Question 642 of 1113Ch 8 · Software Engineering & OOP
Software is best defined as:
AA set of executable programs only
BA set of programs, associated documentation, and configuration data
CHardware instructions stored in ROM
DAn operating system and its utilities
Answer is hidden
Question 643 of 1113Ch 8 · Software Engineering & OOP
A Use Case describes interaction between:
AClasses and objects
BModules and components
CActor and the system (product)
DDatabase and application
Answer is hidden
Question 644 of 1113Ch 8 · Software Engineering & OOP
CASE (Computer-Aided Software Engineering) tools are primarily used for:
AOnly code compilation
BOnly testing
CSupporting all phases of software development and project management
DDatabase administration only
Answer is hidden
Question 645 of 1113Ch 8 · Software Engineering & OOP
Vertical lines (lifelines) in a UML Sequence Diagram represent:
AMethod calls
BObjects or actors
CTime intervals
DReturn values
Answer is hidden
Question 646 of 1113Ch 8 · Software Engineering & OOP
In C++ templates, in the declaration template <class T>, T represents:
AA specific class name
BA template type parameter (placeholder for any type)
CA typedef alias
DA global variable
Answer is hidden
Question 647 of 1113Ch 8 · Software Engineering & OOP
The primary purpose of C++ namespaces is to:
AAvoid naming conflicts and encapsulate code
BSpeed up compilation
CReplace header files
DManage memory allocation
Answer is hidden
Question 648 of 1113Ch 8 · Software Engineering & OOP
Runtime polymorphism (late binding) in C++ is achieved through:
AFunction overloading
BVirtual functions
COperator overloading
DTemplates
Answer is hidden
Question 649 of 1113Ch 8 · Software Engineering & OOP
The three main phases of Object-Oriented development are:
AAnalysis, Design, and Implementation
BRequirements, Coding, and Testing
CPlanning, Execution, and Closure
DModelling, Prototyping, and Deployment
Answer is hidden
Question 650 of 1113Ch 8 · Software Engineering & OOP
Which SDLC model explicitly pairs each development phase with a testing phase in a V-shape?
AWaterfall Model
BV-Model (Verification and Validation)
CSpiral Model
DAgile Model
Answer is hidden
Question 651 of 1113Ch 8 · Software Engineering & OOP
Version control systems are used primarily to:
ACompile source code
BTrack and manage multiple versions of code and files
CDebug runtime errors
DManage database schemas
Answer is hidden
Question 652 of 1113Ch 8 · Software Engineering & OOP
The arrow notation in UML represents which relationship?
AAssociation
BAggregation
CGeneralisation (Inheritance)
DDependency
Answer is hidden
Question 653 of 1113Ch 8 · Software Engineering & OOP
Which C/C++ keyword CANNOT be used as an identifier (variable name)?
Awhile
Bcount
Cvalue
Ddata
Answer is hidden
Question 654 of 1113Ch 8 · Software Engineering & OOP
The operator used to access a member of a structure through a pointer in C is:
A.
B->
C::
D*
Answer is hidden
Question 655 of 1113Ch 8 · Software Engineering & OOP
Given classes A, B: public A, C: public B, the type of inheritance demonstrated is:
AMultiple inheritance
BMultilevel inheritance
CHierarchical inheritance
DHybrid inheritance
Answer is hidden
Question 656 of 1113Ch 9 · Introduction to AI and intelligent agent
The term 'Artificial Intelligence' was formally coined at which event?
AThe Turing Test proposal
BThe 1956 Dartmouth Conference
CThe first computer science degree program
DThe invention of the perceptron
Answer is hidden
Question 657 of 1113Ch 9 · Introduction to AI and intelligent agent
An agent's actuators are used to:
APerceive the environment
BAct upon the environment
CStore past percepts only
DCompute a utility function only
Answer is hidden
Question 658 of 1113Ch 9 · Introduction to AI and intelligent agent
A simple reflex agent selects its actions based on:
AA model of the world and future goals
BOnly the current percept, using condition-action rules
CA utility function
DCommunication with other agents
Answer is hidden
Question 659 of 1113Ch 9 · Introduction to AI and intelligent agent
Which type of agent maintains an internal state to handle partial observability?
ASimple reflex agent
BModel-based reflex agent
CRandom agent
DNone of the agent types
Answer is hidden
Question 660 of 1113Ch 9 · Introduction to AI and intelligent agent
A utility-based agent is most useful when:
AThere is only one possible goal
BMultiple goals conflict and a trade-off/preference must be chosen
CThe environment is always deterministic
DNo actions are available
Answer is hidden
Question 661 of 1113Ch 9 · Introduction to AI and intelligent agent
An environment where the outcome of an action is not fully predictable is called:
ADeterministic
BStochastic
CStatic
DFully observable
Answer is hidden
Question 662 of 1113Ch 9 · Introduction to AI and intelligent agent
An environment that can change while the agent is still deciding on an action is called:
AStatic
BDynamic
CDeterministic
DSingle-agent
Answer is hidden
Question 663 of 1113Ch 9 · Introduction to AI and intelligent agent
If an agent's sensors provide complete information about the current state, the environment is:
APartially observable
BFully observable
CStochastic
DMulti-agent
Answer is hidden
Question 664 of 1113Ch 9 · Introduction to AI and intelligent agent
The 'acting humanly' perspective of AI is closely associated with:
AThe Turing Test
BBayesian networks
CGenetic algorithms
DBackpropagation
Answer is hidden
Question 665 of 1113Ch 9 · Introduction to AI and intelligent agent
A goal-based agent differs from a simple reflex agent mainly by:
AHaving no actuators
BConsidering future consequences of actions to achieve a goal
CIgnoring all percepts
DNever using condition-action rules
Answer is hidden
Question 666 of 1113Ch 9 · Problem solving and searching techniques
A Constraint Satisfaction Problem is defined by:
AStates and actions only
BVariables, domains, and constraints
CA utility function only
DA heuristic function only
Answer is hidden
Question 667 of 1113Ch 9 · Problem solving and searching techniques
Which uninformed search strategy explores the search tree level by level?
ADFS
BBFS
CHill climbing
DA* search
Answer is hidden
Question 668 of 1113Ch 9 · Problem solving and searching techniques
Depth-First Search generally uses:
AMore memory than BFS
BLess memory than BFS
CExactly the same memory as BFS
DNo memory at all
Answer is hidden
Question 669 of 1113Ch 9 · Problem solving and searching techniques
Iterative Deepening Search combines the advantages of:
AOnly DFS
BOnly BFS
CBFS's completeness/optimality with DFS's low memory usage
DMinimax and alpha-beta pruning
Answer is hidden
Question 670 of 1113Ch 9 · Problem solving and searching techniques
A* search selects the next node to expand based on:
AOnly the heuristic h(n)
BOnly the path cost g(n)
Cf(n) = g(n) + h(n)
DA random selection
Answer is hidden
Question 671 of 1113Ch 9 · Problem solving and searching techniques
A* search is guaranteed to find the optimal solution when the heuristic is:
AAlways zero
BAdmissible (never overestimates the true cost)
CAlways an overestimate
DIgnored entirely
Answer is hidden
Question 672 of 1113Ch 9 · Problem solving and searching techniques
Hill climbing search can fail to find the global optimum because it may get stuck at a:
AGlobal maximum
BLocal maximum
CStarting state only
DGoal state
Answer is hidden
Question 673 of 1113Ch 9 · Problem solving and searching techniques
Simulated annealing differs from basic hill climbing by:
ANever accepting a worse move
BOccasionally accepting a worse move to escape local optima
CIgnoring the current state entirely
DOnly working on adversarial games
Answer is hidden
Question 674 of 1113Ch 9 · Problem solving and searching techniques
The Minimax algorithm is used primarily for:
ASingle-agent path planning
BTwo-player adversarial (zero-sum) games
CClustering unlabeled data
DTraining neural networks
Answer is hidden
Question 675 of 1113Ch 9 · Problem solving and searching techniques
Alpha-beta pruning improves minimax by:
AChanging the final decision to a suboptimal one
BSkipping branches that cannot affect the final decision, without changing the result
CRemoving the need for a game tree
DMaking the search less accurate
Answer is hidden
Question 676 of 1113Ch 9 · Knowledge representation
A semantic network represents knowledge using:
AOnly numeric probabilities
BNodes (concepts) connected by labeled edges (relationships)
COnly if-then rules
DGenetic algorithm chromosomes
Answer is hidden
Question 677 of 1113Ch 9 · Knowledge representation
A frame represents knowledge using:
ASlots and fillers
BOnly logical connectives
CA game tree
DA neural network layer
Answer is hidden
Question 678 of 1113Ch 9 · Knowledge representation
A tautology in propositional logic is a formula that is:
AAlways false
BAlways true, regardless of interpretation
CSometimes true, sometimes false
DUndefined
Answer is hidden
Question 679 of 1113Ch 9 · Knowledge representation
Resolution as an inference technique works by:
ADirectly guessing the answer
BConverting statements to clausal form and deriving a contradiction
CIgnoring all premises
DOnly working with fuzzy logic
Answer is hidden
Question 680 of 1113Ch 9 · Knowledge representation
The symbol ∀ in First-Order Predicate Logic represents:
AExistential quantification ('there exists')
BUniversal quantification ('for all')
CLogical negation
DLogical implication
Answer is hidden
Question 681 of 1113Ch 9 · Knowledge representation
Unification in FOPL is used to:
AFind a substitution that makes two expressions identical
BCompute a truth table
CBuild a semantic network
DTrain a neural network
Answer is hidden
Question 682 of 1113Ch 9 · Knowledge representation
Bayes' Rule is expressed as:
AP(A|B) = P(A) + P(B)
BP(A|B) = P(B|A)P(A)/P(B)
CP(A|B) = P(A)/P(B) only
DP(A|B) = P(B) - P(A)
Answer is hidden
Question 683 of 1113Ch 9 · Knowledge representation
A Bayesian network is structured as a:
ADirected acyclic graph (DAG) of variables and dependencies
BBinary search tree
CSimple linked list
DFully connected undirected graph only
Answer is hidden
Question 684 of 1113Ch 9 · Knowledge representation
Reasoning in belief (Bayesian) networks typically involves computing:
AThe shortest path between nodes
BThe posterior probability of variables given evidence
CA minimax value
DA fitness function
Answer is hidden
Question 685 of 1113Ch 9 · Knowledge representation
Which of these is an issue commonly identified in knowledge representation?
AChoosing the correct programming language
BChoosing the right granularity and structure for representing knowledge
CDetermining CPU clock speed
DSelecting a network topology
Answer is hidden
Question 686 of 1113Ch 9 · Expert system and natural language processing
The component of an expert system that applies rules to derive new conclusions is the:
AKnowledge base
BInference engine
CUser interface
DExplanation facility
Answer is hidden
Question 687 of 1113Ch 9 · Expert system and natural language processing
'Knowing how to ride a bicycle' is an example of:
ADeclarative knowledge
BProcedural knowledge
CSemantic knowledge only
DNo knowledge type
Answer is hidden
Question 688 of 1113Ch 9 · Expert system and natural language processing
Which expert system component explains the reasoning behind its conclusions?
AKnowledge base
BExplanation facility
CKnowledge acquisition module
DInference engine only
Answer is hidden
Question 689 of 1113Ch 9 · Expert system and natural language processing
The step in NLP that involves breaking text into individual words/tokens is called:
ASemantic analysis
BLexical analysis
CPragmatic analysis
DDiscourse integration
Answer is hidden
Question 690 of 1113Ch 9 · Expert system and natural language processing
Generating human-readable text from structured data is the task of:
ANatural Language Understanding (NLU)
BNatural Language Generation (NLG)
CMachine vision
DGenetic algorithms
Answer is hidden
Question 691 of 1113Ch 9 · Expert system and natural language processing
Ambiguity in language (a word or sentence having multiple meanings) is considered a:
ABenefit of NLP systems
BMajor challenge in NLP
CNon-issue in NLP
DOnly a speech recognition issue
Answer is hidden
Question 692 of 1113Ch 9 · Expert system and natural language processing
Which stage of machine vision involves isolating regions of interest in an image?
AImage acquisition
BSegmentation
CPreprocessing only
DFeature extraction only
Answer is hidden
Question 693 of 1113Ch 9 · Expert system and natural language processing
Robotics combines AI with which other disciplines?
AOnly pure mathematics
BMechanical engineering and electronics
COnly linguistics
DOnly databases
Answer is hidden
Question 694 of 1113Ch 9 · Expert system and natural language processing
Knowledge acquisition in expert system development refers to:
ADeleting outdated rules
BExtracting and structuring expert knowledge into the knowledge base
CRunning the inference engine
DOnly user interface design
Answer is hidden
Question 695 of 1113Ch 9 · Expert system and natural language processing
A knowledge engineer's primary role in expert system development is to:
AWrite the final report only
BWork with domain experts to elicit and encode their knowledge
COnly design the graphical interface
DOptimize hardware performance
Answer is hidden
Question 696 of 1113Ch 9 · Machine learning
Supervised learning requires training data that is:
AUnlabeled
BLabeled with known input-output pairs
CRandomly generated only
DAlways numeric
Answer is hidden
Question 697 of 1113Ch 9 · Machine learning
Which learning paradigm finds patterns in unlabeled data (e.g., clustering)?
ASupervised learning
BUnsupervised learning
CReinforcement learning
DGenetic learning
Answer is hidden
Question 698 of 1113Ch 9 · Machine learning
In reinforcement learning, an agent learns by:
AUsing only labeled datasets
BReceiving rewards or penalties from interacting with an environment
CClustering data points
DApplying fuzzy logic rules
Answer is hidden
Question 699 of 1113Ch 9 · Machine learning
A decision tree typically chooses attribute splits based on:
ARandom selection
BInformation gain (or entropy reduction)
CFuzzy membership values
DGenetic crossover
Answer is hidden
Question 700 of 1113Ch 9 · Machine learning
The Naive Bayes classifier assumes that features are:
APerfectly correlated
BConditionally independent given the class
CAlways continuous
DIrrelevant to classification
Answer is hidden
Question 701 of 1113Ch 9 · Machine learning
In a Fuzzy Inference System, the process of converting a crisp input into a fuzzy value is called:
ADefuzzification
BFuzzification
CSelection
DCrossover
Answer is hidden
Question 702 of 1113Ch 9 · Machine learning
Converting the fuzzy output of an inference system back into a crisp value is called:
AFuzzification
BDefuzzification
CMutation
DEncoding
Answer is hidden
Question 703 of 1113Ch 9 · Machine learning
Which of these is a well-known fuzzy inference method?
AMamdani method
BBackpropagation method
CMinimax method
DA* method
Answer is hidden
Question 704 of 1113Ch 9 · Machine learning
In a Genetic Algorithm, the operator that combines parts of two parent chromosomes is called:
ASelection
BCrossover
CMutation
DFitness evaluation
Answer is hidden
Question 705 of 1113Ch 9 · Machine learning
The fitness function in a Genetic Algorithm is used to:
ASelect the encoding scheme
BEvaluate how good a candidate solution is
CPerform defuzzification
DConvert labels to features
Answer is hidden
Question 706 of 1113Ch 9 · Neural networks
The McCulloch-Pitts neuron is best described as:
AA modern deep learning architecture
BAn early binary threshold model of a neuron
CA fuzzy inference system
DA genetic algorithm operator
Answer is hidden
Question 707 of 1113Ch 9 · Neural networks
In an artificial neuron, the activation function is applied to:
AThe raw input values only
BThe weighted sum of the inputs
CThe learning rate
DThe fitness function
Answer is hidden
Question 708 of 1113Ch 9 · Neural networks
Which activation function outputs values strictly between 0 and 1?
AReLU
BSigmoid
CStep function only
DLinear function
Answer is hidden
Question 709 of 1113Ch 9 · Neural networks
A single-layer Perceptron can correctly classify data that is:
ANon-linearly separable only
BLinearly separable
CAlways randomly distributed
DNever classifiable
Answer is hidden
Question 710 of 1113Ch 9 · Neural networks
Gradient descent updates a neural network's weights by moving:
AIn a random direction
BIn the direction that increases the error
CIn the direction that most reduces the error (negative gradient)
DOnly after training is complete
Answer is hidden
Question 711 of 1113Ch 9 · Neural networks
Hebbian learning is summarized by the principle:
A'The strongest neuron wins'
B'Neurons that fire together, wire together'
C'Error must always be zero'
D'Only output neurons learn'
Answer is hidden
Question 712 of 1113Ch 9 · Neural networks
The Adaline model differs from the basic Perceptron mainly by using:
AA step activation function during training
BA linear activation function trained with the delta rule
CNo activation function at all
DOnly unsupervised learning
Answer is hidden
Question 713 of 1113Ch 9 · Neural networks
A Multilayer Perceptron (MLP) is capable of solving problems that a single-layer perceptron cannot, mainly because it has:
AMore output neurons only
BOne or more hidden layers enabling non-linear decision boundaries
CNo activation function
DOnly linear connections
Answer is hidden
Question 714 of 1113Ch 9 · Neural networks
The Backpropagation algorithm trains a neural network by:
APropagating error backward through the network to update weights via gradient descent
BRandomly guessing weights until correct
COnly adjusting the input layer
DIgnoring the output error
Answer is hidden
Question 715 of 1113Ch 9 · Neural networks
A Hopfield network is primarily used as a(n):
AFeedforward classifier only
BAssociative (content-addressable) memory
CGenetic algorithm encoder
DFuzzy inference engine
Answer is hidden
Question 716 of 1113Ch 10 · Engineering Drawings and Their Concepts
The area of an A0 drawing sheet is:
A0.25 m²
B1 m²
C2 m²
D0.5 m²
Answer is hidden
Question 717 of 1113Ch 10 · Engineering Drawings and Their Concepts
The size of an A4 sheet is:
A148 × 210 mm
B297 × 420 mm
C420 × 594 mm
D210 × 297 mm
Answer is hidden
Question 718 of 1113Ch 10 · Engineering Drawings and Their Concepts
The title block of a drawing sheet is normally placed at the:
ACentre of the sheet
BTop-right corner
CTop-left corner
DBottom-right corner
Answer is hidden
Question 719 of 1113Ch 10 · Engineering Drawings and Their Concepts
In the unidirectional system of dimensioning, dimension figures are:
ARead from the right side only
BAll read from the bottom of the sheet
CPlaced inside the object always
DParallel to the dimension lines
Answer is hidden
Question 720 of 1113Ch 10 · Engineering Drawings and Their Concepts
A drawing made to a scale of 1 : 50 has a representative fraction of:
A50
B5/1
C1/50
D1/5
Answer is hidden
Question 721 of 1113Ch 10 · Engineering Drawings and Their Concepts
A scale that can show three units such as metre, decimetre and centimetre is a:
AScale of chords
BComparative scale
CPlain scale
DDiagonal scale
Answer is hidden
Question 722 of 1113Ch 10 · Engineering Drawings and Their Concepts
In first-angle projection, the top view is placed:
ABelow the front view
BBehind the front view
CAbove the front view
DTo the left of the front view
Answer is hidden
Question 723 of 1113Ch 10 · Engineering Drawings and Their Concepts
The true shape of an inclined surface is obtained from a/an:
APerspective view
BIsometric view
CAuxiliary view
DFront view
Answer is hidden
Question 724 of 1113Ch 10 · Engineering Drawings and Their Concepts
In isometric projection, lengths along the isometric axes are reduced to about:
A50% of true length
B82% of true length
C70.7% of true length
D100% of true length
Answer is hidden
Question 725 of 1113Ch 10 · Engineering Drawings and Their Concepts
The angle between any two isometric axes is:
A30°
B120°
C90°
D45°
Answer is hidden
Question 726 of 1113Ch 10 · Engineering Drawings and Their Concepts
In cabinet oblique projection, the receding lines are drawn:
ATo full scale
BConverging to a vanishing point
CTo half scale
DTo isometric scale
Answer is hidden
Question 727 of 1113Ch 10 · Engineering Drawings and Their Concepts
Which of the following is NOT sectioned (hatched) when cut along its axis?
ACasting body
BHub of a pulley
CShaft
DFlange of a coupling
Answer is hidden
Question 728 of 1113Ch 10 · Engineering Economics
Rs 10,000 is deposited at 10% compound interest per year. Its value after 2 years is:
ARs 12,210
BRs 12,000
CRs 12,100
DRs 11,000
Answer is hidden
Question 729 of 1113Ch 10 · Engineering Economics
The effective annual interest rate for 12% per year compounded monthly is about:
A12%
B1%
C12.68%
D13.5%
Answer is hidden
Question 730 of 1113Ch 10 · Engineering Economics
The factor used to find the equal annual payment needed to repay a present loan is the:
ACompound amount factor (F/P)
BCapital recovery factor (A/P)
CSinking fund factor (A/F)
DPresent worth factor (P/F)
Answer is hidden
Question 731 of 1113Ch 10 · Engineering Economics
The present worth of a perpetual annual income of Rs 1,000 at 10% interest is:
AInfinite
BRs 100
CRs 1,000
DRs 10,000
Answer is hidden
Question 732 of 1113Ch 10 · Engineering Economics
A project is economically acceptable by the NPV method when:
ANPV ≥ 0 at the MARR
BNPV is negative
CIRR is less than MARR
DNPV equals the initial investment
Answer is hidden
Question 733 of 1113Ch 10 · Engineering Economics
The internal rate of return is the discount rate at which:
ANPV is maximum
BNPV equals zero
CB/C ratio equals zero
DPayback is minimum
Answer is hidden
Question 734 of 1113Ch 10 · Engineering Economics
Compared with the simple payback period, the discounted payback period:
AIs always shorter
BConsiders cash flows after payback
CConsiders the time value of money
DIgnores all cash flows
Answer is hidden
Question 735 of 1113Ch 10 · Engineering Economics
MARR is best described as:
AThe inflation rate only
BThe minimum acceptable rate of return set by the investor
CThe rate at which NPV is maximum
DThe maximum rate charged by banks
Answer is hidden
Question 736 of 1113Ch 10 · Engineering Economics
For comparing alternatives with unequal lives, the most convenient method is:
AAnnual worth (equivalent uniform annual) method
BComparing first costs only
CSimple payback
DComparing total undiscounted costs
Answer is hidden
Question 737 of 1113Ch 10 · Engineering Economics
A machine costs Rs 60,000 with salvage Rs 10,000 after 5 years. Straight-line annual depreciation is:
ARs 12,000
BRs 50,000
CRs 10,000
DRs 14,000
Answer is hidden
Question 738 of 1113Ch 10 · Engineering Economics
The standard rate of Value Added Tax in Nepal is:
A15%
B10%
C13%
D18%
Answer is hidden
Question 739 of 1113Ch 10 · Engineering Economics
Under Nepal's Income Tax Act 2058, depreciation of assets is calculated using:
ASinking fund method
BPool-based declining balance method
COnly straight-line method
DUnits-of-production method only
Answer is hidden
Question 740 of 1113Ch 10 · Project Planning and Scheduling
A project is best defined as:
AA permanent organisation
BAny repetitive production activity
CA continuous routine operation
DA temporary endeavour undertaken to create a unique product, service or result
Answer is hidden
Question 741 of 1113Ch 10 · Project Planning and Scheduling
The phase of the project life cycle in which the feasibility study is carried out is:
AExecution phase
BInitiation/concept phase
CMonitoring phase
DClosure phase
Answer is hidden
Question 742 of 1113Ch 10 · Project Planning and Scheduling
The hierarchical decomposition of the total project scope into work packages is called:
ALogical framework
BGantt chart
CCritical path
DWork Breakdown Structure (WBS)
Answer is hidden
Question 743 of 1113Ch 10 · Project Planning and Scheduling
A major limitation of a bar (Gantt) chart is that it:
ADoes not clearly show interdependencies between activities
BCannot show activity durations
CIs difficult to understand
DCannot show a time scale
Answer is hidden
Question 744 of 1113Ch 10 · Project Planning and Scheduling
In an activity-on-arrow network, a dummy activity:
AHas zero duration and shows logical dependency only
BConsumes resources
CIs always on the critical path
DHas the longest duration
Answer is hidden
Question 745 of 1113Ch 10 · Project Planning and Scheduling
The critical path of a project network is the:
APath with maximum float
BShortest path through the network
CLongest path, with zero total float
DPath with the most activities
Answer is hidden
Question 746 of 1113Ch 10 · Project Planning and Scheduling
An activity has ES = 5, EF = 9, LS = 8, LF = 12. Its total float is:
A0
B7
C3
D4
Answer is hidden
Question 747 of 1113Ch 10 · Project Planning and Scheduling
In PERT, with to = 2, tm = 5 and tp = 14 days, the expected time is:
A21 days
B5 days
C6 days
D7 days
Answer is hidden
Question 748 of 1113Ch 10 · Project Planning and Scheduling
PERT is most suitable for:
AMass production lines
BRepetitive construction with known durations
CResearch and development projects with uncertain durations
DRoutine maintenance only
Answer is hidden
Question 749 of 1113Ch 10 · Project Planning and Scheduling
While crashing a project, the activity crashed first is the critical activity with the:
ALowest cost slope
BLongest duration
CMaximum float
DHighest cost slope
Answer is hidden
Question 750 of 1113Ch 10 · Project Planning and Scheduling
Rescheduling activities within their available float without changing the project completion date is called:
AFast-tracking
BResource smoothing
CCrashing
DResource levelling
Answer is hidden
Question 751 of 1113Ch 10 · Project Planning and Scheduling
In earned value management, a cost performance index (CPI) of 0.8 means the project is:
AAhead of schedule
BOver budget
CUnder budget
DExactly on budget
Answer is hidden
Question 752 of 1113Ch 10 · Project Management
The number of communication channels among 6 stakeholders is:
A30
B36
C6
D15
Answer is hidden
Question 753 of 1113Ch 10 · Project Management
Buying insurance against a project risk is an example of risk:
AAvoidance
BTransfer
CMitigation
DAcceptance
Answer is hidden
Question 754 of 1113Ch 10 · Project Management
Changing the project plan to eliminate a threat entirely is risk:
AAcceptance
BAvoidance
CTransfer
DExploitation
Answer is hidden
Question 755 of 1113Ch 10 · Project Management
A reserve kept for identified risks ('known unknowns') is the:
AManagement reserve
BRetention money
CSinking fund
DContingency reserve
Answer is hidden
Question 756 of 1113Ch 10 · Project Management
A quantitative risk analysis technique that uses repeated random sampling of uncertain variables is:
AChecklist analysis
BMonte Carlo simulation
CSWOT analysis
DBrainstorming
Answer is hidden
Question 757 of 1113Ch 10 · Project Management
In a BOT arrangement, the private party:
AOnly designs the project
BBuilds, operates for a concession period and then transfers the facility
COnly supplies labour
DBuys the project from government permanently
Answer is hidden
Question 758 of 1113Ch 10 · Project Management
Project finance on a non-recourse basis means lenders are repaid mainly from:
AGovernment taxes
BThe sponsor's other assets
CThe project's own cash flows
DPersonal guarantees of engineers
Answer is hidden
Question 759 of 1113Ch 10 · Project Management
Public procurement in Nepal is governed by the:
ALabour Act 2074
BCompany Act 2063 only
CPublic Procurement Act 2063
DContract Act 2025
Answer is hidden
Question 760 of 1113Ch 10 · Project Management
The security submitted with a bid, forfeited if the bidder withdraws the bid during its validity, is the:
ABid security
BAdvance payment guarantee
CRetention money
DPerformance security
Answer is hidden
Question 761 of 1113Ch 10 · Project Management
A contract in which payment is made on the basis of measured quantities of work and quoted unit rates is a/an:
ACost-plus contract
BTurnkey contract
CLump-sum contract
DItem-rate (unit-rate) contract
Answer is hidden
Question 762 of 1113Ch 10 · Project Management
A contract in which one contractor is responsible for design, procurement, construction and commissioning is a:
APercentage-rate contract
BLabour contract
CItem-rate contract
DTurnkey (EPC) contract
Answer is hidden
Question 763 of 1113Ch 10 · Project Management
A pre-agreed amount payable by the contractor for delay in completion is called:
ALiquidated damages
BMobilisation advance
CVariation
DRetention money
Answer is hidden
Question 764 of 1113Ch 10 · Engineering Professional Practice
According to engineering codes of ethics, an engineer's foremost obligation is to:
AObey all instructions of the client
BMaximise the employer's profit
CHold paramount the safety, health and welfare of the public
DComplete work at minimum cost
Answer is hidden
Question 765 of 1113Ch 10 · Engineering Professional Practice
An engineer asked to design work outside his/her area of expertise should:
AAsk a junior to do it
BAccept to gain experience
CSign the drawings anyway
DDecline or engage a competent specialist
Answer is hidden
Question 766 of 1113Ch 10 · Engineering Professional Practice
The ethical theory that seeks the greatest good for the greatest number is:
AVirtue ethics
BUtilitarianism
CEgoism
DDeontology
Answer is hidden
Question 767 of 1113Ch 10 · Engineering Professional Practice
An engineer who has a financial interest in a supplier recommended to a client should:
AReject all other suppliers
BDisclose the conflict of interest to the client
CKeep it secret
DAccept a commission from the supplier
Answer is hidden
Question 768 of 1113Ch 10 · Engineering Professional Practice
Signing and sealing drawings not prepared or supervised by oneself is:
AA normal professional courtesy
BUnethical
CAcceptable if paid
DRequired by law
Answer is hidden
Question 769 of 1113Ch 10 · Engineering Professional Practice
Whistle-blowing is generally justified when:
AIt brings personal benefit
BThe engineer dislikes the manager
CSerious public harm is involved and internal channels have been exhausted
DNo evidence is available
Answer is hidden
Question 770 of 1113Ch 10 · Engineering Professional Practice
The seismic design provisions for buildings in Nepal are contained in:
ANepal National Building Code (NBC 105)
BLabour Act
CPublic Procurement Act
DElectricity Act
Answer is hidden
Question 771 of 1113Ch 10 · Engineering Professional Practice
The law that sets out environmental assessment requirements (IEE/EIA) for projects in Nepal is the:
AArbitration Act 2055
BNepal Engineering Council Act 2055
CEnvironment Protection Act 2076
DCompany Act 2063
Answer is hidden
Question 772 of 1113Ch 10 · Engineering Professional Practice
The Nepal Engineers' Association was established in:
A2055 BS (1998 AD)
B2019 BS (1962 AD)
C2046 BS (1990 AD)
D2072 BS (2015 AD)
Answer is hidden
Question 773 of 1113Ch 10 · Engineering Professional Practice
The Nepal Engineers' Association is best described as:
AA voluntary professional association of engineers
BA government ministry
CA contractors' federation
DThe statutory regulatory body that registers engineers
Answer is hidden
Question 774 of 1113Ch 10 · Engineering Professional Practice
In the hierarchy of controls for occupational safety, the last line of defence is:
AEngineering controls
BElimination
CPersonal protective equipment
DSubstitution
Answer is hidden
Question 775 of 1113Ch 10 · Engineering Professional Practice
A leading cause of fatal accidents on construction sites is:
ANoise exposure
BFalls from height
CPoor lighting in offices
DEye strain
Answer is hidden
Question 776 of 1113Ch 10 · Engineering Regulatory Body: Nepal Engineering Council
The Nepal Engineering Council was established under the:
APublic Procurement Act 2063
BNepal Engineering Council Act 2055 (1998)
CCompany Act 2063
DBuilding Act 2055
Answer is hidden
Question 777 of 1113Ch 10 · Engineering Regulatory Body: Nepal Engineering Council
The Nepal Engineering Council Regulations were issued in:
A2074 BS
B2055 BS
C2063 BS
D2057 BS
Answer is hidden
Question 778 of 1113Ch 10 · Engineering Regulatory Body: Nepal Engineering Council
The Nepal Engineering Council is best described as:
AA trade union
BA voluntary association of engineers
CA statutory body regulating the engineering profession
DA private consulting firm
Answer is hidden
Question 779 of 1113Ch 10 · Engineering Regulatory Body: Nepal Engineering Council
A person who wants to practise as an engineer in Nepal must:
AOnly hold a trade licence
BRegister with the Company Registrar
CBe registered with the Nepal Engineering Council
DOnly be a member of NEA
Answer is hidden
Question 780 of 1113Ch 10 · Engineering Regulatory Body: Nepal Engineering Council
Recognition of engineering educational programmes and institutions in Nepal is a function of the:
ADepartment of Industry
BNepal Engineering Council
CPublic Procurement Monitoring Office
DNepal Engineers' Association
Answer is hidden
Question 781 of 1113Ch 10 · Engineering Regulatory Body: Nepal Engineering Council
A disciplinary action the Nepal Engineering Council can take for serious professional misconduct is:
ACancellation of the engineer's registration
BRevoking citizenship
CConfiscation of property
DImprisonment without trial
Answer is hidden
Question 782 of 1113Ch 10 · Engineering Regulatory Body: Nepal Engineering Council
The official who maintains the register of engineers at NEC is the:
AChief Justice
BRegistrar
CAuditor General
DCompany Registrar
Answer is hidden
Question 783 of 1113Ch 10 · Engineering Regulatory Body: Nepal Engineering Council
According to the NEC code of conduct, an engineer should:
ASign drawings prepared by others without checking
BAccept any work offered
CShare confidential client data freely
DUndertake only work within his/her competence
Answer is hidden
Question 784 of 1113Ch 10 · Engineering Regulatory Body: Nepal Engineering Council
Obtaining work by paying a bribe is:
AA violation of the code of conduct
BAllowed if disclosed later
CAcceptable in competitive markets
DRequired for public contracts
Answer is hidden
Question 785 of 1113Ch 10 · Engineering Regulatory Body: Nepal Engineering Council
Which statement about NEC and NEA is correct?
ABoth are voluntary
BNEC registration is compulsory to practise; NEA membership is voluntary
CBoth are government ministries
DNEA registration is compulsory; NEC membership is voluntary
Answer is hidden
Question 786 of 1113Ch 10 · Project Planning, Design and Implementation
The approval of design, drawing before the construction of a building in the city area of Nepal is done by ............
Avillage development committee
Bdistrict development committee
Cmunicipality
Dnone of the above
Answer is hidden
Question 787 of 1113Ch 10 · Project Planning, Design and Implementation
The width of the standard A-series drawing paper such as A₄, A₃, A₂, ...... is ............
A1/3 times the length of the paper
B1/√2 times the length of the paper
C1/2 times the length of the paper
D1/√3 times the length of the paper
Answer is hidden
Question 788 of 1113Ch 10 · Project Planning, Design and Implementation
The area of A₀ size paper is ............[cite: 15]
A0.25 m²
B0.5 m²
C0.75 m²
D1 m²
Answer is hidden
Question 789 of 1113Ch 10 · Project Planning, Design and Implementation
The standard size of drawing board of designation D₁ is (in mm) ............[cite: 15]
A1000 × 700 × 25
B100 × 75 × 25
C1500 × 750 × 25
D1500 × 700 × 25
Answer is hidden
Question 790 of 1113Ch 10 · Project Planning, Design and Implementation
Paper is designated by which letter?[cite: 15]
AA
BB
CC
DD
Answer is hidden
Question 791 of 1113Ch 10 · Project Planning, Design and Implementation
Title block gives information about ............[cite: 15]
Atitle of the drawing
Bscale used for the drawing
Cserial number of the drawing
Dall of the above
Answer is hidden
Question 792 of 1113Ch 10 · Project Planning, Design and Implementation
Which of the following is not included in title block of drawing sheet?[cite: 15]
ASheet number
BScale
CMethod of projection
DSize of sheet
Answer is hidden
Question 793 of 1113Ch 10 · Project Planning, Design and Implementation
As per BIS, the size of title block in drawing sheet is ............[cite: 15]
A25 mm × 10 mm
B100 mm × 25 mm
C65 mm × 185 mm
D185 mm × 65 mm
Answer is hidden
Question 794 of 1113Ch 10 · Project Planning, Design and Implementation
The length: width in case of an arrow head is ............[cite: 15]
A1:1
B2:1
C3:1
D4:1
Answer is hidden
Question 795 of 1113Ch 10 · Project Planning, Design and Implementation
What is the inclination of inclined lettering?[cite: 15]
A75 degree
B65 degree
C45 degree
D85 degree
Answer is hidden
Question 796 of 1113Ch 10 · Project Planning, Design and Implementation
The aspect ratio of a letter refers to the ratio of its ............[cite: 15]
Aheight to its width
Bwidth to height
Clength to width
Dwidth to length
Answer is hidden
Question 797 of 1113Ch 10 · Project Planning, Design and Implementation
The size of the letter means the ............ of the letter.[cite: 15]
Athickness
Bheight
Clength
Dwidth
Answer is hidden
Question 798 of 1113Ch 10 · Project Planning, Design and Implementation
The dimension system is unidirectional if ............[cite: 15]
Adimensions in the drawing sheet can be read from anywhere on the drawing sheet
Bdimensions in the drawing sheet can be read from the bottom edge of the drawing sheet
Cdimensions in the drawing sheet can be read from the bottom and right-hand edge of the drawing sheet
Ddimensions cannot be read
Answer is hidden
Question 799 of 1113Ch 10 · Project Planning, Design and Implementation
In aligned system of dimensioning, the dimensions may be read from ............[cite: 15]
Abottom or right hand edges
Bbottom or left hand edges
Conly from bottom
Donly from left side
Answer is hidden
Question 800 of 1113Ch 10 · Project Planning, Design and Implementation
Maps are drawn in which scale?[cite: 15]
AEnlarging
BReducing
CBalanced
DAll of the above
Answer is hidden
Question 801 of 1113Ch 10 · Project Planning, Design and Implementation
A full scale technical drawing will have a scale factor of ............
A1:1
B1:2
C2:1
D1:4
Answer is hidden
Question 802 of 1113Ch 10 · Project Planning, Design and Implementation
Which of the following represent reducing scale?
A1:1
B1:25
C2:1
D10:1
Answer is hidden
Question 803 of 1113Ch 10 · Project Planning, Design and Implementation
Which of the following is enlarging scale?
A1:5
B1:2
C5:1
D1:2
Answer is hidden
Question 804 of 1113Ch 10 · Project Planning, Design and Implementation
Given representative factor as 4/50 and maximum length is 100 cm. Find the length of scale.
A8 cm
B10 cm
C9.7 cm
D12 cm
Answer is hidden
Question 805 of 1113Ch 10 · Project Planning, Design and Implementation
A line of 1 meter is shown by 1 cm on a scale; its representative factor (RF) is ............[cite: 16]
A1
B100
C1/100
D1/50
Answer is hidden
Question 806 of 1113Ch 10 · Project Planning, Design and Implementation
Freehand sketching can be done only when one has ............[cite: 16]
Aproper proficiency
Bgood practice
Cgood intuition
Dall of the above
Answer is hidden
Question 807 of 1113Ch 10 · Project Planning, Design and Implementation
The techniques for free hand sketch to drawing circle is ............[cite: 16]
Afixing a fixed point and are
Bfixing the perimeter
Cfixing the radius only
Dnone of the above
Answer is hidden
Question 808 of 1113Ch 10 · Project Planning, Design and Implementation
The type of line that projects from an object for the express purpose of locating a dimension is a ............[cite: 16]
Avisible line
Bhidden line
Cextension line
Ddimension line
Answer is hidden
Question 809 of 1113Ch 10 · Project Planning, Design and Implementation
Which the following is represented by a dotted line?[cite: 16]
AHidden edges
BProjection line
CVisible outlines
DHatching line
Answer is hidden
Question 810 of 1113Ch 10 · Project Planning, Design and Implementation
Which of the following line is used for dimension lines?[cite: 16]
AContinuous thick
BContinuous thin
CChain thin
DShort zig-zag line
Answer is hidden
Question 811 of 1113Ch 10 · Project Planning, Design and Implementation
Which of the following line is used for visible outlines?[cite: 16]
AContinuous thick
BContinuous thin
CChain thin
DShort zig-zag line
Answer is hidden
Question 812 of 1113Ch 10 · Project Planning, Design and Implementation
The hidden line are drawn as ............[cite: 16]
Adashed narrow lines
Bdashed wide lines
Clong-dashed dotted wide line
Dlong-dashed double dotted wide line
Answer is hidden
Question 813 of 1113Ch 10 · Project Planning, Design and Implementation
The hidden line represent ............[cite: 16]
Afeatures that can be seen in the current view
Bextension line or leader line
Cfeatures that cannot be seen in the current view
Daxis of symmetrical parts
Answer is hidden
Question 814 of 1113Ch 10 · Project Planning, Design and Implementation
Which of the following lines are used to show that the object is cut and then viewed?[cite: 16]
AHidden lines
BLeader lines
CCentre lines
DHatching lines
Answer is hidden
Question 815 of 1113Ch 10 · Project Planning, Design and Implementation
T square is used alone to draw ............[cite: 16]
Avertical line
Binclined line
Chorizontal line
Dnone of the above
Answer is hidden
Question 816 of 1113Ch 10 · Project Planning, Design and Implementation
French curves are used to draw ............[cite: 16]
Aregular curves
Bcircle
Cirregular curves
Dnone of the above
Answer is hidden
Question 817 of 1113Ch 10 · Project Planning, Design and Implementation
The hardness of pencil lead increases as the numeral letter H ............[cite: 16]
Aincreases
Bremains constant
Cdecreases
Dnone of the above
Answer is hidden
Question 818 of 1113Ch 10 · Project Planning, Design and Implementation
Which of the following is not a pencil?[cite: 16]
AHB
B2B
Cdrafter
Dnone of the above
Answer is hidden
Question 819 of 1113Ch 10 · Project Planning, Design and Implementation
What is additional 3rd view on orthographic projection in general for simple objects?
AFront view
BTop view
CSide view
DView at 45° perpendiculars to horizontal plane
Answer is hidden
Question 820 of 1113Ch 10 · Project Planning, Design and Implementation
The isometric projection of a circle is a ............[cite: 14]
Acircle
Bellipse
Chyperbola
Dparabola
Answer is hidden
Question 821 of 1113Ch 10 · Project Planning, Design and Implementation
A technical drawing of an object that shows the relationship or order of assembly of various parts is known as ............[cite: 14]
Aorthographic projection
Bexploded view drawing
Ccompacted view drawing
Daxonometric drawing
Answer is hidden
Question 822 of 1113Ch 10 · Project Planning, Design and Implementation
All the axonometric projections are single-plane ............ projection.[cite: 14]
Aorthographic
Bperspective
Cisometric
Doblique
Answer is hidden
Question 823 of 1113Ch 10 · Project Planning, Design and Implementation
............ type of axonometric drawing has equal foreshortening along two axis directions and a different amount on the third axis.[cite: 14]
ADiametric
BMulti view
CIsometric
DTrimetric
Answer is hidden
Question 824 of 1113Ch 10 · Project Planning, Design and Implementation
The principle views associated with orthographic projection are ............[cite: 14]
Afront view
Bright side view
Ctop view
Dall of the above
Answer is hidden
Question 825 of 1113Ch 10 · Project Planning, Design and Implementation
The principle reason for using an auxiliary view is ............[cite: 14]
Ato eliminate hidden lines
Bto create a true projection plane from an inclined plane in one of the primary views
Cto show cylinders as ellipses
Dto locate center marks
Answer is hidden
Question 826 of 1113Ch 10 · Project Planning, Design and Implementation
............ is the plane upon which the top view is projected.[cite: 14]
AHorizontal
BFrontal
CProfile
DBase
Answer is hidden
Question 827 of 1113Ch 10 · Project Planning, Design and Implementation
The isometric projection of a sphere is a ............[cite: 14]
Acircle
Bellipse
Chyperbola
Dparabola
Answer is hidden
Question 828 of 1113Ch 10 · Project Planning, Design and Implementation
In isometric drawing ............[cite: 14]
Aall axes are equally inclined
Btwo axes are equally inclined
Cnone of the axes are equally inclined
Dnone of the above
Answer is hidden
Question 829 of 1113Ch 10 · Project Planning, Design and Implementation
The value of the ratio of isometric projection length to true length is ............[cite: 14]
A0.141
B0.372
C0.815
D0.642
Answer is hidden
Question 830 of 1113Ch 10 · Project Planning, Design and Implementation
What type of sketch shows the front in true shape?[cite: 14]
AIsometric
BPerspective
COblique
DAxonometric
Answer is hidden
Question 831 of 1113Ch 10 · Project Planning, Design and Implementation
If an isometric drawing is made use of an isometric scale, then the drawings are called ............[cite: 14]
Aisometric projection
Bisometric view
Cperspective projection
Dorthographic view
Answer is hidden
Question 832 of 1113Ch 10 · Project Planning, Design and Implementation
When using an isometric view, you line up the drawing along three axis that are separated by ............ from each other.[cite: 14]
A180-degree
B90-degree
C120-degree
D60-degree
Answer is hidden
Question 833 of 1113Ch 10 · Project Planning, Design and Implementation
The development of cylinder is a ............[cite: 14]
Arectangle
Bcircle
Cellipse
Dnone of the above
Answer is hidden
Question 834 of 1113Ch 10 · Project Planning, Design and Implementation
The following is the method for development of a right regular prism.[cite: 14]
AParallel line method
BRadial line method
CTriangulation method
DApproximate method
Answer is hidden
Question 835 of 1113Ch 10 · Project Planning, Design and Implementation
The solid which is generated by the revolution of a right-angle triangle about one of its perpendicular sides which remains fixed is called ............[cite: 14]
Aa prism
Ba pyramid
Ca cylinder
Da cone
Answer is hidden
Question 836 of 1113Ch 10 · Project Planning, Design and Implementation
When a pyramid or cone is cut by a cutting plane parallel to its base, the remaining portion thus obtained after removing the top portion is called ............[cite: 14]
Aa prism
Bfrustum
Ca cylinder
Da cone
Answer is hidden
Question 837 of 1113Ch 10 · Project Planning, Design and Implementation
The side view of an object is drawn in ............ faces.[cite: 14]
Avertical plane
Bhorizontal plane
Cprofile plane
Dany of the above
Answer is hidden
Question 838 of 1113Ch 10 · Project Planning, Design and Implementation
A tetrahedron has four equal ............ faces.[cite: 14]
Asquare
Brectangular
Ctriangular
Dnone of the above
Answer is hidden
Question 839 of 1113Ch 10 · Project Planning, Design and Implementation
Hatching lines are drawn at ............ degree to reference line.[cite: 14]
A30
B45
C60
D90
Answer is hidden
Question 840 of 1113Ch 10 · Project Planning, Design and Implementation
In a cash flow series ............
Auniform gradient signifies that an income or disbursement changes by the same amount in each interest period
Beither an increase or decrease in the amount of a cash flow is called the gradient
Cthe gradient in the cash flow may be positive or negative
Dall of the above
Answer is hidden
Question 841 of 1113Ch 10 · Project Planning, Design and Implementation
Which item comes under financial activities in cash flow?
ARedemption of preference share
BIssue of preference share
CInterest paid
DAll of the above
Answer is hidden
Question 842 of 1113Ch 10 · Project Planning, Design and Implementation
Cash flow example from a financing activity is ............
Apayment of dividends
Breceipt of dividend on investment
Ccash received from customers
Dpurchase of fixed asset
Answer is hidden
Question 843 of 1113Ch 10 · Project Planning, Design and Implementation
The statement of cash flow clarifies cash flows according to ............
Aoperating and non-operating flows
Binflow and outflow
Cinvesting and non-operating flows
Doperating, investing, and financing activities
Answer is hidden
Question 844 of 1113Ch 10 · Project Planning, Design and Implementation
Cash flow example from an investing activity is ............
Aissue of debenture
Brepayment of long-term loan
Cpurchase of raw materials for cash
Dsale of investment by non-financial enterprise
Answer is hidden
Question 845 of 1113Ch 10 · Project Planning, Design and Implementation
Heterogeneous cash flows can be made comparable by ............
Adiscounting technique
Bcompounding technique
Ceither (a) or (b)
Dnone of the above
Answer is hidden
Question 846 of 1113Ch 10 · Project Planning, Design and Implementation
Time value of money supports the comparison of cash flows recorded at different time period by ............
Adiscounting all cash flows to a common point of time
Bcompounding all cash flows to a common point of time
Cusing either (a) or (b)
Dnone of the above
Answer is hidden
Question 847 of 1113Ch 10 · Project Planning, Design and Implementation
What is the element of total cost?
AMaterial and labor cost
BLabor and fuel cost
CFuel and machine cost
DAll of the above
Answer is hidden
Question 848 of 1113Ch 10 · Project Planning, Design and Implementation
Statement of cash flows includes ............
Afinancing activities
Boperating activities
Cinvesting activities
Dall of the above
Answer is hidden
Question 849 of 1113Ch 10 · Project Planning, Design and Implementation
Material cost is concerned with ............
Adirect cost
Bindirect cost
Cboth (a) and (b)
Dnone of the above
Answer is hidden
Question 850 of 1113Ch 10 · Project Planning, Design and Implementation
In cash flows, when a company invests in fixed assets and short-term financial investments results in ............
Aincreased liabilities
Bincreased equity
Cincreased cash
Ddecreased cash
Answer is hidden
Question 851 of 1113Ch 10 · Project Planning, Design and Implementation
If desired rate of return is minimum by actual rate of return, then it is classified as ............
Afuture cash flows
Bpresent cash flow
Cpositive cash flows
Dnegative cash flows
Answer is hidden
Question 852 of 1113Ch 10 · Project Planning, Design and Implementation
The given symbol in a drawing represents ............
Aperspective projection
Bthird angle projection
Cfirst angle projection
Doblique projection
Answer is hidden
Question 853 of 1113Ch 10 · Project Planning, Design and Implementation
The side view of given orthographic projection is ............
Aa
Bb
Cc
Dd
Answer is hidden
Question 854 of 1113Ch 10 · Project Planning, Design and Implementation
The top view of given figure is ............
Aa
Bb
Cc
Dd
Answer is hidden
Question 855 of 1113Ch 10 · Project Planning, Design and Implementation
In cash flow diagram, which of the following is true?
ATime 1 is considered to be the end of time period 1
BA vertical arrow pointing up indicates a positive cash flow
CAn arrow pointing downward indicates a negative cash flow
DAll of the above
Answer is hidden
Question 856 of 1113Ch 10 · Project Planning, Design and Implementation
Payback period is counted only after ............
Atendering for the project
Bstarting of the construction of the project
Ccompletion of the construction of the project
Dcommissioning of the project
Answer is hidden
Question 857 of 1113Ch 10 · Project Planning, Design and Implementation
Time value of money indicates that ............
Aa unit of money obtained today is worth more than a unit of money obtained in future
Ba unit of money obtained today is worth less than a unit of money obtained in future
Cthere is no difference in the value of money obtained today and tomorrow
Dnone of the above
Answer is hidden
Question 858 of 1113Ch 10 · Project Planning, Design and Implementation
Pick up the correct statement from the following:
AThe change in the amount of money over a given time period is called 'time value of money', a most important concept in engineering economy
BThe manifestation of the time value of money is termed as interest
CInterest on borrowing = Present amount owed - Original loan
DAll of the above
Answer is hidden
Question 859 of 1113Ch 10 · Project Planning, Design and Implementation
If the nominal rate of interest is 10% per annum and there is quarterly compounding, the effective rate of interest will be ............
A10% per annum
B10.10% per annum
C10.25% per annum
D10.38% per annum
Answer is hidden
Question 860 of 1113Ch 10 · Project Planning, Design and Implementation
How long will it take money to double itself if invested at 5% compounded annually?
A13.7 years
B14.7 years
C14.2 years
D15.3 years
Answer is hidden
Question 861 of 1113Ch 10 · Project Planning, Design and Implementation
Equal payment series sinking fund factor is ............
A(A/F, i, n)
B(F/P, i, n)
C(A/P, i, n)
D(P/A, i, n)
Answer is hidden
Question 862 of 1113Ch 10 · Project Planning, Design and Implementation
In a project equal investment is done on regular basis for replacement of the property, then it is called ............
Afuture investment
Bcapital recovery
Csinking fund
Dall of the above
Answer is hidden
Question 863 of 1113Ch 10 · Project Planning, Design and Implementation
Sinking fund is ............
Athe fund for rebuilding a structure when its economic life is over
Braised to meet maintenance costs
CNPV = 0
Dall of the above
Answer is hidden
Question 864 of 1113Ch 10 · Project Planning, Design and Implementation
The term (1 + i)ⁿ is called ............
Asingle payment discount amount factor
Bsingle payment compound amount factor
Cannual compound amount factor
Dnone of the above
Answer is hidden
Question 865 of 1113Ch 10 · Project Planning, Design and Implementation
What is the expression for the capital recovery amount?
AP [i(1+i)ⁿ / ((1+i)ⁿ - 1)]
BP [(1+i)ⁿ / ((1+i)ⁿ - 1)]
CP [i(1-i)ⁿ / ((1-i)ⁿ - 1)]
DP [(1-i)ⁿ / ((1-i)ⁿ - 1)]
Answer is hidden
Question 866 of 1113Ch 10 · Project Planning, Design and Implementation
If a is the base amount expenditure, b is the increase in the operation cost each year over a period of n years, the total cost of maintenance is ............
Aa + (n-1)b
Ba + x (n-1)b
Ca x (n-1)b
DDiscounted payback
Answer is hidden
Question 867 of 1113Ch 10 · Project Planning, Design and Implementation
Which method is not mostly adopted for selection of project?
APayback
BDiscounted payback
CIRR
DB/C
Answer is hidden
Question 868 of 1113Ch 10 · Project Planning, Design and Implementation
The cash flow is either increasing or decreasing with equal amount every period, the type of series is ............
Auniform payment series
Bgeometric payment series
Clinear gradient series
Dirregular payment series
Answer is hidden
Question 869 of 1113Ch 10 · Project Planning, Design and Implementation
The additional money received from selling one specified level of output is ............
Anormal cost
Bmarginal revenue
Caverage revenue
Dequivalent revenue
Answer is hidden
Question 870 of 1113Ch 10 · Project Planning, Design and Implementation
If production is less than breakeven point, the product will be ............
Alesser than consumption
Bequal to consumption
Cgreater than consumption
Dall of the above
Answer is hidden
Question 871 of 1113Ch 10 · Project Planning, Design and Implementation
The actual profitability of any project is best analyzed from .........
AIRR
BDiscounted payback period
CARR
Dnone of the above
Answer is hidden
Question 872 of 1113Ch 10 · Project Planning, Design and Implementation
The decision rule for project acceptance is that .........
Aif IRR > 0
Bif IRR > MARR
Cif IRR < MARR
Dif IRR = 0
Answer is hidden
Question 873 of 1113Ch 10 · Project Planning, Design and Implementation
Which of the following factors does not depend on the time value of money?
AB/C ratio
BAccounting rate of return
CNPV
DIRR
Answer is hidden
Question 874 of 1113Ch 10 · Project Planning, Design and Implementation
If a seller recovers his capital along with accumulated compensating interest not in one single lump-sum payment but in periodical equal payments, over time ............
Acapital recovery annuity is availed
Bpresent worth annuity is availed
Csinking fund annuity is availed
Dfuture worth annuity is availed
Answer is hidden
Question 875 of 1113Ch 10 · Project Planning, Design and Implementation
Depreciation is charged on ............
Afixed assets
Bcurrent assets
Cboth fixed and current assets
Dnone of the above
Answer is hidden
Question 876 of 1113Ch 10 · Project Planning, Design and Implementation
Which of the following asset generally assumed not to depreciate?
AMachinery
BBuilding
CLand
DAll of the above
Answer is hidden
Question 877 of 1113Ch 10 · Project Planning, Design and Implementation
Under the diminishing balance method, the amount of depreciation is calculated on ............[cite: 15]
Athe written-down value of the asset
Bthe market value of the asset
Cthe original cost of the asset
Dthe expected realizable value of the asset
Answer is hidden
Question 878 of 1113Ch 10 · Project Planning, Design and Implementation
If the percentage fall in quantity demanded is more than the percentage rise in price charged, ............[cite: 15]
Athe revenue will rise
Bthe revenue will fall
Cis not related with discount rate
Dnone of the above
Answer is hidden
Question 879 of 1113Ch 10 · Project Planning, Design and Implementation
The estimated value of depreciable assets after its useful life is called ............[cite: 15]
Aactual value
Breplacement value
Cdisposal (residual) value
Dcurrent value
Answer is hidden
Question 880 of 1113Ch 10 · Project Planning, Design and Implementation
If there is no inflation during a period, then the money cash flow would be equal to ............[cite: 15]
Apresent value
Breal cash flow
Creal cash flow + present value
Dreal cash flow - present value
Answer is hidden
Question 881 of 1113Ch 10 · Project Planning, Design and Implementation
What is the limit of annual income for an unmarried individual upto which only 1% income tax is levied?[cite: 15]
A5 lakhs
B6 lakhs
C5.5 lakhs
D7 lakhs
Answer is hidden
Question 882 of 1113Ch 10 · Project Planning, Design and Implementation
IRR is calculated ............[cite: 15]
Awhen NPV is less than zero
Bwhen NPV more than zero
Cwhen NPV equal to 0
Dwhen NPV equal to MARR
Answer is hidden
Question 883 of 1113Ch 10 · Project Planning, Design and Implementation
The time value of money is primarily related to .........[cite: 15]
Atime and money
Btime and interest
Cmoney and valise
Dinterest and inflation
Answer is hidden
Question 884 of 1113Ch 10 · Project Planning, Design and Implementation
Salvage value is defined as ............[cite: 15]
Avalue of dismantled materials at the end of its utility period
Bestimated value of a built-up property at the end of its useful life without being dismantled
Cvalue of the property shown in the account book in that particular year
Dpresent value of a property considering it to be replaced at the current market rates
Answer is hidden
Question 885 of 1113Ch 10 · Project Planning, Design and Implementation
The minimum value of benefit-cost ratio for the selection of any project should be ............[cite: 15]
Aless than one
Bone
Cgreater than one
Dnone of the above
Answer is hidden
Question 886 of 1113Ch 10 · Project Planning, Design and Implementation
The benefit cost ratio is ............[cite: 15]
Adirectly proportional to discount rate
Binversely proportional to discount rate
Cno array relation with discount rate
Dall of the above
Answer is hidden
Question 887 of 1113Ch 10 · Project Planning, Design and Implementation
The project contractor relies on the cost of the estimate ............[cite: 15]
Afor submission of a competitive bid for a lump-sum contract
Bfor a unit price contract
Cfor preparation of a definitive estimate to help negotiate contract
Dall of the above
Answer is hidden
Question 888 of 1113Ch 10 · Project Planning, Design and Implementation
Both architect and engineer make use of the cost estimate of the project ............[cite: 15]
Afor site selection
Bfor designing of the project
Cfor choosing alternatives
Dall of the above
Answer is hidden
Question 889 of 1113Ch 10 · Project Planning, Design and Implementation
The most unpredictable cost of a project is ............[cite: 15]
Aenvironment management cost
Bunderground construction cost
Ctransportation cost
Dsocial management cost
Answer is hidden
Question 890 of 1113Ch 10 · Project Planning, Design and Implementation
The ratio of current assets to current liabilities is known as ............[cite: 15]
Aliquidity ratio
Bcurrent ratio
Cacid-test (or quick) ratio
Ddebts ratio
Answer is hidden
Question 891 of 1113Ch 10 · Project Planning, Design and Implementation
The more critical (or severe) test of the firm's liquidity can be judged by ............[cite: 15]
Aliquidity ratio
Bcurrent ratio
Cacid-test (or quick) ratio
Ddebts ratio
Answer is hidden
Question 892 of 1113Ch 10 · Project Planning, Design and Implementation
Current assets less inventories divided by current liabilities is known as ............[cite: 15]
Aliquidity ratio
Bcurrent ratio
Cacid-test (or quick) ratio
Ddebts ratio
Answer is hidden
Question 893 of 1113Ch 10 · Project Planning, Design and Implementation
The purchase value of assets over its serviceable life is categorized as ............[cite: 15]
Aappreciated liabilities
Bappreciated assets
Cdepreciation
Dappreciation
Answer is hidden
Question 894 of 1113Ch 10 · Project Planning, Design and Implementation
Excessive spending power of consumers that pulls prices up is called ............[cite: 15]
Ademand-pull inflation
Bcost-pull inflation
Ccost-push inflation
Dcost-push inflation
Answer is hidden
Question 895 of 1113Ch 10 · Project Planning, Design and Implementation
Book value means ............[cite: 15]
Aexpected sale price
Bcurrent market price if purchased now
Cvalue as shown in the books of account
Doriginal acquisition price
Answer is hidden
Question 896 of 1113Ch 10 · Project Planning, Design and Implementation
Pokhara Regional International Airport is an example of ............[cite: 13]
Aloan projects
Bgrant projects
Cprivate sector projects
Dprocess oriented projects
Answer is hidden
Question 897 of 1113Ch 10 · Project Planning, Design and Implementation
The process each manager follows during the life of a project is known as ............[cite: 13]
Aproject management
Bmanager life cycle
Cproject management life cycle
Dall of the mentioned
Answer is hidden
Question 898 of 1113Ch 10 · Project Planning, Design and Implementation
The type of projects in which investment in project is repaid by the government to donors agencies is called ............[cite: 13]
Aprivate sector projects
Bgovernment sector projects
Cgrant projects
Dloan projects
Answer is hidden
Question 899 of 1113Ch 10 · Project Planning, Design and Implementation
Who typically offers financial resources to fund a project?[cite: 13]
ADonor
BSponsor
CProject manager
DStakeholder
Answer is hidden
Question 900 of 1113Ch 10 · Project Planning, Design and Implementation
If part of contract work is assigned to another party, it is called ............[cite: 13]
Asub-contracting
Bjoint venture
Cboth (a) and (b)
Dnone of the above
Answer is hidden
Question 901 of 1113Ch 10 · Project Planning, Design and Implementation
Which of the following is not a phase of project management?[cite: 13]
AProject planning
BProject scheduling
CProject controlling
DProject being
Answer is hidden
Question 902 of 1113Ch 10 · Project Planning, Design and Implementation
The project scope statement furnishes the basis for ............[cite: 13]
Aa way to provide updated information to the accounting department
Bprovides links to the client's functional management groups
Callowing the project to move to the next phase
Dall of the above
Answer is hidden
Question 903 of 1113Ch 10 · Project Planning, Design and Implementation
The main principle of an organization, is ............[cite: 13]
Aunity of command and coherency
Beffective control at all level
Cdelegation of authority
Dall of the above
Answer is hidden
Question 904 of 1113Ch 10 · Project Planning, Design and Implementation
The main advantage of line organization is ............[cite: 13]
Aeffective command and control
Bdefined responsibilities at all levels
Cability to quick decision at all level
Dall of the above
Answer is hidden
Question 905 of 1113Ch 10 · Project Planning, Design and Implementation
Ensuring that performance meets established standards that worker's activities occur as planned and that the organization process is called ............[cite: 13]
Acontrolling
Bplanning
Cleading
Dorganizing
Answer is hidden
Question 906 of 1113Ch 10 · Project Planning, Design and Implementation
In which of the following project phases is the project schedule developed?[cite: 13]
AConceptual
BPlanning
CImplementation
DDesign
Answer is hidden
Question 907 of 1113Ch 10 · Project Planning, Design and Implementation
The process of communication contains four major parts. Which part is the vehicle or method used to convey the message?[cite: 13]
ACommunicator
BMessage
CMedium
DRecipient
Answer is hidden
Question 908 of 1113Ch 10 · Project Planning, Design and Implementation
In bar charts, which colour is used to show the actual progress?[cite: 13]
ARed
BBlack
CBlue
DGreen
Answer is hidden
Question 909 of 1113Ch 10 · Project Planning, Design and Implementation
Which method of project planning was invented first?[cite: 13]
ABar chart
BMilestone chart
CCPM
DPERT
Answer is hidden
Question 910 of 1113Ch 10 · Project Planning, Design and Implementation
CPM is based on ............[cite: 13]
Aprobabilistic
Bdeterministic
Cboth (a) and (b)
Dany of (a) or (b)
Answer is hidden
Question 911 of 1113Ch 10 · Project Planning, Design and Implementation
CPM is the ............[cite: 13]
Aactivity oriented
Bevent oriented
Ctarget oriented
Dtime oriented
Answer is hidden
Question 912 of 1113Ch 10 · Project Planning, Design and Implementation
What is a critical path?[cite: 13]
AIt is a path that operates from the starting node to the end node.
BIt is a mixture of all the paths
CIt is the longest path
DIt is the shortest path
Answer is hidden
Question 913 of 1113Ch 10 · Project Planning, Design and Implementation
What happens when a project is scheduled by CPM?[cite: 13]
AA project is divided into various activities
BRequired time for each activity is established
CA sequence of various activities is made according to their importance
DAll of the above
Answer is hidden
Question 914 of 1113Ch 10 · Project Planning, Design and Implementation
When was CPM method introduced?[cite: 13]
A1880
B1900
C1957
D1958
Answer is hidden
Question 915 of 1113Ch 10 · Project Planning, Design and Implementation
For an activity in a CPM analysis, the early finish time is 13 and the late finish time is 13. Which of the following statements is true?[cite: 13]
AThe early start is 6
BThe duration of the activity is 13
CThe slack of this activity is 13
DThe activity is on the critical path
Answer is hidden
Question 916 of 1113Ch 10 · Project Planning, Design and Implementation
Completion of an activity on CPM network diagram, is generally known ............
Aevent
Bnode
Cconnector
Dall of the above
Answer is hidden
Question 917 of 1113Ch 10 · Project Planning, Design and Implementation
In an AOA (activity on arrow) diagram, what does the arrow represent?
Aevent
Bactivity
Cslack
Dall of the above
Answer is hidden
Question 918 of 1113Ch 10 · Project Planning, Design and Implementation
Which of the following is true about dummy?
AIt doesn't consume resources
BIt doesn't have head and tail event
CIt can be added anywhere in the network
DIt simplifies the network
Answer is hidden
Question 919 of 1113Ch 10 · Project Planning, Design and Implementation
Dummy is used for ............
Agrammatical purpose
Blogical purpose
Cboth (a) and (b)
Dnone of the above
Answer is hidden
Question 920 of 1113Ch 10 · Project Planning, Design and Implementation
Which one of the following is captured in the Work Breakdown Structure (WBS)?
AThe life cycle phases
BThe logical order of tasks
CThe scope of the project
DProject costs
Answer is hidden
Question 921 of 1113Ch 10 · Project Planning, Design and Implementation
In project crashing, rent and overheads are treated as ............
Asignificant cost
Binsignificant costs
Cdirect costs
Dindirect costs
Answer is hidden
Question 922 of 1113Ch 10 · Project Planning, Design and Implementation
Project crashing is the method for ............
Ashortening the project duration by reducing the time of one or more critical activities
Badding resources at critical points
Cdoing technical analysis of the finished work for review
Dadding duration to each activity
Answer is hidden
Question 923 of 1113Ch 10 · Project Planning, Design and Implementation
The time with which direct cost does not reduce with the increase in time is known as ............
Acrash time
Bnormal time
Coptimistic time
Dstandard time
Answer is hidden
Question 924 of 1113Ch 10 · Project Planning, Design and Implementation
The time corresponding to minimum total project cost is ............
Acrash time
Bbetween normal time and crash time
Coptimistic time
Dnormal time
Answer is hidden
Question 925 of 1113Ch 10 · Project Planning, Design and Implementation
Which of the following is a project scheduling method that can be applied to software development?
APERT
BCPM
CCMM
DBoth PERT and CPM
Answer is hidden
Question 926 of 1113Ch 10 · Project Planning, Design and Implementation
PERT (Project Evaluation and Review Technique) analysis is based on ............
Aoptimistic time, pessimistic time and most likely time
Bpessimistic time, optional time, maximum time
Coptimistic time, efficient time, most likely time
Dminimax time, optimistic time and harmonic time
Answer is hidden
Question 927 of 1113Ch 10 · Project Planning, Design and Implementation
The full form of PERT is ............
Aprogram evaluation and rate technology
Bprogram evaluation and robot technique
Cprogram evaluation and robot technology
Dprogram evaluation and review technique
Answer is hidden
Question 928 of 1113Ch 10 · Project Planning, Design and Implementation
What is PERT analysis based on?
AOptimistic time
BPessimistic time
CMost likely time
DAll of the above
Answer is hidden
Question 929 of 1113Ch 10 · Project Planning, Design and Implementation
In PERT (Project Evaluation and Review Technique) method expected time (Te) is ............
ATo + Tp + 4Tm / 6
BTo + Tp + 2Tm / 6
CTo + 4Tp + Tm / 6
DTm + 4Tp + To / 6
Answer is hidden
Question 930 of 1113Ch 10 · Project Planning, Design and Implementation
If PERT network consists of 5 activities with standard deviation of 5, 6, 7, 8, and 9. Then, the standard deviation of the entire project is ............
A255
B7
C√255
D49
Answer is hidden
Question 931 of 1113Ch 10 · Project Planning, Design and Implementation
The shortest possible time in which an activity can be achieved under ideal circumstances is known as ............
Aexpected time estimate
Boptimistic time estimate
Cpessimistic time estimate
Dthe most likely time estimate
Answer is hidden
Question 932 of 1113Ch 10 · Project Planning, Design and Implementation
The relation between jobs of a particular type and various durations they have consumed completion is expressed by curve ............
Anormal distribution curve
Bfrequency distribution
Cdistribution curve
Dnone of the above
Answer is hidden
Question 933 of 1113Ch 10 · Project Planning, Design and Implementation
The optimistic, most likely and pessimistic time estimates of an activity are 6, 8, 10 days, what are the expected time and standard deviation?
A8, 0.5
B8, 2
C6, 0.67
D8, 0.67
Answer is hidden
Question 934 of 1113Ch 10 · Project Planning, Design and Implementation
According to the time estimates made by the PERT planners, the maximum time that would be needed to complete an activity is called as ............
Athe most likely time estimate
Boptimistic time estimate
Cexpected time estimate
Dpessimistic time estimate
Answer is hidden
Question 935 of 1113Ch 10 · Project Planning, Design and Implementation
Which of the options is not a notable challenge while scheduling a project?
ADeadlines exist
BIndependent activities
CToo many workers may be required
DCostly delay
Answer is hidden
Question 936 of 1113Ch 10 · Project Planning, Design and Implementation
In which phase of the project most of the money and manpower are required?[cite: 14]
Ainitiation phase
Bplanning phase
Cexecution phase
Dclosing phase
Answer is hidden
Question 937 of 1113Ch 10 · Project Planning, Design and Implementation
Which is the first stage in a project formulation?[cite: 14]
APlanning
BSetting objectives
CControlling
DEvaluating
Answer is hidden
Question 938 of 1113Ch 10 · Project Planning, Design and Implementation
Which of the following involves continuous betterment in planning and detailing with time?[cite: 14]
AProject enhancement
BProgressive elaboration
CProgressive rehabilitation
DContinuous improvement
Answer is hidden
Question 939 of 1113Ch 10 · Project Planning, Design and Implementation
in resource levelling which of the following is constraint?[cite: 14]
ATime
BMoney
CResources
DBoth time and money
Answer is hidden
Question 940 of 1113Ch 10 · Project Planning, Design and Implementation
Which term describes the utilization of resources in a project without altering the project duration?[cite: 14]
AResource smoothing
BResource leveling
CCritical path method
DFast tracking
Answer is hidden
Question 941 of 1113Ch 10 · Project Planning, Design and Implementation
Resource smoothing is ............[cite: 14]
Aan optimization and economical utilization of resources
Ban adjustment of resources without affecting project duration
Ca gradual increase in resources
Da gradual decrease in resources
Answer is hidden
Question 942 of 1113Ch 10 · Project Planning, Design and Implementation
Cost variance (CV) is which of the following equations?[cite: 14]
ACV - BCWP - ACWP
BCV = BCWP - ACWP
CCV = BCWS
DBoth (a) and (c)
Answer is hidden
Question 943 of 1113Ch 10 · Project Planning, Design and Implementation
A technique for performing quantitative analysis of progress is known as ............[cite: 14]
ABCWS
BEVA
CBAC
DCBSE
Answer is hidden
Question 944 of 1113Ch 10 · Project Planning, Design and Implementation
A schedule performance index (SPI) of 0.76 means ............[cite: 14]
Ayou are over budget
Byou are ahead of schedule
Cyou are only progressing at 76 percent of the rate originally planned
Dyou are only progressing at 24 percent of the rate originally planned
Answer is hidden
Question 945 of 1113Ch 10 · Project Planning, Design and Implementation
A cost performance index (CPI) of 0.89 means ............[cite: 14]
Aat this time, we expect the total project to cost 89 percent more than planned
Bwhen the project is completed we will have spent 89 percent more than planned
Cthe project is only progressing at 89 percent of the rate planned
Dthe project is only getting 89 cents out of every dollar invested
Answer is hidden
Question 946 of 1113Ch 10 · Project Planning, Design and Implementation
Capital budgeting is ............[cite: 14]
Areversible
Bunimportant
Cirreversible
Dall of the above
Answer is hidden
Question 947 of 1113Ch 10 · Project Planning, Design and Implementation
In which of the following cases project is in better shape?[cite: 14]
ABoth CPI and SPI are less than 1
BWhen CPI is more than 1 and SPI is less than one
CWhen CPI is less than one and SPI is more than one
DWhen both CPI and SPI are more than one
Answer is hidden
Question 948 of 1113Ch 10 · Project Planning, Design and Implementation
The budgeted cost for all the activities in a project with the help of Earned Value Method is ............[cite: 14]
Aactual cost
Bbudget at completion
Cbudget for completion
Destimate at completion
Answer is hidden
Question 949 of 1113Ch 10 · Project Planning, Design and Implementation
Cost budgeting can be best described by which of the following?[cite: 14]
AThe process of developing the future trends along with the assessment of probabilities, uncertainties, and inflation that could occur during the project
BDefinitive
COrder of magnitude
DConceptual
Answer is hidden
Question 950 of 1113Ch 10 · Project Planning, Design and Implementation
The technique for establishing and maintaining priorities among the various jobs of a project, is known ............[cite: 14]
Aevent flow scheduling technique
Bcritical ratio scheduling
Cslotting technique for scheduling
Dshort interval scheduling
Answer is hidden
Question 951 of 1113Ch 10 · Project Planning, Design and Implementation
The flow of information through MIS is ............[cite: 14]
Aneed dependent
Borganization dependent
Cinformation dependent
Dmanagement dependent
Answer is hidden
Question 952 of 1113Ch 10 · Project Planning, Design and Implementation
The information of MIS comes from the ............[cite: 14]
Ainternal source
Bexternal source
Cboth internal and external source
Dnone of the above
Answer is hidden
Question 953 of 1113Ch 10 · Project Planning, Design and Implementation
Which of the following is NOT an objective of MIS?[cite: 14]
AFacilitate the decisions-making process
BProvide requisite information at each level of management
CSupport decision-making
DRecruit people for system
Answer is hidden
Question 954 of 1113Ch 10 · Project Planning, Design and Implementation
The back bone of any organization is ............[cite: 14]
Ainformation
Bemployee
Cmanagement
Dcapital
Answer is hidden
Question 955 of 1113Ch 10 · Project Planning, Design and Implementation
Feasibility study determines ............[cite: 14]
Awhether the project is possible with resources
Bcomparing the project with world class manufacturing norms
Ccalculate the cost crashing each unit
Dadd duration to each unit
Answer is hidden
Question 956 of 1113Ch 10 · Project Planning, Design and Implementation
In project management when does planning take place?
ABefore the project
BDuring the project execution
CAt the start of the project
DAfter the project
Answer is hidden
Question 957 of 1113Ch 10 · Project Planning, Design and Implementation
What process involves deciding how to approach and plan the risk management activities for the project?
APerforming qualitative risk analysis
BPlanning risk management
CPerforming quantitative risk analysis
DIdentifying risks
Answer is hidden
Question 958 of 1113Ch 10 · Project Planning, Design and Implementation
Which of the following is not considered as a risk in project management?
ASpecification delays
BProduct competition
CTesting
DStaff turnover
Answer is hidden
Question 959 of 1113Ch 10 · Project Planning, Design and Implementation
Risk event graph is having following on X axis ............[cite: 15]
AGantt chart
Bwork break down structure
Cproject life cycle
Dsplitting
Answer is hidden
Question 960 of 1113Ch 10 · Project Planning, Design and Implementation
Project performance consists of ............[cite: 15]
Atime
Bcost
Cquality
Dall of the above
Answer is hidden
Question 961 of 1113Ch 10 · Project Planning, Design and Implementation
For a financial institution the most important study of a project to be taken for risks management is ............[cite: 15]
Aappraisal
Benvironmental and social
Ctechnical
Dfinancial and economical
Answer is hidden
Question 962 of 1113Ch 10 · Project Planning, Design and Implementation
Project Manager must ensure that it develops appropriate trade offs as ............[cite: 15]
Atime, cost and performance
Bmoney, cost and return on investment
Cmen, materials and machines
Dtime, value and performance
Answer is hidden
Question 963 of 1113Ch 10 · Project Planning, Design and Implementation
Which stage of project management life cycle requires the maximum time of completion ............[cite: 15]
Aconceptualization
Bplanning
Cexecution
Destimation
Answer is hidden
Question 964 of 1113Ch 10 · Project Planning, Design and Implementation
To be successful in a functional organization, the PM must rely on ............[cite: 15]
Areferent power
Bformal authority
Cinformal power structure
Dboth (a) and (c)
Answer is hidden
Question 965 of 1113Ch 10 · Project Planning, Design and Implementation
If employee does wrong in work, employer have to take responsibility of it, this is known ............[cite: 15]
Ajoint liability
Bvicarious liability
Cconcurrent liability
Dall of the above
Answer is hidden
Question 966 of 1113Ch 10 · Project Planning, Design and Implementation
In a payback period method of project evaluation and appraisal the project with ............ equal to cut off period will be accepted.[cite: 15]
Amore than
Bless than
Cpositive
Dnegative
Answer is hidden
Question 967 of 1113Ch 10 · Project Planning, Design and Implementation
Real rate of return is equal to ............[cite: 15]
ANominal rate + Inflation rate
BNominal rate * Inflation rate
CNominal rate - Inflation rate
DNominal rate / Inflation rate
Answer is hidden
Question 968 of 1113Ch 10 · Project Planning, Design and Implementation
The most successful project manager usually ............[cite: 15]
Aworks their way up from assistants in the project office to full-fledged project managers.
Bsupplementing that experience with formal education
Ccomes right from Harvard's MBA program into managing large projects.
Dis considered the technical expert of their field
Answer is hidden
Question 969 of 1113Ch 10 · Project Planning, Design and Implementation
Risk management is one of the most important jobs for a ............[cite: 15]
Aclient
Binvestor
Cproduction team
Dproject manager
Answer is hidden
Question 970 of 1113Ch 10 · Project Planning, Design and Implementation
Risk management is responsibility of the ............[cite: 15]
Acustomer
Binvestor
Cdeveloper
Dproject team
Answer is hidden
Question 971 of 1113Ch 10 · Project Planning, Design and Implementation
Newspaper, magazine, radio, television are examples of ............[cite: 15]
Astoring information
Bretrieving information
Ccommunication information
Dacquiring information
Answer is hidden
Question 972 of 1113Ch 10 · Project Planning, Design and Implementation
Outsourced projects are susceptible to conflicts as ............[cite: 15]
Apeople get less pay in these projects and work is more
Bmore work pressure and less time horizon
Cthese projects are away from home location
Dpeople are unaccustomed to working together and have different values
Answer is hidden
Question 973 of 1113Ch 10 · Project Planning, Design and Implementation
Conflict occurrence in projects is ............[cite: 15]
Aunavoidable
Bdepend on type of project
Cavoidable
Ddepends on culture
Answer is hidden
Question 974 of 1113Ch 10 · Project Planning, Design and Implementation
What assesses the risk and your plans for risk mitigation and revise these when you learn more about the risk?[cite: 15]
ARisk planning
BRisk identification
CRisk monitoring
DRisk analysis
Answer is hidden
Question 975 of 1113Ch 10 · Project Planning, Design and Implementation
Which of the following risk is the failure of a purchased component to perform as expected?[cite: 15]
AProduct risk
BProject risk
CBusiness risk
DProgramming risk
Answer is hidden
Question 976 of 1113Ch 10 · Project Planning, Design and Implementation
Which of the following risks are derived from the organizational environment where the software is being developed?[cite: 15]
APeople risks
BTechnology risks
CEstimation risks
DOrganizational risks
Answer is hidden
Question 977 of 1113Ch 10 · Project Planning, Design and Implementation
Which risk is connected to the circumstance outside the project that may influence the scope of work and the performance of the organization?[cite: 15]
AOperational risk
BFinancial risk
CStrategic risk
DContextual risk
Answer is hidden
Question 978 of 1113Ch 10 · Project Planning, Design and Implementation
Which of the following is not the part of risk control?[cite: 15]
AExecution of the risk response-strategy
BMonitoring of triggering events
CInitiating contingency plans
DNot watching for new risks
Answer is hidden
Question 979 of 1113Ch 10 · Project Planning, Design and Implementation
Which of the following strategies means that the impact of the risk will be reduced?[cite: 15]
AAvoidance strategies
BMinimization strategies
CContingency plans
DAll of the above
Answer is hidden
Question 980 of 1113Ch 10 · Project Planning, Design and Implementation
When do you perform risk identification?[cite: 15]
AAt the beginning of a project
BDuring project planning
CDuring the whole lifetime of a project
DDuring project execution
Answer is hidden
Question 981 of 1113Ch 10 · Project Planning, Design and Implementation
The project manager has the most authority in the ............ type of organization.[cite: 16]
Aproject expediter
Bmatrix
Cprojectized organization
Dfunctional
Answer is hidden
Question 982 of 1113Ch 10 · Project Planning, Design and Implementation
The successful project managers spend most of their time ............[cite: 16]
Aplanning with their personnel
Bplanning with the top management
Ccommunication with the project team
Dstudying project results
Answer is hidden
Question 983 of 1113Ch 10 · Project Planning, Design and Implementation
Which of the following is not project management goal?[cite: 16]
AKeeping overall costs within budget
BDelivering the software to the customer at the agreed time
CMaintaining a happy and well-functioning development team
DAvoiding customer complaints
Answer is hidden
Question 984 of 1113Ch 10 · Project Planning, Design and Implementation
The decision to request an increase the resources for a project is the responsibility of the ............[cite: 16]
Afunctional manager
Bproject manager
Cdirector of project management
Dcustomer
Answer is hidden
Question 985 of 1113Ch 10 · Project Planning, Design and Implementation
Net present value of a machine is ............[cite: 16]
APV of cash inflows less cost of investment
BPV of cash inflows + cost of investment
CPV of net profit after tax less cost of investment
DPV of cash inflows less average cost of investment
Answer is hidden
Question 986 of 1113Ch 10 · Project Planning, Design and Implementation
Capital structure of a company related with ............[cite: 16]
Ashareholders' funds
Blong term debts, preference share capital and equity capital
Cdebentures and loans
Dtotal assets less liabilities
Answer is hidden
Question 987 of 1113Ch 10 · Project Planning, Design and Implementation
A company that issues stocks and bonds to raise funds results in ............[cite: 16]
Adecrease in cash
Bincrease in cash
Cincrease in equity
Dincrease in liabilities
Answer is hidden
Question 988 of 1113Ch 10 · Project Planning, Design and Implementation
The bond issued without any collateral is called ............[cite: 16]
Apreference share
Bequity share
Cdebenture
Ddebt capital
Answer is hidden
Question 989 of 1113Ch 10 · Project Planning, Design and Implementation
Debenture is ............[cite: 16]
Aunsecured bond
Bbond without collateral
Csource of capital budgeting
Dall of the above
Answer is hidden
Question 990 of 1113Ch 10 · Project Planning, Design and Implementation
A debenture ............[cite: 16]
Ais a long-term loan
Bdoes not require security
Cis a short-term loan
Dreceives dividend payments
Answer is hidden
Question 991 of 1113Ch 10 · Project Planning, Design and Implementation
Which of the following is unsafe share?[cite: 16]
APreference shares
BPrimary shares
CDebentures
DAll of the above
Answer is hidden
Question 992 of 1113Ch 10 · Project Planning, Design and Implementation
The average cost incurred in supplying a particular benefit over the entire life time of the project is called ............[cite: 16]
Aproject cost
Baverage life cycle cost
Cmaintenance cost
Dall of the above
Answer is hidden
Question 993 of 1113Ch 10 · Project Planning, Design and Implementation
The profit of the company is shared in form of dividend but has no voting rights in ............[cite: 16]
Aequity share
BPreference share
Cordinary share
Dnone of the above
Answer is hidden
Question 994 of 1113Ch 10 · Project Planning, Design and Implementation
Point out the false statements ............[cite: 16]
Aa firm can buy its own debentures and shares
Ba company can issue convertible debentures
Ctender assessment
Dcontract assessment
Answer is hidden
Question 995 of 1113Ch 10 · Project Planning, Design and Implementation
If two parties enter into an agreement for performing or not performing any work, then it is known as ............[cite: 16]
Acontract
Btender
Cprocurement
Dadjudication
Answer is hidden
Question 996 of 1113Ch 10 · Project Planning, Design and Implementation
The procurement of works, goods or services by the entity itself is called ............[cite: 16]
Aforce account
Bdirect procurement
Cseal quotation
Dnone of the above
Answer is hidden
Question 997 of 1113Ch 10 · Project Planning, Design and Implementation
For the formation of user's committee, members are selected ............[cite: 16]
Aamong the people of whole district
Bamong the beneficiaries of the project
Cby nomination by the chief district officer of the district
Dnone of the above
Answer is hidden
Question 998 of 1113Ch 10 · Project Planning, Design and Implementation
The project usually completed by user committee's are ............[cite: 16]
Alabor intensive projects
Bcapital intensive projects
Cboth (a) and (b)
Dnone of the above
Answer is hidden
Question 999 of 1113Ch 10 · Project Planning, Design and Implementation
The projects can be carried out out by user committee with cost estimate upto ............[cite: 16]
A10 Millions
B20 Millions
C50 Millions
D500 Millions
Answer is hidden
Question 1000 of 1113Ch 10 · Project Planning, Design and Implementation
For procurement of works upto 2 million, buy which of the following method is to be considered?[cite: 16]
Asealed tender
Bby direct negotiation
Cby bidding
Dby direct labor or direct negotiation
Answer is hidden
Question 1001 of 1113Ch 10 · Project Planning, Design and Implementation
The bid validity period for bid having estimated cost upto 100 million is ............[cite: 17]
A45 days
B60 days
C90 days
D105 days
Answer is hidden
Question 1002 of 1113Ch 10 · Project Planning, Design and Implementation
In project management, what percentage of the total project cost is typically estimated for office management expenses?[cite: 17]
A2.5%
B4%
C10%
D12%
Answer is hidden
Question 1003 of 1113Ch 10 · Project Planning, Design and Implementation
Nepal Government handed over the fast-track project to Nepal Army. After handing in, what type of contract was it?[cite: 17]
ABOT
BBOOT
Cbuild and design
Dbuild, design, procurement, subcontracting and all works
Answer is hidden
Question 1004 of 1113Ch 10 · Project Planning, Design and Implementation
The relation between contract and agreement is ............[cite: 17]
Asynonym
Baptonym
Call contract are agreement but all agreement are not contract
Dall agreement are contract but not all contract are agreement
Answer is hidden
Question 1005 of 1113Ch 10 · Project Planning, Design and Implementation
The ultimate method of resolving any dispute with a contractor is ............[cite: 17]
Anegotiation
Bmediation
Carbitration
Dlitigation
Answer is hidden
Question 1006 of 1113Ch 10 · Project Planning, Design and Implementation
The damages caused due to delay in work are termed as ............[cite: 17]
Aliquidated damage
Bunliquidated damage
Cdirect damages
Dtangible damages
Answer is hidden
Question 1007 of 1113Ch 10 · Project Planning, Design and Implementation
Technical proposal during tendering is included in ............[cite: 17]
Asingle stage single envelope system
Bsingle stage double envelope system
Cdouble stage single envelope system
Ddouble stage double envelope system
Answer is hidden
Question 1008 of 1113Ch 10 · Project Planning, Design and Implementation
The aim of ............ is to do whatever possible to avoid any kind of harm or accident.[cite: 13]
Aminimalist
Breasonable care
Cbeyond one's duty
Dnone of the above
Answer is hidden
Question 1009 of 1113Ch 10 · Project Planning, Design and Implementation
It is important to be at work ............ every day and on time unless you are sick or have a family emergency.[cite: 13]
Aappearance
Battendance
Cattitude
Drespect
Answer is hidden
Question 1010 of 1113Ch 10 · Project Planning, Design and Implementation
............ is the rules and standards that govern the decisions and actions of an engineer as a professional.[cite: 13]
ADoctor in Ethics
BDoctor in Ethics
CEthics
DEngineering Ethics
Answer is hidden
Question 1011 of 1113Ch 10 · Project Planning, Design and Implementation
............ can help engineers make correct decisions and become better professionals.[cite: 13]
AStudy of English
BStudy of Math
CStudy of Ethics
DNone of the above
Answer is hidden
Question 1012 of 1113Ch 10 · Project Planning, Design and Implementation
One of the most important issues faced by the world is that ............[cite: 13]
Acomputer ethics
Bconfidentiality
Cenvironmental deterioration
Dconflict of interest
Answer is hidden
Question 1013 of 1113Ch 10 · Project Planning, Design and Implementation
The prime responsibility of any professional is ............[cite: 13]
Aconfidentiality
Bconflict of interest
Cenvironmental ethics
Dcomputer ethics
Answer is hidden
Question 1014 of 1113Ch 10 · Project Planning, Design and Implementation
Which one does fall under computer ethics?[cite: 13]
AComputers can be used for robbery, crime and blackmailing others
BHacking is used to access private information
CLeak of such information of individual leads to harassments in terms of repeated phone calls
DAll of the above
Answer is hidden
Question 1015 of 1113Ch 10 · Project Planning, Design and Implementation
Fundamental principle of professional engineering ethics is ............[cite: 13]
Auploading and advancing engineering profession
Bmaintain high level of ethical conduct
Cboth (a) and (b)
Dnone of the above
Answer is hidden
Question 1016 of 1113Ch 10 · Project Planning, Design and Implementation
Engineering profession needs cooperation with the profession of ............[cite: 13]
Amedical professional
Baccountant
Clawyer
Dall of the above
Answer is hidden
Question 1017 of 1113Ch 10 · Project Planning, Design and Implementation
Professionalism of engineers is lost due to ............[cite: 13]
Ahonesty
Bdignity
Cbribery
Ddiscipline
Answer is hidden
Question 1018 of 1113Ch 10 · Project Planning, Design and Implementation
For the fulfillment of his/her professional duties engineer should ............[cite: 13]
Aparamount the health of the public
Bparamount the safety of the public
Cwelfare of the public
Dall of the above
Answer is hidden
Question 1019 of 1113Ch 10 · Project Planning, Design and Implementation
Engineer shall act in such a manner as to uphold and enhance the honor and dignity of engineering profession and shall act with ............ for bribery, fraud and corruption.[cite: 13]
Atolerance
Ba penchant
Ca predilection
Dzero tolerance
Answer is hidden
Question 1020 of 1113Ch 10 · Project Planning, Design and Implementation
Engineers shall build their professional reputation on the ............ of their services and shall not compete unfairly with others.[cite: 13]
Apublicity
Bbasis
Cmerit
Dreputation
Answer is hidden
Question 1021 of 1113Ch 10 · Project Planning, Design and Implementation
Engineers shall not disclose, without ............ confidential information coming the business affairs of technical process of any present or former or employer, or public body on which they serve.[cite: 13]
Aediting
Bgetting paid
Cremuneration
Dconsent
Answer is hidden
Question 1022 of 1113Ch 10 · Project Planning, Design and Implementation
Which of the following is not a characteristic of a profession?[cite: 13]
Ait enjoys a high level of public trust and confidence
Bit is organized into associations
Cthere are published authoritative performance and ethical standards
DAll of the above are characteristics of a profession
Answer is hidden
Question 1023 of 1113Ch 10 · Project Planning, Design and Implementation
............ skills such as writing, speaking and body language are important work ethics so that you can be clear in your messages to others.[cite: 13]
ACommunication
BCooperation
CHonesty
DIntegrity
Answer is hidden
Question 1024 of 1113Ch 10 · Project Planning, Design and Implementation
You are a person with a high level of ............ if you stand by your values even if others put pressure on you to do something that is wrong or if they make fun of you.[cite: 13]
Acommunication
Bcooperation
Chonesty
Dintegrity
Answer is hidden
Question 1025 of 1113Ch 10 · Project Planning, Design and Implementation
If you don't have ............ you can really get in trouble for lying, cheating or deceiving others.[cite: 13]
Acommunication
Bcooperation
Chonesty
Dintegrity
Answer is hidden
Question 1026 of 1113Ch 10 · Project Planning, Design and Implementation
If you have ............ you will be a trusted person because they will see that you are committed to your company.[cite: 13]
Acommunication
Borganizational skills
Cloyalty
Drespect
Answer is hidden
Question 1027 of 1113Ch 10 · Project Planning, Design and Implementation
Which of the following an engineer should not follow?[cite: 13]
AAct as faithful agent for client
BAccept compensation from more than one party for same service without the consent of all
CIndicate client the adverse consequences if judgment is over ruled
DUndertake only these assignments for which he is qualified
Answer is hidden
Question 1028 of 1113Ch 10 · Project Planning, Design and Implementation
is based on personal belief, values and individual's conscience rather than reasoning.[cite: 13]
AMoral
BEthics
CBoth (a) and (b)
DNone of the above
Answer is hidden
Question 1029 of 1113Ch 10 · Project Planning, Design and Implementation
If you can keep things at work in order and have a neat workplace, then you have great ............[cite: 13]
Aproductivity
Bcooperate
Corganizational skills
Drespect
Answer is hidden
Question 1030 of 1113Ch 10 · Project Planning, Design and Implementation
It is always important to ............ yourself, others and the place where you work because you don't always agree with them.[cite: 13]
Aappearance
Bcooperate
Ccommunicate
Drespect
Answer is hidden
Question 1031 of 1113Ch 10 · Project Planning, Design and Implementation
Some jobs cannot be done alone and some can be done much better and faster if you possess the quality of ............[cite: 13]
Ahonesty
Bcooperation
Cteamwork
Dintegrity
Answer is hidden
Question 1032 of 1113Ch 10 · Project Planning, Design and Implementation
Strong ............ means you have a high sense of moral and ethical behavior that earns respect of others.[cite: 13]
Aresponsibility
Brespect
Cconfidence
Dcharacter
Answer is hidden
Question 1033 of 1113Ch 10 · Project Planning, Design and Implementation
A personality measure of the strength of a person's convictions is called ............[cite: 13]
Alocus of control
Battitude
Cego strength
Dnone of the above
Answer is hidden
Question 1034 of 1113Ch 10 · Project Planning, Design and Implementation
In ............ a professional assumes full responsibilities and if anything wrong happens he/she sees their own responsibility.[cite: 13]
Aminimalist
Breasonable care
Cbeyond one's duty
Dnone of the above
Answer is hidden
Question 1035 of 1113Ch 10 · Project Planning, Design and Implementation
moves beyond the minimal view's concern.[cite: 13]
AMinimalist
BBeyond one's duty
CReasonable care
DNone of the above
Answer is hidden
Question 1036 of 1113Ch 10 · Project Planning, Design and Implementation
Which of the following is not concerned with the authority of engineers?[cite: 14]
AExpress an opinion on engineering matter
BGood behavior with client
CConscious with his profession
DDivulge the confidential matter
Answer is hidden
Question 1037 of 1113Ch 10 · Project Planning, Design and Implementation
Which of the following is not considered a professional quality of an engineer?[cite: 14]
AGood behavior with clients
BHonesty
CBias towards political parties
DStrong technical skills
Answer is hidden
Question 1038 of 1113Ch 10 · Project Planning, Design and Implementation
The environment which has been modified by human activities is called ............[cite: 14]
AAir pollution
BSoil pollution
CSoil erosion
DWater pollution
Answer is hidden
Question 1039 of 1113Ch 10 · Project Planning, Design and Implementation
The environment which has been modified by human activities is called ............[cite: 14]
Anatural environment
Banthropogenic environment
Cmodern environment
Durban environment
Answer is hidden
Question 1040 of 1113Ch 10 · Project Planning, Design and Implementation
Is the effect of undesirable changes in our surroundings that have harmful effects on plants, animals and human beings.[cite: 14]
APollution
BDegradation
CDeforestation
DClimate change
Answer is hidden
Question 1041 of 1113Ch 10 · Project Planning, Design and Implementation
Development that meets the needs of the present without compromising the ability of future generations to meet their own needs.[cite: 14]
ASustainable development
BHuman development
CEconomic development
DSocial development
Answer is hidden
Question 1042 of 1113Ch 10 · Project Planning, Design and Implementation
According to labor act, employers must conduct periodic health and safety inspections and maintain records of these inspections.[cite: 14]
AAt least once in a year
BAt least twice in a year
CAt least thrice in a year
DAt least 4 times in a year
Answer is hidden
Question 1043 of 1113Ch 10 · Project Planning, Design and Implementation
According to Labor Act, the remuneration for over time is ............[cite: 14]
A2 times the regular pay
B1.75 times the regular pay
C1.5 times the regular pay
D1.25 times the regular pay
Answer is hidden
Question 1044 of 1113Ch 10 · Project Planning, Design and Implementation
The government of Nepal has enforced concepts of occupational safety and health through its ............[cite: 14]
ALabor Act 1992
BLabor Act 1994
CLabor Act 1995
DLabor Act 1995
Answer is hidden
Question 1045 of 1113Ch 10 · Project Planning, Design and Implementation
Engineers day is celebrated on ............[cite: 14]
AShrawan 3
BShrawan 4
CAsar 3
DAsar 4
Answer is hidden
Question 1046 of 1113Ch 10 · Project Planning, Design and Implementation
As per labor law, workers are not allowed to work continuously for more than ............[cite: 14]
A3 hours
B5 hours
C8 hours
D12 hours
Answer is hidden
Question 1047 of 1113Ch 10 · Project Planning, Design and Implementation
According to labors act, the maximum working hour for a labor per week should be ............[cite: 14]
A42 hrs
B45 hrs
C48 hrs
D53 hrs
Answer is hidden
Question 1048 of 1113Ch 10 · Project Planning, Design and Implementation
As per labor law, how many hours workers are allowed to work in a day?[cite: 14]
A3 hours
B5 hours
C8 hours
D12 hours
Answer is hidden
Question 1049 of 1113Ch 10 · Project Planning, Design and Implementation
Nepal engineer's association is ............[cite: 14]
Agovernment body to support NEC
Bindependent organization of Nepalese engineers
Cprivate body which works for betterment of engineers
Dnon-government organization
Answer is hidden
Question 1050 of 1113Ch 10 · Project Planning, Design and Implementation
Nepal engineers association was established in ............ B.S.[cite: 14]
A2010
B2019
C2024
D2034
Answer is hidden
Question 1051 of 1113Ch 10 · Project Planning, Design and Implementation
NEA is registered under the ............[cite: 14]
ASocial Service Act
BNEC Act
CCivil Service Act
DCo-operatives Act
Answer is hidden
Question 1052 of 1113Ch 10 · Project Planning, Design and Implementation
The objectives of NEA are ............[cite: 14]
ATo promote development of the engineering science and technology in Nepal.
BTo promote fellowship goodwill and cooperation assistance among the Nepalese engineers and safeguard their rights and interests.
CBy utilizing, to the highest extent possible, the participation of the positional of the national engineering manpower of the country in the national development activities of Nepal, make effort towards ending foreign dependency in this regard
DAll of the above
Answer is hidden
Question 1053 of 1113Ch 10 · Project Planning, Design and Implementation
NEA is governed by an elected executive council of ............ members.[cite: 14]
A25
B18
C21
D17
Answer is hidden
Question 1054 of 1113Ch 10 · Project Planning, Design and Implementation
The number of executive members in NEA's Provincial committee is ............[cite: 14]
A25 and 15
B21 and 15
C15 and 25
D25 and 16
Answer is hidden
Question 1055 of 1113Ch 10 · Project Planning, Design and Implementation
The number of member directly elected for council from Nepal engineering association ............[cite: 14]
A7
B21
C25
D10
Answer is hidden
Question 1056 of 1113Ch 10 · Project Planning, Design and Implementation
The types of membership issued by NEA are ............[cite: 14]
Ageneral membership
Blife time membership
Cboth of the above
Dnone of the above
Answer is hidden
Question 1057 of 1113Ch 10 · Project Planning, Design and Implementation
NEA is ............ of Nepalese engineers.[cite: 14]
Aindependent nonprofit organization
Bprofitable organization
Cbroker organization
Dall of the above
Answer is hidden
Question 1058 of 1113Ch 10 · Project Planning, Design and Implementation
Which is not a professional engineering body?[cite: 14]
ANepal Engineering Association (NEA)
BSociety of Electrical and Electronics Engineers Association (SEEN)
CSociety of Public Health Engineers Nepal (SOPHEN)
DSociety of Consulting Architectural and Engineering Firms (SCAEF)
Answer is hidden
Question 1059 of 1113Ch 10 · Project Planning, Design and Implementation
CAAN, NEC, NTA, etc. are examples of ............[cite: 14]
Aregulatory body
Bcommercial sectors
CNGOs
DINGOs
Answer is hidden
Question 1060 of 1113Ch 10 · Project Planning, Design and Implementation
How many categories of NEA memberships are there?[cite: 14]
A4
B5
C7
D2
Answer is hidden
Question 1061 of 1113Ch 10 · Project Planning, Design and Implementation
What is the tenure of an executive member of NEA?[cite: 14]
A4 year
B2-year
C3 year
D1 year
Answer is hidden
Question 1062 of 1113Ch 10 · Project Planning, Design and Implementation
Nepal engineering council is an autonomous in under NEC act ............
A2056 B.S.
B2055 B.S.
C2054 B.S.
D2060 B.S.
Answer is hidden
Question 1063 of 1113Ch 10 · Project Planning, Design and Implementation
Nepal Engineering Council [NEC] is ............
Agovernment and autonomous body
Bprivate body
Cnon-profit organization
Dgovernment body
Answer is hidden
Question 1064 of 1113Ch 10 · Project Planning, Design and Implementation
Which of the following is not the function of NEC?
APrepare and implement the policy, plan and programmes
BRecognize the academic institutions
COpening the college
DTo prescribe the basic conditions of student admission
Answer is hidden
Question 1065 of 1113Ch 10 · Project Planning, Design and Implementation
Which one is not concerned with the NEC?
AAccreditation of academic certificate
BAppointment of teacher
CAuthority of opening engineering garage
DAll of the above
Answer is hidden
Question 1066 of 1113Ch 10 · Project Planning, Design and Implementation
When was Nepal engineering council established?
A2054 B.S.
B2055 B.S.
C2056 B.S.
D2057 B.S.
Answer is hidden
Question 1067 of 1113Ch 10 · Project Planning, Design and Implementation
NEC contacts the GoN through ministry of ............
Afinance
Bphysical infrastructure and transportation
Chome affairs
Dlocal development
Answer is hidden
Question 1068 of 1113Ch 10 · Project Planning, Design and Implementation
The decisions of NEC are authenticated by ............
Apresident
Bvice president
Cregistrar
Dmember nominated by president
Answer is hidden
Question 1069 of 1113Ch 10 · Project Planning, Design and Implementation
NEC does not approach for ............
Aengineer
Boverseer to engineer
Cminimum degree BE
Dall of the above
Answer is hidden
Question 1070 of 1113Ch 10 · Project Planning, Design and Implementation
The number of section in NEC act 2055 is ............
A18
B28
C38
D48
Answer is hidden
Question 1071 of 1113Ch 10 · Project Planning, Design and Implementation
The academic qualification of the chief of NEC is ............
Amaster's degree in engineering
Bmaster's degree in economics
Cmaster's degree in finance
Dbachelor's degree in engineering in engineering
Answer is hidden
Question 1072 of 1113Ch 10 · Project Planning, Design and Implementation
The general experience required for nomination of chairperson of NEC is ............
A10 yrs
B15 yrs
C20 yrs
D25 yrs
Answer is hidden
Question 1073 of 1113Ch 10 · Project Planning, Design and Implementation
What is the requirement for being chairman of NEC?
ABachelor Degree and Engineering experience of 10 years
BBachelor Degree and Engineering experience of 15 years
CMaster Degree and Engineering experience of 15 years
DMaster Degree and Engineering experience of 10 years
Answer is hidden
Question 1074 of 1113Ch 10 · Project Planning, Design and Implementation
Who appoints the chairman of NEC?
AThe Government of Nepal
BThe President of Nepal
CMinistry of home affairs
DThe supreme court
Answer is hidden
Question 1075 of 1113Ch 10 · Project Planning, Design and Implementation
Who is the first president of NEC?
AEr. Shiv Mangal Giri
BProf. Dr. Padam Bahadur Shahi
CEr. Ram Babusharma
DNone of the above
Answer is hidden
Question 1076 of 1113Ch 10 · Project Planning, Design and Implementation
What is the minimum qualification of vice president of the NEC?
AMasters in Engineering and 15 years' experience
BBachelors in Engineering and 15 years' experience
CMasters in Engineering and 10 years experience
DBachelors in Engineering and 10 years experience
Answer is hidden
Question 1077 of 1113Ch 10 · Project Planning, Design and Implementation
An American engineer willing to work in Nepal may apply for registration under ............[cite: 16]
ACategory A
BCategory B
CCategory C
DCategory D
Answer is hidden
Question 1078 of 1113Ch 10 · Project Planning, Design and Implementation
Which of the following category of engineer is not mention in engineering council rule?[cite: 16]
ACharted engineer
BProfessional engineer
CGeneral engineer
DAll of the above
Answer is hidden
Question 1079 of 1113Ch 10 · Project Planning, Design and Implementation
Book of foreign engineers is maintained in ............[cite: 16]
ANepali
BEnglish
Cboth (a) and (b)
Dnone of the above
Answer is hidden
Question 1080 of 1113Ch 10 · Project Planning, Design and Implementation
NEC publishes the name of registered engineers each year as well as every fourth year. The name of foreigner engineers publishes ............[cite: 16]
Aeach year
Bevery fourth year
Cboth (a) and (b)
Dnone of the above
Answer is hidden
Question 1081 of 1113Ch 10 · Project Planning, Design and Implementation
NEC has classified an engineers in to ............ categories.[cite: 16]
A2
B3
C4
D5
Answer is hidden
Question 1082 of 1113Ch 10 · Project Planning, Design and Implementation
Registration charge of general engineers for students studied in foreign universities is ............[cite: 16]
ARs. 3000
BRs. 4000
CRs. 10000
DRs. 15000
Answer is hidden
Question 1083 of 1113Ch 10 · Project Planning, Design and Implementation
Total number of registration category of engineer in NEC is ............[cite: 16]
A3
B4
C5
D6
Answer is hidden
Question 1084 of 1113Ch 10 · Project Planning, Design and Implementation
The min qualification required for engineer practices in Nepal is ............[cite: 16]
ABE
BBE + register in NEC
CME
DME + register in NEC
Answer is hidden
Question 1085 of 1113Ch 10 · Project Planning, Design and Implementation
The interval of surveillance of colleges registered under NEC is ............[cite: 16]
Aevery 2 years
Bonce in every 3 years
Ctwice in 4 years
Dthrice in every 5 years
Answer is hidden
Question 1086 of 1113Ch 10 · Project Planning, Design and Implementation
In general, Nepal engineering council meeting per year should be held ............[cite: 16]
A2 times
B3 times
C4 times
D5 times
Answer is hidden
Question 1087 of 1113Ch 10 · Project Planning, Design and Implementation
Minimum .......... of the members should be present in a meeting to fulfil the quorum of NEC.[cite: 16]
A0.25
B0.5
C0.75
D1
Answer is hidden
Question 1088 of 1113Ch 10 · Project Planning, Design and Implementation
If a motion submitted to a meeting of council to remove the name from the book on charge of violating professional code of conduct is passed by ............ majority of council, the name of the engineer is removed from the book.[cite: 16]
Atwo third
Bgeneral
Cthree - fourth
Dfull
Answer is hidden
Question 1089 of 1113Ch 10 · Project Planning, Design and Implementation
Which of the following reasons caused desolution of NEC by GON?[cite: 16]
ACommittee of NEC work against the act and regulations
B50% of the member are bankrupt
CCollege recognition is given without fulfilling the criteria of NEC regulations
DFormation of new government of Nepal
Answer is hidden
Question 1090 of 1113Ch 10 · Project Planning, Design and Implementation
The minimum time period allocated by GoN for formation of new council after the dissolution of current NEC like is ............[cite: 16]
A3 months
B6 months
C9 months
D1 year
Answer is hidden
Question 1091 of 1113Ch 10 · Project Planning, Design and Implementation
For temporary affiliation, the supervision of college conducted by NEC for ............[cite: 16]
Aone time in a year
Bonce in two year
Ctwice times in a year
Dthree times a year
Answer is hidden
Question 1092 of 1113Ch 10 · Project Planning, Design and Implementation
For permanent affiliation, the supervision of college conducted by NEC for ............[cite: 16]
Aone time in a year
Bonce in two year
Ctwice times in a year
Dthree times a year
Answer is hidden
Question 1093 of 1113Ch 10 · Project Planning, Design and Implementation
How much % college should score at least in average to get permanent affiliation for new college from NEC?[cite: 16]