Question 1 of 78Introduction to Environmental Engineering

The general mass balance equation for a control volume is

Aaccumulation = input โˆ’ output + generation โˆ’ consumption
Baccumulation = generation โˆ’ consumption only
Caccumulation = input + output โˆ’ generation
Dinput = output under all circumstances
Answer is hidden
Question 2 of 78Introduction to Environmental Engineering

A conservative substance in an environmental system is one that

Ais always present at very low concentration
Bdoes not decay, react or settle out, so its generation and consumption terms are zero
Cdecays exponentially with time
Dis removed completely by treatment
Answer is hidden
Question 3 of 78Introduction to Environmental Engineering

Which of the following is a non-conservative substance?

AChloride
BSodium
CTotal dissolved solids in a non-reacting stream
DBiochemical oxygen demand
Answer is hidden
Question 4 of 78Introduction to Environmental Engineering

A system is said to be at steady state when

Athere is no flow into or out of the system
Bno property changes with time, so the accumulation term is zero
Cthe concentration is zero everywhere
Dall reactions have reached chemical equilibrium
Answer is hidden
Question 5 of 78Introduction to Environmental Engineering

A stream of 2 mยณ/s carrying 10 mg/L of a conservative substance joins a stream of 3 mยณ/s carrying 5 mg/L. The mixed concentration is

A7 mg/L
B5 mg/L
C7.5 mg/L
D15 mg/L
Answer is hidden
Question 6 of 78Introduction to Environmental Engineering

For a substance decaying by first-order kinetics with rate constant k, the half-life is

A2k
B1/k
Ck/0.693
D0.693/k
Answer is hidden
Question 7 of 78Introduction to Environmental Engineering

In an ecosystem, the approximate proportion of energy transferred from one trophic level to the next is

A100 per cent
B90 per cent
C10 per cent
D50 per cent
Answer is hidden
Question 8 of 78Introduction to Environmental Engineering

Biomagnification refers to

Athe accumulation of a substance within a single organism over its lifetime
Bthe breakdown of a pollutant by micro-organisms
Cthe increase in concentration of a persistent substance at successive trophic levels
Dthe dilution of a pollutant in a large water body
Answer is hidden
Question 9 of 78Introduction to Environmental Engineering

In the nitrogen cycle, the process that converts ammonia to nitrite and then to nitrate is

Anitrogen fixation
Bdenitrification, which is an anoxic process
Cammonification
Dnitrification, which is an aerobic process
Answer is hidden
Question 10 of 78Introduction to Environmental Engineering

Denitrification in a wastewater treatment plant requires

Aa temperature above 60 ยฐC
Bthe addition of ammonia
Canoxic conditions and an available carbon source
Dfully aerobic conditions and vigorous aeration
Answer is hidden
Question 11 of 78Introduction to Environmental Engineering

The phosphorus cycle differs from the carbon and nitrogen cycles principally in that it

Aoccurs only in the oceans
Bis much faster than the others
Chas no significant gaseous or atmospheric phase
Dinvolves no biological uptake
Answer is hidden
Question 12 of 78Introduction to Environmental Engineering

For a dilute aqueous solution, a concentration of 1 mg/L is equivalent to

A1 per cent
B1 part per thousand
C1 part per million by mass
D1 part per billion
Answer is hidden
Question 13 of 78Introduction to Environmental Engineering

The first step in analysing any environmental mass balance problem should be to

Alook up the decay constant
Bconvert all units to SI
Cdefine the system and draw its boundary explicitly
Dassume the system is at steady state
Answer is hidden
Question 14 of 78Environmental Regulation and Impact Assessment

The purpose of environmental screening is to

Adecide whether a proposal requires an environmental assessment and at what level
Bidentify the significant issues the assessment should cover
Cevaluate the effectiveness of mitigation measures
Ddescribe the existing environmental conditions
Answer is hidden
Question 15 of 78Environmental Regulation and Impact Assessment

Environmental scoping is carried out in order to

Adetermine which issues, impacts and alternatives the assessment will examine and in what depth
Bdecide whether an assessment is needed at all
Cobtain approval for the completed report
Dmeasure existing pollutant concentrations
Answer is hidden
Question 16 of 78Environmental Regulation and Impact Assessment

In Nepal, the level of environmental assessment required for a proposal is determined principally by

Athe proponent's own judgement
Bthe cost of the project alone
Cthe preference of the local community
Dthe schedules to the Environment Protection Rules, which list project types and thresholds
Answer is hidden
Question 17 of 78Environmental Regulation and Impact Assessment

The terms of reference for an EIA study must normally be

Aprepared after the study is complete
Bdrafted only by the project proponent without review
Comitted if the project is small
Dapproved by the competent authority before the study begins
Answer is hidden
Question 18 of 78Environmental Regulation and Impact Assessment

The baseline study in an EIA is important because

Ait provides the reference against which predicted impacts and later monitoring results are measured
Bit replaces the need for monitoring
Cit determines whether the project is profitable
Dit establishes the terms of reference
Answer is hidden
Question 19 of 78Environmental Regulation and Impact Assessment

Cumulative impacts in an environmental assessment refer to

Aimpacts confined to the project site
Bthe combined effect of the project together with other existing and proposed activities
Cimpacts that reverse themselves over time
Dimpacts that occur only during construction
Answer is hidden
Question 20 of 78Environmental Regulation and Impact Assessment

The correct order of the mitigation hierarchy is

Arectify, compensate, avoid, minimise, reduce
Bcompensate, reduce, rectify, minimise, avoid
Cminimise, avoid, compensate, rectify, reduce
Davoid, minimise, rectify, reduce over time, compensate
Answer is hidden
Question 21 of 78Environmental Regulation and Impact Assessment

In the analysis of alternatives within an EIA, the 'no action' alternative

Ais considered only for very large projects
Bis the same as the least-cost alternative
Cshould be excluded because the project is already decided
Dmust always be included, as the benchmark against which other options are judged
Answer is hidden
Question 22 of 78Environmental Regulation and Impact Assessment

The Environmental Management Plan in an EIA report specifies

Aonly the predicted impacts
Bonly the baseline conditions
Cthe financial return on the project
Dthe mitigation measures with responsibility, timing, cost and monitoring arrangements
Answer is hidden
Question 23 of 78Environmental Regulation and Impact Assessment

The essential difference between environmental monitoring and environmental auditing is that monitoring is performance against criteria

Aa legal requirement, while auditing is voluntary in every case
Bcarried out before the project, while auditing is carried out during scoping
Crepeated measurement of environmental parameters, while auditing is periodic evaluation of
Dconcerned only with air quality
Answer is hidden
Question 24 of 78Environmental Regulation and Impact Assessment

Post-project environmental auditing is valuable principally because it

Areduces the cost of the project
Breplaces the need for an EMP
Ccompares the impacts that actually occurred with those predicted, improving future assessments
Ddetermines the terms of reference
Answer is hidden
Question 25 of 78Environmental Regulation and Impact Assessment

Which of the following is legally enforceable?

AAn international textbook recommendation
BA best practice guideline issued by an agency
CA technical manual published by a professional body
DA standard notified under an Act or its Rules
Answer is hidden
Question 26 of 78Environmental Regulation and Impact Assessment

An emission standard differs from an ambient standard in that an emission standard

Adepends on the assimilative capacity of the receiving body
Bdescribes the quality to be maintained in the surrounding environment
Climits what leaves a particular source, at the point of discharge
Dapplies only to water and not to air
Answer is hidden
Question 27 of 78Engineering Survey

The principle of working from the whole to the part in surveying is followed in order to

Aprevent the accumulation of errors over the survey
Ballow the use of lower-accuracy instruments throughout
Cavoid the need for any checks
Dreduce the cost of the survey
Answer is hidden
Question 28 of 78Engineering Survey

Systematic errors in surveying are

Aalways negligible in practice
Bcompensating and reduced only by repeated measurement
Cthe same as blunders
Dcumulative and can be corrected by calibration or calculation
Answer is hidden
Question 29 of 78Engineering Survey

In differential levelling, the height of instrument is obtained by

Asubtracting the back sight from the reduced level
Badding the fore sight to the reduced level
Cadding the back sight to the reduced level of the point on which it is taken
Daveraging the back sight and fore sight
Answer is hidden
Question 30 of 78Engineering Survey

The rise and fall method of reducing levels is preferred to the height of instrument method when

Athere are a very large number of intermediate sights
Bspeed of computation is the only consideration
Conly two points are to be levelled
Da full arithmetic check on the intermediate sights is required
Answer is hidden
Question 31 of 78Engineering Survey

The fore bearing and back bearing of a survey line should differ by

A360 degrees
B90 degrees
C45 degrees
Dexactly 180 degrees
Answer is hidden
Question 32 of 78Engineering Survey

Bowditch's rule for adjusting a closed traverse distributes the closing error

Aequally among all stations
Bentirely to the last line
Cin proportion to the lengths of the traverse lines
Din proportion to the interior angles only
Answer is hidden
Question 33 of 78Engineering Survey

Contour lines on a topographic map can cross one another only in the case of

Aan overhanging cliff
Ba vertical cliff
Ca saddle
Da uniform slope
Answer is hidden
Question 34 of 78Engineering Survey

Closely spaced contour lines on a map indicate

Aa uniform gentle slope
Ba water body
Cflat ground
Dsteep ground
Answer is hidden
Question 35 of 78Engineering Survey

Where a contour line crosses a valley, it forms a V that points

Ain a direction unrelated to the flow
Balways towards the north
Cdownstream, away from the higher ground
Dupstream, towards the higher ground
Answer is hidden
Question 36 of 78Engineering Survey

A smaller contour interval would normally be chosen for

Areconnaissance surveys only
Bmountainous terrain mapped at a small scale
Cany terrain where time is short
Dflat terrain mapped at a large scale
Answer is hidden
Question 37 of 78Engineering Survey

The essential difference between a hydrographic survey and a land survey is that in a hydrographic survey

Ano positions need to be fixed
Bthe soundings must be reduced to a common datum using simultaneous records of water level
Celevations are not required
Dno instruments are used
Answer is hidden
Question 38 of 78Engineering Survey

An echo sounder determines water depth by measuring

Athe temperature difference between surface and bed
Bthe travel time of an acoustic pulse reflected from the bed
Cthe pressure at the water surface
Dthe electrical conductivity of the water
Answer is hidden
Question 39 of 78Engineering Survey

In stream gauging with a current meter, the mean velocity in a vertical is commonly taken as the velocity at

A0.6 of the depth below the surface, or the average of the values at 0.2 and 0.8 depth
B0.5 of the depth in all cases
Cthe channel bed
Dthe water surface
Answer is hidden
Question 40 of 78Green Engineering and Sustainable Design

Sustainable development, as defined in the Brundtland report, means development that needs

Ameets the needs of the present without compromising the ability of future generations to meet their own
Bprohibits all use of natural resources
Cmaximises economic growth in the shortest time
Dconsiders only environmental factors
Answer is hidden
Question 41 of 78Green Engineering and Sustainable Design

Life cycle assessment is described as cradle to grave because it considers impacts

Aonly from the factory gate to the consumer
Bfrom raw material extraction through manufacture and use to final disposal
Conly at the end of the product's life
Donly during the manufacturing stage
Answer is hidden
Question 42 of 78Green Engineering and Sustainable Design

The four stages of a life cycle assessment, in order, are

Ainventory analysis, goal definition, interpretation, impact assessment
Bimpact assessment, inventory analysis, interpretation, scoping
Cgoal and scope definition, inventory analysis, impact assessment, interpretation
Dscreening, scoping, baseline, monitoring
Answer is hidden
Question 43 of 78Green Engineering and Sustainable Design

The functional unit in a life cycle assessment is

Athe total cost of the product
Bthe quantified performance of the system, to which all inputs and outputs are normalised
Cthe factory in which the product is made
Dthe mass of the finished product
Answer is hidden
Question 44 of 78Green Engineering and Sustainable Design

Environmental risk is best described as a function of

Aexposure alone
Bhazard alone
Cthe cost of the control measure
Dhazard and exposure together
Answer is hidden
Question 45 of 78Green Engineering and Sustainable Design

In health risk assessment, carcinogens are conventionally treated as having

Ano dose-response relationship at all
Bno threshold, so a slope factor is used instead of a reference dose
Ca clear threshold below which no effect occurs
Dthe same dose-response relationship as non-carcinogens
Answer is hidden
Question 46 of 78Green Engineering and Sustainable Design

A hazard quotient greater than 1 in a risk assessment indicates that

Athe exposure has been measured incorrectly
Bthe substance is a carcinogen
Cthe estimated intake exceeds the reference dose, so adverse effects are possible
Dthe risk is negligible
Answer is hidden
Question 47 of 78Green Engineering and Sustainable Design

Risk assessment and risk management are kept as separate activities because

Arisk assessment is purely a legal exercise
Bseparating them prevents the scientific evaluation from being influenced by the desired policy outcome
Crisk management is not necessary
Dthey are carried out in different countries
Answer is hidden
Question 48 of 78Green Engineering and Sustainable Design

People generally tolerate a voluntary, familiar risk far more readily than an involuntary one of the same numerical magnitude because

Athe calculation method differs between the two
Bvoluntary risks are always smaller
Cinvoluntary risks are never quantified
Drisk perception is influenced by factors such as control, familiarity and dread as well as by probability
Answer is hidden
Question 49 of 78Green Engineering and Sustainable Design

Certification of an organisation to ISO 14001 indicates that

Ait produces no waste of any kind
Bit operates an environmental management system meeting the standard's requirements
Cits products have the lowest environmental impact available
Dits emissions are below all statutory limits
Answer is hidden
Question 50 of 78Green Engineering and Sustainable Design

Cleaner production differs fundamentally from end-of-pipe treatment in that cleaner production

Aprevents the waste from being generated, rather than treating it after it is formed
Bapplies only to air emissions
Cis a more efficient form of effluent treatment
Drequires larger treatment plants
Answer is hidden
Question 51 of 78Green Engineering and Sustainable Design

Among cleaner production techniques, the measure that typically yields substantial savings at almost no capital cost is

Agood housekeeping
Bcomplete technology change
Crelocation of the factory
Dconstruction of a new treatment plant
Answer is hidden
Question 52 of 78Green Engineering and Sustainable Design

The statement that quality cannot be inspected into a product means that

Ainspection separates good from bad but does not reduce the number of defects produced
Bdefects are unavoidable in any process
Cquality is determined only by the customer
Dinspection should be abandoned altogether
Answer is hidden
Question 53 of 78Estimating, Costing and Valuation

The essential difference between estimating and costing is that estimating afterwards

Adetermines the actual cost, while costing forecasts it
Bapplies only to buildings
Cforecasts the probable cost before the work is executed, while costing determines the actual cost
Dis carried out only by the contractor
Answer is hidden
Question 54 of 78Estimating, Costing and Valuation

A cube rate estimate is generally more accurate than a plinth area estimate because it

Ais based on the detailed drawings
Bmeasures every item of work separately
Cincludes the cost of land
Dtakes the height of the building into account as well as the plan area
Answer is hidden
Question 55 of 78Estimating, Costing and Valuation

A supplementary estimate is prepared when

Athe project is abandoned
Bthe sanctioned estimate is exceeded by more than the permitted margin
Cthe work is completed under budget
Dadditional work is found to be necessary while the original work is in progress
Answer is hidden
Question 56 of 78Estimating, Costing and Valuation

In the centre line method of estimating masonry, a deduction must be made

Aat the corners of the building only
Bat every junction of walls
Cat every door and window only
Dnowhere, since the method is exact
Answer is hidden
Question 57 of 78Estimating, Costing and Valuation

Rate analysis for an item of work is required principally in order to

Ameasure the quantity of the item
Bprepare the working drawings
Cfix the contractor's programme
Ddetermine a defensible unit rate from the cost of materials, labour, plant and overheads
Answer is hidden
Question 58 of 78Estimating, Costing and Valuation

In rate analysis, the contractor's overhead and profit is usually taken as

A1 per cent of the total cost
B50 per cent of the total cost
Cthe same as the contingency allowance
D10 to 15 per cent of the cost of materials, labour and plant
Answer is hidden
Question 59 of 78Estimating, Costing and Valuation

The terms lead and lift in estimating refer respectively to

Athe horizontal distance and the vertical height through which material is carried
Bthe time taken to begin and to complete the work
Cthe depth of excavation and the height of filling
Dthe length and breadth of the structure
Answer is hidden
Question 60 of 78Estimating, Costing and Valuation

A specification is necessary in addition to the drawings because the drawings cannot convey

Athe quality of materials and the standard of workmanship required
Bthe arrangement of the components
Cthe location of the work
Dthe dimensions of the structure
Answer is hidden
Question 61 of 78Estimating, Costing and Valuation

In a performance specification, as distinct from a prescriptive specification

Athe required end result is stated and the contractor chooses the method, carrying the risk of achieving it
Bno quality requirement is stated at all
Cthe exact materials and methods are prescribed in detail
Dthe employer carries all the risk of the outcome
Answer is hidden
Question 62 of 78Estimating, Costing and Valuation

The scrap value of a building is

Athe original cost less accumulated depreciation
Bthe value of the building at the end of its useful life if sold intact
Cthe price obtainable in the open market
Dthe value of the dismantled material after deducting the cost of demolition
Answer is hidden
Question 63 of 78Estimating, Costing and Valuation

At the end of an asset's useful life, its book value is equal to

Aits market value
Bits original cost
Czero in every case
Dits scrap value
Answer is hidden
Question 64 of 78Estimating, Costing and Valuation

Depreciation differs from obsolescence in that depreciation is the loss of value due to available

Ademolition costs
Bage, wear and use, whereas obsolescence is loss of value because something better has become
Ca fall in market demand, whereas obsolescence is due to physical wear
Dchanges in the rate of interest
Answer is hidden
Question 65 of 78Estimating, Costing and Valuation

If the net annual income from a property is Rs 200,000 and the expected rate of return is 8 per cent, the capitalised value is approximately

ARs 1,600,000
BRs 2,500,000
CRs 25,000,000
DRs 16,000
Answer is hidden
Question 66 of 78GIS and Remote Sensing

The five components of a geographic information system are

Ahardware, software, maps, satellites and printers
Bcapture, storage, analysis, display and printing
Cpoints, lines, polygons, rasters and vectors
Dhardware, software, data, people and methods
Answer is hidden
Question 67 of 78GIS and Remote Sensing

A map at a scale of 1:1,000 compared with one at 1:1,000,000 is

Aunusable for engineering work
Bof the same scale, since both are ratios
Ca smaller-scale map covering a larger area
Da larger-scale map covering a smaller area in greater detail
Answer is hidden
Question 68 of 78GIS and Remote Sensing

Every map projection necessarily

Ais unsuitable for engineering use
Bpreserves area but never shape
Cdistorts at least one of area, shape, distance and direction
Dpreserves all four properties simultaneously
Answer is hidden
Question 69 of 78GIS and Remote Sensing

For calculating the areas of land cover classes in a catchment, the appropriate projection is

Aa conformal projection such as Mercator
Ban equal-area projection
Ca geographic coordinate system with no projection
Dany projection, since area is unaffected
Answer is hidden
Question 70 of 78GIS and Remote Sensing

Two GIS layers referenced to different datums will

Aoverlay perfectly, since the coordinates are numerical
Bdiffer only in their attribute tables
Cautomatically be reconciled by the software
Dfail to overlay correctly, with positional discrepancies of metres or more
Answer is hidden
Question 71 of 78GIS and Remote Sensing

Which data model is most appropriate for representing land elevation across a catchment?

AEither model gives identical results
BVector polygons, because the catchment has a boundary
CVector points, because elevation is measured at points
DRaster, because elevation is a continuous surface
Answer is hidden
Question 72 of 78GIS and Remote Sensing

If the cell size of a raster layer is halved, the file size will approximately

Aremain unchanged
Bhalve
Cdouble
Dquadruple
Answer is hidden
Question 73 of 78GIS and Remote Sensing

Topology in a vector GIS records

Athe colour used to display each feature
Bthe file format of the layer
Cconnectivity, adjacency and containment between features
Dthe elevation of each feature
Answer is hidden
Question 74 of 78GIS and Remote Sensing

The GIS operation used to define a protection zone of specified width around a river is

Ageocoding
Bbuffering
Cclassification
Doverlay
Answer is hidden
Question 75 of 78GIS and Remote Sensing

Metadata in a GIS refers to

Athe attribute values of each feature
Bthe coordinates of each point
Cthe symbols used in the map legend
Dinformation describing the source, date, scale, projection and accuracy of a data layer
Answer is hidden
Question 76 of 78GIS and Remote Sensing

Radar and lidar are classified as active remote sensing systems because they

Aoperate only in daylight
Brecord only reflected sunlight
Cmeasure temperature directly
Dsupply their own energy and can therefore operate at night and through cloud
Answer is hidden
Question 77 of 78GIS and Remote Sensing

Healthy green vegetation is readily identified in satellite imagery because it

Aabsorbs strongly in the red band and reflects strongly in the near infrared
Bemits no radiation at all
Creflects strongly in the red band and absorbs in the near infrared
Dreflects equally in all bands
Answer is hidden
Question 78 of 78GIS and Remote Sensing

In supervised image classification, the analyst

Aclassifies every pixel manually
Ballows the software to cluster pixels and then labels the clusters
Csupplies training areas of known land cover from which the classifier learns
Duses no reference data at all
Answer is hidden