Question 443 of 1100Ch 6 · Crystallization and Drying
The driving force for crystallization is
Athe viscosity of the mother liquor
Bthe temperature of the solution alone
Csupersaturation
Dthe agitation rate
Answer is hidden
Question 444 of 1100Ch 6 · Crystallization and Drying
To produce large crystals, a crystallizer should be operated
Ain the metastable zone with seeding and low supersaturation
Bin the labile zone with very high supersaturation
Cwith the most rapid possible cooling
Dwith no agitation at all
Answer is hidden
Question 445 of 1100Ch 6 · Crystallization and Drying
Crystallization by evaporation rather than by cooling is used when the solute's solubility
Aincreases sharply with temperature
Bdecreases sharply with temperature
Cchanges very little with temperature
Dis extremely low at all temperatures
Answer is hidden
Question 446 of 1100Ch 6 · Crystallization and Drying
Secondary nucleation in an industrial crystallizer is caused principally by
Aa rise in solution temperature
Bcontact of existing crystals with the impeller, the walls and each other
Cspontaneous formation of nuclei in a clear solution
Dthe presence of dust particles only
Answer is hidden
Question 447 of 1100Ch 6 · Crystallization and Drying
The delta L law of crystal growth states that
Alarge crystals grow faster than small ones
Bgeometrically similar crystals in the same solution grow at the same linear rate regardless of size
Csmall crystals grow faster than large ones
Dgrowth rate is proportional to the square of the crystal size
Answer is hidden
Question 448 of 1100Ch 6 · Crystallization and Drying
In the calculation of crystal yield, a common and serious error is to neglect
Athe water of crystallization contained in the crystals
Bthe colour of the mother liquor
Cthe density of the crystals
Dthe agitator power
Answer is hidden
Question 449 of 1100Ch 6 · Crystallization and Drying
The equilibrium moisture content of a solid is
Athe moisture removed during the constant-rate period
Balways zero for every material
Cthe moisture that cannot be removed by drying with air of that humidity and temperature
Dthe total moisture initially present
Answer is hidden
Question 450 of 1100Ch 6 · Crystallization and Drying
During the constant-rate period of drying, the rate is controlled by
Athe external conditions of the drying air
Bthe equilibrium moisture content
Cthe pore structure of the solid
Ddiffusion of moisture within the solid
Answer is hidden
Question 451 of 1100Ch 6 · Crystallization and Drying
During the constant-rate period, the temperature of the wet surface is approximately
Athe dry bulb temperature of the drying air
Bthe wet bulb temperature of the drying air
Cthe dew point of the drying air
Dthe boiling point of water
Answer is hidden
Question 452 of 1100Ch 6 · Crystallization and Drying
The critical moisture content of a solid
Ais always equal to the equilibrium moisture content
Bmarks the beginning of the constant-rate period
Cmarks the end of the constant-rate period and depends on the thickness of the bed and the drying rate
Dis a fixed property of the material alone
Answer is hidden
Question 453 of 1100Ch 6 · Crystallization and Drying
In the second falling-rate period of drying, the rate is governed by
Athe air velocity past the surface
Bthe wet bulb depression
Cthe movement of moisture within the solid
Dthe humidity of the drying air
Answer is hidden
Question 454 of 1100Ch 6 · Crystallization and Drying
Case hardening during drying occurs when
Athe equilibrium moisture content is zero
Bthe air humidity is too high throughout
Cthe material is dried too slowly
Dthe surface is dried too rapidly and forms an impermeable skin that traps moisture inside
Answer is hidden
Question 455 of 1100Ch 6 · Crystallization and Drying
The time required for the falling-rate period of drying, assuming the rate is proportional to the free moisture content, varies
Alinearly with the final moisture content
Bindependently of the final moisture content
Clogarithmically with the final moisture content
Das the square of the final moisture content
Answer is hidden
Question 456 of 1100Ch 6 · Mass Transfer Equipment
In a bubble column, the dispersed phase is
Athe gas, dispersed as bubbles through a continuous liquid
Bneither phase; both are continuous
Cthe liquid, dispersed as droplets through a continuous gas
Da solid suspended in a gas
Answer is hidden
Question 457 of 1100Ch 6 · Mass Transfer Equipment
A packed tower is preferred to a tray tower when
Athe fluids are corrosive and the column diameter is small
Bthe liquid contains suspended solids
Cthe column diameter exceeds two metres
Dside draws and interstage cooling are required
Answer is hidden
Question 458 of 1100Ch 6 · Mass Transfer Equipment
A tray tower is analysed in terms of theoretical stages, whereas a packed tower is analysed in terms of
Aresidence time distribution
Bflooding velocities only
Ctransfer units
Dpressure drop per unit height only
Answer is hidden
Question 459 of 1100Ch 6 · Mass Transfer Equipment
Weeping in a tray column occurs when
Athe vapour rate is too low to support the liquid on the tray
Bthe tray spacing is too large
Cthe liquid rate is too low
Dthe vapour rate is too high
Answer is hidden
Question 460 of 1100Ch 6 · Mass Transfer Equipment
Which tray type offers the best turndown ratio?
ABubble cap tray
BSieve tray
CAll are identical in turndown
DValve tray
Answer is hidden
Question 461 of 1100Ch 6 · Mass Transfer Equipment
The diameter of a tray column is determined principally by
Athe tray thickness
Bthe flooding velocity of the vapour
Cthe number of theoretical stages
Dthe reflux ratio alone
Answer is hidden
Question 462 of 1100Ch 6 · Mass Transfer Equipment
The overall efficiency of a distillation column is defined as
Athe number of theoretical trays divided by the number of actual trays
Bthe ratio of reflux to distillate
Cthe ratio of distillate to feed
Dthe number of actual trays divided by the number of theoretical trays
Answer is hidden
Question 463 of 1100Ch 6 · Mass Transfer Equipment
Spray drying is suitable for heat-sensitive materials despite the high inlet gas temperature because temperature
Athe gas is actually cold at the inlet
Bthe drying occurs under vacuum
Cthe product is never in contact with the gas
Dthe residence time is only a few seconds and evaporative cooling keeps the droplet near the wet bulb
Answer is hidden
Question 464 of 1100Ch 6 · Mass Transfer Equipment
Freeze drying removes moisture by
Aboiling the water at high temperature
Bmechanical pressing followed by hot air
Csublimation of ice under vacuum, without passing through the liquid phase
Ddisplacement with an organic solvent
Answer is hidden
Question 465 of 1100Ch 6 · Mass Transfer Equipment
The lowest temperature to which water can theoretically be cooled in a cooling tower is
Athe dew point of the entering air
Bthe dry bulb temperature of the entering air
Cthe wet bulb temperature of the entering air
D0 °C
Answer is hidden
Question 466 of 1100Ch 6 · Mass Transfer Equipment
The range of a cooling tower is defined as
Athe difference between the outlet water temperature and the wet bulb temperature
Bthe difference between the inlet and outlet water temperatures
Cthe difference between the dry bulb and wet bulb temperatures
Dthe difference between inlet and outlet air temperatures
Answer is hidden
Question 467 of 1100Ch 6 · Mass Transfer Equipment
In a cooling tower, blowdown is carried out in order to
Alimit the build-up of dissolved solids in the circulating water
Braise the approach temperature
Cincrease the rate of evaporation
Dreduce the fan power consumption
Answer is hidden
Question 468 of 1100Ch 6 · Mass Transfer Equipment
Most of the cooling achieved in a cooling tower is due to
Aradiation to the surroundings
Bevaporation of a small fraction of the circulating water
Cconduction through the tower shell
Dsensible heat transfer to the air
Answer is hidden
Question 469 of 1100Ch 7 · Alkalies, Acids, Industrial Gases and Solvents
In the electrolysis of brine, chlorine is liberated at the
Aboth electrodes
Banode
Ccathode
Ddiaphragm
Answer is hidden
Question 470 of 1100Ch 7 · Alkalies, Acids, Industrial Gases and Solvents
Which chlor-alkali cell gives the lowest overall energy consumption and is the standard for new plants?
ACastner-Kellner cell
BMercury cell
CMembrane cell
DDiaphragm cell
Answer is hidden
Question 471 of 1100Ch 7 · Alkalies, Acids, Industrial Gases and Solvents
In the Solvay process for soda ash, the substance recovered and recycled is
Aammonia
Bsodium bicarbonate
Ccalcium chloride
Dcarbon dioxide only
Answer is hidden
Question 472 of 1100Ch 7 · Alkalies, Acids, Industrial Gases and Solvents
The Solvay process cannot be used economically to manufacture potassium carbonate because
Aammonia does not dissolve in potassium solutions
Bpotassium bicarbonate is too soluble to precipitate from the solution
Cthe reaction is endothermic
Dpotassium chloride is unavailable
Answer is hidden
Question 473 of 1100Ch 7 · Alkalies, Acids, Industrial Gases and Solvents
The catalyst used in the contact process for the manufacture of sulphuric acid is
Aplatinum gauze
Bnickel on alumina
Cpromoted iron
Dvanadium pentoxide
Answer is hidden
Question 474 of 1100Ch 7 · Alkalies, Acids, Industrial Gases and Solvents
In the contact process, sulphur trioxide is absorbed in 98 per cent sulphuric acid rather than in water because
Aabsorption in water produces a fine acid mist that is difficult to capture
Bwater would decompose the sulphur trioxide
Cthe reaction with water is endothermic
Dsulphur trioxide is insoluble in water
Answer is hidden
Question 475 of 1100Ch 7 · Alkalies, Acids, Industrial Gases and Solvents
In the Ostwald process for nitric acid, ammonia is oxidised over
Aplatinum-rhodium gauze at about 900 °C
Bpromoted iron at about 500 °C
Ccopper-zinc oxide at about 250 °C
Dvanadium pentoxide at about 450 °C
Answer is hidden
Question 476 of 1100Ch 7 · Alkalies, Acids, Industrial Gases and Solvents
Nitric acid cannot be concentrated beyond about 68 per cent by simple distillation because
Ait becomes immiscible with water
Bit decomposes above that concentration
Cit forms a minimum-boiling azeotrope
Dit forms a maximum-boiling azeotrope with water at that composition
Answer is hidden
Question 477 of 1100Ch 7 · Alkalies, Acids, Industrial Gases and Solvents
In the cryogenic separation of air, the component that is removed first as a vapour from the top of the column is
Anitrogen, because it is the more volatile
Bargon, because it is present in trace amounts
Ccarbon dioxide
Doxygen, because it is the more volatile
Answer is hidden
Question 478 of 1100Ch 7 · Alkalies, Acids, Industrial Gases and Solvents
Acetylene for industrial use is stored dissolved in acetone on a porous filler because
Aacetylene is unstable and can decompose explosively if compressed alone
Bacetylene reacts with steel cylinders
Cacetone increases the calorific value
Dacetylene is a liquid at room temperature
Answer is hidden
Question 479 of 1100Ch 7 · Alkalies, Acids, Industrial Gases and Solvents
Water gas is manufactured by passing steam over incandescent coke; the process is operated in a blow-and-run cycle because
Athe coke must be replaced after each run
Bthe reaction produces too much heat to sustain
Cthe steam reaction is endothermic and cools the bed, which must be reheated by an air blow
Dthe steam supply is intermittent
Answer is hidden
Question 480 of 1100Ch 7 · Alkalies, Acids, Industrial Gases and Solvents
In the Haber-Bosch process, the catalyst used is
Aplatinum-rhodium
Bpromoted iron
Ccopper-zinc oxide
Dvanadium pentoxide
Answer is hidden
Question 481 of 1100Ch 7 · Alkalies, Acids, Industrial Gases and Solvents
The cumene process is industrially important because it produces
Aphenol and acetone together in fixed proportion
Bonly acetone
Cbenzene and propylene
Donly phenol
Answer is hidden
Question 482 of 1100Ch 7 · Cement, Refractories, Glass and Surface Coatings
Gypsum is added to Portland cement clinker during grinding in order to
Aimpart a white colour
Baccelerate the setting of the cement
Cincrease the ultimate strength
Dretard the setting time by controlling the hydration of tricalcium aluminate
Answer is hidden
Question 483 of 1100Ch 7 · Cement, Refractories, Glass and Surface Coatings
The compound in Portland cement chiefly responsible for early strength development is
Atricalcium silicate (C₃S)
Bdicalcium silicate (C₂S)
Ctetracalcium aluminoferrite (C₄AF)
Dgypsum
Answer is hidden
Question 484 of 1100Ch 7 · Cement, Refractories, Glass and Surface Coatings
For mass concrete work such as a large dam, the preferred cement is one with
Athe finest possible grinding
Ba high gypsum content
Ca high C₂S and low C₃A content, giving a low heat of hydration
Da high C₃S and high C₃A content
Answer is hidden
Question 485 of 1100Ch 7 · Cement, Refractories, Glass and Surface Coatings
Portland cement hardens by
Aevaporation of the mixing water
Bchemical reaction with water, so it can set under water
Ccrystallisation on cooling
Dabsorption of carbon dioxide from the air
Answer is hidden
Question 486 of 1100Ch 7 · Cement, Refractories, Glass and Surface Coatings
Magnesite and dolomite refractories are classified as
Abasic refractories
Bneutral refractories
Cacidic refractories
Dinsulating refractories
Answer is hidden
Question 487 of 1100Ch 7 · Cement, Refractories, Glass and Surface Coatings
A refractory of high porosity generally has
Agood slag resistance and high strength
Bgood insulating value and thermal shock resistance but poor slag resistance and strength
Chigh thermal conductivity
Dthe highest possible refractoriness under load
Answer is hidden
Question 488 of 1100Ch 7 · Cement, Refractories, Glass and Surface Coatings
In glass manufacture, limestone is added principally to
Aimpart colour to the glass
Blower the melting point of the batch
Cact as a network former
Dact as a stabiliser and make the glass chemically durable and insoluble
Answer is hidden
Question 489 of 1100Ch 7 · Cement, Refractories, Glass and Surface Coatings
Borosilicate glass is preferred for laboratory glassware because it has
Aa very high refractive index
Ba low coefficient of thermal expansion and therefore high thermal shock resistance
Cthe ability to be cut after tempering
Da lower melting point than soda-lime glass
Answer is hidden
Question 490 of 1100Ch 7 · Cement, Refractories, Glass and Surface Coatings
The annealing of glass in a lehr is carried out in order to
Arelieve internal stresses developed during forming
Bcolour the glass
Cremove bubbles from the melt
Dincrease the refractive index
Answer is hidden
Question 491 of 1100Ch 7 · Cement, Refractories, Glass and Surface Coatings
In the float process, molten glass is floated on a bath of
Awater
Bmolten lead
Cmolten tin
Dmolten glass of a different composition
Answer is hidden
Question 492 of 1100Ch 7 · Cement, Refractories, Glass and Surface Coatings
In a paint formulation, the component that forms the continuous film and determines adhesion and durability is the
Abinder
Bpigment
Cdrier
Dsolvent
Answer is hidden
Question 493 of 1100Ch 7 · Cement, Refractories, Glass and Surface Coatings
Titanium dioxide is the most widely used white pigment because of its
Aability to act as a solvent
Blow cost compared with all alternatives
Ccatalytic action in drying
Dvery high refractive index, which gives excellent opacity
Answer is hidden
Question 494 of 1100Ch 7 · Cement, Refractories, Glass and Surface Coatings
A lacquer differs from a varnish and an enamel chiefly in that it
Acontains no resin
Bdries by oxidation with atmospheric oxygen
Cdries purely by evaporation of the solvent, with no chemical change
Dcontains no solvent at all
Answer is hidden
Question 495 of 1100Ch 7 · Fertilizer Industries
In the fertilizer grade notation, the second and third numbers represent the percentages of
Aelemental P and K
BP₂O₅ and K₂O
Cphosphate rock and potash ore
Dphosphoric acid and potassium hydroxide
Answer is hidden
Question 496 of 1100Ch 7 · Fertilizer Industries
The principal reason phosphate rock must be chemically processed before use as a fertilizer is that
Ait is too fine to spread
Bit is chemically unstable
Cit is insoluble and therefore unavailable to plants
Dit contains too much nitrogen
Answer is hidden
Question 497 of 1100Ch 7 · Fertilizer Industries
In the wet process for phosphoric acid, the major solid by-product is
Aphosphogypsum, calcium sulphate
Bammonium chloride
Csodium sulphate
Dcalcium chloride
Answer is hidden
Question 498 of 1100Ch 7 · Fertilizer Industries
Triple superphosphate has a much higher P₂O₅ content than single superphosphate because
Ait is made with nitric acid
Bit uses a richer grade of phosphate rock
Cit contains added ammonia
Dit is made with phosphoric acid, so no diluting calcium sulphate is formed
Answer is hidden
Question 499 of 1100Ch 7 · Fertilizer Industries
Diammonium phosphate (DAP) is produced by reacting phosphoric acid with
Apotassium chloride
Bone mole of ammonia per mole of acid
Csulphuric acid
Dtwo moles of ammonia per mole of acid
Answer is hidden
Question 500 of 1100Ch 7 · Fertilizer Industries
Urea is manufactured from ammonia and carbon dioxide through the intermediate
Aammonium carbonate
Bammonium carbamate
Cammonium nitrate
Dbiuret
Answer is hidden
Question 501 of 1100Ch 7 · Fertilizer Industries
Urea is the most important solid nitrogenous fertilizer because it has
Ano tendency to absorb moisture
Bthe lowest cost of manufacture of any fertilizer
Can alkaline effect on the soil
Dthe highest nitrogen content of any solid fertilizer, about 46 per cent
Answer is hidden
Question 502 of 1100Ch 7 · Fertilizer Industries
Biuret in urea fertilizer is undesirable because it is
Atoxic to plants, so its content must be kept below about 1 per cent
Bstrongly hygroscopic
Cresponsible for the fertilizer's colour
Dexplosive on storage
Answer is hidden
Question 503 of 1100Ch 7 · Fertilizer Industries
Ammonium nitrate requires careful regulation in storage and transport because it
Ais highly corrosive to all metals
Bis a strong oxidiser and presents an explosion hazard
Cis radioactive
Ddecomposes to release ammonia at room temperature
Answer is hidden
Question 504 of 1100Ch 7 · Fertilizer Industries
Ammonium sulphate fertilizer has the disadvantage that it
Aacidifies the soil on repeated use
Bhas the highest nitrogen content of all fertilizers
Ccannot be applied to alkaline soils
Dcontains no sulphur
Answer is hidden
Question 505 of 1100Ch 7 · Fertilizer Industries
Potassium sulphate is preferred to potassium chloride for crops such as tobacco and grapes because it
Ahas a higher K₂O content
Balso supplies nitrogen
Cis cheaper to manufacture
Dsupplies no chloride, to which these crops are sensitive
Answer is hidden
Question 506 of 1100Ch 7 · Fertilizer Industries
The Mannheim process is used for the manufacture of
Apotassium sulphate from potassium chloride and sulphuric acid
Bpotassium chloride from sylvinite
Cammonium sulphate from ammonia
Dphosphoric acid from phosphate rock
Answer is hidden
Question 507 of 1100Ch 7 · Fertilizer Industries
Potassium chloride is separated from sodium chloride in sylvinite ore mainly by flotation
Adistillation
Belectrolysis of the molten ore
Cmagnetic separation
Dfractional crystallisation exploiting the different temperature dependence of their solubilities, or by froth
Answer is hidden
Question 508 of 1100Ch 7 · Natural Product and Consumer Product Industries
The principal purpose of chemical pulping of wood is to
Adissolve the cellulose
Bbleach the wood white
Cremove all the water from the wood
Ddissolve and remove the lignin so that the cellulose fibres are freed
Answer is hidden
Question 509 of 1100Ch 7 · Natural Product and Consumer Product Industries
In the kraft pulping process, the active chemicals in the white liquor are
Asodium hydroxide and sodium sulphide
Bsodium hydroxide alone
Ccalcium bisulphite and sulphurous acid
Dchlorine dioxide and oxygen
Answer is hidden
Question 510 of 1100Ch 7 · Natural Product and Consumer Product Industries
In the kraft recovery cycle, green liquor is converted back to white liquor by
Acausticising with lime to convert sodium carbonate to sodium hydroxide
Bevaporating it in multiple effects
Cadding fresh sulphuric acid
Dburning it in the recovery furnace
Answer is hidden
Question 511 of 1100Ch 7 · Natural Product and Consumer Product Industries
In a cane sugar mill, bagasse is used principally as
Aan animal feed only
Bfuel to raise steam, making the mill largely energy self-sufficient
Ca clarifying agent for the juice
Da source of additional sucrose
Answer is hidden
Question 512 of 1100Ch 7 · Natural Product and Consumer Product Industries
Rectified spirit obtained by ordinary distillation of fermented liquor contains about 95 per cent ethanol because
Aethanol and water form a minimum-boiling azeotrope at that composition
Bethanol decomposes above that concentration
Cwater is insoluble in ethanol above 95 per cent
Dthe fermentation cannot proceed beyond that concentration
Answer is hidden
Question 513 of 1100Ch 7 · Natural Product and Consumer Product Industries
Citric acid is manufactured commercially by fermentation using
ALactobacillus
BSaccharomyces cerevisiae
CEscherichia coli
DAspergillus niger
Answer is hidden
Question 514 of 1100Ch 7 · Natural Product and Consumer Product Industries
In the hydrogenation of vegetable oils, the iodine value of the product
Aincreases, because new double bonds are formed
Bbecomes zero immediately
Cdecreases, because double bonds are saturated
Dremains unchanged
Answer is hidden
Question 515 of 1100Ch 7 · Natural Product and Consumer Product Industries
The valuable by-product recovered during the manufacture of soap by saponification is
Acaustic soda
Bglycerine
Csodium chloride
Dfatty alcohol
Answer is hidden
Question 516 of 1100Ch 7 · Natural Product and Consumer Product Industries
Synthetic detergents are superior to soap in hard water because they
Acontain no surfactant
Bdo not form insoluble precipitates with calcium and magnesium ions
Chave a much higher pH
Ddissolve the hardness salts completely
Answer is hidden
Question 517 of 1100Ch 7 · Natural Product and Consumer Product Industries
Branched-chain alkylbenzene sulphonate detergents were replaced by the linear form because the branched compounds
Aresist biodegradation and caused persistent foaming in rivers
Bwere too expensive to manufacture
Cwere corrosive to washing machines
Ddid not clean effectively
Answer is hidden
Question 518 of 1100Ch 7 · Natural Product and Consumer Product Industries
Nylon 6,6 is manufactured by the condensation polymerisation of
Ahexamethylene diamine and adipic acid
Bethylene glycol and terephthalic acid
Cacrylonitrile
Dcaprolactam alone
Answer is hidden
Question 519 of 1100Ch 7 · Natural Product and Consumer Product Industries
Viscose rayon is correctly described as
Aa condensation polyester
Ba fully synthetic polyamide
Ca regenerated cellulose fibre
Da natural protein fibre
Answer is hidden
Question 520 of 1100Ch 7 · Natural Product and Consumer Product Industries
Vat dyes such as indigo are applied to cotton by
Adissolving them directly in hot water
Breducing them to a soluble leuco form, applying, and re-oxidising in the fibre
Cdispersing them with a surfactant at high temperature
Dforming a covalent bond with the cellulose
Answer is hidden
Question 521 of 1100Ch 7 · Petroleum Refining, Petrochemicals and Polymers
Vacuum distillation is used for the atmospheric residue because
Areducing the pressure lowers the boiling temperature and prevents thermal cracking
Batmospheric distillation cannot handle liquids
Cthe residue must be pressurised to separate
Dit increases the relative volatility of all components
Answer is hidden
Question 522 of 1100Ch 7 · Petroleum Refining, Petrochemicals and Polymers
Catalytic reforming of naphtha is carried out principally to
Acombine small olefins into larger molecules
Bremove sulphur from the feed
Cbreak large molecules into smaller ones
Draise the octane number by converting paraffins and naphthenes to aromatics
Answer is hidden
Question 523 of 1100Ch 7 · Petroleum Refining, Petrochemicals and Polymers
The catalyst used in modern catalytic reforming is
Apromoted iron
Bplatinum-rhenium on chlorided alumina
Ca zeolite
Dcobalt-molybdenum on alumina
Answer is hidden
Question 524 of 1100Ch 7 · Petroleum Refining, Petrochemicals and Polymers
In a fluid catalytic cracking unit, the heat required for the endothermic cracking reaction is supplied by
Aan external fired heater on the reactor
Bthe exothermic cracking reactions themselves
Cburning the coke deposited on the catalyst in the regenerator
Delectrical heating of the catalyst
Answer is hidden
Question 525 of 1100Ch 7 · Petroleum Refining, Petrochemicals and Polymers
Compared with thermal cracking, catalytic cracking produces
Aa higher yield of gasoline with a higher octane number
Bno gasoline at all
Cmore gas and more coke
Da product richer in straight-chain paraffins
Answer is hidden
Question 526 of 1100Ch 7 · Petroleum Refining, Petrochemicals and Polymers
In the octane number scale, the reference compound assigned a value of 100 is
An-heptane
Biso-octane
Cbenzene
Dn-octane
Answer is hidden
Question 527 of 1100Ch 7 · Petroleum Refining, Petrochemicals and Polymers
A hydrocarbon with a high octane number will generally have
Aa high cetane number
Bno cetane number at all
Ca low cetane number
Da cetane number equal to its octane number
Answer is hidden
Question 528 of 1100Ch 7 · Petroleum Refining, Petrochemicals and Polymers
Ethylene and propylene are produced industrially mainly by
Acatalytic reforming of naphtha
Bfractional distillation of crude oil
Csteam cracking of ethane, naphtha or gas oil at 800-900 °C
Dhydrogenation of acetylene
Answer is hidden
Question 529 of 1100Ch 7 · Petroleum Refining, Petrochemicals and Polymers
The feedstock that gives the highest proportion of ethylene relative to other products in a steam cracker is
Anaphtha
Bheavy gas oil
Cvacuum residue
Dethane
Answer is hidden
Question 530 of 1100Ch 7 · Petroleum Refining, Petrochemicals and Polymers
Which of the following is a condensation polymer?
APolyvinyl chloride
BPolystyrene
CNylon 6,6
DPolyethylene
Answer is hidden
Question 531 of 1100Ch 7 · Petroleum Refining, Petrochemicals and Polymers
A thermosetting plastic differs from a thermoplastic in that it
Ais cross-linked into a three-dimensional network and cannot be softened and remoulded
Balways has a lower melting point
Csoftens on heating and can be remoulded repeatedly
Dcontains no carbon
Answer is hidden
Question 532 of 1100Ch 7 · Petroleum Refining, Petrochemicals and Polymers
High-density polyethylene differs from low-density polyethylene chiefly in that HDPE has
Amore branching and hence greater flexibility
Blinear chains with little branching, giving higher density and rigidity
Ca cross-linked thermosetting structure
Da different monomer
Answer is hidden
Question 533 of 1100Ch 7 · Petroleum Refining, Petrochemicals and Polymers
Among the formaldehyde resins, the one offering the best hardness, water resistance and surface quality is
Aall three are identical in performance
Burea-formaldehyde
Cphenol-formaldehyde
Dmelamine-formaldehyde
Answer is hidden
Question 534 of 1100Ch 7 · Nanotechnology
The nanoscale is generally defined as the size range
A1 to 100 nanometres
B1 to 100 micrometres
C1 to 100 millimetres
D100 to 1000 nanometres
Answer is hidden
Question 535 of 1100Ch 7 · Nanotechnology
The principal reason nanoparticles show greatly enhanced catalytic activity compared with the bulk material is
Atheir lower purity
Btheir very high surface-area-to-volume ratio, which places many more atoms at the surface
Ctheir larger particle mass
Dtheir higher density
Answer is hidden
Question 536 of 1100Ch 7 · Nanotechnology
Quantum dots emit light of different colours depending on
Athe temperature alone
Bthe shape of the container
Ctheir particle size
Dtheir chemical composition only
Answer is hidden
Question 537 of 1100Ch 7 · Nanotechnology
A carbon nanotube is classified as a
Athree-dimensional nanomaterial
Bzero-dimensional nanomaterial
Cone-dimensional nanomaterial
Dtwo-dimensional nanomaterial
Answer is hidden
Question 538 of 1100Ch 7 · Nanotechnology
Graphene is best described as
Aa closed cage of sixty carbon atoms
Ba rolled cylinder of carbon atoms
Ca single atomic layer of carbon atoms in a hexagonal lattice
Dan amorphous form of carbon
Answer is hidden
Question 539 of 1100Ch 7 · Nanotechnology
Synthesis of nanomaterials by ball milling of a bulk material is an example of
Aa top-down approach
Bchemical vapour deposition
Ca bottom-up approach
Dself-assembly
Answer is hidden
Question 540 of 1100Ch 7 · Nanotechnology
The melting point of a metallic nanoparticle compared with that of the bulk metal is
Asignificantly lower
Bexactly the same
Csignificantly higher
Dindependent of particle size
Answer is hidden
Question 541 of 1100Ch 7 · Nanotechnology
Titanium dioxide nanoparticles are used in self-cleaning glass because they
Aabsorb water into the glass
Bphotocatalytically decompose organic dirt under ultraviolet light and make the surface hydrophilic
Creflect all visible light
Dform a hard scratch-resistant layer only
Answer is hidden
Question 542 of 1100Ch 7 · Nanotechnology
Zinc oxide and titanium dioxide nanoparticles are preferred to their bulk forms in sunscreens because they
Ablock ultraviolet radiation while appearing transparent rather than white on the skin
Babsorb more visible light
Cpenetrate deep into the bloodstream
Dchemically react with ultraviolet light to produce vitamin D
Answer is hidden
Question 543 of 1100Ch 7 · Nanotechnology
The main advantage of nanoparticle-based targeted drug delivery is that it
Aincreases the toxicity of the drug to healthy tissue
Beliminates the need for any drug at all
Cmakes all drugs effective orally
Dconcentrates the drug at the diseased site, reducing the dose needed and the side effects
Answer is hidden
Question 544 of 1100Ch 7 · Nanotechnology
Superparamagnetic iron oxide nanoparticles are used in medicine principally as
Aoral antibiotics
BX-ray shielding
Ccontrast agents for magnetic resonance imaging and for magnetic hyperthermia
Dstructural implants
Answer is hidden
Question 545 of 1100Ch 7 · Nanotechnology
Nano-fertilizers offer an advantage over conventional fertilizers because they
Aeliminate the need for soil
Bcontain no nutrients at all
Crelease nutrients in a controlled manner, so less is needed and runoff losses are reduced
Ddissolve instantly and completely on application
Answer is hidden
Question 546 of 1100Ch 7 · Nanotechnology
The toxicity of a nanomaterial depends on
Aits size, shape, surface chemistry and solubility, not on its chemical composition alone
Bnothing, since all nanomaterials are safe
Cits chemical composition alone
Dits colour
Answer is hidden
Question 547 of 1100Ch 8 · Introduction to Process Control, Modelling and Controller Modes
The primary objective of a process control system is
Aelimination of all measurement error
Bmaximisation of production rate
Cthe safety of personnel, the plant and the environment
Dminimisation of capital cost
Answer is hidden
Question 548 of 1100Ch 8 · Introduction to Process Control, Modelling and Controller Modes
A control problem in which the set point is held constant and the controller must counteract disturbances is called
Aa regulatory problem
Ba servo problem
Ca feedforward problem
Dan open-loop problem
Answer is hidden
Question 549 of 1100Ch 8 · Introduction to Process Control, Modelling and Controller Modes
The proportional band of a controller is related to its gain by
APB = 100Kc
BPB = Kc
CPB = Kc/100
DPB = 100/Kc
Answer is hidden
Question 550 of 1100Ch 8 · Introduction to Process Control, Modelling and Controller Modes
A purely proportional controller always leaves a steady-state offset because
Ait saturates at the set point
Ba non-zero error is required to hold the controller output away from its bias value
Cits gain is always too low
Dit responds only to the rate of change of error
Answer is hidden
Question 551 of 1100Ch 8 · Introduction to Process Control, Modelling and Controller Modes
Increasing the gain of a proportional controller will
Ahave no effect on the offset
Breduce the offset but never eliminate it, and eventually cause instability
Celiminate the offset completely
Dincrease the offset
Answer is hidden
Question 552 of 1100Ch 8 · Introduction to Process Control, Modelling and Controller Modes
Integral action in a controller is used principally to
Areduce the effect of measurement noise
Banticipate future errors
Cspeed up the initial response
Deliminate steady-state offset
Answer is hidden
Question 553 of 1100Ch 8 · Introduction to Process Control, Modelling and Controller Modes
Reset windup in a PI controller occurs when
Athe measurement signal becomes noisy
Bthe derivative gain is set too high
Cthe set point is changed too slowly
Da sustained error saturates the final control element while the integral term continues to accumulate
Answer is hidden
Question 554 of 1100Ch 8 · Introduction to Process Control, Modelling and Controller Modes
Derivative action cannot be used alone as a control mode because
Ait eliminates offset too quickly
Bit cannot be implemented in hardware
Cit produces no output when the error is constant, however large that error may be
Dit always makes the loop unstable
Answer is hidden
Question 555 of 1100Ch 8 · Introduction to Process Control, Modelling and Controller Modes
Derivative action is generally avoided on flow control loops because
Aflow loops have no offset
Bflow measurements are noisy and differentiation amplifies the noise
Cderivative action cannot handle liquids
Dflow loops respond too slowly
Answer is hidden
Question 556 of 1100Ch 8 · Introduction to Process Control, Modelling and Controller Modes
An air-to-open control valve will, on failure of the instrument air supply,
Aclose
Boscillate
Cremain in its last position
Dopen fully
Answer is hidden
Question 557 of 1100Ch 8 · Introduction to Process Control, Modelling and Controller Modes
For cooling water supplied to an exothermic reactor, the control valve should be selected as
Afail-open, so that cooling continues if the air supply fails
Bfail-closed, to stop the flow of water
Cfail-in-place
Deither, since it makes no difference
Answer is hidden
Question 558 of 1100Ch 8 · Introduction to Process Control, Modelling and Controller Modes
An equal percentage valve characteristic means that
Athe flow is independent of stem position
Bthe valve passes most of its flow in the first part of the travel
Cequal increments of lift produce equal increments of flow
Dequal increments of stem lift produce equal percentage changes in the existing flow
Answer is hidden
Question 559 of 1100Ch 8 · Introduction to Process Control, Modelling and Controller Modes
Cavitation in a control valve occurs when the pressure at the vena contracta falls below the liquid's vapour pressure and
Athe valve is fully closed
Bthe downstream pressure remains below the vapour pressure
Cthe downstream pressure then recovers above the vapour pressure, collapsing the bubbles
Dthe liquid temperature falls sharply
Answer is hidden
Question 560 of 1100Ch 8 · Advanced Control Schemes
The principal advantage of feedforward control over feedback control is that it
Ais unaffected by model inaccuracy
Bhandles unmeasured disturbances automatically
Ctakes corrective action before the disturbance affects the controlled variable
Drequires no measurement of any kind
Answer is hidden
Question 561 of 1100Ch 8 · Advanced Control Schemes
The most serious limitation of pure feedforward control is that
Ait responds only after an error appears
Bit always makes the loop unstable
Cit cannot compensate for disturbances that are not measured
Dit cannot be combined with feedback
Answer is hidden
Question 562 of 1100Ch 8 · Advanced Control Schemes
In a cascade control system, the output of the master controller serves as
Athe measurement of the slave controller
Bthe set point of the slave controller
Cthe disturbance to the process
Dthe direct signal to the control valve
Answer is hidden
Question 563 of 1100Ch 8 · Advanced Control Schemes
For cascade control to be effective, the inner (slave) loop must be
Asignificantly slower than the outer loop
Bsignificantly faster than the outer loop, typically by a factor of three to five
Ccontrolled by a PID controller with derivative action
Dexactly the same speed as the outer loop
Answer is hidden
Question 564 of 1100Ch 8 · Advanced Control Schemes
In a cascade control system, integral action is normally required in
Aboth controllers equally
Bneither controller
Cthe slave controller only
Dthe master controller only
Answer is hidden
Question 565 of 1100Ch 8 · Advanced Control Schemes
In ratio control, the stream that is measured but not manipulated is called the
Acontrolled stream
Bmanipulated stream
Cset point stream
Dwild stream
Answer is hidden
Question 566 of 1100Ch 8 · Advanced Control Schemes
The preferred implementation of ratio control multiplies the measured wild flow by the desired ratio rather than dividing two measurements because
Athe ratio would otherwise be inverted
Bdivision amplifies measurement noise at low flow rates
Cdivision cannot be performed by a controller
Dmultiplication is cheaper to implement
Answer is hidden
Question 567 of 1100Ch 8 · Advanced Control Schemes
Split-range control refers to an arrangement in which
Athe signal is split between the controller and the recorder
Bone controller output drives two or more final control elements over different parts of its range
Cthe control range is divided between two operators
Dtwo controllers share one measurement
Answer is hidden
Question 568 of 1100Ch 8 · Advanced Control Schemes
Tray temperature is commonly used to control composition in a distillation column because
Atemperature is the variable to be controlled
Bcomposition is not important in distillation
Con-line composition analysers are slow and expensive, and temperature responds quickly
Dtemperature is unaffected by pressure changes
Answer is hidden
Question 569 of 1100Ch 8 · Advanced Control Schemes
Pressure control is established first on a distillation column because
Apressure affects only the condenser
Brelative volatility, and hence the entire separation, depends on pressure
Cpressure is the easiest variable to measure
Dthe column cannot be started otherwise
Answer is hidden
Question 570 of 1100Ch 8 · Advanced Control Schemes
In the relative gain array, a relative gain of exactly 1.0 for a particular pairing indicates that
Athe loop is unstable
Bthe loop does not interact with the other loops
Cthe pairing must be avoided
Dthe loops interact very strongly
Answer is hidden
Question 571 of 1100Ch 8 · Advanced Control Schemes
A pairing with a negative relative gain should
Abe used only with derivative action
Bnever be used, because the loop will be unstable if the other loop is switched off or saturates
Cbe used only for level loops
Dalways be preferred, since it shows strong coupling
Answer is hidden
Question 572 of 1100Ch 8 · Advanced Control Schemes
Cascade control of reactor temperature onto jacket temperature is used because
Ait removes the need for integral action anywhere
Bit eliminates the need for a control valve
Cdisturbances in the coolant supply are corrected by the fast inner loop before they reach the reactor
Dthe jacket temperature is the variable of real interest
Answer is hidden
Question 573 of 1100Ch 8 · Linear Open-loop Systems
A first-order system subjected to a step input reaches what percentage of its final value in one time constant?
A95 per cent
B50 per cent
C86.5 per cent
D63.2 per cent
Answer is hidden
Question 574 of 1100Ch 8 · Linear Open-loop Systems
A first-order system responding to a step change
Aoscillates with decaying amplitude
Bapproaches its final value exponentially without overshoot or oscillation
Covershoots and then settles
Dresponds instantaneously
Answer is hidden
Question 575 of 1100Ch 8 · Linear Open-loop Systems
A liquid level tank whose outflow is maintained by a constant-displacement pump behaves as
Aa second-order underdamped system
Ba first-order system with time constant AR
Ca pure integrator with no self-regulation
Da system with dead time only
Answer is hidden
Question 576 of 1100Ch 8 · Linear Open-loop Systems
A second-order system with a damping coefficient of 0.5 will
Aapproach the final value without any overshoot
Boscillate with decaying amplitude and overshoot its final value
Coscillate with constant amplitude
Ddiverge from the final value
Answer is hidden
Question 577 of 1100Ch 8 · Linear Open-loop Systems
The fastest response of a second-order system that exhibits no overshoot at all occurs when the system is
Aoverdamped, with ζ greater than 1
Bundamped, with ζ = 0
Cunderdamped, with ζ less than 1
Dcritically damped, with ζ = 1
Answer is hidden
Question 578 of 1100Ch 8 · Linear Open-loop Systems
The decay ratio of an underdamped second-order response is related to the overshoot by
Adecay ratio = overshoot
Bdecay ratio = (overshoot)²
Cdecay ratio = √overshoot
Ddecay ratio = 1 − overshoot
Answer is hidden
Question 579 of 1100Ch 8 · Linear Open-loop Systems
Two non-interacting first-order systems in series will produce a response that is
Aalways overdamped and therefore never oscillatory
Bunstable
Calways underdamped and oscillatory
Dcritically damped in every case
Answer is hidden
Question 580 of 1100Ch 8 · Linear Open-loop Systems
A U-tube manometer is a classic example of a second-order system because it possesses
Atwo non-interacting capacities
Binertia of the liquid column, a gravitational restoring force and viscous damping
Ca pure integrating action
Ddead time and a first-order lag
Answer is hidden
Question 581 of 1100Ch 8 · Linear Open-loop Systems
Compared with the corresponding non-interacting system, two interacting tanks in series give a response that is
Aidentical in every respect
Bfaster, because the tanks assist each other
Coscillatory
Dmore sluggish, because interaction increases the effective damping
Answer is hidden
Question 582 of 1100Ch 8 · Linear Open-loop Systems
The transfer function representing a dead time of θ is
Aθs
B1/θs
C1/(θs + 1)
De−θs
Answer is hidden
Question 583 of 1100Ch 8 · Linear Open-loop Systems
Dead time is particularly troublesome in a feedback control loop because it
Areduces the process gain to zero
Beliminates the steady-state offset
Cincreases the amplitude ratio at high frequency
Dadds phase lag that grows without limit as frequency rises, while causing no attenuation
Answer is hidden
Question 584 of 1100Ch 8 · Linear Open-loop Systems
A process with a large ratio of dead time to time constant is best handled by
Aincreasing the controller gain sharply
Bdetuning the controller or using a dead-time compensator such as a Smith predictor
Cadding more derivative action
Dremoving integral action entirely
Answer is hidden
Question 585 of 1100Ch 8 · Linear Open-loop Systems
Inverse response, in which the output initially moves in the direction opposite to its eventual change, is caused by
Aexcessive integral action
Ba pole at the origin
Ca zero in the right half of the complex plane
Da negative steady-state gain
Answer is hidden
Question 586 of 1100Ch 8 · Linear Closed-loop Systems
For a simple feedback loop, the closed-loop transfer function for a set point change is
Athe inverse of the open-loop transfer function
Bthe product of the forward path blocks divided by one plus the open-loop transfer function
Cthe product of all blocks around the loop
Done plus the open-loop transfer function
Answer is hidden
Question 587 of 1100Ch 8 · Linear Closed-loop Systems
When a first-order process is placed under proportional control, the closed-loop time constant is
Azero
Bidentical to that of the process
Clarger than that of the process alone
Dsmaller than that of the process alone, so the response is faster
Answer is hidden
Question 588 of 1100Ch 8 · Linear Closed-loop Systems
For a first-order process under proportional control with loop gain product KcKp, the offset following a unit step change in set point is
Azero
BKcKp/(1 + KcKp)
C1/(1 + KcKp)
D1 + KcKp
Answer is hidden
Question 589 of 1100Ch 8 · Linear Closed-loop Systems
Adding integral action to a proportional controller on a first-order process
Aleaves the closed-loop order unchanged
Braises the order of the closed loop to two and can cause overshoot
Cguarantees that the response cannot oscillate
Dmakes the closed loop first order
Answer is hidden
Question 590 of 1100Ch 8 · Linear Closed-loop Systems
The characteristic equation of a feedback control system is
A1 + GOL = 0
BGOL = 0
C1 − GOL = 0
DGOL = 1
Answer is hidden
Question 591 of 1100Ch 8 · Linear Closed-loop Systems
A feedback control system is stable if and only if
Aat least one root has a negative real part
Ball roots are real
Cthe open-loop gain is greater than one
Dall roots of the characteristic equation have negative real parts
Answer is hidden
Question 592 of 1100Ch 8 · Linear Closed-loop Systems
If one coefficient of the characteristic polynomial is negative while the others are positive, the system is
Acertainly stable
Bstable only if the gain is low
Cmarginally stable
Dcertainly unstable
Answer is hidden
Question 593 of 1100Ch 8 · Linear Closed-loop Systems
In the Routh array, the number of roots lying in the right half of the complex plane equals
Athe degree of the polynomial
Bthe number of rows in the array
Cthe number of zero entries in the array
Dthe number of sign changes in the first column
Answer is hidden
Question 594 of 1100Ch 8 · Linear Closed-loop Systems
The ultimate gain of a control loop is the proportional gain at which
Athe offset becomes zero
Bthe loop oscillates continuously with constant amplitude
Cthe response becomes critically damped
Dthe controller output saturates
Answer is hidden
Question 595 of 1100Ch 8 · Linear Closed-loop Systems
Which of the following changes tends to make a control loop less stable?
ARemoving a lag from the loop
BAdding derivative action
CDecreasing the controller gain
DIncreasing the dead time in the loop
Answer is hidden
Question 596 of 1100Ch 8 · Linear Closed-loop Systems
A first-order process controlled by a purely proportional controller is
Astable for any value of the controller gain
Balways unstable
Cstable only at very low gain
Dunstable above a certain gain
Answer is hidden
Question 597 of 1100Ch 8 · Linear Closed-loop Systems
The standard electronic instrument signal range is
A0 to 20 mA
B3 to 15 mA
C0 to 10 V only
D4 to 20 mA
Answer is hidden
Question 598 of 1100Ch 8 · Linear Closed-loop Systems
Persistent cycling of an otherwise well-tuned control loop is most commonly caused by
Aexcessive derivative gain
Btoo wide a proportional band
Cstiction in the control valve stem packing
Dan oversized transmitter span
Answer is hidden
Question 599 of 1100Ch 8 · Frequency Response and Controller Tuning
When a stable linear system is subjected to a sustained sinusoidal input, the output is
Aa sinusoid of the same frequency but different amplitude and phase
Ba steady constant value
Ca sinusoid of different frequency
Dan exponentially growing signal
Answer is hidden
Question 600 of 1100Ch 8 · Frequency Response and Controller Tuning
For a first-order lag at the corner frequency, the amplitude ratio and phase angle are
A0.707 and −90°
B1.0 and 0°
C0.707 and −45°
D0.5 and −90°
Answer is hidden
Question 601 of 1100Ch 8 · Frequency Response and Controller Tuning
The high-frequency asymptote of the Bode amplitude plot for a first-order lag has a slope of
A−40 decibels per decade
Bzero
C−20 decibels per decade
D−10 decibels per decade
Answer is hidden
Question 602 of 1100Ch 8 · Frequency Response and Controller Tuning
The amplitude ratio of a pure dead time element is
Aproportional to frequency
Bunity at all frequencies
Cinversely proportional to frequency
Dzero at all frequencies
Answer is hidden
Question 603 of 1100Ch 8 · Frequency Response and Controller Tuning
According to the Bode stability criterion, a closed-loop system is stable if the open-loop amplitude ratio is
Aequal to 1 at zero frequency
Bless than 1 at all frequencies
Cgreater than 1 at the frequency where the phase lag is −180°
Dless than 1 at the frequency where the phase lag is −180°
Answer is hidden
Question 604 of 1100Ch 8 · Frequency Response and Controller Tuning
The phase angle contributed by a pure integrating element is
A−90° at all frequencies
B−45° at all frequencies
C0°
D+90° at all frequencies
Answer is hidden
Question 605 of 1100Ch 8 · Frequency Response and Controller Tuning
The gain margin of a control loop is defined as
Athe ultimate gain divided by the actual gain at all frequencies
Bthe reciprocal of the open-loop amplitude ratio at the crossover frequency
C180° plus the phase angle where AR = 1
Dthe amplitude ratio at zero frequency
Answer is hidden
Question 606 of 1100Ch 8 · Frequency Response and Controller Tuning
A recommended design value for the phase margin of a control loop is
A90 to 120 degrees
B180 degrees
C30 to 45 degrees
D0 to 5 degrees
Answer is hidden
Question 607 of 1100Ch 8 · Frequency Response and Controller Tuning
In the Ziegler-Nichols continuous cycling method, the controller gain for a PI controller is set at
A0.6 Kcu
B1.2 Kcu
C0.5 Kcu
D0.45 Kcu
Answer is hidden
Question 608 of 1100Ch 8 · Frequency Response and Controller Tuning
The principal practical objection to the Ziegler-Nichols continuous cycling tuning method is that
Ait cannot be used on PI controllers
Bit requires the plant to be driven to the point of sustained oscillation
Cit needs a mathematical model of the process
Dit gives an excessively sluggish response
Answer is hidden
Question 609 of 1100Ch 8 · Frequency Response and Controller Tuning
The process reaction curve method of tuning requires
Ano plant test at all
Bdriving the loop to continuous oscillation
Ca single step test with the controller in manual
Da frequency response test over many frequencies
Answer is hidden
Question 610 of 1100Ch 8 · Frequency Response and Controller Tuning
Among the integral error criteria, the one that gives the least oscillatory controller settings is
AIAE
BISE
Call three give identical settings
DITAE
Answer is hidden
Question 611 of 1100Ch 8 · Frequency Response and Controller Tuning
A control loop that cycles slowly and continuously, and whose behaviour does not improve at any controller setting, most probably suffers from
Atoo high a controller gain
Btoo much derivative action
Cstiction or hysteresis in the control valve
Dan incorrectly ranged transmitter
Answer is hidden
Question 612 of 1100Ch 8 · Instrumentation
The accuracy of an instrument refers to
Ahow close its reading is to the true value
Bthe slope of its calibration curve
Chow closely repeated readings agree with one another
Dthe smallest change it can detect
Answer is hidden
Question 613 of 1100Ch 8 · Instrumentation
A thermocouple generates an EMF as a result of
Athe differential expansion of two bonded metals
Bthe Seebeck effect at the junction of two dissimilar metals
Cthe emission of thermal radiation
Dthe change in electrical resistance with temperature
Answer is hidden
Question 614 of 1100Ch 8 · Instrumentation
Compared with a thermocouple, a platinum resistance thermometer offers
Ano need for any external power supply
Ba faster response and higher output voltage
Cgreater accuracy, stability and linearity but a narrower range and slower response
Da wider temperature range and lower cost
Answer is hidden
Question 615 of 1100Ch 8 · Instrumentation
A piezoelectric pressure transducer is unsuitable for measuring
Aa steady, unchanging pressure
Bvibration
Crapidly fluctuating pressures
Dshock and blast pressures
Answer is hidden
Question 616 of 1100Ch 8 · Instrumentation
An electromagnetic flowmeter can be used only when the fluid
Acontains no suspended solids
Bis non-conductive
Cis electrically conductive
Dis a gas
Answer is hidden
Question 617 of 1100Ch 8 · Instrumentation
The instrument that measures true mass flow rate directly, rather than inferring it from volumetric flow, is the
Aorifice meter
Bvortex shedding meter
CCoriolis meter
Dturbine meter
Answer is hidden
Question 618 of 1100Ch 8 · Instrumentation
Differential pressure measurement of liquid level requires that
Athe liquid be electrically conductive
Bthe density of the liquid be known and reasonably constant
Cthe tank be open to the atmosphere
Dthe liquid contain no solids
Answer is hidden
Question 619 of 1100Ch 8 · Instrumentation
The Karl Fischer titration is used specifically for the determination of
Adissolved oxygen
Bwater content
Ctotal solids content
DpH
Answer is hidden
Question 620 of 1100Ch 8 · Instrumentation
At 25 °C, the theoretical response of a glass pH electrode is approximately
A1.0 mV per pH unit
B59.16 mV per pH unit
C100 mV per pH unit
D0.059 mV per pH unit
Answer is hidden
Question 621 of 1100Ch 8 · Instrumentation
The glass membrane of a pH electrode must never be allowed to dry out because
Athe cable will become disconnected
Bthe reference electrolyte will crystallise
Cthe hydrated gel layer responsible for the response is lost and the electrode fails
Dthe glass will crack immediately
Answer is hidden
Question 622 of 1100Ch 8 · Instrumentation
pH control is regarded as one of the most difficult control problems because
Athe titration curve is extremely non-linear, so the process gain varies by orders of magnitude
BpH responds too slowly to be controlled
Creagent valves cannot be automated
DpH cannot be measured on line
Answer is hidden
Question 623 of 1100Ch 8 · Instrumentation
In reversed phase HPLC, the stationary phase is non-polar and the mobile phase polar, so
Aelution order depends only on molecular weight
Ball compounds elute at the same time
Cpolar compounds elute first and non-polar compounds are retained longest
Dnon-polar compounds elute first
Answer is hidden
Question 624 of 1100Ch 8 · Instrumentation
HPLC is preferred to gas chromatography for the analysis of
Apermanent gases
Bvolatile solvents only
Cnon-volatile and thermally labile compounds such as proteins and many pharmaceuticals
Dlight hydrocarbons
Answer is hidden
Question 625 of 1100Ch 9 · Types of Hazards in Chemical Industries
In the hierarchy of hazard control, personal protective equipment is regarded as
Athe first and most effective control measure
Bequivalent in effectiveness to elimination
Cthe last line of defence, to be used only when higher controls are impracticable
Dan engineering control
Answer is hidden
Question 626 of 1100Ch 9 · Types of Hazards in Chemical Industries
The flash point of a flammable liquid is the lowest temperature at which
Ait ignites spontaneously without any external source
Bit continues to burn once ignited
Cit begins to boil
Dit gives off enough vapour to form a mixture that ignites momentarily on application of a flame
Answer is hidden
Question 627 of 1100Ch 9 · Types of Hazards in Chemical Industries
A vapour-air mixture whose concentration is above the upper flammable limit
Awill ignite more violently than at any other concentration
Bwill not ignite, because it is too rich in fuel
Cwill ignite only below the flash point
Dwill detonate rather than deflagrate
Answer is hidden
Question 628 of 1100Ch 9 · Types of Hazards in Chemical Industries
The principal difference between a deflagration and a detonation is that in a detonation
Ano pressure rise occurs
Bthe combustion front travels faster than the speed of sound, producing a shock wave
Cthe flame front travels more slowly
Dno oxygen is required
Answer is hidden
Question 629 of 1100Ch 9 · Types of Hazards in Chemical Industries
A BLEVE occurs when vapour
Aa flammable cloud drifts and ignites in the open
Ba dust cloud ignites in a confined space
Ca vessel containing a liquid above its atmospheric boiling point fails and the contents flash instantly to
Da reaction generates heat faster than it can be removed
Answer is hidden
Question 630 of 1100Ch 9 · Types of Hazards in Chemical Industries
In a dust explosion, the secondary explosion is usually
Aidentical in magnitude to the primary
Bimpossible if the dust is fine
Cfar more destructive than the primary, because the primary blast disperses settled dust
Dmuch weaker than the primary
Answer is hidden
Question 631 of 1100Ch 9 · Types of Hazards in Chemical Industries
A storage tank is most likely to collapse inwards when
Athe relief valve lifts
Bit is drained or steam-cleaned and then cools without an adequate vacuum breaker
Cit is overfilled with liquid
Dit is pressurised with nitrogen
Answer is hidden
Question 632 of 1100Ch 9 · Types of Hazards in Chemical Industries
The TLV-STEL of a substance refers to the permissible exposure averaged over
A15 minutes
B40 hours
C8 hours
Dan instant that must never be exceeded
Answer is hidden
Question 633 of 1100Ch 9 · Types of Hazards in Chemical Industries
A substance with a lower LD50 value than another is
Aless toxic
Bmore corrosive
Cmore flammable
Dmore toxic
Answer is hidden
Question 634 of 1100Ch 9 · Types of Hazards in Chemical Industries
Carbon monoxide is classified as a
Anon-toxic gas
Bchemical asphyxiant, because it interferes with the transport of oxygen in the blood
Ccorrosive gas
Dsimple asphyxiant, because it displaces oxygen from the air
Answer is hidden
Question 635 of 1100Ch 9 · Types of Hazards in Chemical Industries
Electrostatic ignition of a flammable atmosphere is prevented principally by
Araising the ambient temperature
Bbonding and earthing all conductive equipment and limiting fill velocities
Cusing plastic containers for flammable liquids
Dincreasing the flow rate to disperse the charge
Answer is hidden
Question 636 of 1100Ch 9 · Types of Hazards in Chemical Industries
Noise-induced hearing loss is particularly insidious because it
Aoccurs only above 120 decibels
Bdevelops painlessly and gradually, and is permanent and irreversible
Cappears suddenly and can be reversed by rest
Daffects only very low frequencies
Answer is hidden
Question 637 of 1100Ch 9 · Types of Hazards in Chemical Industries
A HAZOP study is characterised by team
Athe calculation of a numerical hazard index from material properties
Ba deductive analysis starting from a defined top event
Cthe systematic application of guide words to process parameters, node by node, by a multidisciplinary
Dan inductive analysis tracing forward from an initiating event
Answer is hidden
Question 638 of 1100Ch 9 · Occupational Health and Safety Management
The international standard for occupational health and safety management systems is
AISO 9001
BISO 17025
CISO 45001
DISO 14001
Answer is hidden
Question 639 of 1100Ch 9 · Occupational Health and Safety Management
The main practical value of investigating near misses is that
Athey are far more numerous than injuries and reveal the same underlying causes before harm occurs
Bthey are more serious than actual injuries
Cthey are required for insurance claims
Dthey allow blame to be assigned more easily
Answer is hidden
Question 640 of 1100Ch 9 · Occupational Health and Safety Management
A low lost-time injury frequency rate at a chemical plant
Ais a leading indicator of future performance
Bproves that the risk of a major accident is low
Cmeans no hazards remain on the site
Ddoes not by itself indicate good process safety performance
Answer is hidden
Question 641 of 1100Ch 9 · Occupational Health and Safety Management
Acids must never be stored alongside cyanide or sulphide salts because
Athe containers would corrode more slowly
Bcontact would liberate highly toxic hydrogen cyanide or hydrogen sulphide gas
Cthe mixture would solidify
Dthe acid would be neutralised and wasted
Answer is hidden
Question 642 of 1100Ch 9 · Occupational Health and Safety Management
A cartridge-type filtering respirator must never be used
Awhen dust is present
Bfor protection against organic vapours
Cin an oxygen-deficient or unknown atmosphere
Din a well-ventilated area
Answer is hidden
Question 643 of 1100Ch 9 · Occupational Health and Safety Management
Lockout-tagout procedures must isolate
Aelectrical energy only
Bonly the energy sources the worker considers relevant
Call forms of stored energy, including pressure, mechanical, thermal and chemical as well as electrical
Dthe process fluid but not the utilities
Answer is hidden
Question 644 of 1100Ch 9 · Occupational Health and Safety Management
The majority of fatalities in confined space incidents are
Awould-be rescuers who enter without breathing apparatus
Bcaused by falls from height
Cthe result of fire
Dthe original entrants alone
Answer is hidden
Question 645 of 1100Ch 9 · Occupational Health and Safety Management
A hot work permit is required principally to ensure that
Athe equipment is properly earthed only
Bthe work is completed within a set time
Cthe welder holds a valid trade certificate
Dgas testing, removal of combustibles and a fire watch are in place before and after the work
Answer is hidden
Question 646 of 1100Ch 9 · Occupational Health and Safety Management
Management of change procedures exist because accidents
Aunreviewed modifications to plant, process or organisation are a common underlying cause of major
Bthey are required only for changes to electrical systems
Cchanges are always prohibited in chemical plants
Dthey reduce the cost of modifications
Answer is hidden
Question 647 of 1100Ch 9 · Occupational Health and Safety Management
The correct sequence of the disaster management cycle is
Apreparedness, mitigation, recovery, response
Bmitigation, preparedness, response, recovery
Crecovery, response, preparedness, mitigation
Dresponse, recovery, mitigation, preparedness
Answer is hidden
Question 648 of 1100Ch 9 · Occupational Health and Safety Management
An off-site emergency plan differs from an on-site plan in that it
Ais prepared solely by the insurance company
Baddresses consequences that extend beyond the plant boundary and is prepared with the local authority
Ccovers only the plant's own employees
Dapplies only to fires
Answer is hidden
Question 649 of 1100Ch 9 · Occupational Health and Safety Management
Taking out insurance against a major accident
Aeliminates the hazard entirely
Bremoves the need for engineering controls
Ctransfers the financial consequences but does not reduce the physical risk
Dis a form of engineering control
Answer is hidden
Question 650 of 1100Ch 9 · Occupational Health and Safety Management
Under Nepal's Labour Act, 2074, safety equipment required for the work must be
Ashared between employer and worker equally
Bpurchased by the worker
Cprovided by the employer at the employer's cost
Dprovided only on written request by the worker
Answer is hidden
Question 651 of 1100Ch 9 · Pollution and Its Control
Ground-level ozone in an urban atmosphere is classified as
Aa secondary pollutant, formed from nitrogen oxides and volatile organics in sunlight
Ba primary pollutant emitted by power stations
Ca primary pollutant emitted by vehicles
Dan inert gas with no health effects
Answer is hidden
Question 652 of 1100Ch 9 · Pollution and Its Control
Acid rain is caused principally by atmospheric emissions of
Acarbon monoxide alone
Bcarbon dioxide and methane
Csulphur dioxide and oxides of nitrogen
Dchlorofluorocarbons and halons
Answer is hidden
Question 653 of 1100Ch 9 · Pollution and Its Control
A temperature inversion over an industrial area results in
Atrapping of pollutants near the ground and severely reduced dispersion
Ba reduction in emissions at source
Cthe complete destruction of pollutants
Dimproved dispersion of pollutants
Answer is hidden
Question 654 of 1100Ch 9 · Pollution and Its Control
Of the following, the device least suitable for removing particles smaller than 5 micrometres is the
Aelectrostatic precipitator
Bgravity settling chamber
Cventuri scrubber
Dfabric filter
Answer is hidden
Question 655 of 1100Ch 9 · Pollution and Its Control
The collection efficiency of a cyclone separator increases as
Athe gas velocity is reduced
Bthe particle density is reduced
Cits diameter is increased
Dits diameter is reduced, which is why multiple small cyclones are used in parallel
Answer is hidden
Question 656 of 1100Ch 9 · Pollution and Its Control
The performance of an electrostatic precipitator is most strongly affected by
Athe height of the stack
Bthe electrical resistivity of the dust
Cthe colour of the dust
Dthe moisture content of the collected dust alone
Answer is hidden
Question 657 of 1100Ch 9 · Pollution and Its Control
A fabric filter (baghouse) is unsuitable when the gas stream
Ais near its dew point, since condensed moisture blinds the bags
Bhas a high dust loading
Ccontains very fine particles
Dis at ambient temperature
Answer is hidden
Question 658 of 1100Ch 9 · Pollution and Its Control
In flue gas desulphurisation using a lime or limestone slurry, the principal solid product is
Agypsum, calcium sulphate
Bcalcium carbide
Csodium sulphate
Delemental sulphur
Answer is hidden
Question 659 of 1100Ch 9 · Pollution and Its Control
Selective catalytic reduction for the control of nitrogen oxides uses
Aammonia or urea injected over a catalyst
Blime slurry in a wet scrubber
Can electrostatic field
Dactivated carbon adsorption
Answer is hidden
Question 660 of 1100Ch 9 · Pollution and Its Control
For any given wastewater, the chemical oxygen demand is
Aexactly equal to the biochemical oxygen demand
Balways less than the biochemical oxygen demand
Calways greater than the biochemical oxygen demand
Dunrelated to the biochemical oxygen demand
Answer is hidden
Question 661 of 1100Ch 9 · Pollution and Its Control
A wastewater with a BOD to COD ratio of 0.1 is best described as
Afree of organic matter
Bsuitable for direct discharge
Cpoorly biodegradable, so physico-chemical treatment is indicated
Dreadily biodegradable, so biological treatment will work well
Answer is hidden
Question 662 of 1100Ch 9 · Pollution and Its Control
Eutrophication of a freshwater body is usually limited by the availability of
Acarbon
Boxygen
Cnitrogen
Dphosphorus
Answer is hidden
Question 663 of 1100Ch 9 · Pollution and Its Control
The principal environmental legislation currently governing pollution control in Nepal is the
AConsumer Protection Act, 2075 (2018)
BEnvironment Protection Act, 2076 (2019)
CLabour Act, 2074 (2017)
DEnvironment Protection Act, 2053 (1996)
Answer is hidden
Question 664 of 1100Ch 9 · Industrial Waste Management
In the waste management hierarchy, the most preferred option is
Aprevention of waste generation at source
Brecycling
Cenergy recovery
Dsecure landfill
Answer is hidden
Question 665 of 1100Ch 9 · Industrial Waste Management
Compared with end-of-pipe treatment, source reduction is preferred because
Ait requires more equipment
Bit produces more sludge
Cit prevents the waste from being formed rather than transferring the problem to another medium
Dit is always legally required
Answer is hidden
Question 666 of 1100Ch 9 · Industrial Waste Management
Primary treatment of wastewater removes approximately what proportion of the BOD?
AAbout 30 per cent
BAbout 90 per cent
CNone at all
DEssentially all of it
Answer is hidden
Question 667 of 1100Ch 9 · Industrial Waste Management
In the activated sludge process, part of the settled sludge is returned to the aeration tank in order to
Amaintain the required concentration of micro-organisms
Bdilute the incoming wastewater
Cincrease the hydraulic loading
Dremove nutrients chemically
Answer is hidden
Question 668 of 1100Ch 9 · Industrial Waste Management
Bulking in an activated sludge plant refers to
Apoor settling of the sludge caused by the growth of filamentous organisms
Bexcessive accumulation of grit
Coverloading of the screens
Dformation of scum on the primary clarifier
Answer is hidden
Question 669 of 1100Ch 9 · Industrial Waste Management
Anaerobic treatment is preferred to aerobic treatment for high-strength industrial effluents because it
Aproduces an effluent that always meets discharge standards
Bproduces methane and generates far less excess sludge
Cis much faster than aerobic treatment
Drequires no temperature control
Answer is hidden
Question 670 of 1100Ch 9 · Industrial Waste Management
Hexavalent chromium in an industrial effluent is normally treated by
Aoxidation to a higher oxidation state
Breduction to the trivalent form followed by precipitation as the hydroxide
Cdilution with clean water
Ddirect discharge, since it is non-toxic
Answer is hidden
Question 671 of 1100Ch 9 · Industrial Waste Management
Segregation of industrial effluent streams at source is recommended because stream
Ait is cheaper to build one large pipe
Bmixed effluents are always easier to treat
Cit reduces the total volume of effluent to zero
Deach stream can be treated by the method appropriate to it, instead of diluting a concentrated toxic
Answer is hidden
Question 672 of 1100Ch 9 · Industrial Waste Management
A waste is classified as hazardous if it exhibits
Aignitability, corrosivity, reactivity or toxicity
Ba high water content
Ca low calorific value
Da strong colour
Answer is hidden
Question 673 of 1100Ch 9 · Industrial Waste Management
The cradle-to-grave principle for hazardous waste means that
Athe waste must be buried immediately on generation
Bthe waste may be exported without restriction
Cthe generator remains responsible for the waste through transport, treatment and final disposal
Dresponsibility passes to the transporter once collected
Answer is hidden
Question 674 of 1100Ch 9 · Industrial Waste Management
The three Ts of effective hazardous waste incineration are
Atime, transport and treatment
Btemperature, time and turbulence
Cturbulence, toxicity and tonnage
Dtemperature, toxicity and transport
Answer is hidden
Question 675 of 1100Ch 9 · Industrial Waste Management
An effluent standard differs from a stream standard in that an effluent standard
Aspecifies the quality to be maintained in the receiving water body
Blimits the quality of the discharge at the point it leaves the plant
Cdepends on the designated use of the river
Drequires knowledge of the assimilative capacity of the receiving water
Answer is hidden
Question 676 of 1100Ch 9 · Industrial Waste Management
In the environmental impact assessment process, the step that determines which issues and impacts should be studied in detail is called
Aauditing
Bscreening
Cscoping
Dbaseline study
Answer is hidden
Question 677 of 1100Ch 9 · Solid Waste Disposal, Recovery and Cleaner Production
The single most important step in an effective municipal solid waste management system is
Aincreasing the capacity of the landfill
Bpurchasing more collection vehicles
Csegregation of waste at source
Dincreasing the height of the incinerator stack
Answer is hidden
Question 678 of 1100Ch 9 · Solid Waste Disposal, Recovery and Cleaner Production
For successful composting, the carbon-to-nitrogen ratio of the feedstock should be approximately
A25 to 30
B5 to 10
C1 to 2
D100 to 150
Answer is hidden
Question 679 of 1100Ch 9 · Solid Waste Disposal, Recovery and Cleaner Production
A sanitary landfill differs from an open dump principally in that it has
Aa higher waste compaction only
Bno need for any monitoring
Can engineered liner, leachate collection and treatment, gas extraction and daily cover
Da larger area
Answer is hidden
Question 680 of 1100Ch 9 · Solid Waste Disposal, Recovery and Cleaner Production
Capturing landfill gas is environmentally beneficial even when the energy is not used because
Ait increases the landfill capacity
Bmethane is a far more potent greenhouse gas than the carbon dioxide produced by burning it
Cmethane is toxic to humans at any concentration
Dthe gas has no calorific value
Answer is hidden
Question 681 of 1100Ch 9 · Solid Waste Disposal, Recovery and Cleaner Production
Refuse-derived fuel is particularly suitable for use in cement kilns because incorporated into the clinker
Atheir high temperature and long residence time destroy organic compounds completely and the ash is
Bcement kilns operate at low temperature
Ccement kilns produce no emissions
Dthe fuel requires no preparation
Answer is hidden
Question 682 of 1100Ch 9 · Solid Waste Disposal, Recovery and Cleaner Production
Which of the following is an example of by-product recovery rather than end-of-pipe treatment?
AInstalling a taller stack to disperse emissions
BProducing saleable gypsum from flue gas desulphurisation
CSending sludge to landfill
DDiluting an effluent before discharge
Answer is hidden
Question 683 of 1100Ch 9 · Solid Waste Disposal, Recovery and Cleaner Production
Cleaner production is best described as
Aa system of environmental penalties
Ban improved form of end-of-pipe treatment
Ca method of designing taller stacks
Da preventive strategy applied at source to processes, products and services
Answer is hidden
Question 684 of 1100Ch 9 · Solid Waste Disposal, Recovery and Cleaner Production
Life cycle assessment evaluates the environmental impact of a product
Afrom raw material extraction through manufacture and use to final disposal
Bonly during its use
Conly at the point of disposal
Donly during its manufacture
Answer is hidden
Question 685 of 1100Ch 9 · Solid Waste Disposal, Recovery and Cleaner Production
ISO 14001 certification of a company confirms that
Aits emissions are below all national limits
Bits products are environmentally superior to competitors' products
Cit produces no waste
Dit has an environmental management system meeting the standard's requirements
Answer is hidden
Question 686 of 1100Ch 9 · Solid Waste Disposal, Recovery and Cleaner Production
The polluter pays principle holds that
Athe cost of preventing and remedying pollution should be borne by the party that causes it
Bthe government should bear the cost of all pollution control
Cpollution is acceptable provided a fee is paid
Dconsumers should pay for industrial pollution
Answer is hidden
Question 687 of 1100Ch 9 · Solid Waste Disposal, Recovery and Cleaner Production
The precautionary principle states that irreversible harm
Ano action should be taken until the science is conclusive
Bonly proven harms require regulation
Clack of full scientific certainty should not be used as a reason to postpone measures to prevent serious or
Dall industrial activity should cease
Answer is hidden
Question 688 of 1100Ch 9 · Solid Waste Disposal, Recovery and Cleaner Production
Extended producer responsibility means that
Aconsumers must dispose of products themselves
Bthe government disposes of all products
Cthe producer remains responsible for the product at the end of its useful life
Dthe producer is responsible only until the product is sold
Answer is hidden
Question 689 of 1100Ch 9 · Solid Waste Disposal, Recovery and Cleaner Production
Under Nepal's Solid Waste Management Act, 2068 (2011), primary responsibility for the management of municipal solid waste rests with
Athe individual householder alone
Bthe local bodies
Cprivate companies exclusively
Dthe federal ministry directly
Answer is hidden
Question 690 of 1100Ch 9 · Quality and Quality Control
The essential difference between quality control and quality assurance is that quality control is
Apreventive, while quality assurance is detective
Bconcerned only with documentation
Cdetective and product oriented, while quality assurance is preventive and process oriented
Dcarried out only by management
Answer is hidden
Question 691 of 1100Ch 9 · Quality and Quality Control
The statement that quality cannot be inspected into a product means that
Ainspection is unnecessary in any process
Binspection sorts good from bad but does not reduce the number of defects produced
Cinspection should be carried out more frequently
Donly the customer can judge quality
Answer is hidden
Question 692 of 1100Ch 9 · Quality and Quality Control
Among the four categories of quality cost, the most expensive is usually
Aprevention cost
Bappraisal cost
Cinternal failure cost
Dexternal failure cost
Answer is hidden
Question 693 of 1100Ch 9 · Quality and Quality Control
A process that exhibits only common cause variation is described as
Aproducing only acceptable product
Bincapable of improvement
Cout of control
Din statistical control, and therefore predictable
Answer is hidden
Question 694 of 1100Ch 9 · Quality and Quality Control
Control limits on a control chart are
Aalways the same as the specification limits
Bcalculated from the process data and describe what the process actually does
Cchosen arbitrarily by the operator
Dset by the customer and describe what is wanted
Answer is hidden
Question 695 of 1100Ch 9 · Quality and Quality Control
For measured variable data, the pair of control charts normally used together is
Athe Pareto chart and the histogram
Bthe p chart and the np chart
Cthe X-bar chart and the R chart
Dthe c chart and the u chart
Answer is hidden
Question 696 of 1100Ch 9 · Quality and Quality Control
A process capability index Cpk of 1.0 indicates that
Athe process is out of statistical control
Bthe process cannot produce any acceptable product
Cthe process output just fills the specification with no margin for drift
Dthe process is highly capable
Answer is hidden
Question 697 of 1100Ch 9 · Quality and Quality Control
The Pareto chart is used in quality improvement to
Adisplay the distribution of a measured variable
Borganise possible causes by category
Cidentify the few causes responsible for the majority of the defects
Dshow the relationship between two variables
Answer is hidden
Question 698 of 1100Ch 9 · Quality and Quality Control
In acceptance sampling, the producer's risk is the probability that
Aa good lot is rejected by the sampling plan
Bthe sample is drawn incorrectly
Cthe inspector makes a measurement error
Da bad lot is accepted by the sampling plan
Answer is hidden
Question 699 of 1100Ch 9 · Quality and Quality Control
A quality circle is best described as problems
Aa compulsory training programme for all staff
Ba team of external auditors
Ca committee of senior managers who set quality policy
Da small voluntary group of employees from the same work area who identify and solve work-related
Answer is hidden
Question 700 of 1100Ch 9 · Quality and Quality Control
The Japanese term kaizen refers to
Aa single large capital investment in new equipment
Bcontinuous incremental improvement involving everyone in the organisation
Ca statistical sampling technique
Dthe elimination of the quality department
Answer is hidden
Question 701 of 1100Ch 9 · Quality and Quality Control
Poka-yoke, or mistake proofing, refers to
Aincreasing the frequency of statistical sampling
Bpunishing operators who make errors
Cinspecting every item produced
Ddesigning a process so that an error cannot be made or cannot pass undetected
Answer is hidden
Question 702 of 1100Ch 9 · Quality and Quality Control
Certification of a company to ISO 9001 means that
Aits products are certified as superior to those of competitors
Bits quality management system meets the requirements of the standard
Cits products carry a compulsory national quality mark
Dit has achieved a defect rate of 3.4 per million
Answer is hidden
Question 703 of 1100Ch 10 · Engineering Drawings and Their Concepts
The area of an A0 drawing sheet is:
A0.25 m²
B1 m²
C2 m²
D0.5 m²
Answer is hidden
Question 704 of 1100Ch 10 · Engineering Drawings and Their Concepts
The size of an A4 sheet is:
A148 × 210 mm
B297 × 420 mm
C420 × 594 mm
D210 × 297 mm
Answer is hidden
Question 705 of 1100Ch 10 · Engineering Drawings and Their Concepts
The title block of a drawing sheet is normally placed at the:
ACentre of the sheet
BTop-right corner
CTop-left corner
DBottom-right corner
Answer is hidden
Question 706 of 1100Ch 10 · Engineering Drawings and Their Concepts
In the unidirectional system of dimensioning, dimension figures are:
ARead from the right side only
BAll read from the bottom of the sheet
CPlaced inside the object always
DParallel to the dimension lines
Answer is hidden
Question 707 of 1100Ch 10 · Engineering Drawings and Their Concepts
A drawing made to a scale of 1 : 50 has a representative fraction of:
A50
B5/1
C1/50
D1/5
Answer is hidden
Question 708 of 1100Ch 10 · Engineering Drawings and Their Concepts
A scale that can show three units such as metre, decimetre and centimetre is a:
AScale of chords
BComparative scale
CPlain scale
DDiagonal scale
Answer is hidden
Question 709 of 1100Ch 10 · Engineering Drawings and Their Concepts
In first-angle projection, the top view is placed:
ABelow the front view
BBehind the front view
CAbove the front view
DTo the left of the front view
Answer is hidden
Question 710 of 1100Ch 10 · Engineering Drawings and Their Concepts
The true shape of an inclined surface is obtained from a/an:
APerspective view
BIsometric view
CAuxiliary view
DFront view
Answer is hidden
Question 711 of 1100Ch 10 · Engineering Drawings and Their Concepts
In isometric projection, lengths along the isometric axes are reduced to about:
A50% of true length
B82% of true length
C70.7% of true length
D100% of true length
Answer is hidden
Question 712 of 1100Ch 10 · Engineering Drawings and Their Concepts
The angle between any two isometric axes is:
A30°
B120°
C90°
D45°
Answer is hidden
Question 713 of 1100Ch 10 · Engineering Drawings and Their Concepts
In cabinet oblique projection, the receding lines are drawn:
ATo full scale
BConverging to a vanishing point
CTo half scale
DTo isometric scale
Answer is hidden
Question 714 of 1100Ch 10 · Engineering Drawings and Their Concepts
Which of the following is NOT sectioned (hatched) when cut along its axis?
ACasting body
BHub of a pulley
CShaft
DFlange of a coupling
Answer is hidden
Question 715 of 1100Ch 10 · Engineering Economics
Rs 10,000 is deposited at 10% compound interest per year. Its value after 2 years is:
ARs 12,210
BRs 12,000
CRs 12,100
DRs 11,000
Answer is hidden
Question 716 of 1100Ch 10 · Engineering Economics
The effective annual interest rate for 12% per year compounded monthly is about:
A12%
B1%
C12.68%
D13.5%
Answer is hidden
Question 717 of 1100Ch 10 · Engineering Economics
The factor used to find the equal annual payment needed to repay a present loan is the:
ACompound amount factor (F/P)
BCapital recovery factor (A/P)
CSinking fund factor (A/F)
DPresent worth factor (P/F)
Answer is hidden
Question 718 of 1100Ch 10 · Engineering Economics
The present worth of a perpetual annual income of Rs 1,000 at 10% interest is:
AInfinite
BRs 100
CRs 1,000
DRs 10,000
Answer is hidden
Question 719 of 1100Ch 10 · Engineering Economics
A project is economically acceptable by the NPV method when:
ANPV ≥ 0 at the MARR
BNPV is negative
CIRR is less than MARR
DNPV equals the initial investment
Answer is hidden
Question 720 of 1100Ch 10 · Engineering Economics
The internal rate of return is the discount rate at which:
ANPV is maximum
BNPV equals zero
CB/C ratio equals zero
DPayback is minimum
Answer is hidden
Question 721 of 1100Ch 10 · Engineering Economics
Compared with the simple payback period, the discounted payback period:
AIs always shorter
BConsiders cash flows after payback
CConsiders the time value of money
DIgnores all cash flows
Answer is hidden
Question 722 of 1100Ch 10 · Engineering Economics
MARR is best described as:
AThe inflation rate only
BThe minimum acceptable rate of return set by the investor
CThe rate at which NPV is maximum
DThe maximum rate charged by banks
Answer is hidden
Question 723 of 1100Ch 10 · Engineering Economics
For comparing alternatives with unequal lives, the most convenient method is:
AAnnual worth (equivalent uniform annual) method
BComparing first costs only
CSimple payback
DComparing total undiscounted costs
Answer is hidden
Question 724 of 1100Ch 10 · Engineering Economics
A machine costs Rs 60,000 with salvage Rs 10,000 after 5 years. Straight-line annual depreciation is:
ARs 12,000
BRs 50,000
CRs 10,000
DRs 14,000
Answer is hidden
Question 725 of 1100Ch 10 · Engineering Economics
The standard rate of Value Added Tax in Nepal is:
A15%
B10%
C13%
D18%
Answer is hidden
Question 726 of 1100Ch 10 · Engineering Economics
Under Nepal's Income Tax Act 2058, depreciation of assets is calculated using:
ASinking fund method
BPool-based declining balance method
COnly straight-line method
DUnits-of-production method only
Answer is hidden
Question 727 of 1100Ch 10 · Project Planning and Scheduling
A project is best defined as:
AA permanent organisation
BAny repetitive production activity
CA continuous routine operation
DA temporary endeavour undertaken to create a unique product, service or result
Answer is hidden
Question 728 of 1100Ch 10 · Project Planning and Scheduling
The phase of the project life cycle in which the feasibility study is carried out is:
AExecution phase
BInitiation/concept phase
CMonitoring phase
DClosure phase
Answer is hidden
Question 729 of 1100Ch 10 · Project Planning and Scheduling
The hierarchical decomposition of the total project scope into work packages is called:
ALogical framework
BGantt chart
CCritical path
DWork Breakdown Structure (WBS)
Answer is hidden
Question 730 of 1100Ch 10 · Project Planning and Scheduling
A major limitation of a bar (Gantt) chart is that it:
ADoes not clearly show interdependencies between activities
BCannot show activity durations
CIs difficult to understand
DCannot show a time scale
Answer is hidden
Question 731 of 1100Ch 10 · Project Planning and Scheduling
In an activity-on-arrow network, a dummy activity:
AHas zero duration and shows logical dependency only
BConsumes resources
CIs always on the critical path
DHas the longest duration
Answer is hidden
Question 732 of 1100Ch 10 · Project Planning and Scheduling
The critical path of a project network is the:
APath with maximum float
BShortest path through the network
CLongest path, with zero total float
DPath with the most activities
Answer is hidden
Question 733 of 1100Ch 10 · Project Planning and Scheduling
An activity has ES = 5, EF = 9, LS = 8, LF = 12. Its total float is:
A0
B7
C3
D4
Answer is hidden
Question 734 of 1100Ch 10 · Project Planning and Scheduling
In PERT, with to = 2, tm = 5 and tp = 14 days, the expected time is:
A21 days
B5 days
C6 days
D7 days
Answer is hidden
Question 735 of 1100Ch 10 · Project Planning and Scheduling
PERT is most suitable for:
AMass production lines
BRepetitive construction with known durations
CResearch and development projects with uncertain durations
DRoutine maintenance only
Answer is hidden
Question 736 of 1100Ch 10 · Project Planning and Scheduling
While crashing a project, the activity crashed first is the critical activity with the:
ALowest cost slope
BLongest duration
CMaximum float
DHighest cost slope
Answer is hidden
Question 737 of 1100Ch 10 · Project Planning and Scheduling
Rescheduling activities within their available float without changing the project completion date is called:
AFast-tracking
BResource smoothing
CCrashing
DResource levelling
Answer is hidden
Question 738 of 1100Ch 10 · Project Planning and Scheduling
In earned value management, a cost performance index (CPI) of 0.8 means the project is:
AAhead of schedule
BOver budget
CUnder budget
DExactly on budget
Answer is hidden
Question 739 of 1100Ch 10 · Project Management
The number of communication channels among 6 stakeholders is:
A30
B36
C6
D15
Answer is hidden
Question 740 of 1100Ch 10 · Project Management
Buying insurance against a project risk is an example of risk:
AAvoidance
BTransfer
CMitigation
DAcceptance
Answer is hidden
Question 741 of 1100Ch 10 · Project Management
Changing the project plan to eliminate a threat entirely is risk:
AAcceptance
BAvoidance
CTransfer
DExploitation
Answer is hidden
Question 742 of 1100Ch 10 · Project Management
A reserve kept for identified risks ('known unknowns') is the:
AManagement reserve
BRetention money
CSinking fund
DContingency reserve
Answer is hidden
Question 743 of 1100Ch 10 · Project Management
A quantitative risk analysis technique that uses repeated random sampling of uncertain variables is:
AChecklist analysis
BMonte Carlo simulation
CSWOT analysis
DBrainstorming
Answer is hidden
Question 744 of 1100Ch 10 · Project Management
In a BOT arrangement, the private party:
AOnly designs the project
BBuilds, operates for a concession period and then transfers the facility
COnly supplies labour
DBuys the project from government permanently
Answer is hidden
Question 745 of 1100Ch 10 · Project Management
Project finance on a non-recourse basis means lenders are repaid mainly from:
AGovernment taxes
BThe sponsor's other assets
CThe project's own cash flows
DPersonal guarantees of engineers
Answer is hidden
Question 746 of 1100Ch 10 · Project Management
Public procurement in Nepal is governed by the:
ALabour Act 2074
BCompany Act 2063 only
CPublic Procurement Act 2063
DContract Act 2025
Answer is hidden
Question 747 of 1100Ch 10 · Project Management
The security submitted with a bid, forfeited if the bidder withdraws the bid during its validity, is the:
ABid security
BAdvance payment guarantee
CRetention money
DPerformance security
Answer is hidden
Question 748 of 1100Ch 10 · Project Management
A contract in which payment is made on the basis of measured quantities of work and quoted unit rates is a/an:
ACost-plus contract
BTurnkey contract
CLump-sum contract
DItem-rate (unit-rate) contract
Answer is hidden
Question 749 of 1100Ch 10 · Project Management
A contract in which one contractor is responsible for design, procurement, construction and commissioning is a:
APercentage-rate contract
BLabour contract
CItem-rate contract
DTurnkey (EPC) contract
Answer is hidden
Question 750 of 1100Ch 10 · Project Management
A pre-agreed amount payable by the contractor for delay in completion is called:
ALiquidated damages
BMobilisation advance
CVariation
DRetention money
Answer is hidden
Question 751 of 1100Ch 10 · Engineering Professional Practice
According to engineering codes of ethics, an engineer's foremost obligation is to:
AObey all instructions of the client
BMaximise the employer's profit
CHold paramount the safety, health and welfare of the public
DComplete work at minimum cost
Answer is hidden
Question 752 of 1100Ch 10 · Engineering Professional Practice
An engineer asked to design work outside his/her area of expertise should:
AAsk a junior to do it
BAccept to gain experience
CSign the drawings anyway
DDecline or engage a competent specialist
Answer is hidden
Question 753 of 1100Ch 10 · Engineering Professional Practice
The ethical theory that seeks the greatest good for the greatest number is:
AVirtue ethics
BUtilitarianism
CEgoism
DDeontology
Answer is hidden
Question 754 of 1100Ch 10 · Engineering Professional Practice
An engineer who has a financial interest in a supplier recommended to a client should:
AReject all other suppliers
BDisclose the conflict of interest to the client
CKeep it secret
DAccept a commission from the supplier
Answer is hidden
Question 755 of 1100Ch 10 · Engineering Professional Practice
Signing and sealing drawings not prepared or supervised by oneself is:
AA normal professional courtesy
BUnethical
CAcceptable if paid
DRequired by law
Answer is hidden
Question 756 of 1100Ch 10 · Engineering Professional Practice
Whistle-blowing is generally justified when:
AIt brings personal benefit
BThe engineer dislikes the manager
CSerious public harm is involved and internal channels have been exhausted
DNo evidence is available
Answer is hidden
Question 757 of 1100Ch 10 · Engineering Professional Practice
The seismic design provisions for buildings in Nepal are contained in:
ANepal National Building Code (NBC 105)
BLabour Act
CPublic Procurement Act
DElectricity Act
Answer is hidden
Question 758 of 1100Ch 10 · Engineering Professional Practice
The law that sets out environmental assessment requirements (IEE/EIA) for projects in Nepal is the:
AArbitration Act 2055
BNepal Engineering Council Act 2055
CEnvironment Protection Act 2076
DCompany Act 2063
Answer is hidden
Question 759 of 1100Ch 10 · Engineering Professional Practice
The Nepal Engineers' Association was established in:
A2055 BS (1998 AD)
B2019 BS (1962 AD)
C2046 BS (1990 AD)
D2072 BS (2015 AD)
Answer is hidden
Question 760 of 1100Ch 10 · Engineering Professional Practice
The Nepal Engineers' Association is best described as:
AA voluntary professional association of engineers
BA government ministry
CA contractors' federation
DThe statutory regulatory body that registers engineers
Answer is hidden
Question 761 of 1100Ch 10 · Engineering Professional Practice
In the hierarchy of controls for occupational safety, the last line of defence is:
AEngineering controls
BElimination
CPersonal protective equipment
DSubstitution
Answer is hidden
Question 762 of 1100Ch 10 · Engineering Professional Practice
A leading cause of fatal accidents on construction sites is:
ANoise exposure
BFalls from height
CPoor lighting in offices
DEye strain
Answer is hidden
Question 763 of 1100Ch 10 · Engineering Regulatory Body: Nepal Engineering Council
The Nepal Engineering Council was established under the:
APublic Procurement Act 2063
BNepal Engineering Council Act 2055 (1998)
CCompany Act 2063
DBuilding Act 2055
Answer is hidden
Question 764 of 1100Ch 10 · Engineering Regulatory Body: Nepal Engineering Council
The Nepal Engineering Council Regulations were issued in:
A2074 BS
B2055 BS
C2063 BS
D2057 BS
Answer is hidden
Question 765 of 1100Ch 10 · Engineering Regulatory Body: Nepal Engineering Council
The Nepal Engineering Council is best described as:
AA trade union
BA voluntary association of engineers
CA statutory body regulating the engineering profession
DA private consulting firm
Answer is hidden
Question 766 of 1100Ch 10 · Engineering Regulatory Body: Nepal Engineering Council
A person who wants to practise as an engineer in Nepal must:
AOnly hold a trade licence
BRegister with the Company Registrar
CBe registered with the Nepal Engineering Council
DOnly be a member of NEA
Answer is hidden
Question 767 of 1100Ch 10 · Engineering Regulatory Body: Nepal Engineering Council
Recognition of engineering educational programmes and institutions in Nepal is a function of the:
ADepartment of Industry
BNepal Engineering Council
CPublic Procurement Monitoring Office
DNepal Engineers' Association
Answer is hidden
Question 768 of 1100Ch 10 · Engineering Regulatory Body: Nepal Engineering Council
A disciplinary action the Nepal Engineering Council can take for serious professional misconduct is:
ACancellation of the engineer's registration
BRevoking citizenship
CConfiscation of property
DImprisonment without trial
Answer is hidden
Question 769 of 1100Ch 10 · Engineering Regulatory Body: Nepal Engineering Council
The official who maintains the register of engineers at NEC is the:
AChief Justice
BRegistrar
CAuditor General
DCompany Registrar
Answer is hidden
Question 770 of 1100Ch 10 · Engineering Regulatory Body: Nepal Engineering Council
According to the NEC code of conduct, an engineer should:
ASign drawings prepared by others without checking
BAccept any work offered
CShare confidential client data freely
DUndertake only work within his/her competence
Answer is hidden
Question 771 of 1100Ch 10 · Engineering Regulatory Body: Nepal Engineering Council
Obtaining work by paying a bribe is:
AA violation of the code of conduct
BAllowed if disclosed later
CAcceptable in competitive markets
DRequired for public contracts
Answer is hidden
Question 772 of 1100Ch 10 · Engineering Regulatory Body: Nepal Engineering Council
Which statement about NEC and NEA is correct?
ABoth are voluntary
BNEC registration is compulsory to practise; NEA membership is voluntary
CBoth are government ministries
DNEA registration is compulsory; NEC membership is voluntary
Answer is hidden
Question 773 of 1100Ch 10 · Project Planning, Design and Implementation
The approval of design, drawing before the construction of a building in the city area of Nepal is done by ............
Avillage development committee
Bdistrict development committee
Cmunicipality
Dnone of the above
Answer is hidden
Question 774 of 1100Ch 10 · Project Planning, Design and Implementation
The width of the standard A-series drawing paper such as A₄, A₃, A₂, ...... is ............
A1/3 times the length of the paper
B1/√2 times the length of the paper
C1/2 times the length of the paper
D1/√3 times the length of the paper
Answer is hidden
Question 775 of 1100Ch 10 · Project Planning, Design and Implementation
The area of A₀ size paper is ............[cite: 15]
A0.25 m²
B0.5 m²
C0.75 m²
D1 m²
Answer is hidden
Question 776 of 1100Ch 10 · Project Planning, Design and Implementation
The standard size of drawing board of designation D₁ is (in mm) ............[cite: 15]
A1000 × 700 × 25
B100 × 75 × 25
C1500 × 750 × 25
D1500 × 700 × 25
Answer is hidden
Question 777 of 1100Ch 10 · Project Planning, Design and Implementation
Paper is designated by which letter?[cite: 15]
AA
BB
CC
DD
Answer is hidden
Question 778 of 1100Ch 10 · Project Planning, Design and Implementation
Title block gives information about ............[cite: 15]
Atitle of the drawing
Bscale used for the drawing
Cserial number of the drawing
Dall of the above
Answer is hidden
Question 779 of 1100Ch 10 · Project Planning, Design and Implementation
Which of the following is not included in title block of drawing sheet?[cite: 15]
ASheet number
BScale
CMethod of projection
DSize of sheet
Answer is hidden
Question 780 of 1100Ch 10 · Project Planning, Design and Implementation
As per BIS, the size of title block in drawing sheet is ............[cite: 15]
A25 mm × 10 mm
B100 mm × 25 mm
C65 mm × 185 mm
D185 mm × 65 mm
Answer is hidden
Question 781 of 1100Ch 10 · Project Planning, Design and Implementation
The length: width in case of an arrow head is ............[cite: 15]
A1:1
B2:1
C3:1
D4:1
Answer is hidden
Question 782 of 1100Ch 10 · Project Planning, Design and Implementation
What is the inclination of inclined lettering?[cite: 15]
A75 degree
B65 degree
C45 degree
D85 degree
Answer is hidden
Question 783 of 1100Ch 10 · Project Planning, Design and Implementation
The aspect ratio of a letter refers to the ratio of its ............[cite: 15]
Aheight to its width
Bwidth to height
Clength to width
Dwidth to length
Answer is hidden
Question 784 of 1100Ch 10 · Project Planning, Design and Implementation
The size of the letter means the ............ of the letter.[cite: 15]
Athickness
Bheight
Clength
Dwidth
Answer is hidden
Question 785 of 1100Ch 10 · Project Planning, Design and Implementation
The dimension system is unidirectional if ............[cite: 15]
Adimensions in the drawing sheet can be read from anywhere on the drawing sheet
Bdimensions in the drawing sheet can be read from the bottom edge of the drawing sheet
Cdimensions in the drawing sheet can be read from the bottom and right-hand edge of the drawing sheet
Ddimensions cannot be read
Answer is hidden
Question 786 of 1100Ch 10 · Project Planning, Design and Implementation
In aligned system of dimensioning, the dimensions may be read from ............[cite: 15]
Abottom or right hand edges
Bbottom or left hand edges
Conly from bottom
Donly from left side
Answer is hidden
Question 787 of 1100Ch 10 · Project Planning, Design and Implementation
Maps are drawn in which scale?[cite: 15]
AEnlarging
BReducing
CBalanced
DAll of the above
Answer is hidden
Question 788 of 1100Ch 10 · Project Planning, Design and Implementation
A full scale technical drawing will have a scale factor of ............
A1:1
B1:2
C2:1
D1:4
Answer is hidden
Question 789 of 1100Ch 10 · Project Planning, Design and Implementation
Which of the following represent reducing scale?
A1:1
B1:25
C2:1
D10:1
Answer is hidden
Question 790 of 1100Ch 10 · Project Planning, Design and Implementation
Which of the following is enlarging scale?
A1:5
B1:2
C5:1
D1:2
Answer is hidden
Question 791 of 1100Ch 10 · Project Planning, Design and Implementation
Given representative factor as 4/50 and maximum length is 100 cm. Find the length of scale.
A8 cm
B10 cm
C9.7 cm
D12 cm
Answer is hidden
Question 792 of 1100Ch 10 · Project Planning, Design and Implementation
A line of 1 meter is shown by 1 cm on a scale; its representative factor (RF) is ............[cite: 16]
A1
B100
C1/100
D1/50
Answer is hidden
Question 793 of 1100Ch 10 · Project Planning, Design and Implementation
Freehand sketching can be done only when one has ............[cite: 16]
Aproper proficiency
Bgood practice
Cgood intuition
Dall of the above
Answer is hidden
Question 794 of 1100Ch 10 · Project Planning, Design and Implementation
The techniques for free hand sketch to drawing circle is ............[cite: 16]
Afixing a fixed point and are
Bfixing the perimeter
Cfixing the radius only
Dnone of the above
Answer is hidden
Question 795 of 1100Ch 10 · Project Planning, Design and Implementation
The type of line that projects from an object for the express purpose of locating a dimension is a ............[cite: 16]
Avisible line
Bhidden line
Cextension line
Ddimension line
Answer is hidden
Question 796 of 1100Ch 10 · Project Planning, Design and Implementation
Which the following is represented by a dotted line?[cite: 16]
AHidden edges
BProjection line
CVisible outlines
DHatching line
Answer is hidden
Question 797 of 1100Ch 10 · Project Planning, Design and Implementation
Which of the following line is used for dimension lines?[cite: 16]
AContinuous thick
BContinuous thin
CChain thin
DShort zig-zag line
Answer is hidden
Question 798 of 1100Ch 10 · Project Planning, Design and Implementation
Which of the following line is used for visible outlines?[cite: 16]
AContinuous thick
BContinuous thin
CChain thin
DShort zig-zag line
Answer is hidden
Question 799 of 1100Ch 10 · Project Planning, Design and Implementation
The hidden line are drawn as ............[cite: 16]
Adashed narrow lines
Bdashed wide lines
Clong-dashed dotted wide line
Dlong-dashed double dotted wide line
Answer is hidden
Question 800 of 1100Ch 10 · Project Planning, Design and Implementation
The hidden line represent ............[cite: 16]
Afeatures that can be seen in the current view
Bextension line or leader line
Cfeatures that cannot be seen in the current view
Daxis of symmetrical parts
Answer is hidden
Question 801 of 1100Ch 10 · Project Planning, Design and Implementation
Which of the following lines are used to show that the object is cut and then viewed?[cite: 16]
AHidden lines
BLeader lines
CCentre lines
DHatching lines
Answer is hidden
Question 802 of 1100Ch 10 · Project Planning, Design and Implementation
T square is used alone to draw ............[cite: 16]
Avertical line
Binclined line
Chorizontal line
Dnone of the above
Answer is hidden
Question 803 of 1100Ch 10 · Project Planning, Design and Implementation
French curves are used to draw ............[cite: 16]
Aregular curves
Bcircle
Cirregular curves
Dnone of the above
Answer is hidden
Question 804 of 1100Ch 10 · Project Planning, Design and Implementation
The hardness of pencil lead increases as the numeral letter H ............[cite: 16]
Aincreases
Bremains constant
Cdecreases
Dnone of the above
Answer is hidden
Question 805 of 1100Ch 10 · Project Planning, Design and Implementation
Which of the following is not a pencil?[cite: 16]
AHB
B2B
Cdrafter
Dnone of the above
Answer is hidden
Question 806 of 1100Ch 10 · Project Planning, Design and Implementation
What is additional 3rd view on orthographic projection in general for simple objects?
AFront view
BTop view
CSide view
DView at 45° perpendiculars to horizontal plane
Answer is hidden
Question 807 of 1100Ch 10 · Project Planning, Design and Implementation
The isometric projection of a circle is a ............[cite: 14]
Acircle
Bellipse
Chyperbola
Dparabola
Answer is hidden
Question 808 of 1100Ch 10 · Project Planning, Design and Implementation
A technical drawing of an object that shows the relationship or order of assembly of various parts is known as ............[cite: 14]
Aorthographic projection
Bexploded view drawing
Ccompacted view drawing
Daxonometric drawing
Answer is hidden
Question 809 of 1100Ch 10 · Project Planning, Design and Implementation
All the axonometric projections are single-plane ............ projection.[cite: 14]
Aorthographic
Bperspective
Cisometric
Doblique
Answer is hidden
Question 810 of 1100Ch 10 · Project Planning, Design and Implementation
............ type of axonometric drawing has equal foreshortening along two axis directions and a different amount on the third axis.[cite: 14]
ADiametric
BMulti view
CIsometric
DTrimetric
Answer is hidden
Question 811 of 1100Ch 10 · Project Planning, Design and Implementation
The principle views associated with orthographic projection are ............[cite: 14]
Afront view
Bright side view
Ctop view
Dall of the above
Answer is hidden
Question 812 of 1100Ch 10 · Project Planning, Design and Implementation
The principle reason for using an auxiliary view is ............[cite: 14]
Ato eliminate hidden lines
Bto create a true projection plane from an inclined plane in one of the primary views
Cto show cylinders as ellipses
Dto locate center marks
Answer is hidden
Question 813 of 1100Ch 10 · Project Planning, Design and Implementation
............ is the plane upon which the top view is projected.[cite: 14]
AHorizontal
BFrontal
CProfile
DBase
Answer is hidden
Question 814 of 1100Ch 10 · Project Planning, Design and Implementation
The isometric projection of a sphere is a ............[cite: 14]
Acircle
Bellipse
Chyperbola
Dparabola
Answer is hidden
Question 815 of 1100Ch 10 · Project Planning, Design and Implementation
In isometric drawing ............[cite: 14]
Aall axes are equally inclined
Btwo axes are equally inclined
Cnone of the axes are equally inclined
Dnone of the above
Answer is hidden
Question 816 of 1100Ch 10 · Project Planning, Design and Implementation
The value of the ratio of isometric projection length to true length is ............[cite: 14]
A0.141
B0.372
C0.815
D0.642
Answer is hidden
Question 817 of 1100Ch 10 · Project Planning, Design and Implementation
What type of sketch shows the front in true shape?[cite: 14]
AIsometric
BPerspective
COblique
DAxonometric
Answer is hidden
Question 818 of 1100Ch 10 · Project Planning, Design and Implementation
If an isometric drawing is made use of an isometric scale, then the drawings are called ............[cite: 14]
Aisometric projection
Bisometric view
Cperspective projection
Dorthographic view
Answer is hidden
Question 819 of 1100Ch 10 · Project Planning, Design and Implementation
When using an isometric view, you line up the drawing along three axis that are separated by ............ from each other.[cite: 14]
A180-degree
B90-degree
C120-degree
D60-degree
Answer is hidden
Question 820 of 1100Ch 10 · Project Planning, Design and Implementation
The development of cylinder is a ............[cite: 14]
Arectangle
Bcircle
Cellipse
Dnone of the above
Answer is hidden
Question 821 of 1100Ch 10 · Project Planning, Design and Implementation
The following is the method for development of a right regular prism.[cite: 14]
AParallel line method
BRadial line method
CTriangulation method
DApproximate method
Answer is hidden
Question 822 of 1100Ch 10 · Project Planning, Design and Implementation
The solid which is generated by the revolution of a right-angle triangle about one of its perpendicular sides which remains fixed is called ............[cite: 14]
Aa prism
Ba pyramid
Ca cylinder
Da cone
Answer is hidden
Question 823 of 1100Ch 10 · Project Planning, Design and Implementation
When a pyramid or cone is cut by a cutting plane parallel to its base, the remaining portion thus obtained after removing the top portion is called ............[cite: 14]
Aa prism
Bfrustum
Ca cylinder
Da cone
Answer is hidden
Question 824 of 1100Ch 10 · Project Planning, Design and Implementation
The side view of an object is drawn in ............ faces.[cite: 14]
Avertical plane
Bhorizontal plane
Cprofile plane
Dany of the above
Answer is hidden
Question 825 of 1100Ch 10 · Project Planning, Design and Implementation
A tetrahedron has four equal ............ faces.[cite: 14]
Asquare
Brectangular
Ctriangular
Dnone of the above
Answer is hidden
Question 826 of 1100Ch 10 · Project Planning, Design and Implementation
Hatching lines are drawn at ............ degree to reference line.[cite: 14]
A30
B45
C60
D90
Answer is hidden
Question 827 of 1100Ch 10 · Project Planning, Design and Implementation
In a cash flow series ............
Auniform gradient signifies that an income or disbursement changes by the same amount in each interest period
Beither an increase or decrease in the amount of a cash flow is called the gradient
Cthe gradient in the cash flow may be positive or negative
Dall of the above
Answer is hidden
Question 828 of 1100Ch 10 · Project Planning, Design and Implementation
Which item comes under financial activities in cash flow?
ARedemption of preference share
BIssue of preference share
CInterest paid
DAll of the above
Answer is hidden
Question 829 of 1100Ch 10 · Project Planning, Design and Implementation
Cash flow example from a financing activity is ............
Apayment of dividends
Breceipt of dividend on investment
Ccash received from customers
Dpurchase of fixed asset
Answer is hidden
Question 830 of 1100Ch 10 · Project Planning, Design and Implementation
The statement of cash flow clarifies cash flows according to ............
Aoperating and non-operating flows
Binflow and outflow
Cinvesting and non-operating flows
Doperating, investing, and financing activities
Answer is hidden
Question 831 of 1100Ch 10 · Project Planning, Design and Implementation
Cash flow example from an investing activity is ............
Aissue of debenture
Brepayment of long-term loan
Cpurchase of raw materials for cash
Dsale of investment by non-financial enterprise
Answer is hidden
Question 832 of 1100Ch 10 · Project Planning, Design and Implementation
Heterogeneous cash flows can be made comparable by ............
Adiscounting technique
Bcompounding technique
Ceither (a) or (b)
Dnone of the above
Answer is hidden
Question 833 of 1100Ch 10 · Project Planning, Design and Implementation
Time value of money supports the comparison of cash flows recorded at different time period by ............
Adiscounting all cash flows to a common point of time
Bcompounding all cash flows to a common point of time
Cusing either (a) or (b)
Dnone of the above
Answer is hidden
Question 834 of 1100Ch 10 · Project Planning, Design and Implementation
What is the element of total cost?
AMaterial and labor cost
BLabor and fuel cost
CFuel and machine cost
DAll of the above
Answer is hidden
Question 835 of 1100Ch 10 · Project Planning, Design and Implementation
Statement of cash flows includes ............
Afinancing activities
Boperating activities
Cinvesting activities
Dall of the above
Answer is hidden
Question 836 of 1100Ch 10 · Project Planning, Design and Implementation
Material cost is concerned with ............
Adirect cost
Bindirect cost
Cboth (a) and (b)
Dnone of the above
Answer is hidden
Question 837 of 1100Ch 10 · Project Planning, Design and Implementation
In cash flows, when a company invests in fixed assets and short-term financial investments results in ............
Aincreased liabilities
Bincreased equity
Cincreased cash
Ddecreased cash
Answer is hidden
Question 838 of 1100Ch 10 · Project Planning, Design and Implementation
If desired rate of return is minimum by actual rate of return, then it is classified as ............
Afuture cash flows
Bpresent cash flow
Cpositive cash flows
Dnegative cash flows
Answer is hidden
Question 839 of 1100Ch 10 · Project Planning, Design and Implementation
The given symbol in a drawing represents ............
Aperspective projection
Bthird angle projection
Cfirst angle projection
Doblique projection
Answer is hidden
Question 840 of 1100Ch 10 · Project Planning, Design and Implementation
The side view of given orthographic projection is ............
Aa
Bb
Cc
Dd
Answer is hidden
Question 841 of 1100Ch 10 · Project Planning, Design and Implementation
The top view of given figure is ............
Aa
Bb
Cc
Dd
Answer is hidden
Question 842 of 1100Ch 10 · Project Planning, Design and Implementation
In cash flow diagram, which of the following is true?
ATime 1 is considered to be the end of time period 1
BA vertical arrow pointing up indicates a positive cash flow
CAn arrow pointing downward indicates a negative cash flow
DAll of the above
Answer is hidden
Question 843 of 1100Ch 10 · Project Planning, Design and Implementation
Payback period is counted only after ............
Atendering for the project
Bstarting of the construction of the project
Ccompletion of the construction of the project
Dcommissioning of the project
Answer is hidden
Question 844 of 1100Ch 10 · Project Planning, Design and Implementation
Time value of money indicates that ............
Aa unit of money obtained today is worth more than a unit of money obtained in future
Ba unit of money obtained today is worth less than a unit of money obtained in future
Cthere is no difference in the value of money obtained today and tomorrow
Dnone of the above
Answer is hidden
Question 845 of 1100Ch 10 · Project Planning, Design and Implementation
Pick up the correct statement from the following:
AThe change in the amount of money over a given time period is called 'time value of money', a most important concept in engineering economy
BThe manifestation of the time value of money is termed as interest
CInterest on borrowing = Present amount owed - Original loan
DAll of the above
Answer is hidden
Question 846 of 1100Ch 10 · Project Planning, Design and Implementation
If the nominal rate of interest is 10% per annum and there is quarterly compounding, the effective rate of interest will be ............
A10% per annum
B10.10% per annum
C10.25% per annum
D10.38% per annum
Answer is hidden
Question 847 of 1100Ch 10 · Project Planning, Design and Implementation
How long will it take money to double itself if invested at 5% compounded annually?
A13.7 years
B14.7 years
C14.2 years
D15.3 years
Answer is hidden
Question 848 of 1100Ch 10 · Project Planning, Design and Implementation
Equal payment series sinking fund factor is ............
A(A/F, i, n)
B(F/P, i, n)
C(A/P, i, n)
D(P/A, i, n)
Answer is hidden
Question 849 of 1100Ch 10 · Project Planning, Design and Implementation
In a project equal investment is done on regular basis for replacement of the property, then it is called ............
Afuture investment
Bcapital recovery
Csinking fund
Dall of the above
Answer is hidden
Question 850 of 1100Ch 10 · Project Planning, Design and Implementation
Sinking fund is ............
Athe fund for rebuilding a structure when its economic life is over
Braised to meet maintenance costs
CNPV = 0
Dall of the above
Answer is hidden
Question 851 of 1100Ch 10 · Project Planning, Design and Implementation
The term (1 + i)ⁿ is called ............
Asingle payment discount amount factor
Bsingle payment compound amount factor
Cannual compound amount factor
Dnone of the above
Answer is hidden
Question 852 of 1100Ch 10 · Project Planning, Design and Implementation
What is the expression for the capital recovery amount?
AP [i(1+i)ⁿ / ((1+i)ⁿ - 1)]
BP [(1+i)ⁿ / ((1+i)ⁿ - 1)]
CP [i(1-i)ⁿ / ((1-i)ⁿ - 1)]
DP [(1-i)ⁿ / ((1-i)ⁿ - 1)]
Answer is hidden
Question 853 of 1100Ch 10 · Project Planning, Design and Implementation
If a is the base amount expenditure, b is the increase in the operation cost each year over a period of n years, the total cost of maintenance is ............
Aa + (n-1)b
Ba + x (n-1)b
Ca x (n-1)b
DDiscounted payback
Answer is hidden
Question 854 of 1100Ch 10 · Project Planning, Design and Implementation
Which method is not mostly adopted for selection of project?
APayback
BDiscounted payback
CIRR
DB/C
Answer is hidden
Question 855 of 1100Ch 10 · Project Planning, Design and Implementation
The cash flow is either increasing or decreasing with equal amount every period, the type of series is ............
Auniform payment series
Bgeometric payment series
Clinear gradient series
Dirregular payment series
Answer is hidden
Question 856 of 1100Ch 10 · Project Planning, Design and Implementation
The additional money received from selling one specified level of output is ............
Anormal cost
Bmarginal revenue
Caverage revenue
Dequivalent revenue
Answer is hidden
Question 857 of 1100Ch 10 · Project Planning, Design and Implementation
If production is less than breakeven point, the product will be ............
Alesser than consumption
Bequal to consumption
Cgreater than consumption
Dall of the above
Answer is hidden
Question 858 of 1100Ch 10 · Project Planning, Design and Implementation
The actual profitability of any project is best analyzed from .........
AIRR
BDiscounted payback period
CARR
Dnone of the above
Answer is hidden
Question 859 of 1100Ch 10 · Project Planning, Design and Implementation
The decision rule for project acceptance is that .........
Aif IRR > 0
Bif IRR > MARR
Cif IRR < MARR
Dif IRR = 0
Answer is hidden
Question 860 of 1100Ch 10 · Project Planning, Design and Implementation
Which of the following factors does not depend on the time value of money?
AB/C ratio
BAccounting rate of return
CNPV
DIRR
Answer is hidden
Question 861 of 1100Ch 10 · Project Planning, Design and Implementation
If a seller recovers his capital along with accumulated compensating interest not in one single lump-sum payment but in periodical equal payments, over time ............
Acapital recovery annuity is availed
Bpresent worth annuity is availed
Csinking fund annuity is availed
Dfuture worth annuity is availed
Answer is hidden
Question 862 of 1100Ch 10 · Project Planning, Design and Implementation
Depreciation is charged on ............
Afixed assets
Bcurrent assets
Cboth fixed and current assets
Dnone of the above
Answer is hidden
Question 863 of 1100Ch 10 · Project Planning, Design and Implementation
Which of the following asset generally assumed not to depreciate?
AMachinery
BBuilding
CLand
DAll of the above
Answer is hidden
Question 864 of 1100Ch 10 · Project Planning, Design and Implementation
Under the diminishing balance method, the amount of depreciation is calculated on ............[cite: 15]
Athe written-down value of the asset
Bthe market value of the asset
Cthe original cost of the asset
Dthe expected realizable value of the asset
Answer is hidden
Question 865 of 1100Ch 10 · Project Planning, Design and Implementation
If the percentage fall in quantity demanded is more than the percentage rise in price charged, ............[cite: 15]
Athe revenue will rise
Bthe revenue will fall
Cis not related with discount rate
Dnone of the above
Answer is hidden
Question 866 of 1100Ch 10 · Project Planning, Design and Implementation
The estimated value of depreciable assets after its useful life is called ............[cite: 15]
Aactual value
Breplacement value
Cdisposal (residual) value
Dcurrent value
Answer is hidden
Question 867 of 1100Ch 10 · Project Planning, Design and Implementation
If there is no inflation during a period, then the money cash flow would be equal to ............[cite: 15]
Apresent value
Breal cash flow
Creal cash flow + present value
Dreal cash flow - present value
Answer is hidden
Question 868 of 1100Ch 10 · Project Planning, Design and Implementation
What is the limit of annual income for an unmarried individual upto which only 1% income tax is levied?[cite: 15]
A5 lakhs
B6 lakhs
C5.5 lakhs
D7 lakhs
Answer is hidden
Question 869 of 1100Ch 10 · Project Planning, Design and Implementation
IRR is calculated ............[cite: 15]
Awhen NPV is less than zero
Bwhen NPV more than zero
Cwhen NPV equal to 0
Dwhen NPV equal to MARR
Answer is hidden
Question 870 of 1100Ch 10 · Project Planning, Design and Implementation
The time value of money is primarily related to .........[cite: 15]
Atime and money
Btime and interest
Cmoney and valise
Dinterest and inflation
Answer is hidden
Question 871 of 1100Ch 10 · Project Planning, Design and Implementation
Salvage value is defined as ............[cite: 15]
Avalue of dismantled materials at the end of its utility period
Bestimated value of a built-up property at the end of its useful life without being dismantled
Cvalue of the property shown in the account book in that particular year
Dpresent value of a property considering it to be replaced at the current market rates
Answer is hidden
Question 872 of 1100Ch 10 · Project Planning, Design and Implementation
The minimum value of benefit-cost ratio for the selection of any project should be ............[cite: 15]
Aless than one
Bone
Cgreater than one
Dnone of the above
Answer is hidden
Question 873 of 1100Ch 10 · Project Planning, Design and Implementation
The benefit cost ratio is ............[cite: 15]
Adirectly proportional to discount rate
Binversely proportional to discount rate
Cno array relation with discount rate
Dall of the above
Answer is hidden
Question 874 of 1100Ch 10 · Project Planning, Design and Implementation
The project contractor relies on the cost of the estimate ............[cite: 15]
Afor submission of a competitive bid for a lump-sum contract
Bfor a unit price contract
Cfor preparation of a definitive estimate to help negotiate contract
Dall of the above
Answer is hidden
Question 875 of 1100Ch 10 · Project Planning, Design and Implementation
Both architect and engineer make use of the cost estimate of the project ............[cite: 15]
Afor site selection
Bfor designing of the project
Cfor choosing alternatives
Dall of the above
Answer is hidden
Question 876 of 1100Ch 10 · Project Planning, Design and Implementation
The most unpredictable cost of a project is ............[cite: 15]
Aenvironment management cost
Bunderground construction cost
Ctransportation cost
Dsocial management cost
Answer is hidden
Question 877 of 1100Ch 10 · Project Planning, Design and Implementation
The ratio of current assets to current liabilities is known as ............[cite: 15]
Aliquidity ratio
Bcurrent ratio
Cacid-test (or quick) ratio
Ddebts ratio
Answer is hidden
Question 878 of 1100Ch 10 · Project Planning, Design and Implementation
The more critical (or severe) test of the firm's liquidity can be judged by ............[cite: 15]
Aliquidity ratio
Bcurrent ratio
Cacid-test (or quick) ratio
Ddebts ratio
Answer is hidden
Question 879 of 1100Ch 10 · Project Planning, Design and Implementation
Current assets less inventories divided by current liabilities is known as ............[cite: 15]
Aliquidity ratio
Bcurrent ratio
Cacid-test (or quick) ratio
Ddebts ratio
Answer is hidden
Question 880 of 1100Ch 10 · Project Planning, Design and Implementation
The purchase value of assets over its serviceable life is categorized as ............[cite: 15]
Aappreciated liabilities
Bappreciated assets
Cdepreciation
Dappreciation
Answer is hidden
Question 881 of 1100Ch 10 · Project Planning, Design and Implementation
Excessive spending power of consumers that pulls prices up is called ............[cite: 15]
Ademand-pull inflation
Bcost-pull inflation
Ccost-push inflation
Dcost-push inflation
Answer is hidden
Question 882 of 1100Ch 10 · Project Planning, Design and Implementation
Book value means ............[cite: 15]
Aexpected sale price
Bcurrent market price if purchased now
Cvalue as shown in the books of account
Doriginal acquisition price
Answer is hidden
Question 883 of 1100Ch 10 · Project Planning, Design and Implementation
Pokhara Regional International Airport is an example of ............[cite: 13]
Aloan projects
Bgrant projects
Cprivate sector projects
Dprocess oriented projects
Answer is hidden
Question 884 of 1100Ch 10 · Project Planning, Design and Implementation
The process each manager follows during the life of a project is known as ............[cite: 13]
Aproject management
Bmanager life cycle
Cproject management life cycle
Dall of the mentioned
Answer is hidden
Question 885 of 1100Ch 10 · Project Planning, Design and Implementation
The type of projects in which investment in project is repaid by the government to donors agencies is called ............[cite: 13]
Aprivate sector projects
Bgovernment sector projects
Cgrant projects
Dloan projects
Answer is hidden
Question 886 of 1100Ch 10 · Project Planning, Design and Implementation
Who typically offers financial resources to fund a project?[cite: 13]
ADonor
BSponsor
CProject manager
DStakeholder
Answer is hidden
Question 887 of 1100Ch 10 · Project Planning, Design and Implementation
If part of contract work is assigned to another party, it is called ............[cite: 13]
Asub-contracting
Bjoint venture
Cboth (a) and (b)
Dnone of the above
Answer is hidden
Question 888 of 1100Ch 10 · Project Planning, Design and Implementation
Which of the following is not a phase of project management?[cite: 13]
AProject planning
BProject scheduling
CProject controlling
DProject being
Answer is hidden
Question 889 of 1100Ch 10 · Project Planning, Design and Implementation
The project scope statement furnishes the basis for ............[cite: 13]
Aa way to provide updated information to the accounting department
Bprovides links to the client's functional management groups
Callowing the project to move to the next phase
Dall of the above
Answer is hidden
Question 890 of 1100Ch 10 · Project Planning, Design and Implementation
The main principle of an organization, is ............[cite: 13]
Aunity of command and coherency
Beffective control at all level
Cdelegation of authority
Dall of the above
Answer is hidden
Question 891 of 1100Ch 10 · Project Planning, Design and Implementation
The main advantage of line organization is ............[cite: 13]
Aeffective command and control
Bdefined responsibilities at all levels
Cability to quick decision at all level
Dall of the above
Answer is hidden
Question 892 of 1100Ch 10 · Project Planning, Design and Implementation
Ensuring that performance meets established standards that worker's activities occur as planned and that the organization process is called ............[cite: 13]
Acontrolling
Bplanning
Cleading
Dorganizing
Answer is hidden
Question 893 of 1100Ch 10 · Project Planning, Design and Implementation
In which of the following project phases is the project schedule developed?[cite: 13]
AConceptual
BPlanning
CImplementation
DDesign
Answer is hidden
Question 894 of 1100Ch 10 · Project Planning, Design and Implementation
The process of communication contains four major parts. Which part is the vehicle or method used to convey the message?[cite: 13]
ACommunicator
BMessage
CMedium
DRecipient
Answer is hidden
Question 895 of 1100Ch 10 · Project Planning, Design and Implementation
In bar charts, which colour is used to show the actual progress?[cite: 13]
ARed
BBlack
CBlue
DGreen
Answer is hidden
Question 896 of 1100Ch 10 · Project Planning, Design and Implementation
Which method of project planning was invented first?[cite: 13]
ABar chart
BMilestone chart
CCPM
DPERT
Answer is hidden
Question 897 of 1100Ch 10 · Project Planning, Design and Implementation
CPM is based on ............[cite: 13]
Aprobabilistic
Bdeterministic
Cboth (a) and (b)
Dany of (a) or (b)
Answer is hidden
Question 898 of 1100Ch 10 · Project Planning, Design and Implementation
CPM is the ............[cite: 13]
Aactivity oriented
Bevent oriented
Ctarget oriented
Dtime oriented
Answer is hidden
Question 899 of 1100Ch 10 · Project Planning, Design and Implementation
What is a critical path?[cite: 13]
AIt is a path that operates from the starting node to the end node.
BIt is a mixture of all the paths
CIt is the longest path
DIt is the shortest path
Answer is hidden
Question 900 of 1100Ch 10 · Project Planning, Design and Implementation
What happens when a project is scheduled by CPM?[cite: 13]
AA project is divided into various activities
BRequired time for each activity is established
CA sequence of various activities is made according to their importance
DAll of the above
Answer is hidden
Question 901 of 1100Ch 10 · Project Planning, Design and Implementation
When was CPM method introduced?[cite: 13]
A1880
B1900
C1957
D1958
Answer is hidden
Question 902 of 1100Ch 10 · Project Planning, Design and Implementation
For an activity in a CPM analysis, the early finish time is 13 and the late finish time is 13. Which of the following statements is true?[cite: 13]
AThe early start is 6
BThe duration of the activity is 13
CThe slack of this activity is 13
DThe activity is on the critical path
Answer is hidden
Question 903 of 1100Ch 10 · Project Planning, Design and Implementation
Completion of an activity on CPM network diagram, is generally known ............
Aevent
Bnode
Cconnector
Dall of the above
Answer is hidden
Question 904 of 1100Ch 10 · Project Planning, Design and Implementation
In an AOA (activity on arrow) diagram, what does the arrow represent?
Aevent
Bactivity
Cslack
Dall of the above
Answer is hidden
Question 905 of 1100Ch 10 · Project Planning, Design and Implementation
Which of the following is true about dummy?
AIt doesn't consume resources
BIt doesn't have head and tail event
CIt can be added anywhere in the network
DIt simplifies the network
Answer is hidden
Question 906 of 1100Ch 10 · Project Planning, Design and Implementation
Dummy is used for ............
Agrammatical purpose
Blogical purpose
Cboth (a) and (b)
Dnone of the above
Answer is hidden
Question 907 of 1100Ch 10 · Project Planning, Design and Implementation
Which one of the following is captured in the Work Breakdown Structure (WBS)?
AThe life cycle phases
BThe logical order of tasks
CThe scope of the project
DProject costs
Answer is hidden
Question 908 of 1100Ch 10 · Project Planning, Design and Implementation
In project crashing, rent and overheads are treated as ............
Asignificant cost
Binsignificant costs
Cdirect costs
Dindirect costs
Answer is hidden
Question 909 of 1100Ch 10 · Project Planning, Design and Implementation
Project crashing is the method for ............
Ashortening the project duration by reducing the time of one or more critical activities
Badding resources at critical points
Cdoing technical analysis of the finished work for review
Dadding duration to each activity
Answer is hidden
Question 910 of 1100Ch 10 · Project Planning, Design and Implementation
The time with which direct cost does not reduce with the increase in time is known as ............
Acrash time
Bnormal time
Coptimistic time
Dstandard time
Answer is hidden
Question 911 of 1100Ch 10 · Project Planning, Design and Implementation
The time corresponding to minimum total project cost is ............
Acrash time
Bbetween normal time and crash time
Coptimistic time
Dnormal time
Answer is hidden
Question 912 of 1100Ch 10 · Project Planning, Design and Implementation
Which of the following is a project scheduling method that can be applied to software development?
APERT
BCPM
CCMM
DBoth PERT and CPM
Answer is hidden
Question 913 of 1100Ch 10 · Project Planning, Design and Implementation
PERT (Project Evaluation and Review Technique) analysis is based on ............
Aoptimistic time, pessimistic time and most likely time
Bpessimistic time, optional time, maximum time
Coptimistic time, efficient time, most likely time
Dminimax time, optimistic time and harmonic time
Answer is hidden
Question 914 of 1100Ch 10 · Project Planning, Design and Implementation
The full form of PERT is ............
Aprogram evaluation and rate technology
Bprogram evaluation and robot technique
Cprogram evaluation and robot technology
Dprogram evaluation and review technique
Answer is hidden
Question 915 of 1100Ch 10 · Project Planning, Design and Implementation
What is PERT analysis based on?
AOptimistic time
BPessimistic time
CMost likely time
DAll of the above
Answer is hidden
Question 916 of 1100Ch 10 · Project Planning, Design and Implementation
In PERT (Project Evaluation and Review Technique) method expected time (Te) is ............
ATo + Tp + 4Tm / 6
BTo + Tp + 2Tm / 6
CTo + 4Tp + Tm / 6
DTm + 4Tp + To / 6
Answer is hidden
Question 917 of 1100Ch 10 · Project Planning, Design and Implementation
If PERT network consists of 5 activities with standard deviation of 5, 6, 7, 8, and 9. Then, the standard deviation of the entire project is ............
A255
B7
C√255
D49
Answer is hidden
Question 918 of 1100Ch 10 · Project Planning, Design and Implementation
The shortest possible time in which an activity can be achieved under ideal circumstances is known as ............
Aexpected time estimate
Boptimistic time estimate
Cpessimistic time estimate
Dthe most likely time estimate
Answer is hidden
Question 919 of 1100Ch 10 · Project Planning, Design and Implementation
The relation between jobs of a particular type and various durations they have consumed completion is expressed by curve ............
Anormal distribution curve
Bfrequency distribution
Cdistribution curve
Dnone of the above
Answer is hidden
Question 920 of 1100Ch 10 · Project Planning, Design and Implementation
The optimistic, most likely and pessimistic time estimates of an activity are 6, 8, 10 days, what are the expected time and standard deviation?
A8, 0.5
B8, 2
C6, 0.67
D8, 0.67
Answer is hidden
Question 921 of 1100Ch 10 · Project Planning, Design and Implementation
According to the time estimates made by the PERT planners, the maximum time that would be needed to complete an activity is called as ............
Athe most likely time estimate
Boptimistic time estimate
Cexpected time estimate
Dpessimistic time estimate
Answer is hidden
Question 922 of 1100Ch 10 · Project Planning, Design and Implementation
Which of the options is not a notable challenge while scheduling a project?
ADeadlines exist
BIndependent activities
CToo many workers may be required
DCostly delay
Answer is hidden
Question 923 of 1100Ch 10 · Project Planning, Design and Implementation
In which phase of the project most of the money and manpower are required?[cite: 14]
Ainitiation phase
Bplanning phase
Cexecution phase
Dclosing phase
Answer is hidden
Question 924 of 1100Ch 10 · Project Planning, Design and Implementation
Which is the first stage in a project formulation?[cite: 14]
APlanning
BSetting objectives
CControlling
DEvaluating
Answer is hidden
Question 925 of 1100Ch 10 · Project Planning, Design and Implementation
Which of the following involves continuous betterment in planning and detailing with time?[cite: 14]
AProject enhancement
BProgressive elaboration
CProgressive rehabilitation
DContinuous improvement
Answer is hidden
Question 926 of 1100Ch 10 · Project Planning, Design and Implementation
in resource levelling which of the following is constraint?[cite: 14]
ATime
BMoney
CResources
DBoth time and money
Answer is hidden
Question 927 of 1100Ch 10 · Project Planning, Design and Implementation
Which term describes the utilization of resources in a project without altering the project duration?[cite: 14]
AResource smoothing
BResource leveling
CCritical path method
DFast tracking
Answer is hidden
Question 928 of 1100Ch 10 · Project Planning, Design and Implementation
Resource smoothing is ............[cite: 14]
Aan optimization and economical utilization of resources
Ban adjustment of resources without affecting project duration
Ca gradual increase in resources
Da gradual decrease in resources
Answer is hidden
Question 929 of 1100Ch 10 · Project Planning, Design and Implementation
Cost variance (CV) is which of the following equations?[cite: 14]
ACV - BCWP - ACWP
BCV = BCWP - ACWP
CCV = BCWS
DBoth (a) and (c)
Answer is hidden
Question 930 of 1100Ch 10 · Project Planning, Design and Implementation
A technique for performing quantitative analysis of progress is known as ............[cite: 14]
ABCWS
BEVA
CBAC
DCBSE
Answer is hidden
Question 931 of 1100Ch 10 · Project Planning, Design and Implementation
A schedule performance index (SPI) of 0.76 means ............[cite: 14]
Ayou are over budget
Byou are ahead of schedule
Cyou are only progressing at 76 percent of the rate originally planned
Dyou are only progressing at 24 percent of the rate originally planned
Answer is hidden
Question 932 of 1100Ch 10 · Project Planning, Design and Implementation
A cost performance index (CPI) of 0.89 means ............[cite: 14]
Aat this time, we expect the total project to cost 89 percent more than planned
Bwhen the project is completed we will have spent 89 percent more than planned
Cthe project is only progressing at 89 percent of the rate planned
Dthe project is only getting 89 cents out of every dollar invested
Answer is hidden
Question 933 of 1100Ch 10 · Project Planning, Design and Implementation
Capital budgeting is ............[cite: 14]
Areversible
Bunimportant
Cirreversible
Dall of the above
Answer is hidden
Question 934 of 1100Ch 10 · Project Planning, Design and Implementation
In which of the following cases project is in better shape?[cite: 14]
ABoth CPI and SPI are less than 1
BWhen CPI is more than 1 and SPI is less than one
CWhen CPI is less than one and SPI is more than one
DWhen both CPI and SPI are more than one
Answer is hidden
Question 935 of 1100Ch 10 · Project Planning, Design and Implementation
The budgeted cost for all the activities in a project with the help of Earned Value Method is ............[cite: 14]
Aactual cost
Bbudget at completion
Cbudget for completion
Destimate at completion
Answer is hidden
Question 936 of 1100Ch 10 · Project Planning, Design and Implementation
Cost budgeting can be best described by which of the following?[cite: 14]
AThe process of developing the future trends along with the assessment of probabilities, uncertainties, and inflation that could occur during the project
BDefinitive
COrder of magnitude
DConceptual
Answer is hidden
Question 937 of 1100Ch 10 · Project Planning, Design and Implementation
The technique for establishing and maintaining priorities among the various jobs of a project, is known ............[cite: 14]
Aevent flow scheduling technique
Bcritical ratio scheduling
Cslotting technique for scheduling
Dshort interval scheduling
Answer is hidden
Question 938 of 1100Ch 10 · Project Planning, Design and Implementation
The flow of information through MIS is ............[cite: 14]
Aneed dependent
Borganization dependent
Cinformation dependent
Dmanagement dependent
Answer is hidden
Question 939 of 1100Ch 10 · Project Planning, Design and Implementation
The information of MIS comes from the ............[cite: 14]
Ainternal source
Bexternal source
Cboth internal and external source
Dnone of the above
Answer is hidden
Question 940 of 1100Ch 10 · Project Planning, Design and Implementation
Which of the following is NOT an objective of MIS?[cite: 14]
AFacilitate the decisions-making process
BProvide requisite information at each level of management
CSupport decision-making
DRecruit people for system
Answer is hidden
Question 941 of 1100Ch 10 · Project Planning, Design and Implementation
The back bone of any organization is ............[cite: 14]
Ainformation
Bemployee
Cmanagement
Dcapital
Answer is hidden
Question 942 of 1100Ch 10 · Project Planning, Design and Implementation
Feasibility study determines ............[cite: 14]
Awhether the project is possible with resources
Bcomparing the project with world class manufacturing norms
Ccalculate the cost crashing each unit
Dadd duration to each unit
Answer is hidden
Question 943 of 1100Ch 10 · Project Planning, Design and Implementation
In project management when does planning take place?
ABefore the project
BDuring the project execution
CAt the start of the project
DAfter the project
Answer is hidden
Question 944 of 1100Ch 10 · Project Planning, Design and Implementation
What process involves deciding how to approach and plan the risk management activities for the project?
APerforming qualitative risk analysis
BPlanning risk management
CPerforming quantitative risk analysis
DIdentifying risks
Answer is hidden
Question 945 of 1100Ch 10 · Project Planning, Design and Implementation
Which of the following is not considered as a risk in project management?
ASpecification delays
BProduct competition
CTesting
DStaff turnover
Answer is hidden
Question 946 of 1100Ch 10 · Project Planning, Design and Implementation
Risk event graph is having following on X axis ............[cite: 15]
AGantt chart
Bwork break down structure
Cproject life cycle
Dsplitting
Answer is hidden
Question 947 of 1100Ch 10 · Project Planning, Design and Implementation
Project performance consists of ............[cite: 15]
Atime
Bcost
Cquality
Dall of the above
Answer is hidden
Question 948 of 1100Ch 10 · Project Planning, Design and Implementation
For a financial institution the most important study of a project to be taken for risks management is ............[cite: 15]
Aappraisal
Benvironmental and social
Ctechnical
Dfinancial and economical
Answer is hidden
Question 949 of 1100Ch 10 · Project Planning, Design and Implementation
Project Manager must ensure that it develops appropriate trade offs as ............[cite: 15]
Atime, cost and performance
Bmoney, cost and return on investment
Cmen, materials and machines
Dtime, value and performance
Answer is hidden
Question 950 of 1100Ch 10 · Project Planning, Design and Implementation
Which stage of project management life cycle requires the maximum time of completion ............[cite: 15]
Aconceptualization
Bplanning
Cexecution
Destimation
Answer is hidden
Question 951 of 1100Ch 10 · Project Planning, Design and Implementation
To be successful in a functional organization, the PM must rely on ............[cite: 15]
Areferent power
Bformal authority
Cinformal power structure
Dboth (a) and (c)
Answer is hidden
Question 952 of 1100Ch 10 · Project Planning, Design and Implementation
If employee does wrong in work, employer have to take responsibility of it, this is known ............[cite: 15]
Ajoint liability
Bvicarious liability
Cconcurrent liability
Dall of the above
Answer is hidden
Question 953 of 1100Ch 10 · Project Planning, Design and Implementation
In a payback period method of project evaluation and appraisal the project with ............ equal to cut off period will be accepted.[cite: 15]
Amore than
Bless than
Cpositive
Dnegative
Answer is hidden
Question 954 of 1100Ch 10 · Project Planning, Design and Implementation
Real rate of return is equal to ............[cite: 15]
ANominal rate + Inflation rate
BNominal rate * Inflation rate
CNominal rate - Inflation rate
DNominal rate / Inflation rate
Answer is hidden
Question 955 of 1100Ch 10 · Project Planning, Design and Implementation
The most successful project manager usually ............[cite: 15]
Aworks their way up from assistants in the project office to full-fledged project managers.
Bsupplementing that experience with formal education
Ccomes right from Harvard's MBA program into managing large projects.
Dis considered the technical expert of their field
Answer is hidden
Question 956 of 1100Ch 10 · Project Planning, Design and Implementation
Risk management is one of the most important jobs for a ............[cite: 15]
Aclient
Binvestor
Cproduction team
Dproject manager
Answer is hidden
Question 957 of 1100Ch 10 · Project Planning, Design and Implementation
Risk management is responsibility of the ............[cite: 15]
Acustomer
Binvestor
Cdeveloper
Dproject team
Answer is hidden
Question 958 of 1100Ch 10 · Project Planning, Design and Implementation
Newspaper, magazine, radio, television are examples of ............[cite: 15]
Astoring information
Bretrieving information
Ccommunication information
Dacquiring information
Answer is hidden
Question 959 of 1100Ch 10 · Project Planning, Design and Implementation
Outsourced projects are susceptible to conflicts as ............[cite: 15]
Apeople get less pay in these projects and work is more
Bmore work pressure and less time horizon
Cthese projects are away from home location
Dpeople are unaccustomed to working together and have different values
Answer is hidden
Question 960 of 1100Ch 10 · Project Planning, Design and Implementation
Conflict occurrence in projects is ............[cite: 15]
Aunavoidable
Bdepend on type of project
Cavoidable
Ddepends on culture
Answer is hidden
Question 961 of 1100Ch 10 · Project Planning, Design and Implementation
What assesses the risk and your plans for risk mitigation and revise these when you learn more about the risk?[cite: 15]
ARisk planning
BRisk identification
CRisk monitoring
DRisk analysis
Answer is hidden
Question 962 of 1100Ch 10 · Project Planning, Design and Implementation
Which of the following risk is the failure of a purchased component to perform as expected?[cite: 15]
AProduct risk
BProject risk
CBusiness risk
DProgramming risk
Answer is hidden
Question 963 of 1100Ch 10 · Project Planning, Design and Implementation
Which of the following risks are derived from the organizational environment where the software is being developed?[cite: 15]
APeople risks
BTechnology risks
CEstimation risks
DOrganizational risks
Answer is hidden
Question 964 of 1100Ch 10 · Project Planning, Design and Implementation
Which risk is connected to the circumstance outside the project that may influence the scope of work and the performance of the organization?[cite: 15]
AOperational risk
BFinancial risk
CStrategic risk
DContextual risk
Answer is hidden
Question 965 of 1100Ch 10 · Project Planning, Design and Implementation
Which of the following is not the part of risk control?[cite: 15]
AExecution of the risk response-strategy
BMonitoring of triggering events
CInitiating contingency plans
DNot watching for new risks
Answer is hidden
Question 966 of 1100Ch 10 · Project Planning, Design and Implementation
Which of the following strategies means that the impact of the risk will be reduced?[cite: 15]
AAvoidance strategies
BMinimization strategies
CContingency plans
DAll of the above
Answer is hidden
Question 967 of 1100Ch 10 · Project Planning, Design and Implementation
When do you perform risk identification?[cite: 15]
AAt the beginning of a project
BDuring project planning
CDuring the whole lifetime of a project
DDuring project execution
Answer is hidden
Question 968 of 1100Ch 10 · Project Planning, Design and Implementation
The project manager has the most authority in the ............ type of organization.[cite: 16]
Aproject expediter
Bmatrix
Cprojectized organization
Dfunctional
Answer is hidden
Question 969 of 1100Ch 10 · Project Planning, Design and Implementation
The successful project managers spend most of their time ............[cite: 16]
Aplanning with their personnel
Bplanning with the top management
Ccommunication with the project team
Dstudying project results
Answer is hidden
Question 970 of 1100Ch 10 · Project Planning, Design and Implementation
Which of the following is not project management goal?[cite: 16]
AKeeping overall costs within budget
BDelivering the software to the customer at the agreed time
CMaintaining a happy and well-functioning development team
DAvoiding customer complaints
Answer is hidden
Question 971 of 1100Ch 10 · Project Planning, Design and Implementation
The decision to request an increase the resources for a project is the responsibility of the ............[cite: 16]
Afunctional manager
Bproject manager
Cdirector of project management
Dcustomer
Answer is hidden
Question 972 of 1100Ch 10 · Project Planning, Design and Implementation
Net present value of a machine is ............[cite: 16]
APV of cash inflows less cost of investment
BPV of cash inflows + cost of investment
CPV of net profit after tax less cost of investment
DPV of cash inflows less average cost of investment
Answer is hidden
Question 973 of 1100Ch 10 · Project Planning, Design and Implementation
Capital structure of a company related with ............[cite: 16]
Ashareholders' funds
Blong term debts, preference share capital and equity capital
Cdebentures and loans
Dtotal assets less liabilities
Answer is hidden
Question 974 of 1100Ch 10 · Project Planning, Design and Implementation
A company that issues stocks and bonds to raise funds results in ............[cite: 16]
Adecrease in cash
Bincrease in cash
Cincrease in equity
Dincrease in liabilities
Answer is hidden
Question 975 of 1100Ch 10 · Project Planning, Design and Implementation
The bond issued without any collateral is called ............[cite: 16]
Apreference share
Bequity share
Cdebenture
Ddebt capital
Answer is hidden
Question 976 of 1100Ch 10 · Project Planning, Design and Implementation
Debenture is ............[cite: 16]
Aunsecured bond
Bbond without collateral
Csource of capital budgeting
Dall of the above
Answer is hidden
Question 977 of 1100Ch 10 · Project Planning, Design and Implementation
A debenture ............[cite: 16]
Ais a long-term loan
Bdoes not require security
Cis a short-term loan
Dreceives dividend payments
Answer is hidden
Question 978 of 1100Ch 10 · Project Planning, Design and Implementation
Which of the following is unsafe share?[cite: 16]
APreference shares
BPrimary shares
CDebentures
DAll of the above
Answer is hidden
Question 979 of 1100Ch 10 · Project Planning, Design and Implementation
The average cost incurred in supplying a particular benefit over the entire life time of the project is called ............[cite: 16]
Aproject cost
Baverage life cycle cost
Cmaintenance cost
Dall of the above
Answer is hidden
Question 980 of 1100Ch 10 · Project Planning, Design and Implementation
The profit of the company is shared in form of dividend but has no voting rights in ............[cite: 16]
Aequity share
BPreference share
Cordinary share
Dnone of the above
Answer is hidden
Question 981 of 1100Ch 10 · Project Planning, Design and Implementation
Point out the false statements ............[cite: 16]
Aa firm can buy its own debentures and shares
Ba company can issue convertible debentures
Ctender assessment
Dcontract assessment
Answer is hidden
Question 982 of 1100Ch 10 · Project Planning, Design and Implementation
If two parties enter into an agreement for performing or not performing any work, then it is known as ............[cite: 16]
Acontract
Btender
Cprocurement
Dadjudication
Answer is hidden
Question 983 of 1100Ch 10 · Project Planning, Design and Implementation
The procurement of works, goods or services by the entity itself is called ............[cite: 16]
Aforce account
Bdirect procurement
Cseal quotation
Dnone of the above
Answer is hidden
Question 984 of 1100Ch 10 · Project Planning, Design and Implementation
For the formation of user's committee, members are selected ............[cite: 16]
Aamong the people of whole district
Bamong the beneficiaries of the project
Cby nomination by the chief district officer of the district
Dnone of the above
Answer is hidden
Question 985 of 1100Ch 10 · Project Planning, Design and Implementation
The project usually completed by user committee's are ............[cite: 16]
Alabor intensive projects
Bcapital intensive projects
Cboth (a) and (b)
Dnone of the above
Answer is hidden
Question 986 of 1100Ch 10 · Project Planning, Design and Implementation
The projects can be carried out out by user committee with cost estimate upto ............[cite: 16]
A10 Millions
B20 Millions
C50 Millions
D500 Millions
Answer is hidden
Question 987 of 1100Ch 10 · Project Planning, Design and Implementation
For procurement of works upto 2 million, buy which of the following method is to be considered?[cite: 16]
Asealed tender
Bby direct negotiation
Cby bidding
Dby direct labor or direct negotiation
Answer is hidden
Question 988 of 1100Ch 10 · Project Planning, Design and Implementation
The bid validity period for bid having estimated cost upto 100 million is ............[cite: 17]
A45 days
B60 days
C90 days
D105 days
Answer is hidden
Question 989 of 1100Ch 10 · Project Planning, Design and Implementation
In project management, what percentage of the total project cost is typically estimated for office management expenses?[cite: 17]
A2.5%
B4%
C10%
D12%
Answer is hidden
Question 990 of 1100Ch 10 · Project Planning, Design and Implementation
Nepal Government handed over the fast-track project to Nepal Army. After handing in, what type of contract was it?[cite: 17]
ABOT
BBOOT
Cbuild and design
Dbuild, design, procurement, subcontracting and all works
Answer is hidden
Question 991 of 1100Ch 10 · Project Planning, Design and Implementation
The relation between contract and agreement is ............[cite: 17]
Asynonym
Baptonym
Call contract are agreement but all agreement are not contract
Dall agreement are contract but not all contract are agreement
Answer is hidden
Question 992 of 1100Ch 10 · Project Planning, Design and Implementation
The ultimate method of resolving any dispute with a contractor is ............[cite: 17]
Anegotiation
Bmediation
Carbitration
Dlitigation
Answer is hidden
Question 993 of 1100Ch 10 · Project Planning, Design and Implementation
The damages caused due to delay in work are termed as ............[cite: 17]
Aliquidated damage
Bunliquidated damage
Cdirect damages
Dtangible damages
Answer is hidden
Question 994 of 1100Ch 10 · Project Planning, Design and Implementation
Technical proposal during tendering is included in ............[cite: 17]
Asingle stage single envelope system
Bsingle stage double envelope system
Cdouble stage single envelope system
Ddouble stage double envelope system
Answer is hidden
Question 995 of 1100Ch 10 · Project Planning, Design and Implementation
The aim of ............ is to do whatever possible to avoid any kind of harm or accident.[cite: 13]
Aminimalist
Breasonable care
Cbeyond one's duty
Dnone of the above
Answer is hidden
Question 996 of 1100Ch 10 · Project Planning, Design and Implementation
It is important to be at work ............ every day and on time unless you are sick or have a family emergency.[cite: 13]
Aappearance
Battendance
Cattitude
Drespect
Answer is hidden
Question 997 of 1100Ch 10 · Project Planning, Design and Implementation
............ is the rules and standards that govern the decisions and actions of an engineer as a professional.[cite: 13]
ADoctor in Ethics
BDoctor in Ethics
CEthics
DEngineering Ethics
Answer is hidden
Question 998 of 1100Ch 10 · Project Planning, Design and Implementation
............ can help engineers make correct decisions and become better professionals.[cite: 13]
AStudy of English
BStudy of Math
CStudy of Ethics
DNone of the above
Answer is hidden
Question 999 of 1100Ch 10 · Project Planning, Design and Implementation
One of the most important issues faced by the world is that ............[cite: 13]
Acomputer ethics
Bconfidentiality
Cenvironmental deterioration
Dconflict of interest
Answer is hidden
Question 1000 of 1100Ch 10 · Project Planning, Design and Implementation
The prime responsibility of any professional is ............[cite: 13]
Aconfidentiality
Bconflict of interest
Cenvironmental ethics
Dcomputer ethics
Answer is hidden
Question 1001 of 1100Ch 10 · Project Planning, Design and Implementation
Which one does fall under computer ethics?[cite: 13]
AComputers can be used for robbery, crime and blackmailing others
BHacking is used to access private information
CLeak of such information of individual leads to harassments in terms of repeated phone calls
DAll of the above
Answer is hidden
Question 1002 of 1100Ch 10 · Project Planning, Design and Implementation
Fundamental principle of professional engineering ethics is ............[cite: 13]
Auploading and advancing engineering profession
Bmaintain high level of ethical conduct
Cboth (a) and (b)
Dnone of the above
Answer is hidden
Question 1003 of 1100Ch 10 · Project Planning, Design and Implementation
Engineering profession needs cooperation with the profession of ............[cite: 13]
Amedical professional
Baccountant
Clawyer
Dall of the above
Answer is hidden
Question 1004 of 1100Ch 10 · Project Planning, Design and Implementation
Professionalism of engineers is lost due to ............[cite: 13]
Ahonesty
Bdignity
Cbribery
Ddiscipline
Answer is hidden
Question 1005 of 1100Ch 10 · Project Planning, Design and Implementation
For the fulfillment of his/her professional duties engineer should ............[cite: 13]
Aparamount the health of the public
Bparamount the safety of the public
Cwelfare of the public
Dall of the above
Answer is hidden
Question 1006 of 1100Ch 10 · Project Planning, Design and Implementation
Engineer shall act in such a manner as to uphold and enhance the honor and dignity of engineering profession and shall act with ............ for bribery, fraud and corruption.[cite: 13]
Atolerance
Ba penchant
Ca predilection
Dzero tolerance
Answer is hidden
Question 1007 of 1100Ch 10 · Project Planning, Design and Implementation
Engineers shall build their professional reputation on the ............ of their services and shall not compete unfairly with others.[cite: 13]
Apublicity
Bbasis
Cmerit
Dreputation
Answer is hidden
Question 1008 of 1100Ch 10 · Project Planning, Design and Implementation
Engineers shall not disclose, without ............ confidential information coming the business affairs of technical process of any present or former or employer, or public body on which they serve.[cite: 13]
Aediting
Bgetting paid
Cremuneration
Dconsent
Answer is hidden
Question 1009 of 1100Ch 10 · Project Planning, Design and Implementation
Which of the following is not a characteristic of a profession?[cite: 13]
Ait enjoys a high level of public trust and confidence
Bit is organized into associations
Cthere are published authoritative performance and ethical standards
DAll of the above are characteristics of a profession
Answer is hidden
Question 1010 of 1100Ch 10 · Project Planning, Design and Implementation
............ skills such as writing, speaking and body language are important work ethics so that you can be clear in your messages to others.[cite: 13]
ACommunication
BCooperation
CHonesty
DIntegrity
Answer is hidden
Question 1011 of 1100Ch 10 · Project Planning, Design and Implementation
You are a person with a high level of ............ if you stand by your values even if others put pressure on you to do something that is wrong or if they make fun of you.[cite: 13]
Acommunication
Bcooperation
Chonesty
Dintegrity
Answer is hidden
Question 1012 of 1100Ch 10 · Project Planning, Design and Implementation
If you don't have ............ you can really get in trouble for lying, cheating or deceiving others.[cite: 13]
Acommunication
Bcooperation
Chonesty
Dintegrity
Answer is hidden
Question 1013 of 1100Ch 10 · Project Planning, Design and Implementation
If you have ............ you will be a trusted person because they will see that you are committed to your company.[cite: 13]
Acommunication
Borganizational skills
Cloyalty
Drespect
Answer is hidden
Question 1014 of 1100Ch 10 · Project Planning, Design and Implementation
Which of the following an engineer should not follow?[cite: 13]
AAct as faithful agent for client
BAccept compensation from more than one party for same service without the consent of all
CIndicate client the adverse consequences if judgment is over ruled
DUndertake only these assignments for which he is qualified
Answer is hidden
Question 1015 of 1100Ch 10 · Project Planning, Design and Implementation
is based on personal belief, values and individual's conscience rather than reasoning.[cite: 13]
AMoral
BEthics
CBoth (a) and (b)
DNone of the above
Answer is hidden
Question 1016 of 1100Ch 10 · Project Planning, Design and Implementation
If you can keep things at work in order and have a neat workplace, then you have great ............[cite: 13]
Aproductivity
Bcooperate
Corganizational skills
Drespect
Answer is hidden
Question 1017 of 1100Ch 10 · Project Planning, Design and Implementation
It is always important to ............ yourself, others and the place where you work because you don't always agree with them.[cite: 13]
Aappearance
Bcooperate
Ccommunicate
Drespect
Answer is hidden
Question 1018 of 1100Ch 10 · Project Planning, Design and Implementation
Some jobs cannot be done alone and some can be done much better and faster if you possess the quality of ............[cite: 13]
Ahonesty
Bcooperation
Cteamwork
Dintegrity
Answer is hidden
Question 1019 of 1100Ch 10 · Project Planning, Design and Implementation
Strong ............ means you have a high sense of moral and ethical behavior that earns respect of others.[cite: 13]
Aresponsibility
Brespect
Cconfidence
Dcharacter
Answer is hidden
Question 1020 of 1100Ch 10 · Project Planning, Design and Implementation
A personality measure of the strength of a person's convictions is called ............[cite: 13]
Alocus of control
Battitude
Cego strength
Dnone of the above
Answer is hidden
Question 1021 of 1100Ch 10 · Project Planning, Design and Implementation
In ............ a professional assumes full responsibilities and if anything wrong happens he/she sees their own responsibility.[cite: 13]
Aminimalist
Breasonable care
Cbeyond one's duty
Dnone of the above
Answer is hidden
Question 1022 of 1100Ch 10 · Project Planning, Design and Implementation
moves beyond the minimal view's concern.[cite: 13]
AMinimalist
BBeyond one's duty
CReasonable care
DNone of the above
Answer is hidden
Question 1023 of 1100Ch 10 · Project Planning, Design and Implementation
Which of the following is not concerned with the authority of engineers?[cite: 14]
AExpress an opinion on engineering matter
BGood behavior with client
CConscious with his profession
DDivulge the confidential matter
Answer is hidden
Question 1024 of 1100Ch 10 · Project Planning, Design and Implementation
Which of the following is not considered a professional quality of an engineer?[cite: 14]
AGood behavior with clients
BHonesty
CBias towards political parties
DStrong technical skills
Answer is hidden
Question 1025 of 1100Ch 10 · Project Planning, Design and Implementation
The environment which has been modified by human activities is called ............[cite: 14]
AAir pollution
BSoil pollution
CSoil erosion
DWater pollution
Answer is hidden
Question 1026 of 1100Ch 10 · Project Planning, Design and Implementation
The environment which has been modified by human activities is called ............[cite: 14]
Anatural environment
Banthropogenic environment
Cmodern environment
Durban environment
Answer is hidden
Question 1027 of 1100Ch 10 · Project Planning, Design and Implementation
Is the effect of undesirable changes in our surroundings that have harmful effects on plants, animals and human beings.[cite: 14]
APollution
BDegradation
CDeforestation
DClimate change
Answer is hidden
Question 1028 of 1100Ch 10 · Project Planning, Design and Implementation
Development that meets the needs of the present without compromising the ability of future generations to meet their own needs.[cite: 14]
ASustainable development
BHuman development
CEconomic development
DSocial development
Answer is hidden
Question 1029 of 1100Ch 10 · Project Planning, Design and Implementation
According to labor act, employers must conduct periodic health and safety inspections and maintain records of these inspections.[cite: 14]
AAt least once in a year
BAt least twice in a year
CAt least thrice in a year
DAt least 4 times in a year
Answer is hidden
Question 1030 of 1100Ch 10 · Project Planning, Design and Implementation
According to Labor Act, the remuneration for over time is ............[cite: 14]
A2 times the regular pay
B1.75 times the regular pay
C1.5 times the regular pay
D1.25 times the regular pay
Answer is hidden
Question 1031 of 1100Ch 10 · Project Planning, Design and Implementation
The government of Nepal has enforced concepts of occupational safety and health through its ............[cite: 14]
ALabor Act 1992
BLabor Act 1994
CLabor Act 1995
DLabor Act 1995
Answer is hidden
Question 1032 of 1100Ch 10 · Project Planning, Design and Implementation
Engineers day is celebrated on ............[cite: 14]
AShrawan 3
BShrawan 4
CAsar 3
DAsar 4
Answer is hidden
Question 1033 of 1100Ch 10 · Project Planning, Design and Implementation
As per labor law, workers are not allowed to work continuously for more than ............[cite: 14]
A3 hours
B5 hours
C8 hours
D12 hours
Answer is hidden
Question 1034 of 1100Ch 10 · Project Planning, Design and Implementation
According to labors act, the maximum working hour for a labor per week should be ............[cite: 14]
A42 hrs
B45 hrs
C48 hrs
D53 hrs
Answer is hidden
Question 1035 of 1100Ch 10 · Project Planning, Design and Implementation
As per labor law, how many hours workers are allowed to work in a day?[cite: 14]
A3 hours
B5 hours
C8 hours
D12 hours
Answer is hidden
Question 1036 of 1100Ch 10 · Project Planning, Design and Implementation
Nepal engineer's association is ............[cite: 14]
Agovernment body to support NEC
Bindependent organization of Nepalese engineers
Cprivate body which works for betterment of engineers
Dnon-government organization
Answer is hidden
Question 1037 of 1100Ch 10 · Project Planning, Design and Implementation
Nepal engineers association was established in ............ B.S.[cite: 14]
A2010
B2019
C2024
D2034
Answer is hidden
Question 1038 of 1100Ch 10 · Project Planning, Design and Implementation
NEA is registered under the ............[cite: 14]
ASocial Service Act
BNEC Act
CCivil Service Act
DCo-operatives Act
Answer is hidden
Question 1039 of 1100Ch 10 · Project Planning, Design and Implementation
The objectives of NEA are ............[cite: 14]
ATo promote development of the engineering science and technology in Nepal.
BTo promote fellowship goodwill and cooperation assistance among the Nepalese engineers and safeguard their rights and interests.
CBy utilizing, to the highest extent possible, the participation of the positional of the national engineering manpower of the country in the national development activities of Nepal, make effort towards ending foreign dependency in this regard
DAll of the above
Answer is hidden
Question 1040 of 1100Ch 10 · Project Planning, Design and Implementation
NEA is governed by an elected executive council of ............ members.[cite: 14]
A25
B18
C21
D17
Answer is hidden
Question 1041 of 1100Ch 10 · Project Planning, Design and Implementation
The number of executive members in NEA's Provincial committee is ............[cite: 14]
A25 and 15
B21 and 15
C15 and 25
D25 and 16
Answer is hidden
Question 1042 of 1100Ch 10 · Project Planning, Design and Implementation
The number of member directly elected for council from Nepal engineering association ............[cite: 14]
A7
B21
C25
D10
Answer is hidden
Question 1043 of 1100Ch 10 · Project Planning, Design and Implementation
The types of membership issued by NEA are ............[cite: 14]
Ageneral membership
Blife time membership
Cboth of the above
Dnone of the above
Answer is hidden
Question 1044 of 1100Ch 10 · Project Planning, Design and Implementation
NEA is ............ of Nepalese engineers.[cite: 14]
Aindependent nonprofit organization
Bprofitable organization
Cbroker organization
Dall of the above
Answer is hidden
Question 1045 of 1100Ch 10 · Project Planning, Design and Implementation
Which is not a professional engineering body?[cite: 14]
ANepal Engineering Association (NEA)
BSociety of Electrical and Electronics Engineers Association (SEEN)
CSociety of Public Health Engineers Nepal (SOPHEN)
DSociety of Consulting Architectural and Engineering Firms (SCAEF)
Answer is hidden
Question 1046 of 1100Ch 10 · Project Planning, Design and Implementation
CAAN, NEC, NTA, etc. are examples of ............[cite: 14]
Aregulatory body
Bcommercial sectors
CNGOs
DINGOs
Answer is hidden
Question 1047 of 1100Ch 10 · Project Planning, Design and Implementation
How many categories of NEA memberships are there?[cite: 14]
A4
B5
C7
D2
Answer is hidden
Question 1048 of 1100Ch 10 · Project Planning, Design and Implementation
What is the tenure of an executive member of NEA?[cite: 14]
A4 year
B2-year
C3 year
D1 year
Answer is hidden
Question 1049 of 1100Ch 10 · Project Planning, Design and Implementation
Nepal engineering council is an autonomous in under NEC act ............
A2056 B.S.
B2055 B.S.
C2054 B.S.
D2060 B.S.
Answer is hidden
Question 1050 of 1100Ch 10 · Project Planning, Design and Implementation
Nepal Engineering Council [NEC] is ............
Agovernment and autonomous body
Bprivate body
Cnon-profit organization
Dgovernment body
Answer is hidden
Question 1051 of 1100Ch 10 · Project Planning, Design and Implementation
Which of the following is not the function of NEC?
APrepare and implement the policy, plan and programmes
BRecognize the academic institutions
COpening the college
DTo prescribe the basic conditions of student admission
Answer is hidden
Question 1052 of 1100Ch 10 · Project Planning, Design and Implementation
Which one is not concerned with the NEC?
AAccreditation of academic certificate
BAppointment of teacher
CAuthority of opening engineering garage
DAll of the above
Answer is hidden
Question 1053 of 1100Ch 10 · Project Planning, Design and Implementation
When was Nepal engineering council established?
A2054 B.S.
B2055 B.S.
C2056 B.S.
D2057 B.S.
Answer is hidden
Question 1054 of 1100Ch 10 · Project Planning, Design and Implementation
NEC contacts the GoN through ministry of ............
Afinance
Bphysical infrastructure and transportation
Chome affairs
Dlocal development
Answer is hidden
Question 1055 of 1100Ch 10 · Project Planning, Design and Implementation
The decisions of NEC are authenticated by ............
Apresident
Bvice president
Cregistrar
Dmember nominated by president
Answer is hidden
Question 1056 of 1100Ch 10 · Project Planning, Design and Implementation
NEC does not approach for ............
Aengineer
Boverseer to engineer
Cminimum degree BE
Dall of the above
Answer is hidden
Question 1057 of 1100Ch 10 · Project Planning, Design and Implementation
The number of section in NEC act 2055 is ............
A18
B28
C38
D48
Answer is hidden
Question 1058 of 1100Ch 10 · Project Planning, Design and Implementation
The academic qualification of the chief of NEC is ............
Amaster's degree in engineering
Bmaster's degree in economics
Cmaster's degree in finance
Dbachelor's degree in engineering in engineering
Answer is hidden
Question 1059 of 1100Ch 10 · Project Planning, Design and Implementation
The general experience required for nomination of chairperson of NEC is ............
A10 yrs
B15 yrs
C20 yrs
D25 yrs
Answer is hidden
Question 1060 of 1100Ch 10 · Project Planning, Design and Implementation
What is the requirement for being chairman of NEC?
ABachelor Degree and Engineering experience of 10 years
BBachelor Degree and Engineering experience of 15 years
CMaster Degree and Engineering experience of 15 years
DMaster Degree and Engineering experience of 10 years
Answer is hidden
Question 1061 of 1100Ch 10 · Project Planning, Design and Implementation
Who appoints the chairman of NEC?
AThe Government of Nepal
BThe President of Nepal
CMinistry of home affairs
DThe supreme court
Answer is hidden
Question 1062 of 1100Ch 10 · Project Planning, Design and Implementation
Who is the first president of NEC?
AEr. Shiv Mangal Giri
BProf. Dr. Padam Bahadur Shahi
CEr. Ram Babusharma
DNone of the above
Answer is hidden
Question 1063 of 1100Ch 10 · Project Planning, Design and Implementation
What is the minimum qualification of vice president of the NEC?
AMasters in Engineering and 15 years' experience
BBachelors in Engineering and 15 years' experience
CMasters in Engineering and 10 years experience
DBachelors in Engineering and 10 years experience
Answer is hidden
Question 1064 of 1100Ch 10 · Project Planning, Design and Implementation
An American engineer willing to work in Nepal may apply for registration under ............[cite: 16]
ACategory A
BCategory B
CCategory C
DCategory D
Answer is hidden
Question 1065 of 1100Ch 10 · Project Planning, Design and Implementation
Which of the following category of engineer is not mention in engineering council rule?[cite: 16]
ACharted engineer
BProfessional engineer
CGeneral engineer
DAll of the above
Answer is hidden
Question 1066 of 1100Ch 10 · Project Planning, Design and Implementation
Book of foreign engineers is maintained in ............[cite: 16]
ANepali
BEnglish
Cboth (a) and (b)
Dnone of the above
Answer is hidden
Question 1067 of 1100Ch 10 · Project Planning, Design and Implementation
NEC publishes the name of registered engineers each year as well as every fourth year. The name of foreigner engineers publishes ............[cite: 16]
Aeach year
Bevery fourth year
Cboth (a) and (b)
Dnone of the above
Answer is hidden
Question 1068 of 1100Ch 10 · Project Planning, Design and Implementation
NEC has classified an engineers in to ............ categories.[cite: 16]
A2
B3
C4
D5
Answer is hidden
Question 1069 of 1100Ch 10 · Project Planning, Design and Implementation
Registration charge of general engineers for students studied in foreign universities is ............[cite: 16]
ARs. 3000
BRs. 4000
CRs. 10000
DRs. 15000
Answer is hidden
Question 1070 of 1100Ch 10 · Project Planning, Design and Implementation
Total number of registration category of engineer in NEC is ............[cite: 16]
A3
B4
C5
D6
Answer is hidden
Question 1071 of 1100Ch 10 · Project Planning, Design and Implementation
The min qualification required for engineer practices in Nepal is ............[cite: 16]
ABE
BBE + register in NEC
CME
DME + register in NEC
Answer is hidden
Question 1072 of 1100Ch 10 · Project Planning, Design and Implementation
The interval of surveillance of colleges registered under NEC is ............[cite: 16]
Aevery 2 years
Bonce in every 3 years
Ctwice in 4 years
Dthrice in every 5 years
Answer is hidden
Question 1073 of 1100Ch 10 · Project Planning, Design and Implementation
In general, Nepal engineering council meeting per year should be held ............[cite: 16]
A2 times
B3 times
C4 times
D5 times
Answer is hidden
Question 1074 of 1100Ch 10 · Project Planning, Design and Implementation
Minimum .......... of the members should be present in a meeting to fulfil the quorum of NEC.[cite: 16]
A0.25
B0.5
C0.75
D1
Answer is hidden
Question 1075 of 1100Ch 10 · Project Planning, Design and Implementation
If a motion submitted to a meeting of council to remove the name from the book on charge of violating professional code of conduct is passed by ............ majority of council, the name of the engineer is removed from the book.[cite: 16]
Atwo third
Bgeneral
Cthree - fourth
Dfull
Answer is hidden
Question 1076 of 1100Ch 10 · Project Planning, Design and Implementation
Which of the following reasons caused desolution of NEC by GON?[cite: 16]
ACommittee of NEC work against the act and regulations
B50% of the member are bankrupt
CCollege recognition is given without fulfilling the criteria of NEC regulations
DFormation of new government of Nepal
Answer is hidden
Question 1077 of 1100Ch 10 · Project Planning, Design and Implementation
The minimum time period allocated by GoN for formation of new council after the dissolution of current NEC like is ............[cite: 16]
A3 months
B6 months
C9 months
D1 year
Answer is hidden
Question 1078 of 1100Ch 10 · Project Planning, Design and Implementation
For temporary affiliation, the supervision of college conducted by NEC for ............[cite: 16]
Aone time in a year
Bonce in two year
Ctwice times in a year
Dthree times a year
Answer is hidden
Question 1079 of 1100Ch 10 · Project Planning, Design and Implementation
For permanent affiliation, the supervision of college conducted by NEC for ............[cite: 16]
Aone time in a year
Bonce in two year
Ctwice times in a year
Dthree times a year
Answer is hidden
Question 1080 of 1100Ch 10 · Project Planning, Design and Implementation
How much % college should score at least in average to get permanent affiliation for new college from NEC?[cite: 16]