cut nor fill
DCut
Answer is hidden
Question 694 of 1100Ch 9 · Quantity Survey

A maximum (peak) on a mass haul curve corresponds on the ground to:

AThe point of greatest fill
BA change from cut to fill
CThe end of the project
DA change from fill to cut
Answer is hidden
Question 695 of 1100Ch 9 · Quantity Survey

The area enclosed between the mass haul curve and a balancing line represents:

AThe shrinkage of the fill
BThe volume of borrow required
CThe haul, that is volume multiplied by distance
DThe free-haul distance
Answer is hidden
Question 696 of 1100Ch 9 · Quantity Survey

If the mass haul curve lies above the balancing line, the direction of haul is:

AIndeterminate
BVertical
CForward, from left to right
DBackward, from right to left
Answer is hidden
Question 697 of 1100Ch 9 · Quantity Survey

The volume of material transported beyond the free-haul distance is called:

ABorrow
BBulking
COverhaul
DWaste
Answer is hidden
Question 698 of 1100Ch 9 · Quantity Survey

Excavated soil occupying a greater volume in the loose state than in situ is described as:

ABulking or swell
BConsolidation
COverhaul
DShrinkage
Answer is hidden
Question 699 of 1100Ch 9 · Quantity Survey

The unit weight of a 16 mm reinforcement bar, using the standard formula, is approximately:

A3.85 kg/m
B2.47 kg/m
C0.99 kg/m
D1.58 kg/m
Answer is hidden
Question 700 of 1100Ch 9 · Quantity Survey

To compute the area of a closed traverse from the coordinates of its corners, the appropriate method is:

ASimpson's rule
BThe shoelace (cross-multiplication) rule
CThe grid method of spot levels
DThe average end-area formula
Answer is hidden
Question 701 of 1100Ch 9 · Quantity Survey

For one cubic metre of 1:2:4 nominal mix concrete, the quantity of cement is about:

A10 bags
B4.5 bags
C8.6 bags
D6.3 bags
Answer is hidden
Question 702 of 1100Ch 9 · Quantity Survey

The estimate prepared item by item from the drawings and priced at analysed rates, forming the basis of the bill of quantities, is the:

APlinth area estimate
BDetailed estimate
CCube rate estimate
DRevised estimate
Answer is hidden
Question 703 of 1100Ch 10 · Engineering Drawings and Their Concepts

The area of an A0 drawing sheet is:

A0.25 m²
B1 m²
C2 m²
D0.5 m²
Answer is hidden
Question 704 of 1100Ch 10 · Engineering Drawings and Their Concepts

The size of an A4 sheet is:

A148 × 210 mm
B297 × 420 mm
C420 × 594 mm
D210 × 297 mm
Answer is hidden
Question 705 of 1100Ch 10 · Engineering Drawings and Their Concepts

The title block of a drawing sheet is normally placed at the:

ACentre of the sheet
BTop-right corner
CTop-left corner
DBottom-right corner
Answer is hidden
Question 706 of 1100Ch 10 · Engineering Drawings and Their Concepts

In the unidirectional system of dimensioning, dimension figures are:

ARead from the right side only
BAll read from the bottom of the sheet
CPlaced inside the object always
DParallel to the dimension lines
Answer is hidden
Question 707 of 1100Ch 10 · Engineering Drawings and Their Concepts

A drawing made to a scale of 1 : 50 has a representative fraction of:

A50
B5/1
C1/50
D1/5
Answer is hidden
Question 708 of 1100Ch 10 · Engineering Drawings and Their Concepts

A scale that can show three units such as metre, decimetre and centimetre is a:

AScale of chords
BComparative scale
CPlain scale
DDiagonal scale
Answer is hidden
Question 709 of 1100Ch 10 · Engineering Drawings and Their Concepts

In first-angle projection, the top view is placed:

ABelow the front view
BBehind the front view
CAbove the front view
DTo the left of the front view
Answer is hidden
Question 710 of 1100Ch 10 · Engineering Drawings and Their Concepts

The true shape of an inclined surface is obtained from a/an:

APerspective view
BIsometric view
CAuxiliary view
DFront view
Answer is hidden
Question 711 of 1100Ch 10 · Engineering Drawings and Their Concepts

In isometric projection, lengths along the isometric axes are reduced to about:

A50% of true length
B82% of true length
C70.7% of true length
D100% of true length
Answer is hidden
Question 712 of 1100Ch 10 · Engineering Drawings and Their Concepts

The angle between any two isometric axes is:

A30°
B120°
C90°
D45°
Answer is hidden
Question 713 of 1100Ch 10 · Engineering Drawings and Their Concepts

In cabinet oblique projection, the receding lines are drawn:

ATo full scale
BConverging to a vanishing point
CTo half scale
DTo isometric scale
Answer is hidden
Question 714 of 1100Ch 10 · Engineering Drawings and Their Concepts

Which of the following is NOT sectioned (hatched) when cut along its axis?

ACasting body
BHub of a pulley
CShaft
DFlange of a coupling
Answer is hidden
Question 715 of 1100Ch 10 · Engineering Economics

Rs 10,000 is deposited at 10% compound interest per year. Its value after 2 years is:

ARs 12,210
BRs 12,000
CRs 12,100
DRs 11,000
Answer is hidden
Question 716 of 1100Ch 10 · Engineering Economics

The effective annual interest rate for 12% per year compounded monthly is about:

A12%
B1%
C12.68%
D13.5%
Answer is hidden
Question 717 of 1100Ch 10 · Engineering Economics

The factor used to find the equal annual payment needed to repay a present loan is the:

ACompound amount factor (F/P)
BCapital recovery factor (A/P)
CSinking fund factor (A/F)
DPresent worth factor (P/F)
Answer is hidden
Question 718 of 1100Ch 10 · Engineering Economics

The present worth of a perpetual annual income of Rs 1,000 at 10% interest is:

AInfinite
BRs 100
CRs 1,000
DRs 10,000
Answer is hidden
Question 719 of 1100Ch 10 · Engineering Economics

A project is economically acceptable by the NPV method when:

ANPV ≥ 0 at the MARR
BNPV is negative
CIRR is less than MARR
DNPV equals the initial investment
Answer is hidden
Question 720 of 1100Ch 10 · Engineering Economics

The internal rate of return is the discount rate at which:

ANPV is maximum
BNPV equals zero
CB/C ratio equals zero
DPayback is minimum
Answer is hidden
Question 721 of 1100Ch 10 · Engineering Economics

Compared with the simple payback period, the discounted payback period:

AIs always shorter
BConsiders cash flows after payback
CConsiders the time value of money
DIgnores all cash flows
Answer is hidden
Question 722 of 1100Ch 10 · Engineering Economics

MARR is best described as:

AThe inflation rate only
BThe minimum acceptable rate of return set by the investor
CThe rate at which NPV is maximum
DThe maximum rate charged by banks
Answer is hidden
Question 723 of 1100Ch 10 · Engineering Economics

For comparing alternatives with unequal lives, the most convenient method is:

AAnnual worth (equivalent uniform annual) method
BComparing first costs only
CSimple payback
DComparing total undiscounted costs
Answer is hidden
Question 724 of 1100Ch 10 · Engineering Economics

A machine costs Rs 60,000 with salvage Rs 10,000 after 5 years. Straight-line annual depreciation is:

ARs 12,000
BRs 50,000
CRs 10,000
DRs 14,000
Answer is hidden
Question 725 of 1100Ch 10 · Engineering Economics

The standard rate of Value Added Tax in Nepal is:

A15%
B10%
C13%
D18%
Answer is hidden
Question 726 of 1100Ch 10 · Engineering Economics

Under Nepal's Income Tax Act 2058, depreciation of assets is calculated using:

ASinking fund method
BPool-based declining balance method
COnly straight-line method
DUnits-of-production method only
Answer is hidden
Question 727 of 1100Ch 10 · Project Planning and Scheduling

A project is best defined as:

AA permanent organisation
BAny repetitive production activity
CA continuous routine operation
DA temporary endeavour undertaken to create a unique product, service or result
Answer is hidden
Question 728 of 1100Ch 10 · Project Planning and Scheduling

The phase of the project life cycle in which the feasibility study is carried out is:

AExecution phase
BInitiation/concept phase
CMonitoring phase
DClosure phase
Answer is hidden
Question 729 of 1100Ch 10 · Project Planning and Scheduling

The hierarchical decomposition of the total project scope into work packages is called:

ALogical framework
BGantt chart
CCritical path
DWork Breakdown Structure (WBS)
Answer is hidden
Question 730 of 1100Ch 10 · Project Planning and Scheduling

A major limitation of a bar (Gantt) chart is that it:

ADoes not clearly show interdependencies between activities
BCannot show activity durations
CIs difficult to understand
DCannot show a time scale
Answer is hidden
Question 731 of 1100Ch 10 · Project Planning and Scheduling

In an activity-on-arrow network, a dummy activity:

AHas zero duration and shows logical dependency only
BConsumes resources
CIs always on the critical path
DHas the longest duration
Answer is hidden
Question 732 of 1100Ch 10 · Project Planning and Scheduling

The critical path of a project network is the:

APath with maximum float
BShortest path through the network
CLongest path, with zero total float
DPath with the most activities
Answer is hidden
Question 733 of 1100Ch 10 · Project Planning and Scheduling

An activity has ES = 5, EF = 9, LS = 8, LF = 12. Its total float is:

A0
B7
C3
D4
Answer is hidden
Question 734 of 1100Ch 10 · Project Planning and Scheduling

In PERT, with to = 2, tm = 5 and tp = 14 days, the expected time is:

A21 days
B5 days
C6 days
D7 days
Answer is hidden
Question 735 of 1100Ch 10 · Project Planning and Scheduling

PERT is most suitable for:

AMass production lines
BRepetitive construction with known durations
CResearch and development projects with uncertain durations
DRoutine maintenance only
Answer is hidden
Question 736 of 1100Ch 10 · Project Planning and Scheduling

While crashing a project, the activity crashed first is the critical activity with the:

ALowest cost slope
BLongest duration
CMaximum float
DHighest cost slope
Answer is hidden
Question 737 of 1100Ch 10 · Project Planning and Scheduling

Rescheduling activities within their available float without changing the project completion date is called:

AFast-tracking
BResource smoothing
CCrashing
DResource levelling
Answer is hidden
Question 738 of 1100Ch 10 · Project Planning and Scheduling

In earned value management, a cost performance index (CPI) of 0.8 means the project is:

AAhead of schedule
BOver budget
CUnder budget
DExactly on budget
Answer is hidden
Question 739 of 1100Ch 10 · Project Management

The number of communication channels among 6 stakeholders is:

A30
B36
C6
D15
Answer is hidden
Question 740 of 1100Ch 10 · Project Management

Buying insurance against a project risk is an example of risk:

AAvoidance
BTransfer
CMitigation
DAcceptance
Answer is hidden
Question 741 of 1100Ch 10 · Project Management

Changing the project plan to eliminate a threat entirely is risk:

AAcceptance
BAvoidance
CTransfer
DExploitation
Answer is hidden
Question 742 of 1100Ch 10 · Project Management

A reserve kept for identified risks ('known unknowns') is the:

AManagement reserve
BRetention money
CSinking fund
DContingency reserve
Answer is hidden
Question 743 of 1100Ch 10 · Project Management

A quantitative risk analysis technique that uses repeated random sampling of uncertain variables is:

AChecklist analysis
BMonte Carlo simulation
CSWOT analysis
DBrainstorming
Answer is hidden
Question 744 of 1100Ch 10 · Project Management

In a BOT arrangement, the private party:

AOnly designs the project
BBuilds, operates for a concession period and then transfers the facility
COnly supplies labour
DBuys the project from government permanently
Answer is hidden
Question 745 of 1100Ch 10 · Project Management

Project finance on a non-recourse basis means lenders are repaid mainly from:

AGovernment taxes
BThe sponsor's other assets
CThe project's own cash flows
DPersonal guarantees of engineers
Answer is hidden
Question 746 of 1100Ch 10 · Project Management

Public procurement in Nepal is governed by the:

ALabour Act 2074
BCompany Act 2063 only
CPublic Procurement Act 2063
DContract Act 2025
Answer is hidden
Question 747 of 1100Ch 10 · Project Management

The security submitted with a bid, forfeited if the bidder withdraws the bid during its validity, is the:

ABid security
BAdvance payment guarantee
CRetention money
DPerformance security
Answer is hidden
Question 748 of 1100Ch 10 · Project Management

A contract in which payment is made on the basis of measured quantities of work and quoted unit rates is a/an:

ACost-plus contract
BTurnkey contract
CLump-sum contract
DItem-rate (unit-rate) contract
Answer is hidden
Question 749 of 1100Ch 10 · Project Management

A contract in which one contractor is responsible for design, procurement, construction and commissioning is a:

APercentage-rate contract
BLabour contract
CItem-rate contract
DTurnkey (EPC) contract
Answer is hidden
Question 750 of 1100Ch 10 · Project Management

A pre-agreed amount payable by the contractor for delay in completion is called:

ALiquidated damages
BMobilisation advance
CVariation
DRetention money
Answer is hidden
Question 751 of 1100Ch 10 · Engineering Professional Practice

According to engineering codes of ethics, an engineer's foremost obligation is to:

AObey all instructions of the client
BMaximise the employer's profit
CHold paramount the safety, health and welfare of the public
DComplete work at minimum cost
Answer is hidden
Question 752 of 1100Ch 10 · Engineering Professional Practice

An engineer asked to design work outside his/her area of expertise should:

AAsk a junior to do it
BAccept to gain experience
CSign the drawings anyway
DDecline or engage a competent specialist
Answer is hidden
Question 753 of 1100Ch 10 · Engineering Professional Practice

The ethical theory that seeks the greatest good for the greatest number is:

AVirtue ethics
BUtilitarianism
CEgoism
DDeontology
Answer is hidden
Question 754 of 1100Ch 10 · Engineering Professional Practice

An engineer who has a financial interest in a supplier recommended to a client should:

AReject all other suppliers
BDisclose the conflict of interest to the client
CKeep it secret
DAccept a commission from the supplier
Answer is hidden
Question 755 of 1100Ch 10 · Engineering Professional Practice

Signing and sealing drawings not prepared or supervised by oneself is:

AA normal professional courtesy
BUnethical
CAcceptable if paid
DRequired by law
Answer is hidden
Question 756 of 1100Ch 10 · Engineering Professional Practice

Whistle-blowing is generally justified when:

AIt brings personal benefit
BThe engineer dislikes the manager
CSerious public harm is involved and internal channels have been exhausted
DNo evidence is available
Answer is hidden
Question 757 of 1100Ch 10 · Engineering Professional Practice

The seismic design provisions for buildings in Nepal are contained in:

ANepal National Building Code (NBC 105)
BLabour Act
CPublic Procurement Act
DElectricity Act
Answer is hidden
Question 758 of 1100Ch 10 · Engineering Professional Practice

The law that sets out environmental assessment requirements (IEE/EIA) for projects in Nepal is the:

AArbitration Act 2055
BNepal Engineering Council Act 2055
CEnvironment Protection Act 2076
DCompany Act 2063
Answer is hidden
Question 759 of 1100Ch 10 · Engineering Professional Practice

The Nepal Engineers' Association was established in:

A2055 BS (1998 AD)
B2019 BS (1962 AD)
C2046 BS (1990 AD)
D2072 BS (2015 AD)
Answer is hidden
Question 760 of 1100Ch 10 · Engineering Professional Practice

The Nepal Engineers' Association is best described as:

AA voluntary professional association of engineers
BA government ministry
CA contractors' federation
DThe statutory regulatory body that registers engineers
Answer is hidden
Question 761 of 1100Ch 10 · Engineering Professional Practice

In the hierarchy of controls for occupational safety, the last line of defence is:

AEngineering controls
BElimination
CPersonal protective equipment
DSubstitution
Answer is hidden
Question 762 of 1100Ch 10 · Engineering Professional Practice

A leading cause of fatal accidents on construction sites is:

ANoise exposure
BFalls from height
CPoor lighting in offices
DEye strain
Answer is hidden
Question 763 of 1100Ch 10 · Engineering Regulatory Body: Nepal Engineering Council

The Nepal Engineering Council was established under the:

APublic Procurement Act 2063
BNepal Engineering Council Act 2055 (1998)
CCompany Act 2063
DBuilding Act 2055
Answer is hidden
Question 764 of 1100Ch 10 · Engineering Regulatory Body: Nepal Engineering Council

The Nepal Engineering Council Regulations were issued in:

A2074 BS
B2055 BS
C2063 BS
D2057 BS
Answer is hidden
Question 765 of 1100Ch 10 · Engineering Regulatory Body: Nepal Engineering Council

The Nepal Engineering Council is best described as:

AA trade union
BA voluntary association of engineers
CA statutory body regulating the engineering profession
DA private consulting firm
Answer is hidden
Question 766 of 1100Ch 10 · Engineering Regulatory Body: Nepal Engineering Council

A person who wants to practise as an engineer in Nepal must:

AOnly hold a trade licence
BRegister with the Company Registrar
CBe registered with the Nepal Engineering Council
DOnly be a member of NEA
Answer is hidden
Question 767 of 1100Ch 10 · Engineering Regulatory Body: Nepal Engineering Council

Recognition of engineering educational programmes and institutions in Nepal is a function of the:

ADepartment of Industry
BNepal Engineering Council
CPublic Procurement Monitoring Office
DNepal Engineers' Association
Answer is hidden
Question 768 of 1100Ch 10 · Engineering Regulatory Body: Nepal Engineering Council

A disciplinary action the Nepal Engineering Council can take for serious professional misconduct is:

ACancellation of the engineer's registration
BRevoking citizenship
CConfiscation of property
DImprisonment without trial
Answer is hidden
Question 769 of 1100Ch 10 · Engineering Regulatory Body: Nepal Engineering Council

The official who maintains the register of engineers at NEC is the:

AChief Justice
BRegistrar
CAuditor General
DCompany Registrar
Answer is hidden
Question 770 of 1100Ch 10 · Engineering Regulatory Body: Nepal Engineering Council

According to the NEC code of conduct, an engineer should:

ASign drawings prepared by others without checking
BAccept any work offered
CShare confidential client data freely
DUndertake only work within his/her competence
Answer is hidden
Question 771 of 1100Ch 10 · Engineering Regulatory Body: Nepal Engineering Council

Obtaining work by paying a bribe is:

AA violation of the code of conduct
BAllowed if disclosed later
CAcceptable in competitive markets
DRequired for public contracts
Answer is hidden
Question 772 of 1100Ch 10 · Engineering Regulatory Body: Nepal Engineering Council

Which statement about NEC and NEA is correct?

ABoth are voluntary
BNEC registration is compulsory to practise; NEA membership is voluntary
CBoth are government ministries
DNEA registration is compulsory; NEC membership is voluntary
Answer is hidden
Question 773 of 1100Ch 10 · Project Planning, Design and Implementation

The approval of design, drawing before the construction of a building in the city area of Nepal is done by ............

Avillage development committee
Bdistrict development committee
Cmunicipality
Dnone of the above
Answer is hidden
Question 774 of 1100Ch 10 · Project Planning, Design and Implementation

The width of the standard A-series drawing paper such as A₄, A₃, A₂, ...... is ............

A1/3 times the length of the paper
B1/√2 times the length of the paper
C1/2 times the length of the paper
D1/√3 times the length of the paper
Answer is hidden
Question 775 of 1100Ch 10 · Project Planning, Design and Implementation

The area of A₀ size paper is ............[cite: 15]

A0.25 m²
B0.5 m²
C0.75 m²
D1 m²
Answer is hidden
Question 776 of 1100Ch 10 · Project Planning, Design and Implementation

The standard size of drawing board of designation D₁ is (in mm) ............[cite: 15]

A1000 × 700 × 25
B100 × 75 × 25
C1500 × 750 × 25
D1500 × 700 × 25
Answer is hidden
Question 777 of 1100Ch 10 · Project Planning, Design and Implementation

Paper is designated by which letter?[cite: 15]

AA
BB
CC
DD
Answer is hidden
Question 778 of 1100Ch 10 · Project Planning, Design and Implementation

Title block gives information about ............[cite: 15]

Atitle of the drawing
Bscale used for the drawing
Cserial number of the drawing
Dall of the above
Answer is hidden
Question 779 of 1100Ch 10 · Project Planning, Design and Implementation

Which of the following is not included in title block of drawing sheet?[cite: 15]

ASheet number
BScale
CMethod of projection
DSize of sheet
Answer is hidden
Question 780 of 1100Ch 10 · Project Planning, Design and Implementation

As per BIS, the size of title block in drawing sheet is ............[cite: 15]

A25 mm × 10 mm
B100 mm × 25 mm
C65 mm × 185 mm
D185 mm × 65 mm
Answer is hidden
Question 781 of 1100Ch 10 · Project Planning, Design and Implementation

The length: width in case of an arrow head is ............[cite: 15]

A1:1
B2:1
C3:1
D4:1
Answer is hidden
Question 782 of 1100Ch 10 · Project Planning, Design and Implementation

What is the inclination of inclined lettering?[cite: 15]

A75 degree
B65 degree
C45 degree
D85 degree
Answer is hidden
Question 783 of 1100Ch 10 · Project Planning, Design and Implementation

The aspect ratio of a letter refers to the ratio of its ............[cite: 15]

Aheight to its width
Bwidth to height
Clength to width
Dwidth to length
Answer is hidden
Question 784 of 1100Ch 10 · Project Planning, Design and Implementation

The size of the letter means the ............ of the letter.[cite: 15]

Athickness
Bheight
Clength
Dwidth
Answer is hidden
Question 785 of 1100Ch 10 · Project Planning, Design and Implementation

The dimension system is unidirectional if ............[cite: 15]

Adimensions in the drawing sheet can be read from anywhere on the drawing sheet
Bdimensions in the drawing sheet can be read from the bottom edge of the drawing sheet
Cdimensions in the drawing sheet can be read from the bottom and right-hand edge of the drawing sheet
Ddimensions cannot be read
Answer is hidden
Question 786 of 1100Ch 10 · Project Planning, Design and Implementation

In aligned system of dimensioning, the dimensions may be read from ............[cite: 15]

Abottom or right hand edges
Bbottom or left hand edges
Conly from bottom
Donly from left side
Answer is hidden
Question 787 of 1100Ch 10 · Project Planning, Design and Implementation

Maps are drawn in which scale?[cite: 15]

AEnlarging
BReducing
CBalanced
DAll of the above
Answer is hidden
Question 788 of 1100Ch 10 · Project Planning, Design and Implementation

A full scale technical drawing will have a scale factor of ............

A1:1
B1:2
C2:1
D1:4
Answer is hidden
Question 789 of 1100Ch 10 · Project Planning, Design and Implementation

Which of the following represent reducing scale?

A1:1
B1:25
C2:1
D10:1
Answer is hidden
Question 790 of 1100Ch 10 · Project Planning, Design and Implementation

Which of the following is enlarging scale?

A1:5
B1:2
C5:1
D1:2
Answer is hidden
Question 791 of 1100Ch 10 · Project Planning, Design and Implementation

Given representative factor as 4/50 and maximum length is 100 cm. Find the length of scale.

A8 cm
B10 cm
C9.7 cm
D12 cm
Answer is hidden
Question 792 of 1100Ch 10 · Project Planning, Design and Implementation

A line of 1 meter is shown by 1 cm on a scale; its representative factor (RF) is ............[cite: 16]

A1
B100
C1/100
D1/50
Answer is hidden
Question 793 of 1100Ch 10 · Project Planning, Design and Implementation

Freehand sketching can be done only when one has ............[cite: 16]

Aproper proficiency
Bgood practice
Cgood intuition
Dall of the above
Answer is hidden
Question 794 of 1100Ch 10 · Project Planning, Design and Implementation

The techniques for free hand sketch to drawing circle is ............[cite: 16]

Afixing a fixed point and are
Bfixing the perimeter
Cfixing the radius only
Dnone of the above
Answer is hidden
Question 795 of 1100Ch 10 · Project Planning, Design and Implementation

The type of line that projects from an object for the express purpose of locating a dimension is a ............[cite: 16]

Avisible line
Bhidden line
Cextension line
Ddimension line
Answer is hidden
Question 796 of 1100Ch 10 · Project Planning, Design and Implementation

Which the following is represented by a dotted line?[cite: 16]

AHidden edges
BProjection line
CVisible outlines
DHatching line
Answer is hidden
Question 797 of 1100Ch 10 · Project Planning, Design and Implementation

Which of the following line is used for dimension lines?[cite: 16]

AContinuous thick
BContinuous thin
CChain thin
DShort zig-zag line
Answer is hidden
Question 798 of 1100Ch 10 · Project Planning, Design and Implementation

Which of the following line is used for visible outlines?[cite: 16]

AContinuous thick
BContinuous thin
CChain thin
DShort zig-zag line
Answer is hidden
Question 799 of 1100Ch 10 · Project Planning, Design and Implementation

The hidden line are drawn as ............[cite: 16]

Adashed narrow lines
Bdashed wide lines
Clong-dashed dotted wide line
Dlong-dashed double dotted wide line
Answer is hidden
Question 800 of 1100Ch 10 · Project Planning, Design and Implementation

The hidden line represent ............[cite: 16]

Afeatures that can be seen in the current view
Bextension line or leader line
Cfeatures that cannot be seen in the current view
Daxis of symmetrical parts
Answer is hidden
Question 801 of 1100Ch 10 · Project Planning, Design and Implementation

Which of the following lines are used to show that the object is cut and then viewed?[cite: 16]

AHidden lines
BLeader lines
CCentre lines
DHatching lines
Answer is hidden
Question 802 of 1100Ch 10 · Project Planning, Design and Implementation

T square is used alone to draw ............[cite: 16]

Avertical line
Binclined line
Chorizontal line
Dnone of the above
Answer is hidden
Question 803 of 1100Ch 10 · Project Planning, Design and Implementation

French curves are used to draw ............[cite: 16]

Aregular curves
Bcircle
Cirregular curves
Dnone of the above
Answer is hidden
Question 804 of 1100Ch 10 · Project Planning, Design and Implementation

The hardness of pencil lead increases as the numeral letter H ............[cite: 16]

Aincreases
Bremains constant
Cdecreases
Dnone of the above
Answer is hidden
Question 805 of 1100Ch 10 · Project Planning, Design and Implementation

Which of the following is not a pencil?[cite: 16]

AHB
B2B
Cdrafter
Dnone of the above
Answer is hidden
Question 806 of 1100Ch 10 · Project Planning, Design and Implementation

What is additional 3rd view on orthographic projection in general for simple objects?

AFront view
BTop view
CSide view
DView at 45° perpendiculars to horizontal plane
Answer is hidden
Question 807 of 1100Ch 10 · Project Planning, Design and Implementation

The isometric projection of a circle is a ............[cite: 14]

Acircle
Bellipse
Chyperbola
Dparabola
Answer is hidden
Question 808 of 1100Ch 10 · Project Planning, Design and Implementation

A technical drawing of an object that shows the relationship or order of assembly of various parts is known as ............[cite: 14]

Aorthographic projection
Bexploded view drawing
Ccompacted view drawing
Daxonometric drawing
Answer is hidden
Question 809 of 1100Ch 10 · Project Planning, Design and Implementation

All the axonometric projections are single-plane ............ projection.[cite: 14]

Aorthographic
Bperspective
Cisometric
Doblique
Answer is hidden
Question 810 of 1100Ch 10 · Project Planning, Design and Implementation

............ type of axonometric drawing has equal foreshortening along two axis directions and a different amount on the third axis.[cite: 14]

ADiametric
BMulti view
CIsometric
DTrimetric
Answer is hidden
Question 811 of 1100Ch 10 · Project Planning, Design and Implementation

The principle views associated with orthographic projection are ............[cite: 14]

Afront view
Bright side view
Ctop view
Dall of the above
Answer is hidden
Question 812 of 1100Ch 10 · Project Planning, Design and Implementation

The principle reason for using an auxiliary view is ............[cite: 14]

Ato eliminate hidden lines
Bto create a true projection plane from an inclined plane in one of the primary views
Cto show cylinders as ellipses
Dto locate center marks
Answer is hidden
Question 813 of 1100Ch 10 · Project Planning, Design and Implementation

............ is the plane upon which the top view is projected.[cite: 14]

AHorizontal
BFrontal
CProfile
DBase
Answer is hidden
Question 814 of 1100Ch 10 · Project Planning, Design and Implementation

The isometric projection of a sphere is a ............[cite: 14]

Acircle
Bellipse
Chyperbola
Dparabola
Answer is hidden
Question 815 of 1100Ch 10 · Project Planning, Design and Implementation

In isometric drawing ............[cite: 14]

Aall axes are equally inclined
Btwo axes are equally inclined
Cnone of the axes are equally inclined
Dnone of the above
Answer is hidden
Question 816 of 1100Ch 10 · Project Planning, Design and Implementation

The value of the ratio of isometric projection length to true length is ............[cite: 14]

A0.141
B0.372
C0.815
D0.642
Answer is hidden
Question 817 of 1100Ch 10 · Project Planning, Design and Implementation

What type of sketch shows the front in true shape?[cite: 14]

AIsometric
BPerspective
COblique
DAxonometric
Answer is hidden
Question 818 of 1100Ch 10 · Project Planning, Design and Implementation

If an isometric drawing is made use of an isometric scale, then the drawings are called ............[cite: 14]

Aisometric projection
Bisometric view
Cperspective projection
Dorthographic view
Answer is hidden
Question 819 of 1100Ch 10 · Project Planning, Design and Implementation

When using an isometric view, you line up the drawing along three axis that are separated by ............ from each other.[cite: 14]

A180-degree
B90-degree
C120-degree
D60-degree
Answer is hidden
Question 820 of 1100Ch 10 · Project Planning, Design and Implementation

The development of cylinder is a ............[cite: 14]

Arectangle
Bcircle
Cellipse
Dnone of the above
Answer is hidden
Question 821 of 1100Ch 10 · Project Planning, Design and Implementation

The following is the method for development of a right regular prism.[cite: 14]

AParallel line method
BRadial line method
CTriangulation method
DApproximate method
Answer is hidden
Question 822 of 1100Ch 10 · Project Planning, Design and Implementation

The solid which is generated by the revolution of a right-angle triangle about one of its perpendicular sides which remains fixed is called ............[cite: 14]

Aa prism
Ba pyramid
Ca cylinder
Da cone
Answer is hidden
Question 823 of 1100Ch 10 · Project Planning, Design and Implementation

When a pyramid or cone is cut by a cutting plane parallel to its base, the remaining portion thus obtained after removing the top portion is called ............[cite: 14]

Aa prism
Bfrustum
Ca cylinder
Da cone
Answer is hidden
Question 824 of 1100Ch 10 · Project Planning, Design and Implementation

The side view of an object is drawn in ............ faces.[cite: 14]

Avertical plane
Bhorizontal plane
Cprofile plane
Dany of the above
Answer is hidden
Question 825 of 1100Ch 10 · Project Planning, Design and Implementation

A tetrahedron has four equal ............ faces.[cite: 14]

Asquare
Brectangular
Ctriangular
Dnone of the above
Answer is hidden
Question 826 of 1100Ch 10 · Project Planning, Design and Implementation

Hatching lines are drawn at ............ degree to reference line.[cite: 14]

A30
B45
C60
D90
Answer is hidden
Question 827 of 1100Ch 10 · Project Planning, Design and Implementation

In a cash flow series ............

Auniform gradient signifies that an income or disbursement changes by the same amount in each interest period
Beither an increase or decrease in the amount of a cash flow is called the gradient
Cthe gradient in the cash flow may be positive or negative
Dall of the above
Answer is hidden
Question 828 of 1100Ch 10 · Project Planning, Design and Implementation

Which item comes under financial activities in cash flow?

ARedemption of preference share
BIssue of preference share
CInterest paid
DAll of the above
Answer is hidden
Question 829 of 1100Ch 10 · Project Planning, Design and Implementation

Cash flow example from a financing activity is ............

Apayment of dividends
Breceipt of dividend on investment
Ccash received from customers
Dpurchase of fixed asset
Answer is hidden
Question 830 of 1100Ch 10 · Project Planning, Design and Implementation

The statement of cash flow clarifies cash flows according to ............

Aoperating and non-operating flows
Binflow and outflow
Cinvesting and non-operating flows
Doperating, investing, and financing activities
Answer is hidden
Question 831 of 1100Ch 10 · Project Planning, Design and Implementation

Cash flow example from an investing activity is ............

Aissue of debenture
Brepayment of long-term loan
Cpurchase of raw materials for cash
Dsale of investment by non-financial enterprise
Answer is hidden
Question 832 of 1100Ch 10 · Project Planning, Design and Implementation

Heterogeneous cash flows can be made comparable by ............

Adiscounting technique
Bcompounding technique
Ceither (a) or (b)
Dnone of the above
Answer is hidden
Question 833 of 1100Ch 10 · Project Planning, Design and Implementation

Time value of money supports the comparison of cash flows recorded at different time period by ............

Adiscounting all cash flows to a common point of time
Bcompounding all cash flows to a common point of time
Cusing either (a) or (b)
Dnone of the above
Answer is hidden
Question 834 of 1100Ch 10 · Project Planning, Design and Implementation

What is the element of total cost?

AMaterial and labor cost
BLabor and fuel cost
CFuel and machine cost
DAll of the above
Answer is hidden
Question 835 of 1100Ch 10 · Project Planning, Design and Implementation

Statement of cash flows includes ............

Afinancing activities
Boperating activities
Cinvesting activities
Dall of the above
Answer is hidden
Question 836 of 1100Ch 10 · Project Planning, Design and Implementation

Material cost is concerned with ............

Adirect cost
Bindirect cost
Cboth (a) and (b)
Dnone of the above
Answer is hidden
Question 837 of 1100Ch 10 · Project Planning, Design and Implementation

In cash flows, when a company invests in fixed assets and short-term financial investments results in ............

Aincreased liabilities
Bincreased equity
Cincreased cash
Ddecreased cash
Answer is hidden
Question 838 of 1100Ch 10 · Project Planning, Design and Implementation

If desired rate of return is minimum by actual rate of return, then it is classified as ............

Afuture cash flows
Bpresent cash flow
Cpositive cash flows
Dnegative cash flows
Answer is hidden
Question 839 of 1100Ch 10 · Project Planning, Design and Implementation

The given symbol in a drawing represents ............

Aperspective projection
Bthird angle projection
Cfirst angle projection
Doblique projection
Answer is hidden
Question 840 of 1100Ch 10 · Project Planning, Design and Implementation

The side view of given orthographic projection is ............

Aa
Bb
Cc
Dd
Answer is hidden
Question 841 of 1100Ch 10 · Project Planning, Design and Implementation

The top view of given figure is ............

Aa
Bb
Cc
Dd
Answer is hidden
Question 842 of 1100Ch 10 · Project Planning, Design and Implementation

In cash flow diagram, which of the following is true?

ATime 1 is considered to be the end of time period 1
BA vertical arrow pointing up indicates a positive cash flow
CAn arrow pointing downward indicates a negative cash flow
DAll of the above
Answer is hidden
Question 843 of 1100Ch 10 · Project Planning, Design and Implementation

Payback period is counted only after ............

Atendering for the project
Bstarting of the construction of the project
Ccompletion of the construction of the project
Dcommissioning of the project
Answer is hidden
Question 844 of 1100Ch 10 · Project Planning, Design and Implementation

Time value of money indicates that ............

Aa unit of money obtained today is worth more than a unit of money obtained in future
Ba unit of money obtained today is worth less than a unit of money obtained in future
Cthere is no difference in the value of money obtained today and tomorrow
Dnone of the above
Answer is hidden
Question 845 of 1100Ch 10 · Project Planning, Design and Implementation

Pick up the correct statement from the following:

AThe change in the amount of money over a given time period is called 'time value of money', a most important concept in engineering economy
BThe manifestation of the time value of money is termed as interest
CInterest on borrowing = Present amount owed - Original loan
DAll of the above
Answer is hidden
Question 846 of 1100Ch 10 · Project Planning, Design and Implementation

If the nominal rate of interest is 10% per annum and there is quarterly compounding, the effective rate of interest will be ............

A10% per annum
B10.10% per annum
C10.25% per annum
D10.38% per annum
Answer is hidden
Question 847 of 1100Ch 10 · Project Planning, Design and Implementation

How long will it take money to double itself if invested at 5% compounded annually?

A13.7 years
B14.7 years
C14.2 years
D15.3 years
Answer is hidden
Question 848 of 1100Ch 10 · Project Planning, Design and Implementation

Equal payment series sinking fund factor is ............

A(A/F, i, n)
B(F/P, i, n)
C(A/P, i, n)
D(P/A, i, n)
Answer is hidden
Question 849 of 1100Ch 10 · Project Planning, Design and Implementation

In a project equal investment is done on regular basis for replacement of the property, then it is called ............

Afuture investment
Bcapital recovery
Csinking fund
Dall of the above
Answer is hidden
Question 850 of 1100Ch 10 · Project Planning, Design and Implementation

Sinking fund is ............

Athe fund for rebuilding a structure when its economic life is over
Braised to meet maintenance costs
CNPV = 0
Dall of the above
Answer is hidden
Question 851 of 1100Ch 10 · Project Planning, Design and Implementation

The term (1 + i)ⁿ is called ............

Asingle payment discount amount factor
Bsingle payment compound amount factor
Cannual compound amount factor
Dnone of the above
Answer is hidden
Question 852 of 1100Ch 10 · Project Planning, Design and Implementation

What is the expression for the capital recovery amount?

AP [i(1+i)ⁿ / ((1+i)ⁿ - 1)]
BP [(1+i)ⁿ / ((1+i)ⁿ - 1)]
CP [i(1-i)ⁿ / ((1-i)ⁿ - 1)]
DP [(1-i)ⁿ / ((1-i)ⁿ - 1)]
Answer is hidden
Question 853 of 1100Ch 10 · Project Planning, Design and Implementation

If a is the base amount expenditure, b is the increase in the operation cost each year over a period of n years, the total cost of maintenance is ............

Aa + (n-1)b
Ba + x (n-1)b
Ca x (n-1)b
DDiscounted payback
Answer is hidden
Question 854 of 1100Ch 10 · Project Planning, Design and Implementation

Which method is not mostly adopted for selection of project?

APayback
BDiscounted payback
CIRR
DB/C
Answer is hidden
Question 855 of 1100Ch 10 · Project Planning, Design and Implementation

The cash flow is either increasing or decreasing with equal amount every period, the type of series is ............

Auniform payment series
Bgeometric payment series
Clinear gradient series
Dirregular payment series
Answer is hidden
Question 856 of 1100Ch 10 · Project Planning, Design and Implementation

The additional money received from selling one specified level of output is ............

Anormal cost
Bmarginal revenue
Caverage revenue
Dequivalent revenue
Answer is hidden
Question 857 of 1100Ch 10 · Project Planning, Design and Implementation

If production is less than breakeven point, the product will be ............

Alesser than consumption
Bequal to consumption
Cgreater than consumption
Dall of the above
Answer is hidden
Question 858 of 1100Ch 10 · Project Planning, Design and Implementation

The actual profitability of any project is best analyzed from .........

AIRR
BDiscounted payback period
CARR
Dnone of the above
Answer is hidden
Question 859 of 1100Ch 10 · Project Planning, Design and Implementation

The decision rule for project acceptance is that .........

Aif IRR > 0
Bif IRR > MARR
Cif IRR < MARR
Dif IRR = 0
Answer is hidden
Question 860 of 1100Ch 10 · Project Planning, Design and Implementation

Which of the following factors does not depend on the time value of money?

AB/C ratio
BAccounting rate of return
CNPV
DIRR
Answer is hidden
Question 861 of 1100Ch 10 · Project Planning, Design and Implementation

If a seller recovers his capital along with accumulated compensating interest not in one single lump-sum payment but in periodical equal payments, over time ............

Acapital recovery annuity is availed
Bpresent worth annuity is availed
Csinking fund annuity is availed
Dfuture worth annuity is availed
Answer is hidden
Question 862 of 1100Ch 10 · Project Planning, Design and Implementation

Depreciation is charged on ............

Afixed assets
Bcurrent assets
Cboth fixed and current assets
Dnone of the above
Answer is hidden
Question 863 of 1100Ch 10 · Project Planning, Design and Implementation

Which of the following asset generally assumed not to depreciate?

AMachinery
BBuilding
CLand
DAll of the above
Answer is hidden
Question 864 of 1100Ch 10 · Project Planning, Design and Implementation

Under the diminishing balance method, the amount of depreciation is calculated on ............[cite: 15]

Athe written-down value of the asset
Bthe market value of the asset
Cthe original cost of the asset
Dthe expected realizable value of the asset
Answer is hidden
Question 865 of 1100Ch 10 · Project Planning, Design and Implementation

If the percentage fall in quantity demanded is more than the percentage rise in price charged, ............[cite: 15]

Athe revenue will rise
Bthe revenue will fall
Cis not related with discount rate
Dnone of the above
Answer is hidden
Question 866 of 1100Ch 10 · Project Planning, Design and Implementation

The estimated value of depreciable assets after its useful life is called ............[cite: 15]

Aactual value
Breplacement value
Cdisposal (residual) value
Dcurrent value
Answer is hidden
Question 867 of 1100Ch 10 · Project Planning, Design and Implementation

If there is no inflation during a period, then the money cash flow would be equal to ............[cite: 15]

Apresent value
Breal cash flow
Creal cash flow + present value
Dreal cash flow - present value
Answer is hidden
Question 868 of 1100Ch 10 · Project Planning, Design and Implementation

What is the limit of annual income for an unmarried individual upto which only 1% income tax is levied?[cite: 15]

A5 lakhs
B6 lakhs
C5.5 lakhs
D7 lakhs
Answer is hidden
Question 869 of 1100Ch 10 · Project Planning, Design and Implementation

IRR is calculated ............[cite: 15]

Awhen NPV is less than zero
Bwhen NPV more than zero
Cwhen NPV equal to 0
Dwhen NPV equal to MARR
Answer is hidden
Question 870 of 1100Ch 10 · Project Planning, Design and Implementation

The time value of money is primarily related to .........[cite: 15]

Atime and money
Btime and interest
Cmoney and valise
Dinterest and inflation
Answer is hidden
Question 871 of 1100Ch 10 · Project Planning, Design and Implementation

Salvage value is defined as ............[cite: 15]

Avalue of dismantled materials at the end of its utility period
Bestimated value of a built-up property at the end of its useful life without being dismantled
Cvalue of the property shown in the account book in that particular year
Dpresent value of a property considering it to be replaced at the current market rates
Answer is hidden
Question 872 of 1100Ch 10 · Project Planning, Design and Implementation

The minimum value of benefit-cost ratio for the selection of any project should be ............[cite: 15]

Aless than one
Bone
Cgreater than one
Dnone of the above
Answer is hidden
Question 873 of 1100Ch 10 · Project Planning, Design and Implementation

The benefit cost ratio is ............[cite: 15]

Adirectly proportional to discount rate
Binversely proportional to discount rate
Cno array relation with discount rate
Dall of the above
Answer is hidden
Question 874 of 1100Ch 10 · Project Planning, Design and Implementation

The project contractor relies on the cost of the estimate ............[cite: 15]

Afor submission of a competitive bid for a lump-sum contract
Bfor a unit price contract
Cfor preparation of a definitive estimate to help negotiate contract
Dall of the above
Answer is hidden
Question 875 of 1100Ch 10 · Project Planning, Design and Implementation

Both architect and engineer make use of the cost estimate of the project ............[cite: 15]

Afor site selection
Bfor designing of the project
Cfor choosing alternatives
Dall of the above
Answer is hidden
Question 876 of 1100Ch 10 · Project Planning, Design and Implementation

The most unpredictable cost of a project is ............[cite: 15]

Aenvironment management cost
Bunderground construction cost
Ctransportation cost
Dsocial management cost
Answer is hidden
Question 877 of 1100Ch 10 · Project Planning, Design and Implementation

The ratio of current assets to current liabilities is known as ............[cite: 15]

Aliquidity ratio
Bcurrent ratio
Cacid-test (or quick) ratio
Ddebts ratio
Answer is hidden
Question 878 of 1100Ch 10 · Project Planning, Design and Implementation

The more critical (or severe) test of the firm's liquidity can be judged by ............[cite: 15]

Aliquidity ratio
Bcurrent ratio
Cacid-test (or quick) ratio
Ddebts ratio
Answer is hidden
Question 879 of 1100Ch 10 · Project Planning, Design and Implementation

Current assets less inventories divided by current liabilities is known as ............[cite: 15]

Aliquidity ratio
Bcurrent ratio
Cacid-test (or quick) ratio
Ddebts ratio
Answer is hidden
Question 880 of 1100Ch 10 · Project Planning, Design and Implementation

The purchase value of assets over its serviceable life is categorized as ............[cite: 15]

Aappreciated liabilities
Bappreciated assets
Cdepreciation
Dappreciation
Answer is hidden
Question 881 of 1100Ch 10 · Project Planning, Design and Implementation

Excessive spending power of consumers that pulls prices up is called ............[cite: 15]

Ademand-pull inflation
Bcost-pull inflation
Ccost-push inflation
Dcost-push inflation
Answer is hidden
Question 882 of 1100Ch 10 · Project Planning, Design and Implementation

Book value means ............[cite: 15]

Aexpected sale price
Bcurrent market price if purchased now
Cvalue as shown in the books of account
Doriginal acquisition price
Answer is hidden
Question 883 of 1100Ch 10 · Project Planning, Design and Implementation

Pokhara Regional International Airport is an example of ............[cite: 13]

Aloan projects
Bgrant projects
Cprivate sector projects
Dprocess oriented projects
Answer is hidden
Question 884 of 1100Ch 10 · Project Planning, Design and Implementation

The process each manager follows during the life of a project is known as ............[cite: 13]

Aproject management
Bmanager life cycle
Cproject management life cycle
Dall of the mentioned
Answer is hidden
Question 885 of 1100Ch 10 · Project Planning, Design and Implementation

The type of projects in which investment in project is repaid by the government to donors agencies is called ............[cite: 13]

Aprivate sector projects
Bgovernment sector projects
Cgrant projects
Dloan projects
Answer is hidden
Question 886 of 1100Ch 10 · Project Planning, Design and Implementation

Who typically offers financial resources to fund a project?[cite: 13]

ADonor
BSponsor
CProject manager
DStakeholder
Answer is hidden
Question 887 of 1100Ch 10 · Project Planning, Design and Implementation

If part of contract work is assigned to another party, it is called ............[cite: 13]

Asub-contracting
Bjoint venture
Cboth (a) and (b)
Dnone of the above
Answer is hidden
Question 888 of 1100Ch 10 · Project Planning, Design and Implementation

Which of the following is not a phase of project management?[cite: 13]

AProject planning
BProject scheduling
CProject controlling
DProject being
Answer is hidden
Question 889 of 1100Ch 10 · Project Planning, Design and Implementation

The project scope statement furnishes the basis for ............[cite: 13]

Aa way to provide updated information to the accounting department
Bprovides links to the client's functional management groups
Callowing the project to move to the next phase
Dall of the above
Answer is hidden
Question 890 of 1100Ch 10 · Project Planning, Design and Implementation

The main principle of an organization, is ............[cite: 13]

Aunity of command and coherency
Beffective control at all level
Cdelegation of authority
Dall of the above
Answer is hidden
Question 891 of 1100Ch 10 · Project Planning, Design and Implementation

The main advantage of line organization is ............[cite: 13]

Aeffective command and control
Bdefined responsibilities at all levels
Cability to quick decision at all level
Dall of the above
Answer is hidden
Question 892 of 1100Ch 10 · Project Planning, Design and Implementation

Ensuring that performance meets established standards that worker's activities occur as planned and that the organization process is called ............[cite: 13]

Acontrolling
Bplanning
Cleading
Dorganizing
Answer is hidden
Question 893 of 1100Ch 10 · Project Planning, Design and Implementation

In which of the following project phases is the project schedule developed?[cite: 13]

AConceptual
BPlanning
CImplementation
DDesign
Answer is hidden
Question 894 of 1100Ch 10 · Project Planning, Design and Implementation

The process of communication contains four major parts. Which part is the vehicle or method used to convey the message?[cite: 13]

ACommunicator
BMessage
CMedium
DRecipient
Answer is hidden
Question 895 of 1100Ch 10 · Project Planning, Design and Implementation

In bar charts, which colour is used to show the actual progress?[cite: 13]

ARed
BBlack
CBlue
DGreen
Answer is hidden
Question 896 of 1100Ch 10 · Project Planning, Design and Implementation

Which method of project planning was invented first?[cite: 13]

ABar chart
BMilestone chart
CCPM
DPERT
Answer is hidden
Question 897 of 1100Ch 10 · Project Planning, Design and Implementation

CPM is based on ............[cite: 13]

Aprobabilistic
Bdeterministic
Cboth (a) and (b)
Dany of (a) or (b)
Answer is hidden
Question 898 of 1100Ch 10 · Project Planning, Design and Implementation

CPM is the ............[cite: 13]

Aactivity oriented
Bevent oriented
Ctarget oriented
Dtime oriented
Answer is hidden
Question 899 of 1100Ch 10 · Project Planning, Design and Implementation

What is a critical path?[cite: 13]

AIt is a path that operates from the starting node to the end node.
BIt is a mixture of all the paths
CIt is the longest path
DIt is the shortest path
Answer is hidden
Question 900 of 1100Ch 10 · Project Planning, Design and Implementation

What happens when a project is scheduled by CPM?[cite: 13]

AA project is divided into various activities
BRequired time for each activity is established
CA sequence of various activities is made according to their importance
DAll of the above
Answer is hidden
Question 901 of 1100Ch 10 · Project Planning, Design and Implementation

When was CPM method introduced?[cite: 13]

A1880
B1900
C1957
D1958
Answer is hidden
Question 902 of 1100Ch 10 · Project Planning, Design and Implementation

For an activity in a CPM analysis, the early finish time is 13 and the late finish time is 13. Which of the following statements is true?[cite: 13]

AThe early start is 6
BThe duration of the activity is 13
CThe slack of this activity is 13
DThe activity is on the critical path
Answer is hidden
Question 903 of 1100Ch 10 · Project Planning, Design and Implementation

Completion of an activity on CPM network diagram, is generally known ............

Aevent
Bnode
Cconnector
Dall of the above
Answer is hidden
Question 904 of 1100Ch 10 · Project Planning, Design and Implementation

In an AOA (activity on arrow) diagram, what does the arrow represent?

Aevent
Bactivity
Cslack
Dall of the above
Answer is hidden
Question 905 of 1100Ch 10 · Project Planning, Design and Implementation

Which of the following is true about dummy?

AIt doesn't consume resources
BIt doesn't have head and tail event
CIt can be added anywhere in the network
DIt simplifies the network
Answer is hidden
Question 906 of 1100Ch 10 · Project Planning, Design and Implementation

Dummy is used for ............

Agrammatical purpose
Blogical purpose
Cboth (a) and (b)
Dnone of the above
Answer is hidden
Question 907 of 1100Ch 10 · Project Planning, Design and Implementation

Which one of the following is captured in the Work Breakdown Structure (WBS)?

AThe life cycle phases
BThe logical order of tasks
CThe scope of the project
DProject costs
Answer is hidden
Question 908 of 1100Ch 10 · Project Planning, Design and Implementation

In project crashing, rent and overheads are treated as ............

Asignificant cost
Binsignificant costs
Cdirect costs
Dindirect costs
Answer is hidden
Question 909 of 1100Ch 10 · Project Planning, Design and Implementation

Project crashing is the method for ............

Ashortening the project duration by reducing the time of one or more critical activities
Badding resources at critical points
Cdoing technical analysis of the finished work for review
Dadding duration to each activity
Answer is hidden
Question 910 of 1100Ch 10 · Project Planning, Design and Implementation

The time with which direct cost does not reduce with the increase in time is known as ............

Acrash time
Bnormal time
Coptimistic time
Dstandard time
Answer is hidden
Question 911 of 1100Ch 10 · Project Planning, Design and Implementation

The time corresponding to minimum total project cost is ............

Acrash time
Bbetween normal time and crash time
Coptimistic time
Dnormal time
Answer is hidden
Question 912 of 1100Ch 10 · Project Planning, Design and Implementation

Which of the following is a project scheduling method that can be applied to software development?

APERT
BCPM
CCMM
DBoth PERT and CPM
Answer is hidden
Question 913 of 1100Ch 10 · Project Planning, Design and Implementation

PERT (Project Evaluation and Review Technique) analysis is based on ............

Aoptimistic time, pessimistic time and most likely time
Bpessimistic time, optional time, maximum time
Coptimistic time, efficient time, most likely time
Dminimax time, optimistic time and harmonic time
Answer is hidden
Question 914 of 1100Ch 10 · Project Planning, Design and Implementation

The full form of PERT is ............

Aprogram evaluation and rate technology
Bprogram evaluation and robot technique
Cprogram evaluation and robot technology
Dprogram evaluation and review technique
Answer is hidden
Question 915 of 1100Ch 10 · Project Planning, Design and Implementation

What is PERT analysis based on?

AOptimistic time
BPessimistic time
CMost likely time
DAll of the above
Answer is hidden
Question 916 of 1100Ch 10 · Project Planning, Design and Implementation

In PERT (Project Evaluation and Review Technique) method expected time (Te) is ............

ATo + Tp + 4Tm / 6
BTo + Tp + 2Tm / 6
CTo + 4Tp + Tm / 6
DTm + 4Tp + To / 6
Answer is hidden
Question 917 of 1100Ch 10 · Project Planning, Design and Implementation

If PERT network consists of 5 activities with standard deviation of 5, 6, 7, 8, and 9. Then, the standard deviation of the entire project is ............

A255
B7
C√255
D49
Answer is hidden
Question 918 of 1100Ch 10 · Project Planning, Design and Implementation

The shortest possible time in which an activity can be achieved under ideal circumstances is known as ............

Aexpected time estimate
Boptimistic time estimate
Cpessimistic time estimate
Dthe most likely time estimate
Answer is hidden
Question 919 of 1100Ch 10 · Project Planning, Design and Implementation

The relation between jobs of a particular type and various durations they have consumed completion is expressed by curve ............

Anormal distribution curve
Bfrequency distribution
Cdistribution curve
Dnone of the above
Answer is hidden
Question 920 of 1100Ch 10 · Project Planning, Design and Implementation

The optimistic, most likely and pessimistic time estimates of an activity are 6, 8, 10 days, what are the expected time and standard deviation?

A8, 0.5
B8, 2
C6, 0.67
D8, 0.67
Answer is hidden
Question 921 of 1100Ch 10 · Project Planning, Design and Implementation

According to the time estimates made by the PERT planners, the maximum time that would be needed to complete an activity is called as ............

Athe most likely time estimate
Boptimistic time estimate
Cexpected time estimate
Dpessimistic time estimate
Answer is hidden
Question 922 of 1100Ch 10 · Project Planning, Design and Implementation

Which of the options is not a notable challenge while scheduling a project?

ADeadlines exist
BIndependent activities
CToo many workers may be required
DCostly delay
Answer is hidden
Question 923 of 1100Ch 10 · Project Planning, Design and Implementation

In which phase of the project most of the money and manpower are required?[cite: 14]

Ainitiation phase
Bplanning phase
Cexecution phase
Dclosing phase
Answer is hidden
Question 924 of 1100Ch 10 · Project Planning, Design and Implementation

Which is the first stage in a project formulation?[cite: 14]

APlanning
BSetting objectives
CControlling
DEvaluating
Answer is hidden
Question 925 of 1100Ch 10 · Project Planning, Design and Implementation

Which of the following involves continuous betterment in planning and detailing with time?[cite: 14]

AProject enhancement
BProgressive elaboration
CProgressive rehabilitation
DContinuous improvement
Answer is hidden
Question 926 of 1100Ch 10 · Project Planning, Design and Implementation

in resource levelling which of the following is constraint?[cite: 14]

ATime
BMoney
CResources
DBoth time and money
Answer is hidden
Question 927 of 1100Ch 10 · Project Planning, Design and Implementation

Which term describes the utilization of resources in a project without altering the project duration?[cite: 14]

AResource smoothing
BResource leveling
CCritical path method
DFast tracking
Answer is hidden
Question 928 of 1100Ch 10 · Project Planning, Design and Implementation

Resource smoothing is ............[cite: 14]

Aan optimization and economical utilization of resources
Ban adjustment of resources without affecting project duration
Ca gradual increase in resources
Da gradual decrease in resources
Answer is hidden
Question 929 of 1100Ch 10 · Project Planning, Design and Implementation

Cost variance (CV) is which of the following equations?[cite: 14]

ACV - BCWP - ACWP
BCV = BCWP - ACWP
CCV = BCWS
DBoth (a) and (c)
Answer is hidden
Question 930 of 1100Ch 10 · Project Planning, Design and Implementation

A technique for performing quantitative analysis of progress is known as ............[cite: 14]

ABCWS
BEVA
CBAC
DCBSE
Answer is hidden
Question 931 of 1100Ch 10 · Project Planning, Design and Implementation

A schedule performance index (SPI) of 0.76 means ............[cite: 14]

Ayou are over budget
Byou are ahead of schedule
Cyou are only progressing at 76 percent of the rate originally planned
Dyou are only progressing at 24 percent of the rate originally planned
Answer is hidden
Question 932 of 1100Ch 10 · Project Planning, Design and Implementation

A cost performance index (CPI) of 0.89 means ............[cite: 14]

Aat this time, we expect the total project to cost 89 percent more than planned
Bwhen the project is completed we will have spent 89 percent more than planned
Cthe project is only progressing at 89 percent of the rate planned
Dthe project is only getting 89 cents out of every dollar invested
Answer is hidden
Question 933 of 1100Ch 10 · Project Planning, Design and Implementation

Capital budgeting is ............[cite: 14]

Areversible
Bunimportant
Cirreversible
Dall of the above
Answer is hidden
Question 934 of 1100Ch 10 · Project Planning, Design and Implementation

In which of the following cases project is in better shape?[cite: 14]

ABoth CPI and SPI are less than 1
BWhen CPI is more than 1 and SPI is less than one
CWhen CPI is less than one and SPI is more than one
DWhen both CPI and SPI are more than one
Answer is hidden
Question 935 of 1100Ch 10 · Project Planning, Design and Implementation

The budgeted cost for all the activities in a project with the help of Earned Value Method is ............[cite: 14]

Aactual cost
Bbudget at completion
Cbudget for completion
Destimate at completion
Answer is hidden
Question 936 of 1100Ch 10 · Project Planning, Design and Implementation

Cost budgeting can be best described by which of the following?[cite: 14]

AThe process of developing the future trends along with the assessment of probabilities, uncertainties, and inflation that could occur during the project
BDefinitive
COrder of magnitude
DConceptual
Answer is hidden
Question 937 of 1100Ch 10 · Project Planning, Design and Implementation

The technique for establishing and maintaining priorities among the various jobs of a project, is known ............[cite: 14]

Aevent flow scheduling technique
Bcritical ratio scheduling
Cslotting technique for scheduling
Dshort interval scheduling
Answer is hidden
Question 938 of 1100Ch 10 · Project Planning, Design and Implementation

The flow of information through MIS is ............[cite: 14]

Aneed dependent
Borganization dependent
Cinformation dependent
Dmanagement dependent
Answer is hidden
Question 939 of 1100Ch 10 · Project Planning, Design and Implementation

The information of MIS comes from the ............[cite: 14]

Ainternal source
Bexternal source
Cboth internal and external source
Dnone of the above
Answer is hidden
Question 940 of 1100Ch 10 · Project Planning, Design and Implementation

Which of the following is NOT an objective of MIS?[cite: 14]

AFacilitate the decisions-making process
BProvide requisite information at each level of management
CSupport decision-making
DRecruit people for system
Answer is hidden
Question 941 of 1100Ch 10 · Project Planning, Design and Implementation

The back bone of any organization is ............[cite: 14]

Ainformation
Bemployee
Cmanagement
Dcapital
Answer is hidden
Question 942 of 1100Ch 10 · Project Planning, Design and Implementation

Feasibility study determines ............[cite: 14]

Awhether the project is possible with resources
Bcomparing the project with world class manufacturing norms
Ccalculate the cost crashing each unit
Dadd duration to each unit
Answer is hidden
Question 943 of 1100Ch 10 · Project Planning, Design and Implementation

In project management when does planning take place?

ABefore the project
BDuring the project execution
CAt the start of the project
DAfter the project
Answer is hidden
Question 944 of 1100Ch 10 · Project Planning, Design and Implementation

What process involves deciding how to approach and plan the risk management activities for the project?

APerforming qualitative risk analysis
BPlanning risk management
CPerforming quantitative risk analysis
DIdentifying risks
Answer is hidden
Question 945 of 1100Ch 10 · Project Planning, Design and Implementation

Which of the following is not considered as a risk in project management?

ASpecification delays
BProduct competition
CTesting
DStaff turnover
Answer is hidden
Question 946 of 1100Ch 10 · Project Planning, Design and Implementation

Risk event graph is having following on X axis ............[cite: 15]

AGantt chart
Bwork break down structure
Cproject life cycle
Dsplitting
Answer is hidden
Question 947 of 1100Ch 10 · Project Planning, Design and Implementation

Project performance consists of ............[cite: 15]

Atime
Bcost
Cquality
Dall of the above
Answer is hidden
Question 948 of 1100Ch 10 · Project Planning, Design and Implementation

For a financial institution the most important study of a project to be taken for risks management is ............[cite: 15]

Aappraisal
Benvironmental and social
Ctechnical
Dfinancial and economical
Answer is hidden
Question 949 of 1100Ch 10 · Project Planning, Design and Implementation

Project Manager must ensure that it develops appropriate trade offs as ............[cite: 15]

Atime, cost and performance
Bmoney, cost and return on investment
Cmen, materials and machines
Dtime, value and performance
Answer is hidden
Question 950 of 1100Ch 10 · Project Planning, Design and Implementation

Which stage of project management life cycle requires the maximum time of completion ............[cite: 15]

Aconceptualization
Bplanning
Cexecution
Destimation
Answer is hidden
Question 951 of 1100Ch 10 · Project Planning, Design and Implementation

To be successful in a functional organization, the PM must rely on ............[cite: 15]

Areferent power
Bformal authority
Cinformal power structure
Dboth (a) and (c)
Answer is hidden
Question 952 of 1100Ch 10 · Project Planning, Design and Implementation

If employee does wrong in work, employer have to take responsibility of it, this is known ............[cite: 15]

Ajoint liability
Bvicarious liability
Cconcurrent liability
Dall of the above
Answer is hidden
Question 953 of 1100Ch 10 · Project Planning, Design and Implementation

In a payback period method of project evaluation and appraisal the project with ............ equal to cut off period will be accepted.[cite: 15]

Amore than
Bless than
Cpositive
Dnegative
Answer is hidden
Question 954 of 1100Ch 10 · Project Planning, Design and Implementation

Real rate of return is equal to ............[cite: 15]

ANominal rate + Inflation rate
BNominal rate * Inflation rate
CNominal rate - Inflation rate
DNominal rate / Inflation rate
Answer is hidden
Question 955 of 1100Ch 10 · Project Planning, Design and Implementation

The most successful project manager usually ............[cite: 15]

Aworks their way up from assistants in the project office to full-fledged project managers.
Bsupplementing that experience with formal education
Ccomes right from Harvard's MBA program into managing large projects.
Dis considered the technical expert of their field
Answer is hidden
Question 956 of 1100Ch 10 · Project Planning, Design and Implementation

Risk management is one of the most important jobs for a ............[cite: 15]

Aclient
Binvestor
Cproduction team
Dproject manager
Answer is hidden
Question 957 of 1100Ch 10 · Project Planning, Design and Implementation

Risk management is responsibility of the ............[cite: 15]

Acustomer
Binvestor
Cdeveloper
Dproject team
Answer is hidden
Question 958 of 1100Ch 10 · Project Planning, Design and Implementation

Newspaper, magazine, radio, television are examples of ............[cite: 15]

Astoring information
Bretrieving information
Ccommunication information
Dacquiring information
Answer is hidden
Question 959 of 1100Ch 10 · Project Planning, Design and Implementation

Outsourced projects are susceptible to conflicts as ............[cite: 15]

Apeople get less pay in these projects and work is more
Bmore work pressure and less time horizon
Cthese projects are away from home location
Dpeople are unaccustomed to working together and have different values
Answer is hidden
Question 960 of 1100Ch 10 · Project Planning, Design and Implementation

Conflict occurrence in projects is ............[cite: 15]

Aunavoidable
Bdepend on type of project
Cavoidable
Ddepends on culture
Answer is hidden
Question 961 of 1100Ch 10 · Project Planning, Design and Implementation

What assesses the risk and your plans for risk mitigation and revise these when you learn more about the risk?[cite: 15]

ARisk planning
BRisk identification
CRisk monitoring
DRisk analysis
Answer is hidden
Question 962 of 1100Ch 10 · Project Planning, Design and Implementation

Which of the following risk is the failure of a purchased component to perform as expected?[cite: 15]

AProduct risk
BProject risk
CBusiness risk
DProgramming risk
Answer is hidden
Question 963 of 1100Ch 10 · Project Planning, Design and Implementation

Which of the following risks are derived from the organizational environment where the software is being developed?[cite: 15]

APeople risks
BTechnology risks
CEstimation risks
DOrganizational risks
Answer is hidden
Question 964 of 1100Ch 10 · Project Planning, Design and Implementation

Which risk is connected to the circumstance outside the project that may influence the scope of work and the performance of the organization?[cite: 15]

AOperational risk
BFinancial risk
CStrategic risk
DContextual risk
Answer is hidden
Question 965 of 1100Ch 10 · Project Planning, Design and Implementation

Which of the following is not the part of risk control?[cite: 15]

AExecution of the risk response-strategy
BMonitoring of triggering events
CInitiating contingency plans
DNot watching for new risks
Answer is hidden
Question 966 of 1100Ch 10 · Project Planning, Design and Implementation

Which of the following strategies means that the impact of the risk will be reduced?[cite: 15]

AAvoidance strategies
BMinimization strategies
CContingency plans
DAll of the above
Answer is hidden
Question 967 of 1100Ch 10 · Project Planning, Design and Implementation

When do you perform risk identification?[cite: 15]

AAt the beginning of a project
BDuring project planning
CDuring the whole lifetime of a project
DDuring project execution
Answer is hidden
Question 968 of 1100Ch 10 · Project Planning, Design and Implementation

The project manager has the most authority in the ............ type of organization.[cite: 16]

Aproject expediter
Bmatrix
Cprojectized organization
Dfunctional
Answer is hidden
Question 969 of 1100Ch 10 · Project Planning, Design and Implementation

The successful project managers spend most of their time ............[cite: 16]

Aplanning with their personnel
Bplanning with the top management
Ccommunication with the project team
Dstudying project results
Answer is hidden
Question 970 of 1100Ch 10 · Project Planning, Design and Implementation

Which of the following is not project management goal?[cite: 16]

AKeeping overall costs within budget
BDelivering the software to the customer at the agreed time
CMaintaining a happy and well-functioning development team
DAvoiding customer complaints
Answer is hidden
Question 971 of 1100Ch 10 · Project Planning, Design and Implementation

The decision to request an increase the resources for a project is the responsibility of the ............[cite: 16]

Afunctional manager
Bproject manager
Cdirector of project management
Dcustomer
Answer is hidden
Question 972 of 1100Ch 10 · Project Planning, Design and Implementation

Net present value of a machine is ............[cite: 16]

APV of cash inflows less cost of investment
BPV of cash inflows + cost of investment
CPV of net profit after tax less cost of investment
DPV of cash inflows less average cost of investment
Answer is hidden
Question 973 of 1100Ch 10 · Project Planning, Design and Implementation

Capital structure of a company related with ............[cite: 16]

Ashareholders' funds
Blong term debts, preference share capital and equity capital
Cdebentures and loans
Dtotal assets less liabilities
Answer is hidden
Question 974 of 1100Ch 10 · Project Planning, Design and Implementation

A company that issues stocks and bonds to raise funds results in ............[cite: 16]

Adecrease in cash
Bincrease in cash
Cincrease in equity
Dincrease in liabilities
Answer is hidden
Question 975 of 1100Ch 10 · Project Planning, Design and Implementation

The bond issued without any collateral is called ............[cite: 16]

Apreference share
Bequity share
Cdebenture
Ddebt capital
Answer is hidden
Question 976 of 1100Ch 10 · Project Planning, Design and Implementation

Debenture is ............[cite: 16]

Aunsecured bond
Bbond without collateral
Csource of capital budgeting
Dall of the above
Answer is hidden
Question 977 of 1100Ch 10 · Project Planning, Design and Implementation

A debenture ............[cite: 16]

Ais a long-term loan
Bdoes not require security
Cis a short-term loan
Dreceives dividend payments
Answer is hidden
Question 978 of 1100Ch 10 · Project Planning, Design and Implementation

Which of the following is unsafe share?[cite: 16]

APreference shares
BPrimary shares
CDebentures
DAll of the above
Answer is hidden
Question 979 of 1100Ch 10 · Project Planning, Design and Implementation

The average cost incurred in supplying a particular benefit over the entire life time of the project is called ............[cite: 16]

Aproject cost
Baverage life cycle cost
Cmaintenance cost
Dall of the above
Answer is hidden
Question 980 of 1100Ch 10 · Project Planning, Design and Implementation

The profit of the company is shared in form of dividend but has no voting rights in ............[cite: 16]

Aequity share
BPreference share
Cordinary share
Dnone of the above
Answer is hidden
Question 981 of 1100Ch 10 · Project Planning, Design and Implementation

Point out the false statements ............[cite: 16]

Aa firm can buy its own debentures and shares
Ba company can issue convertible debentures
Ctender assessment
Dcontract assessment
Answer is hidden
Question 982 of 1100Ch 10 · Project Planning, Design and Implementation

If two parties enter into an agreement for performing or not performing any work, then it is known as ............[cite: 16]

Acontract
Btender
Cprocurement
Dadjudication
Answer is hidden
Question 983 of 1100Ch 10 · Project Planning, Design and Implementation

The procurement of works, goods or services by the entity itself is called ............[cite: 16]

Aforce account
Bdirect procurement
Cseal quotation
Dnone of the above
Answer is hidden
Question 984 of 1100Ch 10 · Project Planning, Design and Implementation

For the formation of user's committee, members are selected ............[cite: 16]

Aamong the people of whole district
Bamong the beneficiaries of the project
Cby nomination by the chief district officer of the district
Dnone of the above
Answer is hidden
Question 985 of 1100Ch 10 · Project Planning, Design and Implementation

The project usually completed by user committee's are ............[cite: 16]

Alabor intensive projects
Bcapital intensive projects
Cboth (a) and (b)
Dnone of the above
Answer is hidden
Question 986 of 1100Ch 10 · Project Planning, Design and Implementation

The projects can be carried out out by user committee with cost estimate upto ............[cite: 16]

A10 Millions
B20 Millions
C50 Millions
D500 Millions
Answer is hidden
Question 987 of 1100Ch 10 · Project Planning, Design and Implementation

For procurement of works upto 2 million, buy which of the following method is to be considered?[cite: 16]

Asealed tender
Bby direct negotiation
Cby bidding
Dby direct labor or direct negotiation
Answer is hidden
Question 988 of 1100Ch 10 · Project Planning, Design and Implementation

The bid validity period for bid having estimated cost upto 100 million is ............[cite: 17]

A45 days
B60 days
C90 days
D105 days
Answer is hidden
Question 989 of 1100Ch 10 · Project Planning, Design and Implementation

In project management, what percentage of the total project cost is typically estimated for office management expenses?[cite: 17]

A2.5%
B4%
C10%
D12%
Answer is hidden
Question 990 of 1100Ch 10 · Project Planning, Design and Implementation

Nepal Government handed over the fast-track project to Nepal Army. After handing in, what type of contract was it?[cite: 17]

ABOT
BBOOT
Cbuild and design
Dbuild, design, procurement, subcontracting and all works
Answer is hidden
Question 991 of 1100Ch 10 · Project Planning, Design and Implementation

The relation between contract and agreement is ............[cite: 17]

Asynonym
Baptonym
Call contract are agreement but all agreement are not contract
Dall agreement are contract but not all contract are agreement
Answer is hidden
Question 992 of 1100Ch 10 · Project Planning, Design and Implementation

The ultimate method of resolving any dispute with a contractor is ............[cite: 17]

Anegotiation
Bmediation
Carbitration
Dlitigation
Answer is hidden
Question 993 of 1100Ch 10 · Project Planning, Design and Implementation

The damages caused due to delay in work are termed as ............[cite: 17]

Aliquidated damage
Bunliquidated damage
Cdirect damages
Dtangible damages
Answer is hidden
Question 994 of 1100Ch 10 · Project Planning, Design and Implementation

Technical proposal during tendering is included in ............[cite: 17]

Asingle stage single envelope system
Bsingle stage double envelope system
Cdouble stage single envelope system
Ddouble stage double envelope system
Answer is hidden
Question 995 of 1100Ch 10 · Project Planning, Design and Implementation

The aim of ............ is to do whatever possible to avoid any kind of harm or accident.[cite: 13]

Aminimalist
Breasonable care
Cbeyond one's duty
Dnone of the above
Answer is hidden
Question 996 of 1100Ch 10 · Project Planning, Design and Implementation

It is important to be at work ............ every day and on time unless you are sick or have a family emergency.[cite: 13]

Aappearance
Battendance
Cattitude
Drespect
Answer is hidden
Question 997 of 1100Ch 10 · Project Planning, Design and Implementation

............ is the rules and standards that govern the decisions and actions of an engineer as a professional.[cite: 13]

ADoctor in Ethics
BDoctor in Ethics
CEthics
DEngineering Ethics
Answer is hidden
Question 998 of 1100Ch 10 · Project Planning, Design and Implementation

............ can help engineers make correct decisions and become better professionals.[cite: 13]

AStudy of English
BStudy of Math
CStudy of Ethics
DNone of the above
Answer is hidden
Question 999 of 1100Ch 10 · Project Planning, Design and Implementation

One of the most important issues faced by the world is that ............[cite: 13]

Acomputer ethics
Bconfidentiality
Cenvironmental deterioration
Dconflict of interest
Answer is hidden
Question 1000 of 1100Ch 10 · Project Planning, Design and Implementation

The prime responsibility of any professional is ............[cite: 13]

Aconfidentiality
Bconflict of interest
Cenvironmental ethics
Dcomputer ethics
Answer is hidden
Question 1001 of 1100Ch 10 · Project Planning, Design and Implementation

Which one does fall under computer ethics?[cite: 13]

AComputers can be used for robbery, crime and blackmailing others
BHacking is used to access private information
CLeak of such information of individual leads to harassments in terms of repeated phone calls
DAll of the above
Answer is hidden
Question 1002 of 1100Ch 10 · Project Planning, Design and Implementation

Fundamental principle of professional engineering ethics is ............[cite: 13]

Auploading and advancing engineering profession
Bmaintain high level of ethical conduct
Cboth (a) and (b)
Dnone of the above
Answer is hidden
Question 1003 of 1100Ch 10 · Project Planning, Design and Implementation

Engineering profession needs cooperation with the profession of ............[cite: 13]

Amedical professional
Baccountant
Clawyer
Dall of the above
Answer is hidden
Question 1004 of 1100Ch 10 · Project Planning, Design and Implementation

Professionalism of engineers is lost due to ............[cite: 13]

Ahonesty
Bdignity
Cbribery
Ddiscipline
Answer is hidden
Question 1005 of 1100Ch 10 · Project Planning, Design and Implementation

For the fulfillment of his/her professional duties engineer should ............[cite: 13]

Aparamount the health of the public
Bparamount the safety of the public
Cwelfare of the public
Dall of the above
Answer is hidden
Question 1006 of 1100Ch 10 · Project Planning, Design and Implementation

Engineer shall act in such a manner as to uphold and enhance the honor and dignity of engineering profession and shall act with ............ for bribery, fraud and corruption.[cite: 13]

Atolerance
Ba penchant
Ca predilection
Dzero tolerance
Answer is hidden
Question 1007 of 1100Ch 10 · Project Planning, Design and Implementation

Engineers shall build their professional reputation on the ............ of their services and shall not compete unfairly with others.[cite: 13]

Apublicity
Bbasis
Cmerit
Dreputation
Answer is hidden
Question 1008 of 1100Ch 10 · Project Planning, Design and Implementation

Engineers shall not disclose, without ............ confidential information coming the business affairs of technical process of any present or former or employer, or public body on which they serve.[cite: 13]

Aediting
Bgetting paid
Cremuneration
Dconsent
Answer is hidden
Question 1009 of 1100Ch 10 · Project Planning, Design and Implementation

Which of the following is not a characteristic of a profession?[cite: 13]

Ait enjoys a high level of public trust and confidence
Bit is organized into associations
Cthere are published authoritative performance and ethical standards
DAll of the above are characteristics of a profession
Answer is hidden
Question 1010 of 1100Ch 10 · Project Planning, Design and Implementation

............ skills such as writing, speaking and body language are important work ethics so that you can be clear in your messages to others.[cite: 13]

ACommunication
BCooperation
CHonesty
DIntegrity
Answer is hidden
Question 1011 of 1100Ch 10 · Project Planning, Design and Implementation

You are a person with a high level of ............ if you stand by your values even if others put pressure on you to do something that is wrong or if they make fun of you.[cite: 13]

Acommunication
Bcooperation
Chonesty
Dintegrity
Answer is hidden
Question 1012 of 1100Ch 10 · Project Planning, Design and Implementation

If you don't have ............ you can really get in trouble for lying, cheating or deceiving others.[cite: 13]

Acommunication
Bcooperation
Chonesty
Dintegrity
Answer is hidden
Question 1013 of 1100Ch 10 · Project Planning, Design and Implementation

If you have ............ you will be a trusted person because they will see that you are committed to your company.[cite: 13]

Acommunication
Borganizational skills
Cloyalty
Drespect
Answer is hidden
Question 1014 of 1100Ch 10 · Project Planning, Design and Implementation

Which of the following an engineer should not follow?[cite: 13]

AAct as faithful agent for client
BAccept compensation from more than one party for same service without the consent of all
CIndicate client the adverse consequences if judgment is over ruled
DUndertake only these assignments for which he is qualified
Answer is hidden
Question 1015 of 1100Ch 10 · Project Planning, Design and Implementation

is based on personal belief, values and individual's conscience rather than reasoning.[cite: 13]

AMoral
BEthics
CBoth (a) and (b)
DNone of the above
Answer is hidden
Question 1016 of 1100Ch 10 · Project Planning, Design and Implementation

If you can keep things at work in order and have a neat workplace, then you have great ............[cite: 13]

Aproductivity
Bcooperate
Corganizational skills
Drespect
Answer is hidden
Question 1017 of 1100Ch 10 · Project Planning, Design and Implementation

It is always important to ............ yourself, others and the place where you work because you don't always agree with them.[cite: 13]

Aappearance
Bcooperate
Ccommunicate
Drespect
Answer is hidden
Question 1018 of 1100Ch 10 · Project Planning, Design and Implementation

Some jobs cannot be done alone and some can be done much better and faster if you possess the quality of ............[cite: 13]

Ahonesty
Bcooperation
Cteamwork
Dintegrity
Answer is hidden
Question 1019 of 1100Ch 10 · Project Planning, Design and Implementation

Strong ............ means you have a high sense of moral and ethical behavior that earns respect of others.[cite: 13]

Aresponsibility
Brespect
Cconfidence
Dcharacter
Answer is hidden
Question 1020 of 1100Ch 10 · Project Planning, Design and Implementation

A personality measure of the strength of a person's convictions is called ............[cite: 13]

Alocus of control
Battitude
Cego strength
Dnone of the above
Answer is hidden
Question 1021 of 1100Ch 10 · Project Planning, Design and Implementation

In ............ a professional assumes full responsibilities and if anything wrong happens he/she sees their own responsibility.[cite: 13]

Aminimalist
Breasonable care
Cbeyond one's duty
Dnone of the above
Answer is hidden
Question 1022 of 1100Ch 10 · Project Planning, Design and Implementation

moves beyond the minimal view's concern.[cite: 13]

AMinimalist
BBeyond one's duty
CReasonable care
DNone of the above
Answer is hidden
Question 1023 of 1100Ch 10 · Project Planning, Design and Implementation

Which of the following is not concerned with the authority of engineers?[cite: 14]

AExpress an opinion on engineering matter
BGood behavior with client
CConscious with his profession
DDivulge the confidential matter
Answer is hidden
Question 1024 of 1100Ch 10 · Project Planning, Design and Implementation

Which of the following is not considered a professional quality of an engineer?[cite: 14]

AGood behavior with clients
BHonesty
CBias towards political parties
DStrong technical skills
Answer is hidden
Question 1025 of 1100Ch 10 · Project Planning, Design and Implementation

The environment which has been modified by human activities is called ............[cite: 14]

AAir pollution
BSoil pollution
CSoil erosion
DWater pollution
Answer is hidden
Question 1026 of 1100Ch 10 · Project Planning, Design and Implementation

The environment which has been modified by human activities is called ............[cite: 14]

Anatural environment
Banthropogenic environment
Cmodern environment
Durban environment
Answer is hidden
Question 1027 of 1100Ch 10 · Project Planning, Design and Implementation

Is the effect of undesirable changes in our surroundings that have harmful effects on plants, animals and human beings.[cite: 14]

APollution
BDegradation
CDeforestation
DClimate change
Answer is hidden
Question 1028 of 1100Ch 10 · Project Planning, Design and Implementation

Development that meets the needs of the present without compromising the ability of future generations to meet their own needs.[cite: 14]

ASustainable development
BHuman development
CEconomic development
DSocial development
Answer is hidden
Question 1029 of 1100Ch 10 · Project Planning, Design and Implementation

According to labor act, employers must conduct periodic health and safety inspections and maintain records of these inspections.[cite: 14]

AAt least once in a year
BAt least twice in a year
CAt least thrice in a year
DAt least 4 times in a year
Answer is hidden
Question 1030 of 1100Ch 10 · Project Planning, Design and Implementation

According to Labor Act, the remuneration for over time is ............[cite: 14]

A2 times the regular pay
B1.75 times the regular pay
C1.5 times the regular pay
D1.25 times the regular pay
Answer is hidden
Question 1031 of 1100Ch 10 · Project Planning, Design and Implementation

The government of Nepal has enforced concepts of occupational safety and health through its ............[cite: 14]

ALabor Act 1992
BLabor Act 1994
CLabor Act 1995
DLabor Act 1995
Answer is hidden
Question 1032 of 1100Ch 10 · Project Planning, Design and Implementation

Engineers day is celebrated on ............[cite: 14]

AShrawan 3
BShrawan 4
CAsar 3
DAsar 4
Answer is hidden
Question 1033 of 1100Ch 10 · Project Planning, Design and Implementation

As per labor law, workers are not allowed to work continuously for more than ............[cite: 14]

A3 hours
B5 hours
C8 hours
D12 hours
Answer is hidden
Question 1034 of 1100Ch 10 · Project Planning, Design and Implementation

According to labors act, the maximum working hour for a labor per week should be ............[cite: 14]

A42 hrs
B45 hrs
C48 hrs
D53 hrs
Answer is hidden
Question 1035 of 1100Ch 10 · Project Planning, Design and Implementation

As per labor law, how many hours workers are allowed to work in a day?[cite: 14]

A3 hours
B5 hours
C8 hours
D12 hours
Answer is hidden
Question 1036 of 1100Ch 10 · Project Planning, Design and Implementation

Nepal engineer's association is ............[cite: 14]

Agovernment body to support NEC
Bindependent organization of Nepalese engineers
Cprivate body which works for betterment of engineers
Dnon-government organization
Answer is hidden
Question 1037 of 1100Ch 10 · Project Planning, Design and Implementation

Nepal engineers association was established in ............ B.S.[cite: 14]

A2010
B2019
C2024
D2034
Answer is hidden
Question 1038 of 1100Ch 10 · Project Planning, Design and Implementation

NEA is registered under the ............[cite: 14]

ASocial Service Act
BNEC Act
CCivil Service Act
DCo-operatives Act
Answer is hidden
Question 1039 of 1100Ch 10 · Project Planning, Design and Implementation

The objectives of NEA are ............[cite: 14]

ATo promote development of the engineering science and technology in Nepal.
BTo promote fellowship goodwill and cooperation assistance among the Nepalese engineers and safeguard their rights and interests.
CBy utilizing, to the highest extent possible, the participation of the positional of the national engineering manpower of the country in the national development activities of Nepal, make effort towards ending foreign dependency in this regard
DAll of the above
Answer is hidden
Question 1040 of 1100Ch 10 · Project Planning, Design and Implementation

NEA is governed by an elected executive council of ............ members.[cite: 14]

A25
B18
C21
D17
Answer is hidden
Question 1041 of 1100Ch 10 · Project Planning, Design and Implementation

The number of executive members in NEA's Provincial committee is ............[cite: 14]

A25 and 15
B21 and 15
C15 and 25
D25 and 16
Answer is hidden
Question 1042 of 1100Ch 10 · Project Planning, Design and Implementation

The number of member directly elected for council from Nepal engineering association ............[cite: 14]

A7
B21
C25
D10
Answer is hidden
Question 1043 of 1100Ch 10 · Project Planning, Design and Implementation

The types of membership issued by NEA are ............[cite: 14]

Ageneral membership
Blife time membership
Cboth of the above
Dnone of the above
Answer is hidden
Question 1044 of 1100Ch 10 · Project Planning, Design and Implementation

NEA is ............ of Nepalese engineers.[cite: 14]

Aindependent nonprofit organization
Bprofitable organization
Cbroker organization
Dall of the above
Answer is hidden
Question 1045 of 1100Ch 10 · Project Planning, Design and Implementation

Which is not a professional engineering body?[cite: 14]

ANepal Engineering Association (NEA)
BSociety of Electrical and Electronics Engineers Association (SEEN)
CSociety of Public Health Engineers Nepal (SOPHEN)
DSociety of Consulting Architectural and Engineering Firms (SCAEF)
Answer is hidden
Question 1046 of 1100Ch 10 · Project Planning, Design and Implementation

CAAN, NEC, NTA, etc. are examples of ............[cite: 14]

Aregulatory body
Bcommercial sectors
CNGOs
DINGOs
Answer is hidden
Question 1047 of 1100Ch 10 · Project Planning, Design and Implementation

How many categories of NEA memberships are there?[cite: 14]

A4
B5
C7
D2
Answer is hidden
Question 1048 of 1100Ch 10 · Project Planning, Design and Implementation

What is the tenure of an executive member of NEA?[cite: 14]

A4 year
B2-year
C3 year
D1 year
Answer is hidden
Question 1049 of 1100Ch 10 · Project Planning, Design and Implementation

Nepal engineering council is an autonomous in under NEC act ............

A2056 B.S.
B2055 B.S.
C2054 B.S.
D2060 B.S.
Answer is hidden
Question 1050 of 1100Ch 10 · Project Planning, Design and Implementation

Nepal Engineering Council [NEC] is ............

Agovernment and autonomous body
Bprivate body
Cnon-profit organization
Dgovernment body
Answer is hidden
Question 1051 of 1100Ch 10 · Project Planning, Design and Implementation

Which of the following is not the function of NEC?

APrepare and implement the policy, plan and programmes
BRecognize the academic institutions
COpening the college
DTo prescribe the basic conditions of student admission
Answer is hidden
Question 1052 of 1100Ch 10 · Project Planning, Design and Implementation

Which one is not concerned with the NEC?

AAccreditation of academic certificate
BAppointment of teacher
CAuthority of opening engineering garage
DAll of the above
Answer is hidden
Question 1053 of 1100Ch 10 · Project Planning, Design and Implementation

When was Nepal engineering council established?

A2054 B.S.
B2055 B.S.
C2056 B.S.
D2057 B.S.
Answer is hidden
Question 1054 of 1100Ch 10 · Project Planning, Design and Implementation

NEC contacts the GoN through ministry of ............

Afinance
Bphysical infrastructure and transportation
Chome affairs
Dlocal development
Answer is hidden
Question 1055 of 1100Ch 10 · Project Planning, Design and Implementation

The decisions of NEC are authenticated by ............

Apresident
Bvice president
Cregistrar
Dmember nominated by president
Answer is hidden
Question 1056 of 1100Ch 10 · Project Planning, Design and Implementation

NEC does not approach for ............

Aengineer
Boverseer to engineer
Cminimum degree BE
Dall of the above
Answer is hidden
Question 1057 of 1100Ch 10 · Project Planning, Design and Implementation

The number of section in NEC act 2055 is ............

A18
B28
C38
D48
Answer is hidden
Question 1058 of 1100Ch 10 · Project Planning, Design and Implementation

The academic qualification of the chief of NEC is ............

Amaster's degree in engineering
Bmaster's degree in economics
Cmaster's degree in finance
Dbachelor's degree in engineering in engineering
Answer is hidden
Question 1059 of 1100Ch 10 · Project Planning, Design and Implementation

The general experience required for nomination of chairperson of NEC is ............

A10 yrs
B15 yrs
C20 yrs
D25 yrs
Answer is hidden
Question 1060 of 1100Ch 10 · Project Planning, Design and Implementation

What is the requirement for being chairman of NEC?

ABachelor Degree and Engineering experience of 10 years
BBachelor Degree and Engineering experience of 15 years
CMaster Degree and Engineering experience of 15 years
DMaster Degree and Engineering experience of 10 years
Answer is hidden
Question 1061 of 1100Ch 10 · Project Planning, Design and Implementation

Who appoints the chairman of NEC?

AThe Government of Nepal
BThe President of Nepal
CMinistry of home affairs
DThe supreme court
Answer is hidden
Question 1062 of 1100Ch 10 · Project Planning, Design and Implementation

Who is the first president of NEC?

AEr. Shiv Mangal Giri
BProf. Dr. Padam Bahadur Shahi
CEr. Ram Babusharma
DNone of the above
Answer is hidden
Question 1063 of 1100Ch 10 · Project Planning, Design and Implementation

What is the minimum qualification of vice president of the NEC?

AMasters in Engineering and 15 years' experience
BBachelors in Engineering and 15 years' experience
CMasters in Engineering and 10 years experience
DBachelors in Engineering and 10 years experience
Answer is hidden
Question 1064 of 1100Ch 10 · Project Planning, Design and Implementation

An American engineer willing to work in Nepal may apply for registration under ............[cite: 16]

ACategory A
BCategory B
CCategory C
DCategory D
Answer is hidden
Question 1065 of 1100Ch 10 · Project Planning, Design and Implementation

Which of the following category of engineer is not mention in engineering council rule?[cite: 16]

ACharted engineer
BProfessional engineer
CGeneral engineer
DAll of the above
Answer is hidden
Question 1066 of 1100Ch 10 · Project Planning, Design and Implementation

Book of foreign engineers is maintained in ............[cite: 16]

ANepali
BEnglish
Cboth (a) and (b)
Dnone of the above
Answer is hidden
Question 1067 of 1100Ch 10 · Project Planning, Design and Implementation

NEC publishes the name of registered engineers each year as well as every fourth year. The name of foreigner engineers publishes ............[cite: 16]

Aeach year
Bevery fourth year
Cboth (a) and (b)
Dnone of the above
Answer is hidden
Question 1068 of 1100Ch 10 · Project Planning, Design and Implementation

NEC has classified an engineers in to ............ categories.[cite: 16]

A2
B3
C4
D5
Answer is hidden
Question 1069 of 1100Ch 10 · Project Planning, Design and Implementation

Registration charge of general engineers for students studied in foreign universities is ............[cite: 16]

ARs. 3000
BRs. 4000
CRs. 10000
DRs. 15000
Answer is hidden
Question 1070 of 1100Ch 10 · Project Planning, Design and Implementation

Total number of registration category of engineer in NEC is ............[cite: 16]

A3
B4
C5
D6
Answer is hidden
Question 1071 of 1100Ch 10 · Project Planning, Design and Implementation

The min qualification required for engineer practices in Nepal is ............[cite: 16]

ABE
BBE + register in NEC
CME
DME + register in NEC
Answer is hidden
Question 1072 of 1100Ch 10 · Project Planning, Design and Implementation

The interval of surveillance of colleges registered under NEC is ............[cite: 16]

Aevery 2 years
Bonce in every 3 years
Ctwice in 4 years
Dthrice in every 5 years
Answer is hidden
Question 1073 of 1100Ch 10 · Project Planning, Design and Implementation

In general, Nepal engineering council meeting per year should be held ............[cite: 16]

A2 times
B3 times
C4 times
D5 times
Answer is hidden
Question 1074 of 1100Ch 10 · Project Planning, Design and Implementation

Minimum .......... of the members should be present in a meeting to fulfil the quorum of NEC.[cite: 16]

A0.25
B0.5
C0.75
D1
Answer is hidden
Question 1075 of 1100Ch 10 · Project Planning, Design and Implementation

If a motion submitted to a meeting of council to remove the name from the book on charge of violating professional code of conduct is passed by ............ majority of council, the name of the engineer is removed from the book.[cite: 16]

Atwo third
Bgeneral
Cthree - fourth
Dfull
Answer is hidden
Question 1076 of 1100Ch 10 · Project Planning, Design and Implementation

Which of the following reasons caused desolution of NEC by GON?[cite: 16]

ACommittee of NEC work against the act and regulations
B50% of the member are bankrupt
CCollege recognition is given without fulfilling the criteria of NEC regulations
DFormation of new government of Nepal
Answer is hidden
Question 1077 of 1100Ch 10 · Project Planning, Design and Implementation

The minimum time period allocated by GoN for formation of new council after the dissolution of current NEC like is ............[cite: 16]

A3 months
B6 months
C9 months
D1 year
Answer is hidden
Question 1078 of 1100Ch 10 · Project Planning, Design and Implementation

For temporary affiliation, the supervision of college conducted by NEC for ............[cite: 16]

Aone time in a year
Bonce in two year
Ctwice times in a year
Dthree times a year
Answer is hidden
Question 1079 of 1100Ch 10 · Project Planning, Design and Implementation

For permanent affiliation, the supervision of college conducted by NEC for ............[cite: 16]

Aone time in a year
Bonce in two year
Ctwice times in a year
Dthree times a year
Answer is hidden
Question 1080 of 1100Ch 10 · Project Planning, Design and Implementation

How much % college should score at least in average to get permanent affiliation for new college from NEC?[cite: 16]

A50%
B60%
C70%
D80%
Answer is hidden
Question 1081 of 1100Ch 10 · Engineering Economics & Project Management

A project is considered economically acceptable when its Benefit-Cost (B/C) ratio is:

AB/C < 1
BB/C > 1
CB/C = 0
DB/C = 1
Answer is hidden
Question 1082 of 1100Ch 10 · Engineering Economics & Project Management

Standard deviation is calculated as:

A√Variance
BVariance²
CMean / Variance
DVariance / n
Answer is hidden
Question 1083 of 1100Ch 10 · Engineering Economics & Project Management

The value at which a buyer and seller agree to complete a transaction is called:

ABook Value
BSalvage Value
CMarket Value
DPresent Value
Answer is hidden
Question 1084 of 1100Ch 10 · Engineering Economics & Project Management

Projects A (6-year life) and B (8-year life) are being compared using the repeatability assumption. The analysis period should be:

A6 years
B8 years
C14 years
D24 years
Answer is hidden
Question 1085 of 1100Ch 10 · Engineering Economics & Project Management

The time value of money concept means:

AMoney always loses value
BMoney always gains value
CA unit of money has different worth at different points in time
DInterest rates are always positive
Answer is hidden
Question 1086 of 1100Ch 10 · Engineering Economics & Project Management

Which capital investment evaluation method is considered LEAST reliable and is rarely used?

AAccounting Rate of Return (ARR)
BNet Present Value (NPV)
CInternal Rate of Return (IRR)
DPayback Period
Answer is hidden
Question 1087 of 1100Ch 10 · Engineering Economics & Project Management

The Schedule Performance Index (SPI) formula in Earned Value Management is:

ASPI = PV / EV
BSPI = EV / PV
CSPI = AC / EV
DSPI = EV / AC
Answer is hidden
Question 1088 of 1100Ch 10 · Engineering Economics & Project Management

Cost overrun in a project is calculated as:

AActual Cost − Planned Cost
BPlanned Cost − Actual Cost
CEarned Value − Planned Value
DActual Cost / Planned Cost
Answer is hidden
Question 1089 of 1100Ch 10 · Engineering Economics & Project Management

In engineering drawings, a 'B' grade pencil is primarily used for:

AFine detail linework
BConstruction lines
CDimension lines
DShading and sketching
Answer is hidden
Question 1090 of 1100Ch 10 · Engineering Economics & Project Management

The standard paper size ratio (width to height) for the ISO A-series is:

A1 : √2
B1 : 2
C√2 : 1
D3 : 4
Answer is hidden
Question 1091 of 1100Ch 10 · NEC & Professional Practice

Who has the authority to appoint the Chairman of the Nepal Engineering Council (NEC)?

AThe Prime Minister
BThe Government of Nepal
CThe NEC Council itself
DThe Minister of Physical Infrastructure
Answer is hidden
Question 1092 of 1100Ch 10 · NEC & Professional Practice

Who appoints the Auditor of NEC?

AThe NEC Council
BThe Ministry of Finance
CThe Auditor General
DThe Government of Nepal
Answer is hidden
Question 1093 of 1100Ch 10 · NEC & Professional Practice

What is the minimum number of council meetings NEC must hold per year?

A2
B4
C6
D12
Answer is hidden
Question 1094 of 1100Ch 10 · NEC & Professional Practice

What is the minimum number of engineering licence examinations NEC must conduct per year?

A1
B2
C3
D4
Answer is hidden
Question 1095 of 1100Ch 10 · NEC & Professional Practice

What is the minimum number of female members required in the NEC Council?

A2
B3
C4
D5
Answer is hidden
Question 1096 of 1100Ch 10 · NEC & Professional Practice

The first executive committee of NEC was formed in which year (BS)?

A2054
B2056
C2058
D2060
Answer is hidden
Question 1097 of 1100Ch 10 · NEC & Professional Practice

Under the NEC Act, the penalty for violating Section 2 (unauthorized engineering practice) is:

AUp to Rs. 5,000
BUp to Rs. 10,000
CUp to Rs. 15,000
DUp to Rs. 25,000
Answer is hidden
Question 1098 of 1100Ch 10 · NEC & Professional Practice

What type of organisation is the Nepal Engineering Council (NEC)?

APrivate body
BGovernmental / statutory body
CNon-Governmental Organisation (NGO)
DInternational organisation
Answer is hidden
Question 1099 of 1100Ch 10 · NEC & Professional Practice

Approval of a Bachelor's Engineering degree for NEC registration is granted by:

AThe university granting the degree
BNEC
CThe Ministry of Education
DThe Government of Nepal
Answer is hidden
Question 1100 of 1100Ch 10 · NEC & Professional Practice

The number of engineers registered with NEC is approximately:

A45,000
B65,000
C89,263
D120,000
Answer is hidden