Chapter 10 · MCQ Read Mode

Project Planning, Design and Implementation

AALL10·398 Total MCQs
Question 1 of 398Engineering Drawings and Their Concepts

The area of an A0 drawing sheet is:

A0.25 m²
B1 m²
C2 m²
D0.5 m²
Answer is hidden
Question 2 of 398Engineering Drawings and Their Concepts

The size of an A4 sheet is:

A148 × 210 mm
B297 × 420 mm
C420 × 594 mm
D210 × 297 mm
Answer is hidden
Question 3 of 398Engineering Drawings and Their Concepts

The title block of a drawing sheet is normally placed at the:

ACentre of the sheet
BTop-right corner
CTop-left corner
DBottom-right corner
Answer is hidden
Question 4 of 398Engineering Drawings and Their Concepts

In the unidirectional system of dimensioning, dimension figures are:

ARead from the right side only
BAll read from the bottom of the sheet
CPlaced inside the object always
DParallel to the dimension lines
Answer is hidden
Question 5 of 398Engineering Drawings and Their Concepts

A drawing made to a scale of 1 : 50 has a representative fraction of:

A50
B5/1
C1/50
D1/5
Answer is hidden
Question 6 of 398Engineering Drawings and Their Concepts

A scale that can show three units such as metre, decimetre and centimetre is a:

AScale of chords
BComparative scale
CPlain scale
DDiagonal scale
Answer is hidden
Question 7 of 398Engineering Drawings and Their Concepts

In first-angle projection, the top view is placed:

ABelow the front view
BBehind the front view
CAbove the front view
DTo the left of the front view
Answer is hidden
Question 8 of 398Engineering Drawings and Their Concepts

The true shape of an inclined surface is obtained from a/an:

APerspective view
BIsometric view
CAuxiliary view
DFront view
Answer is hidden
Question 9 of 398Engineering Drawings and Their Concepts

In isometric projection, lengths along the isometric axes are reduced to about:

A50% of true length
B82% of true length
C70.7% of true length
D100% of true length
Answer is hidden
Question 10 of 398Engineering Drawings and Their Concepts

The angle between any two isometric axes is:

A30°
B120°
C90°
D45°
Answer is hidden
Question 11 of 398Engineering Drawings and Their Concepts

In cabinet oblique projection, the receding lines are drawn:

ATo full scale
BConverging to a vanishing point
CTo half scale
DTo isometric scale
Answer is hidden
Question 12 of 398Engineering Drawings and Their Concepts

Which of the following is NOT sectioned (hatched) when cut along its axis?

ACasting body
BHub of a pulley
CShaft
DFlange of a coupling
Answer is hidden
Question 13 of 398Engineering Economics

Rs 10,000 is deposited at 10% compound interest per year. Its value after 2 years is:

ARs 12,210
BRs 12,000
CRs 12,100
DRs 11,000
Answer is hidden
Question 14 of 398Engineering Economics

The effective annual interest rate for 12% per year compounded monthly is about:

A12%
B1%
C12.68%
D13.5%
Answer is hidden
Question 15 of 398Engineering Economics

The factor used to find the equal annual payment needed to repay a present loan is the:

ACompound amount factor (F/P)
BCapital recovery factor (A/P)
CSinking fund factor (A/F)
DPresent worth factor (P/F)
Answer is hidden
Question 16 of 398Engineering Economics

The present worth of a perpetual annual income of Rs 1,000 at 10% interest is:

AInfinite
BRs 100
CRs 1,000
DRs 10,000
Answer is hidden
Question 17 of 398Engineering Economics

A project is economically acceptable by the NPV method when:

ANPV ≥ 0 at the MARR
BNPV is negative
CIRR is less than MARR
DNPV equals the initial investment
Answer is hidden
Question 18 of 398Engineering Economics

The internal rate of return is the discount rate at which:

ANPV is maximum
BNPV equals zero
CB/C ratio equals zero
DPayback is minimum
Answer is hidden
Question 19 of 398Engineering Economics

Compared with the simple payback period, the discounted payback period:

AIs always shorter
BConsiders cash flows after payback
CConsiders the time value of money
DIgnores all cash flows
Answer is hidden
Question 20 of 398Engineering Economics

MARR is best described as:

AThe inflation rate only
BThe minimum acceptable rate of return set by the investor
CThe rate at which NPV is maximum
DThe maximum rate charged by banks
Answer is hidden
Question 21 of 398Engineering Economics

For comparing alternatives with unequal lives, the most convenient method is:

AAnnual worth (equivalent uniform annual) method
BComparing first costs only
CSimple payback
DComparing total undiscounted costs
Answer is hidden
Question 22 of 398Engineering Economics

A machine costs Rs 60,000 with salvage Rs 10,000 after 5 years. Straight-line annual depreciation is:

ARs 12,000
BRs 50,000
CRs 10,000
DRs 14,000
Answer is hidden
Question 23 of 398Engineering Economics

The standard rate of Value Added Tax in Nepal is:

A15%
B10%
C13%
D18%
Answer is hidden
Question 24 of 398Engineering Economics

Under Nepal's Income Tax Act 2058, depreciation of assets is calculated using:

ASinking fund method
BPool-based declining balance method
COnly straight-line method
DUnits-of-production method only
Answer is hidden
Question 25 of 398Project Planning and Scheduling

A project is best defined as:

AA permanent organisation
BAny repetitive production activity
CA continuous routine operation
DA temporary endeavour undertaken to create a unique product, service or result
Answer is hidden
Question 26 of 398Project Planning and Scheduling

The phase of the project life cycle in which the feasibility study is carried out is:

AExecution phase
BInitiation/concept phase
CMonitoring phase
DClosure phase
Answer is hidden
Question 27 of 398Project Planning and Scheduling

The hierarchical decomposition of the total project scope into work packages is called:

ALogical framework
BGantt chart
CCritical path
DWork Breakdown Structure (WBS)
Answer is hidden
Question 28 of 398Project Planning and Scheduling

A major limitation of a bar (Gantt) chart is that it:

ADoes not clearly show interdependencies between activities
BCannot show activity durations
CIs difficult to understand
DCannot show a time scale
Answer is hidden
Question 29 of 398Project Planning and Scheduling

In an activity-on-arrow network, a dummy activity:

AHas zero duration and shows logical dependency only
BConsumes resources
CIs always on the critical path
DHas the longest duration
Answer is hidden
Question 30 of 398Project Planning and Scheduling

The critical path of a project network is the:

APath with maximum float
BShortest path through the network
CLongest path, with zero total float
DPath with the most activities
Answer is hidden
Question 31 of 398Project Planning and Scheduling

An activity has ES = 5, EF = 9, LS = 8, LF = 12. Its total float is:

A0
B7
C3
D4
Answer is hidden
Question 32 of 398Project Planning and Scheduling

In PERT, with to = 2, tm = 5 and tp = 14 days, the expected time is:

A21 days
B5 days
C6 days
D7 days
Answer is hidden
Question 33 of 398Project Planning and Scheduling

PERT is most suitable for:

AMass production lines
BRepetitive construction with known durations
CResearch and development projects with uncertain durations
DRoutine maintenance only
Answer is hidden
Question 34 of 398Project Planning and Scheduling

While crashing a project, the activity crashed first is the critical activity with the:

ALowest cost slope
BLongest duration
CMaximum float
DHighest cost slope
Answer is hidden
Question 35 of 398Project Planning and Scheduling

Rescheduling activities within their available float without changing the project completion date is called:

AFast-tracking
BResource smoothing
CCrashing
DResource levelling
Answer is hidden
Question 36 of 398Project Planning and Scheduling

In earned value management, a cost performance index (CPI) of 0.8 means the project is:

AAhead of schedule
BOver budget
CUnder budget
DExactly on budget
Answer is hidden
Question 37 of 398Project Management

The number of communication channels among 6 stakeholders is:

A30
B36
C6
D15
Answer is hidden
Question 38 of 398Project Management

Buying insurance against a project risk is an example of risk:

AAvoidance
BTransfer
CMitigation
DAcceptance
Answer is hidden
Question 39 of 398Project Management

Changing the project plan to eliminate a threat entirely is risk:

AAcceptance
BAvoidance
CTransfer
DExploitation
Answer is hidden
Question 40 of 398Project Management

A reserve kept for identified risks ('known unknowns') is the:

AManagement reserve
BRetention money
CSinking fund
DContingency reserve
Answer is hidden
Question 41 of 398Project Management

A quantitative risk analysis technique that uses repeated random sampling of uncertain variables is:

AChecklist analysis
BMonte Carlo simulation
CSWOT analysis
DBrainstorming
Answer is hidden
Question 42 of 398Project Management

In a BOT arrangement, the private party:

AOnly designs the project
BBuilds, operates for a concession period and then transfers the facility
COnly supplies labour
DBuys the project from government permanently
Answer is hidden
Question 43 of 398Project Management

Project finance on a non-recourse basis means lenders are repaid mainly from:

AGovernment taxes
BThe sponsor's other assets
CThe project's own cash flows
DPersonal guarantees of engineers
Answer is hidden
Question 44 of 398Project Management

Public procurement in Nepal is governed by the:

ALabour Act 2074
BCompany Act 2063 only
CPublic Procurement Act 2063
DContract Act 2025
Answer is hidden
Question 45 of 398Project Management

The security submitted with a bid, forfeited if the bidder withdraws the bid during its validity, is the:

ABid security
BAdvance payment guarantee
CRetention money
DPerformance security
Answer is hidden
Question 46 of 398Project Management

A contract in which payment is made on the basis of measured quantities of work and quoted unit rates is a/an:

ACost-plus contract
BTurnkey contract
CLump-sum contract
DItem-rate (unit-rate) contract
Answer is hidden
Question 47 of 398Project Management

A contract in which one contractor is responsible for design, procurement, construction and commissioning is a:

APercentage-rate contract
BLabour contract
CItem-rate contract
DTurnkey (EPC) contract
Answer is hidden
Question 48 of 398Project Management

A pre-agreed amount payable by the contractor for delay in completion is called:

ALiquidated damages
BMobilisation advance
CVariation
DRetention money
Answer is hidden
Question 49 of 398Engineering Professional Practice

According to engineering codes of ethics, an engineer's foremost obligation is to:

AObey all instructions of the client
BMaximise the employer's profit
CHold paramount the safety, health and welfare of the public
DComplete work at minimum cost
Answer is hidden
Question 50 of 398Engineering Professional Practice

An engineer asked to design work outside his/her area of expertise should:

AAsk a junior to do it
BAccept to gain experience
CSign the drawings anyway
DDecline or engage a competent specialist
Answer is hidden
Question 51 of 398Engineering Professional Practice

The ethical theory that seeks the greatest good for the greatest number is:

AVirtue ethics
BUtilitarianism
CEgoism
DDeontology
Answer is hidden
Question 52 of 398Engineering Professional Practice

An engineer who has a financial interest in a supplier recommended to a client should:

AReject all other suppliers
BDisclose the conflict of interest to the client
CKeep it secret
DAccept a commission from the supplier
Answer is hidden
Question 53 of 398Engineering Professional Practice

Signing and sealing drawings not prepared or supervised by oneself is:

AA normal professional courtesy
BUnethical
CAcceptable if paid
DRequired by law
Answer is hidden
Question 54 of 398Engineering Professional Practice

Whistle-blowing is generally justified when:

AIt brings personal benefit
BThe engineer dislikes the manager
CSerious public harm is involved and internal channels have been exhausted
DNo evidence is available
Answer is hidden
Question 55 of 398Engineering Professional Practice

The seismic design provisions for buildings in Nepal are contained in:

ANepal National Building Code (NBC 105)
BLabour Act
CPublic Procurement Act
DElectricity Act
Answer is hidden
Question 56 of 398Engineering Professional Practice

The law that sets out environmental assessment requirements (IEE/EIA) for projects in Nepal is the:

AArbitration Act 2055
BNepal Engineering Council Act 2055
CEnvironment Protection Act 2076
DCompany Act 2063
Answer is hidden
Question 57 of 398Engineering Professional Practice

The Nepal Engineers' Association was established in:

A2055 BS (1998 AD)
B2019 BS (1962 AD)
C2046 BS (1990 AD)
D2072 BS (2015 AD)
Answer is hidden
Question 58 of 398Engineering Professional Practice

The Nepal Engineers' Association is best described as:

AA voluntary professional association of engineers
BA government ministry
CA contractors' federation
DThe statutory regulatory body that registers engineers
Answer is hidden
Question 59 of 398Engineering Professional Practice

In the hierarchy of controls for occupational safety, the last line of defence is:

AEngineering controls
BElimination
CPersonal protective equipment
DSubstitution
Answer is hidden
Question 60 of 398Engineering Professional Practice

A leading cause of fatal accidents on construction sites is:

ANoise exposure
BFalls from height
CPoor lighting in offices
DEye strain
Answer is hidden
Question 61 of 398Engineering Regulatory Body: Nepal Engineering Council

The Nepal Engineering Council was established under the:

APublic Procurement Act 2063
BNepal Engineering Council Act 2055 (1998)
CCompany Act 2063
DBuilding Act 2055
Answer is hidden
Question 62 of 398Engineering Regulatory Body: Nepal Engineering Council

The Nepal Engineering Council Regulations were issued in:

A2074 BS
B2055 BS
C2063 BS
D2057 BS
Answer is hidden
Question 63 of 398Engineering Regulatory Body: Nepal Engineering Council

The Nepal Engineering Council is best described as:

AA trade union
BA voluntary association of engineers
CA statutory body regulating the engineering profession
DA private consulting firm
Answer is hidden
Question 64 of 398Engineering Regulatory Body: Nepal Engineering Council

A person who wants to practise as an engineer in Nepal must:

AOnly hold a trade licence
BRegister with the Company Registrar
CBe registered with the Nepal Engineering Council
DOnly be a member of NEA
Answer is hidden
Question 65 of 398Engineering Regulatory Body: Nepal Engineering Council

Recognition of engineering educational programmes and institutions in Nepal is a function of the:

ADepartment of Industry
BNepal Engineering Council
CPublic Procurement Monitoring Office
DNepal Engineers' Association
Answer is hidden
Question 66 of 398Engineering Regulatory Body: Nepal Engineering Council

A disciplinary action the Nepal Engineering Council can take for serious professional misconduct is:

ACancellation of the engineer's registration
BRevoking citizenship
CConfiscation of property
DImprisonment without trial
Answer is hidden
Question 67 of 398Engineering Regulatory Body: Nepal Engineering Council

The official who maintains the register of engineers at NEC is the:

AChief Justice
BRegistrar
CAuditor General
DCompany Registrar
Answer is hidden
Question 68 of 398Engineering Regulatory Body: Nepal Engineering Council

According to the NEC code of conduct, an engineer should:

ASign drawings prepared by others without checking
BAccept any work offered
CShare confidential client data freely
DUndertake only work within his/her competence
Answer is hidden
Question 69 of 398Engineering Regulatory Body: Nepal Engineering Council

Obtaining work by paying a bribe is:

AA violation of the code of conduct
BAllowed if disclosed later
CAcceptable in competitive markets
DRequired for public contracts
Answer is hidden
Question 70 of 398Engineering Regulatory Body: Nepal Engineering Council

Which statement about NEC and NEA is correct?

ABoth are voluntary
BNEC registration is compulsory to practise; NEA membership is voluntary
CBoth are government ministries
DNEA registration is compulsory; NEC membership is voluntary
Answer is hidden
Question 71 of 398Project Planning, Design and Implementation

The approval of design, drawing before the construction of a building in the city area of Nepal is done by ............

Avillage development committee
Bdistrict development committee
Cmunicipality
Dnone of the above
Answer is hidden
Question 72 of 398Project Planning, Design and Implementation

The width of the standard A-series drawing paper such as A₄, A₃, A₂, ...... is ............

A1/3 times the length of the paper
B1/√2 times the length of the paper
C1/2 times the length of the paper
D1/√3 times the length of the paper
Answer is hidden
Question 73 of 398Project Planning, Design and Implementation

The area of A₀ size paper is ............[cite: 15]

A0.25 m²
B0.5 m²
C0.75 m²
D1 m²
Answer is hidden
Question 74 of 398Project Planning, Design and Implementation

The standard size of drawing board of designation D₁ is (in mm) ............[cite: 15]

A1000 × 700 × 25
B100 × 75 × 25
C1500 × 750 × 25
D1500 × 700 × 25
Answer is hidden
Question 75 of 398Project Planning, Design and Implementation

Paper is designated by which letter?[cite: 15]

AA
BB
CC
DD
Answer is hidden
Question 76 of 398Project Planning, Design and Implementation

Title block gives information about ............[cite: 15]

Atitle of the drawing
Bscale used for the drawing
Cserial number of the drawing
Dall of the above
Answer is hidden
Question 77 of 398Project Planning, Design and Implementation

Which of the following is not included in title block of drawing sheet?[cite: 15]

ASheet number
BScale
CMethod of projection
DSize of sheet
Answer is hidden
Question 78 of 398Project Planning, Design and Implementation

As per BIS, the size of title block in drawing sheet is ............[cite: 15]

A25 mm × 10 mm
B100 mm × 25 mm
C65 mm × 185 mm
D185 mm × 65 mm
Answer is hidden
Question 79 of 398Project Planning, Design and Implementation

The length: width in case of an arrow head is ............[cite: 15]

A1:1
B2:1
C3:1
D4:1
Answer is hidden
Question 80 of 398Project Planning, Design and Implementation

What is the inclination of inclined lettering?[cite: 15]

A75 degree
B65 degree
C45 degree
D85 degree
Answer is hidden
Question 81 of 398Project Planning, Design and Implementation

The aspect ratio of a letter refers to the ratio of its ............[cite: 15]

Aheight to its width
Bwidth to height
Clength to width
Dwidth to length
Answer is hidden
Question 82 of 398Project Planning, Design and Implementation

The size of the letter means the ............ of the letter.[cite: 15]

Athickness
Bheight
Clength
Dwidth
Answer is hidden
Question 83 of 398Project Planning, Design and Implementation

The dimension system is unidirectional if ............[cite: 15]

Adimensions in the drawing sheet can be read from anywhere on the drawing sheet
Bdimensions in the drawing sheet can be read from the bottom edge of the drawing sheet
Cdimensions in the drawing sheet can be read from the bottom and right-hand edge of the drawing sheet
Ddimensions cannot be read
Answer is hidden
Question 84 of 398Project Planning, Design and Implementation

In aligned system of dimensioning, the dimensions may be read from ............[cite: 15]

Abottom or right hand edges
Bbottom or left hand edges
Conly from bottom
Donly from left side
Answer is hidden
Question 85 of 398Project Planning, Design and Implementation

Maps are drawn in which scale?[cite: 15]

AEnlarging
BReducing
CBalanced
DAll of the above
Answer is hidden
Question 86 of 398Project Planning, Design and Implementation

A full scale technical drawing will have a scale factor of ............

A1:1
B1:2
C2:1
D1:4
Answer is hidden
Question 87 of 398Project Planning, Design and Implementation

Which of the following represent reducing scale?

A1:1
B1:25
C2:1
D10:1
Answer is hidden
Question 88 of 398Project Planning, Design and Implementation

Which of the following is enlarging scale?

A1:5
B1:2
C5:1
D1:2
Answer is hidden
Question 89 of 398Project Planning, Design and Implementation

Given representative factor as 4/50 and maximum length is 100 cm. Find the length of scale.

A8 cm
B10 cm
C9.7 cm
D12 cm
Answer is hidden
Question 90 of 398Project Planning, Design and Implementation

A line of 1 meter is shown by 1 cm on a scale; its representative factor (RF) is ............[cite: 16]

A1
B100
C1/100
D1/50
Answer is hidden
Question 91 of 398Project Planning, Design and Implementation

Freehand sketching can be done only when one has ............[cite: 16]

Aproper proficiency
Bgood practice
Cgood intuition
Dall of the above
Answer is hidden
Question 92 of 398Project Planning, Design and Implementation

The techniques for free hand sketch to drawing circle is ............[cite: 16]

Afixing a fixed point and are
Bfixing the perimeter
Cfixing the radius only
Dnone of the above
Answer is hidden
Question 93 of 398Project Planning, Design and Implementation

The type of line that projects from an object for the express purpose of locating a dimension is a ............[cite: 16]

Avisible line
Bhidden line
Cextension line
Ddimension line
Answer is hidden
Question 94 of 398Project Planning, Design and Implementation

Which the following is represented by a dotted line?[cite: 16]

AHidden edges
BProjection line
CVisible outlines
DHatching line
Answer is hidden
Question 95 of 398Project Planning, Design and Implementation

Which of the following line is used for dimension lines?[cite: 16]

AContinuous thick
BContinuous thin
CChain thin
DShort zig-zag line
Answer is hidden
Question 96 of 398Project Planning, Design and Implementation

Which of the following line is used for visible outlines?[cite: 16]

AContinuous thick
BContinuous thin
CChain thin
DShort zig-zag line
Answer is hidden
Question 97 of 398Project Planning, Design and Implementation

The hidden line are drawn as ............[cite: 16]

Adashed narrow lines
Bdashed wide lines
Clong-dashed dotted wide line
Dlong-dashed double dotted wide line
Answer is hidden
Question 98 of 398Project Planning, Design and Implementation

The hidden line represent ............[cite: 16]

Afeatures that can be seen in the current view
Bextension line or leader line
Cfeatures that cannot be seen in the current view
Daxis of symmetrical parts
Answer is hidden
Question 99 of 398Project Planning, Design and Implementation

Which of the following lines are used to show that the object is cut and then viewed?[cite: 16]

AHidden lines
BLeader lines
CCentre lines
DHatching lines
Answer is hidden
Question 100 of 398Project Planning, Design and Implementation

T square is used alone to draw ............[cite: 16]

Avertical line
Binclined line
Chorizontal line
Dnone of the above
Answer is hidden
Question 101 of 398Project Planning, Design and Implementation

French curves are used to draw ............[cite: 16]

Aregular curves
Bcircle
Cirregular curves
Dnone of the above
Answer is hidden
Question 102 of 398Project Planning, Design and Implementation

The hardness of pencil lead increases as the numeral letter H ............[cite: 16]

Aincreases
Bremains constant
Cdecreases
Dnone of the above
Answer is hidden
Question 103 of 398Project Planning, Design and Implementation

Which of the following is not a pencil?[cite: 16]

AHB
B2B
Cdrafter
Dnone of the above
Answer is hidden
Question 104 of 398Project Planning, Design and Implementation

What is additional 3rd view on orthographic projection in general for simple objects?

AFront view
BTop view
CSide view
DView at 45° perpendiculars to horizontal plane
Answer is hidden
Question 105 of 398Project Planning, Design and Implementation

The isometric projection of a circle is a ............[cite: 14]

Acircle
Bellipse
Chyperbola
Dparabola
Answer is hidden
Question 106 of 398Project Planning, Design and Implementation

A technical drawing of an object that shows the relationship or order of assembly of various parts is known as ............[cite: 14]

Aorthographic projection
Bexploded view drawing
Ccompacted view drawing
Daxonometric drawing
Answer is hidden
Question 107 of 398Project Planning, Design and Implementation

All the axonometric projections are single-plane ............ projection.[cite: 14]

Aorthographic
Bperspective
Cisometric
Doblique
Answer is hidden
Question 108 of 398Project Planning, Design and Implementation

............ type of axonometric drawing has equal foreshortening along two axis directions and a different amount on the third axis.[cite: 14]

ADiametric
BMulti view
CIsometric
DTrimetric
Answer is hidden
Question 109 of 398Project Planning, Design and Implementation

The principle views associated with orthographic projection are ............[cite: 14]

Afront view
Bright side view
Ctop view
Dall of the above
Answer is hidden
Question 110 of 398Project Planning, Design and Implementation

The principle reason for using an auxiliary view is ............[cite: 14]

Ato eliminate hidden lines
Bto create a true projection plane from an inclined plane in one of the primary views
Cto show cylinders as ellipses
Dto locate center marks
Answer is hidden
Question 111 of 398Project Planning, Design and Implementation

............ is the plane upon which the top view is projected.[cite: 14]

AHorizontal
BFrontal
CProfile
DBase
Answer is hidden
Question 112 of 398Project Planning, Design and Implementation

The isometric projection of a sphere is a ............[cite: 14]

Acircle
Bellipse
Chyperbola
Dparabola
Answer is hidden
Question 113 of 398Project Planning, Design and Implementation

In isometric drawing ............[cite: 14]

Aall axes are equally inclined
Btwo axes are equally inclined
Cnone of the axes are equally inclined
Dnone of the above
Answer is hidden
Question 114 of 398Project Planning, Design and Implementation

The value of the ratio of isometric projection length to true length is ............[cite: 14]

A0.141
B0.372
C0.815
D0.642
Answer is hidden
Question 115 of 398Project Planning, Design and Implementation

What type of sketch shows the front in true shape?[cite: 14]

AIsometric
BPerspective
COblique
DAxonometric
Answer is hidden
Question 116 of 398Project Planning, Design and Implementation

If an isometric drawing is made use of an isometric scale, then the drawings are called ............[cite: 14]

Aisometric projection
Bisometric view
Cperspective projection
Dorthographic view
Answer is hidden
Question 117 of 398Project Planning, Design and Implementation

When using an isometric view, you line up the drawing along three axis that are separated by ............ from each other.[cite: 14]

A180-degree
B90-degree
C120-degree
D60-degree
Answer is hidden
Question 118 of 398Project Planning, Design and Implementation

The development of cylinder is a ............[cite: 14]

Arectangle
Bcircle
Cellipse
Dnone of the above
Answer is hidden
Question 119 of 398Project Planning, Design and Implementation

The following is the method for development of a right regular prism.[cite: 14]

AParallel line method
BRadial line method
CTriangulation method
DApproximate method
Answer is hidden
Question 120 of 398Project Planning, Design and Implementation

The solid which is generated by the revolution of a right-angle triangle about one of its perpendicular sides which remains fixed is called ............[cite: 14]

Aa prism
Ba pyramid
Ca cylinder
Da cone
Answer is hidden
Question 121 of 398Project Planning, Design and Implementation

When a pyramid or cone is cut by a cutting plane parallel to its base, the remaining portion thus obtained after removing the top portion is called ............[cite: 14]

Aa prism
Bfrustum
Ca cylinder
Da cone
Answer is hidden
Question 122 of 398Project Planning, Design and Implementation

The side view of an object is drawn in ............ faces.[cite: 14]

Avertical plane
Bhorizontal plane
Cprofile plane
Dany of the above
Answer is hidden
Question 123 of 398Project Planning, Design and Implementation

A tetrahedron has four equal ............ faces.[cite: 14]

Asquare
Brectangular
Ctriangular
Dnone of the above
Answer is hidden
Question 124 of 398Project Planning, Design and Implementation

Hatching lines are drawn at ............ degree to reference line.[cite: 14]

A30
B45
C60
D90
Answer is hidden
Question 125 of 398Project Planning, Design and Implementation

In a cash flow series ............

Auniform gradient signifies that an income or disbursement changes by the same amount in each interest period
Beither an increase or decrease in the amount of a cash flow is called the gradient
Cthe gradient in the cash flow may be positive or negative
Dall of the above
Answer is hidden
Question 126 of 398Project Planning, Design and Implementation

Which item comes under financial activities in cash flow?

ARedemption of preference share
BIssue of preference share
CInterest paid
DAll of the above
Answer is hidden
Question 127 of 398Project Planning, Design and Implementation

Cash flow example from a financing activity is ............

Apayment of dividends
Breceipt of dividend on investment
Ccash received from customers
Dpurchase of fixed asset
Answer is hidden
Question 128 of 398Project Planning, Design and Implementation

The statement of cash flow clarifies cash flows according to ............

Aoperating and non-operating flows
Binflow and outflow
Cinvesting and non-operating flows
Doperating, investing, and financing activities
Answer is hidden
Question 129 of 398Project Planning, Design and Implementation

Cash flow example from an investing activity is ............

Aissue of debenture
Brepayment of long-term loan
Cpurchase of raw materials for cash
Dsale of investment by non-financial enterprise
Answer is hidden
Question 130 of 398Project Planning, Design and Implementation

Heterogeneous cash flows can be made comparable by ............

Adiscounting technique
Bcompounding technique
Ceither (a) or (b)
Dnone of the above
Answer is hidden
Question 131 of 398Project Planning, Design and Implementation

Time value of money supports the comparison of cash flows recorded at different time period by ............

Adiscounting all cash flows to a common point of time
Bcompounding all cash flows to a common point of time
Cusing either (a) or (b)
Dnone of the above
Answer is hidden
Question 132 of 398Project Planning, Design and Implementation

What is the element of total cost?

AMaterial and labor cost
BLabor and fuel cost
CFuel and machine cost
DAll of the above
Answer is hidden
Question 133 of 398Project Planning, Design and Implementation

Statement of cash flows includes ............

Afinancing activities
Boperating activities
Cinvesting activities
Dall of the above
Answer is hidden
Question 134 of 398Project Planning, Design and Implementation

Material cost is concerned with ............

Adirect cost
Bindirect cost
Cboth (a) and (b)
Dnone of the above
Answer is hidden
Question 135 of 398Project Planning, Design and Implementation

In cash flows, when a company invests in fixed assets and short-term financial investments results in ............

Aincreased liabilities
Bincreased equity
Cincreased cash
Ddecreased cash
Answer is hidden
Question 136 of 398Project Planning, Design and Implementation

If desired rate of return is minimum by actual rate of return, then it is classified as ............

Afuture cash flows
Bpresent cash flow
Cpositive cash flows
Dnegative cash flows
Answer is hidden
Question 137 of 398Project Planning, Design and Implementation

The given symbol in a drawing represents ............

Aperspective projection
Bthird angle projection
Cfirst angle projection
Doblique projection
Answer is hidden
Question 138 of 398Project Planning, Design and Implementation

The side view of given orthographic projection is ............

Aa
Bb
Cc
Dd
Answer is hidden
Question 139 of 398Project Planning, Design and Implementation

The top view of given figure is ............

Aa
Bb
Cc
Dd
Answer is hidden
Question 140 of 398Project Planning, Design and Implementation

In cash flow diagram, which of the following is true?

ATime 1 is considered to be the end of time period 1
BA vertical arrow pointing up indicates a positive cash flow
CAn arrow pointing downward indicates a negative cash flow
DAll of the above
Answer is hidden
Question 141 of 398Project Planning, Design and Implementation

Payback period is counted only after ............

Atendering for the project
Bstarting of the construction of the project
Ccompletion of the construction of the project
Dcommissioning of the project
Answer is hidden
Question 142 of 398Project Planning, Design and Implementation

Time value of money indicates that ............

Aa unit of money obtained today is worth more than a unit of money obtained in future
Ba unit of money obtained today is worth less than a unit of money obtained in future
Cthere is no difference in the value of money obtained today and tomorrow
Dnone of the above
Answer is hidden
Question 143 of 398Project Planning, Design and Implementation

Pick up the correct statement from the following:

AThe change in the amount of money over a given time period is called 'time value of money', a most important concept in engineering economy
BThe manifestation of the time value of money is termed as interest
CInterest on borrowing = Present amount owed - Original loan
DAll of the above
Answer is hidden
Question 144 of 398Project Planning, Design and Implementation

If the nominal rate of interest is 10% per annum and there is quarterly compounding, the effective rate of interest will be ............

A10% per annum
B10.10% per annum
C10.25% per annum
D10.38% per annum
Answer is hidden
Question 145 of 398Project Planning, Design and Implementation

How long will it take money to double itself if invested at 5% compounded annually?

A13.7 years
B14.7 years
C14.2 years
D15.3 years
Answer is hidden
Question 146 of 398Project Planning, Design and Implementation

Equal payment series sinking fund factor is ............

A(A/F, i, n)
B(F/P, i, n)
C(A/P, i, n)
D(P/A, i, n)
Answer is hidden
Question 147 of 398Project Planning, Design and Implementation

In a project equal investment is done on regular basis for replacement of the property, then it is called ............

Afuture investment
Bcapital recovery
Csinking fund
Dall of the above
Answer is hidden
Question 148 of 398Project Planning, Design and Implementation

Sinking fund is ............

Athe fund for rebuilding a structure when its economic life is over
Braised to meet maintenance costs
CNPV = 0
Dall of the above
Answer is hidden
Question 149 of 398Project Planning, Design and Implementation

The term (1 + i)ⁿ is called ............

Asingle payment discount amount factor
Bsingle payment compound amount factor
Cannual compound amount factor
Dnone of the above
Answer is hidden
Question 150 of 398Project Planning, Design and Implementation

What is the expression for the capital recovery amount?

AP [i(1+i)ⁿ / ((1+i)ⁿ - 1)]
BP [(1+i)ⁿ / ((1+i)ⁿ - 1)]
CP [i(1-i)ⁿ / ((1-i)ⁿ - 1)]
DP [(1-i)ⁿ / ((1-i)ⁿ - 1)]
Answer is hidden
Question 151 of 398Project Planning, Design and Implementation

If a is the base amount expenditure, b is the increase in the operation cost each year over a period of n years, the total cost of maintenance is ............

Aa + (n-1)b
Ba + x (n-1)b
Ca x (n-1)b
DDiscounted payback
Answer is hidden
Question 152 of 398Project Planning, Design and Implementation

Which method is not mostly adopted for selection of project?

APayback
BDiscounted payback
CIRR
DB/C
Answer is hidden
Question 153 of 398Project Planning, Design and Implementation

The cash flow is either increasing or decreasing with equal amount every period, the type of series is ............

Auniform payment series
Bgeometric payment series
Clinear gradient series
Dirregular payment series
Answer is hidden
Question 154 of 398Project Planning, Design and Implementation

The additional money received from selling one specified level of output is ............

Anormal cost
Bmarginal revenue
Caverage revenue
Dequivalent revenue
Answer is hidden
Question 155 of 398Project Planning, Design and Implementation

If production is less than breakeven point, the product will be ............

Alesser than consumption
Bequal to consumption
Cgreater than consumption
Dall of the above
Answer is hidden
Question 156 of 398Project Planning, Design and Implementation

The actual profitability of any project is best analyzed from .........

AIRR
BDiscounted payback period
CARR
Dnone of the above
Answer is hidden
Question 157 of 398Project Planning, Design and Implementation

The decision rule for project acceptance is that .........

Aif IRR > 0
Bif IRR > MARR
Cif IRR < MARR
Dif IRR = 0
Answer is hidden
Question 158 of 398Project Planning, Design and Implementation

Which of the following factors does not depend on the time value of money?

AB/C ratio
BAccounting rate of return
CNPV
DIRR
Answer is hidden
Question 159 of 398Project Planning, Design and Implementation

If a seller recovers his capital along with accumulated compensating interest not in one single lump-sum payment but in periodical equal payments, over time ............

Acapital recovery annuity is availed
Bpresent worth annuity is availed
Csinking fund annuity is availed
Dfuture worth annuity is availed
Answer is hidden
Question 160 of 398Project Planning, Design and Implementation

Depreciation is charged on ............

Afixed assets
Bcurrent assets
Cboth fixed and current assets
Dnone of the above
Answer is hidden
Question 161 of 398Project Planning, Design and Implementation

Which of the following asset generally assumed not to depreciate?

AMachinery
BBuilding
CLand
DAll of the above
Answer is hidden
Question 162 of 398Project Planning, Design and Implementation

Under the diminishing balance method, the amount of depreciation is calculated on ............[cite: 15]

Athe written-down value of the asset
Bthe market value of the asset
Cthe original cost of the asset
Dthe expected realizable value of the asset
Answer is hidden
Question 163 of 398Project Planning, Design and Implementation

If the percentage fall in quantity demanded is more than the percentage rise in price charged, ............[cite: 15]

Athe revenue will rise
Bthe revenue will fall
Cis not related with discount rate
Dnone of the above
Answer is hidden
Question 164 of 398Project Planning, Design and Implementation

The estimated value of depreciable assets after its useful life is called ............[cite: 15]

Aactual value
Breplacement value
Cdisposal (residual) value
Dcurrent value
Answer is hidden
Question 165 of 398Project Planning, Design and Implementation

If there is no inflation during a period, then the money cash flow would be equal to ............[cite: 15]

Apresent value
Breal cash flow
Creal cash flow + present value
Dreal cash flow - present value
Answer is hidden
Question 166 of 398Project Planning, Design and Implementation

What is the limit of annual income for an unmarried individual upto which only 1% income tax is levied?[cite: 15]

A5 lakhs
B6 lakhs
C5.5 lakhs
D7 lakhs
Answer is hidden
Question 167 of 398Project Planning, Design and Implementation

IRR is calculated ............[cite: 15]

Awhen NPV is less than zero
Bwhen NPV more than zero
Cwhen NPV equal to 0
Dwhen NPV equal to MARR
Answer is hidden
Question 168 of 398Project Planning, Design and Implementation

The time value of money is primarily related to .........[cite: 15]

Atime and money
Btime and interest
Cmoney and valise
Dinterest and inflation
Answer is hidden
Question 169 of 398Project Planning, Design and Implementation

Salvage value is defined as ............[cite: 15]

Avalue of dismantled materials at the end of its utility period
Bestimated value of a built-up property at the end of its useful life without being dismantled
Cvalue of the property shown in the account book in that particular year
Dpresent value of a property considering it to be replaced at the current market rates
Answer is hidden
Question 170 of 398Project Planning, Design and Implementation

The minimum value of benefit-cost ratio for the selection of any project should be ............[cite: 15]

Aless than one
Bone
Cgreater than one
Dnone of the above
Answer is hidden
Question 171 of 398Project Planning, Design and Implementation

The benefit cost ratio is ............[cite: 15]

Adirectly proportional to discount rate
Binversely proportional to discount rate
Cno array relation with discount rate
Dall of the above
Answer is hidden
Question 172 of 398Project Planning, Design and Implementation

The project contractor relies on the cost of the estimate ............[cite: 15]

Afor submission of a competitive bid for a lump-sum contract
Bfor a unit price contract
Cfor preparation of a definitive estimate to help negotiate contract
Dall of the above
Answer is hidden
Question 173 of 398Project Planning, Design and Implementation

Both architect and engineer make use of the cost estimate of the project ............[cite: 15]

Afor site selection
Bfor designing of the project
Cfor choosing alternatives
Dall of the above
Answer is hidden
Question 174 of 398Project Planning, Design and Implementation

The most unpredictable cost of a project is ............[cite: 15]

Aenvironment management cost
Bunderground construction cost
Ctransportation cost
Dsocial management cost
Answer is hidden
Question 175 of 398Project Planning, Design and Implementation

The ratio of current assets to current liabilities is known as ............[cite: 15]

Aliquidity ratio
Bcurrent ratio
Cacid-test (or quick) ratio
Ddebts ratio
Answer is hidden
Question 176 of 398Project Planning, Design and Implementation

The more critical (or severe) test of the firm's liquidity can be judged by ............[cite: 15]

Aliquidity ratio
Bcurrent ratio
Cacid-test (or quick) ratio
Ddebts ratio
Answer is hidden
Question 177 of 398Project Planning, Design and Implementation

Current assets less inventories divided by current liabilities is known as ............[cite: 15]

Aliquidity ratio
Bcurrent ratio
Cacid-test (or quick) ratio
Ddebts ratio
Answer is hidden
Question 178 of 398Project Planning, Design and Implementation

The purchase value of assets over its serviceable life is categorized as ............[cite: 15]

Aappreciated liabilities
Bappreciated assets
Cdepreciation
Dappreciation
Answer is hidden
Question 179 of 398Project Planning, Design and Implementation

Excessive spending power of consumers that pulls prices up is called ............[cite: 15]

Ademand-pull inflation
Bcost-pull inflation
Ccost-push inflation
Dcost-push inflation
Answer is hidden
Question 180 of 398Project Planning, Design and Implementation

Book value means ............[cite: 15]

Aexpected sale price
Bcurrent market price if purchased now
Cvalue as shown in the books of account
Doriginal acquisition price
Answer is hidden
Question 181 of 398Project Planning, Design and Implementation

Pokhara Regional International Airport is an example of ............[cite: 13]

Aloan projects
Bgrant projects
Cprivate sector projects
Dprocess oriented projects
Answer is hidden
Question 182 of 398Project Planning, Design and Implementation

The process each manager follows during the life of a project is known as ............[cite: 13]

Aproject management
Bmanager life cycle
Cproject management life cycle
Dall of the mentioned
Answer is hidden
Question 183 of 398Project Planning, Design and Implementation

The type of projects in which investment in project is repaid by the government to donors agencies is called ............[cite: 13]

Aprivate sector projects
Bgovernment sector projects
Cgrant projects
Dloan projects
Answer is hidden
Question 184 of 398Project Planning, Design and Implementation

Who typically offers financial resources to fund a project?[cite: 13]

ADonor
BSponsor
CProject manager
DStakeholder
Answer is hidden
Question 185 of 398Project Planning, Design and Implementation

If part of contract work is assigned to another party, it is called ............[cite: 13]

Asub-contracting
Bjoint venture
Cboth (a) and (b)
Dnone of the above
Answer is hidden
Question 186 of 398Project Planning, Design and Implementation

Which of the following is not a phase of project management?[cite: 13]

AProject planning
BProject scheduling
CProject controlling
DProject being
Answer is hidden
Question 187 of 398Project Planning, Design and Implementation

The project scope statement furnishes the basis for ............[cite: 13]

Aa way to provide updated information to the accounting department
Bprovides links to the client's functional management groups
Callowing the project to move to the next phase
Dall of the above
Answer is hidden
Question 188 of 398Project Planning, Design and Implementation

The main principle of an organization, is ............[cite: 13]

Aunity of command and coherency
Beffective control at all level
Cdelegation of authority
Dall of the above
Answer is hidden
Question 189 of 398Project Planning, Design and Implementation

The main advantage of line organization is ............[cite: 13]

Aeffective command and control
Bdefined responsibilities at all levels
Cability to quick decision at all level
Dall of the above
Answer is hidden
Question 190 of 398Project Planning, Design and Implementation

Ensuring that performance meets established standards that worker's activities occur as planned and that the organization process is called ............[cite: 13]

Acontrolling
Bplanning
Cleading
Dorganizing
Answer is hidden
Question 191 of 398Project Planning, Design and Implementation

In which of the following project phases is the project schedule developed?[cite: 13]

AConceptual
BPlanning
CImplementation
DDesign
Answer is hidden
Question 192 of 398Project Planning, Design and Implementation

The process of communication contains four major parts. Which part is the vehicle or method used to convey the message?[cite: 13]

ACommunicator
BMessage
CMedium
DRecipient
Answer is hidden
Question 193 of 398Project Planning, Design and Implementation

In bar charts, which colour is used to show the actual progress?[cite: 13]

ARed
BBlack
CBlue
DGreen
Answer is hidden
Question 194 of 398Project Planning, Design and Implementation

Which method of project planning was invented first?[cite: 13]

ABar chart
BMilestone chart
CCPM
DPERT
Answer is hidden
Question 195 of 398Project Planning, Design and Implementation

CPM is based on ............[cite: 13]

Aprobabilistic
Bdeterministic
Cboth (a) and (b)
Dany of (a) or (b)
Answer is hidden
Question 196 of 398Project Planning, Design and Implementation

CPM is the ............[cite: 13]

Aactivity oriented
Bevent oriented
Ctarget oriented
Dtime oriented
Answer is hidden
Question 197 of 398Project Planning, Design and Implementation

What is a critical path?[cite: 13]

AIt is a path that operates from the starting node to the end node.
BIt is a mixture of all the paths
CIt is the longest path
DIt is the shortest path
Answer is hidden
Question 198 of 398Project Planning, Design and Implementation

What happens when a project is scheduled by CPM?[cite: 13]

AA project is divided into various activities
BRequired time for each activity is established
CA sequence of various activities is made according to their importance
DAll of the above
Answer is hidden
Question 199 of 398Project Planning, Design and Implementation

When was CPM method introduced?[cite: 13]

A1880
B1900
C1957
D1958
Answer is hidden
Question 200 of 398Project Planning, Design and Implementation

For an activity in a CPM analysis, the early finish time is 13 and the late finish time is 13. Which of the following statements is true?[cite: 13]

AThe early start is 6
BThe duration of the activity is 13
CThe slack of this activity is 13
DThe activity is on the critical path
Answer is hidden
Question 201 of 398Project Planning, Design and Implementation

Completion of an activity on CPM network diagram, is generally known ............

Aevent
Bnode
Cconnector
Dall of the above
Answer is hidden
Question 202 of 398Project Planning, Design and Implementation

In an AOA (activity on arrow) diagram, what does the arrow represent?

Aevent
Bactivity
Cslack
Dall of the above
Answer is hidden
Question 203 of 398Project Planning, Design and Implementation

Which of the following is true about dummy?

AIt doesn't consume resources
BIt doesn't have head and tail event
CIt can be added anywhere in the network
DIt simplifies the network
Answer is hidden
Question 204 of 398Project Planning, Design and Implementation

Dummy is used for ............

Agrammatical purpose
Blogical purpose
Cboth (a) and (b)
Dnone of the above
Answer is hidden
Question 205 of 398Project Planning, Design and Implementation

Which one of the following is captured in the Work Breakdown Structure (WBS)?

AThe life cycle phases
BThe logical order of tasks
CThe scope of the project
DProject costs
Answer is hidden
Question 206 of 398Project Planning, Design and Implementation

In project crashing, rent and overheads are treated as ............

Asignificant cost
Binsignificant costs
Cdirect costs
Dindirect costs
Answer is hidden
Question 207 of 398Project Planning, Design and Implementation

Project crashing is the method for ............

Ashortening the project duration by reducing the time of one or more critical activities
Badding resources at critical points
Cdoing technical analysis of the finished work for review
Dadding duration to each activity
Answer is hidden
Question 208 of 398Project Planning, Design and Implementation

The time with which direct cost does not reduce with the increase in time is known as ............

Acrash time
Bnormal time
Coptimistic time
Dstandard time
Answer is hidden
Question 209 of 398Project Planning, Design and Implementation

The time corresponding to minimum total project cost is ............

Acrash time
Bbetween normal time and crash time
Coptimistic time
Dnormal time
Answer is hidden
Question 210 of 398Project Planning, Design and Implementation

Which of the following is a project scheduling method that can be applied to software development?

APERT
BCPM
CCMM
DBoth PERT and CPM
Answer is hidden
Question 211 of 398Project Planning, Design and Implementation

PERT (Project Evaluation and Review Technique) analysis is based on ............

Aoptimistic time, pessimistic time and most likely time
Bpessimistic time, optional time, maximum time
Coptimistic time, efficient time, most likely time
Dminimax time, optimistic time and harmonic time
Answer is hidden
Question 212 of 398Project Planning, Design and Implementation

The full form of PERT is ............

Aprogram evaluation and rate technology
Bprogram evaluation and robot technique
Cprogram evaluation and robot technology
Dprogram evaluation and review technique
Answer is hidden
Question 213 of 398Project Planning, Design and Implementation

What is PERT analysis based on?

AOptimistic time
BPessimistic time
CMost likely time
DAll of the above
Answer is hidden
Question 214 of 398Project Planning, Design and Implementation

In PERT (Project Evaluation and Review Technique) method expected time (Te) is ............

ATo + Tp + 4Tm / 6
BTo + Tp + 2Tm / 6
CTo + 4Tp + Tm / 6
DTm + 4Tp + To / 6
Answer is hidden
Question 215 of 398Project Planning, Design and Implementation

If PERT network consists of 5 activities with standard deviation of 5, 6, 7, 8, and 9. Then, the standard deviation of the entire project is ............

A255
B7
C√255
D49
Answer is hidden
Question 216 of 398Project Planning, Design and Implementation

The shortest possible time in which an activity can be achieved under ideal circumstances is known as ............

Aexpected time estimate
Boptimistic time estimate
Cpessimistic time estimate
Dthe most likely time estimate
Answer is hidden
Question 217 of 398Project Planning, Design and Implementation

The relation between jobs of a particular type and various durations they have consumed completion is expressed by curve ............

Anormal distribution curve
Bfrequency distribution
Cdistribution curve
Dnone of the above
Answer is hidden
Question 218 of 398Project Planning, Design and Implementation

The optimistic, most likely and pessimistic time estimates of an activity are 6, 8, 10 days, what are the expected time and standard deviation?

A8, 0.5
B8, 2
C6, 0.67
D8, 0.67
Answer is hidden
Question 219 of 398Project Planning, Design and Implementation

According to the time estimates made by the PERT planners, the maximum time that would be needed to complete an activity is called as ............

Athe most likely time estimate
Boptimistic time estimate
Cexpected time estimate
Dpessimistic time estimate
Answer is hidden
Question 220 of 398Project Planning, Design and Implementation

Which of the options is not a notable challenge while scheduling a project?

ADeadlines exist
BIndependent activities
CToo many workers may be required
DCostly delay
Answer is hidden
Question 221 of 398Project Planning, Design and Implementation

In which phase of the project most of the money and manpower are required?[cite: 14]

Ainitiation phase
Bplanning phase
Cexecution phase
Dclosing phase
Answer is hidden
Question 222 of 398Project Planning, Design and Implementation

Which is the first stage in a project formulation?[cite: 14]

APlanning
BSetting objectives
CControlling
DEvaluating
Answer is hidden
Question 223 of 398Project Planning, Design and Implementation

Which of the following involves continuous betterment in planning and detailing with time?[cite: 14]

AProject enhancement
BProgressive elaboration
CProgressive rehabilitation
DContinuous improvement
Answer is hidden
Question 224 of 398Project Planning, Design and Implementation

in resource levelling which of the following is constraint?[cite: 14]

ATime
BMoney
CResources
DBoth time and money
Answer is hidden
Question 225 of 398Project Planning, Design and Implementation

Which term describes the utilization of resources in a project without altering the project duration?[cite: 14]

AResource smoothing
BResource leveling
CCritical path method
DFast tracking
Answer is hidden
Question 226 of 398Project Planning, Design and Implementation

Resource smoothing is ............[cite: 14]

Aan optimization and economical utilization of resources
Ban adjustment of resources without affecting project duration
Ca gradual increase in resources
Da gradual decrease in resources
Answer is hidden
Question 227 of 398Project Planning, Design and Implementation

Cost variance (CV) is which of the following equations?[cite: 14]

ACV - BCWP - ACWP
BCV = BCWP - ACWP
CCV = BCWS
DBoth (a) and (c)
Answer is hidden
Question 228 of 398Project Planning, Design and Implementation

A technique for performing quantitative analysis of progress is known as ............[cite: 14]

ABCWS
BEVA
CBAC
DCBSE
Answer is hidden
Question 229 of 398Project Planning, Design and Implementation

A schedule performance index (SPI) of 0.76 means ............[cite: 14]

Ayou are over budget
Byou are ahead of schedule
Cyou are only progressing at 76 percent of the rate originally planned
Dyou are only progressing at 24 percent of the rate originally planned
Answer is hidden
Question 230 of 398Project Planning, Design and Implementation

A cost performance index (CPI) of 0.89 means ............[cite: 14]

Aat this time, we expect the total project to cost 89 percent more than planned
Bwhen the project is completed we will have spent 89 percent more than planned
Cthe project is only progressing at 89 percent of the rate planned
Dthe project is only getting 89 cents out of every dollar invested
Answer is hidden
Question 231 of 398Project Planning, Design and Implementation

Capital budgeting is ............[cite: 14]

Areversible
Bunimportant
Cirreversible
Dall of the above
Answer is hidden
Question 232 of 398Project Planning, Design and Implementation

In which of the following cases project is in better shape?[cite: 14]

ABoth CPI and SPI are less than 1
BWhen CPI is more than 1 and SPI is less than one
CWhen CPI is less than one and SPI is more than one
DWhen both CPI and SPI are more than one
Answer is hidden
Question 233 of 398Project Planning, Design and Implementation

The budgeted cost for all the activities in a project with the help of Earned Value Method is ............[cite: 14]

Aactual cost
Bbudget at completion
Cbudget for completion
Destimate at completion
Answer is hidden
Question 234 of 398Project Planning, Design and Implementation

Cost budgeting can be best described by which of the following?[cite: 14]

AThe process of developing the future trends along with the assessment of probabilities, uncertainties, and inflation that could occur during the project
BDefinitive
COrder of magnitude
DConceptual
Answer is hidden
Question 235 of 398Project Planning, Design and Implementation

The technique for establishing and maintaining priorities among the various jobs of a project, is known ............[cite: 14]

Aevent flow scheduling technique
Bcritical ratio scheduling
Cslotting technique for scheduling
Dshort interval scheduling
Answer is hidden
Question 236 of 398Project Planning, Design and Implementation

The flow of information through MIS is ............[cite: 14]

Aneed dependent
Borganization dependent
Cinformation dependent
Dmanagement dependent
Answer is hidden
Question 237 of 398Project Planning, Design and Implementation

The information of MIS comes from the ............[cite: 14]

Ainternal source
Bexternal source
Cboth internal and external source
Dnone of the above
Answer is hidden
Question 238 of 398Project Planning, Design and Implementation

Which of the following is NOT an objective of MIS?[cite: 14]

AFacilitate the decisions-making process
BProvide requisite information at each level of management
CSupport decision-making
DRecruit people for system
Answer is hidden
Question 239 of 398Project Planning, Design and Implementation

The back bone of any organization is ............[cite: 14]

Ainformation
Bemployee
Cmanagement
Dcapital
Answer is hidden
Question 240 of 398Project Planning, Design and Implementation

Feasibility study determines ............[cite: 14]

Awhether the project is possible with resources
Bcomparing the project with world class manufacturing norms
Ccalculate the cost crashing each unit
Dadd duration to each unit
Answer is hidden
Question 241 of 398Project Planning, Design and Implementation

In project management when does planning take place?

ABefore the project
BDuring the project execution
CAt the start of the project
DAfter the project
Answer is hidden
Question 242 of 398Project Planning, Design and Implementation

What process involves deciding how to approach and plan the risk management activities for the project?

APerforming qualitative risk analysis
BPlanning risk management
CPerforming quantitative risk analysis
DIdentifying risks
Answer is hidden
Question 243 of 398Project Planning, Design and Implementation

Which of the following is not considered as a risk in project management?

ASpecification delays
BProduct competition
CTesting
DStaff turnover
Answer is hidden
Question 244 of 398Project Planning, Design and Implementation

Risk event graph is having following on X axis ............[cite: 15]

AGantt chart
Bwork break down structure
Cproject life cycle
Dsplitting
Answer is hidden
Question 245 of 398Project Planning, Design and Implementation

Project performance consists of ............[cite: 15]

Atime
Bcost
Cquality
Dall of the above
Answer is hidden
Question 246 of 398Project Planning, Design and Implementation

For a financial institution the most important study of a project to be taken for risks management is ............[cite: 15]

Aappraisal
Benvironmental and social
Ctechnical
Dfinancial and economical
Answer is hidden
Question 247 of 398Project Planning, Design and Implementation

Project Manager must ensure that it develops appropriate trade offs as ............[cite: 15]

Atime, cost and performance
Bmoney, cost and return on investment
Cmen, materials and machines
Dtime, value and performance
Answer is hidden
Question 248 of 398Project Planning, Design and Implementation

Which stage of project management life cycle requires the maximum time of completion ............[cite: 15]

Aconceptualization
Bplanning
Cexecution
Destimation
Answer is hidden
Question 249 of 398Project Planning, Design and Implementation

To be successful in a functional organization, the PM must rely on ............[cite: 15]

Areferent power
Bformal authority
Cinformal power structure
Dboth (a) and (c)
Answer is hidden
Question 250 of 398Project Planning, Design and Implementation

If employee does wrong in work, employer have to take responsibility of it, this is known ............[cite: 15]

Ajoint liability
Bvicarious liability
Cconcurrent liability
Dall of the above
Answer is hidden
Question 251 of 398Project Planning, Design and Implementation

In a payback period method of project evaluation and appraisal the project with ............ equal to cut off period will be accepted.[cite: 15]

Amore than
Bless than
Cpositive
Dnegative
Answer is hidden
Question 252 of 398Project Planning, Design and Implementation

Real rate of return is equal to ............[cite: 15]

ANominal rate + Inflation rate
BNominal rate * Inflation rate
CNominal rate - Inflation rate
DNominal rate / Inflation rate
Answer is hidden
Question 253 of 398Project Planning, Design and Implementation

The most successful project manager usually ............[cite: 15]

Aworks their way up from assistants in the project office to full-fledged project managers.
Bsupplementing that experience with formal education
Ccomes right from Harvard's MBA program into managing large projects.
Dis considered the technical expert of their field
Answer is hidden
Question 254 of 398Project Planning, Design and Implementation

Risk management is one of the most important jobs for a ............[cite: 15]

Aclient
Binvestor
Cproduction team
Dproject manager
Answer is hidden
Question 255 of 398Project Planning, Design and Implementation

Risk management is responsibility of the ............[cite: 15]

Acustomer
Binvestor
Cdeveloper
Dproject team
Answer is hidden
Question 256 of 398Project Planning, Design and Implementation

Newspaper, magazine, radio, television are examples of ............[cite: 15]

Astoring information
Bretrieving information
Ccommunication information
Dacquiring information
Answer is hidden
Question 257 of 398Project Planning, Design and Implementation

Outsourced projects are susceptible to conflicts as ............[cite: 15]

Apeople get less pay in these projects and work is more
Bmore work pressure and less time horizon
Cthese projects are away from home location
Dpeople are unaccustomed to working together and have different values
Answer is hidden
Question 258 of 398Project Planning, Design and Implementation

Conflict occurrence in projects is ............[cite: 15]

Aunavoidable
Bdepend on type of project
Cavoidable
Ddepends on culture
Answer is hidden
Question 259 of 398Project Planning, Design and Implementation

What assesses the risk and your plans for risk mitigation and revise these when you learn more about the risk?[cite: 15]

ARisk planning
BRisk identification
CRisk monitoring
DRisk analysis
Answer is hidden
Question 260 of 398Project Planning, Design and Implementation

Which of the following risk is the failure of a purchased component to perform as expected?[cite: 15]

AProduct risk
BProject risk
CBusiness risk
DProgramming risk
Answer is hidden
Question 261 of 398Project Planning, Design and Implementation

Which of the following risks are derived from the organizational environment where the software is being developed?[cite: 15]

APeople risks
BTechnology risks
CEstimation risks
DOrganizational risks
Answer is hidden
Question 262 of 398Project Planning, Design and Implementation

Which risk is connected to the circumstance outside the project that may influence the scope of work and the performance of the organization?[cite: 15]

AOperational risk
BFinancial risk
CStrategic risk
DContextual risk
Answer is hidden
Question 263 of 398Project Planning, Design and Implementation

Which of the following is not the part of risk control?[cite: 15]

AExecution of the risk response-strategy
BMonitoring of triggering events
CInitiating contingency plans
DNot watching for new risks
Answer is hidden
Question 264 of 398Project Planning, Design and Implementation

Which of the following strategies means that the impact of the risk will be reduced?[cite: 15]

AAvoidance strategies
BMinimization strategies
CContingency plans
DAll of the above
Answer is hidden
Question 265 of 398Project Planning, Design and Implementation

When do you perform risk identification?[cite: 15]

AAt the beginning of a project
BDuring project planning
CDuring the whole lifetime of a project
DDuring project execution
Answer is hidden
Question 266 of 398Project Planning, Design and Implementation

The project manager has the most authority in the ............ type of organization.[cite: 16]

Aproject expediter
Bmatrix
Cprojectized organization
Dfunctional
Answer is hidden
Question 267 of 398Project Planning, Design and Implementation

The successful project managers spend most of their time ............[cite: 16]

Aplanning with their personnel
Bplanning with the top management
Ccommunication with the project team
Dstudying project results
Answer is hidden
Question 268 of 398Project Planning, Design and Implementation

Which of the following is not project management goal?[cite: 16]

AKeeping overall costs within budget
BDelivering the software to the customer at the agreed time
CMaintaining a happy and well-functioning development team
DAvoiding customer complaints
Answer is hidden
Question 269 of 398Project Planning, Design and Implementation

The decision to request an increase the resources for a project is the responsibility of the ............[cite: 16]

Afunctional manager
Bproject manager
Cdirector of project management
Dcustomer
Answer is hidden
Question 270 of 398Project Planning, Design and Implementation

Net present value of a machine is ............[cite: 16]

APV of cash inflows less cost of investment
BPV of cash inflows + cost of investment
CPV of net profit after tax less cost of investment
DPV of cash inflows less average cost of investment
Answer is hidden
Question 271 of 398Project Planning, Design and Implementation

Capital structure of a company related with ............[cite: 16]

Ashareholders' funds
Blong term debts, preference share capital and equity capital
Cdebentures and loans
Dtotal assets less liabilities
Answer is hidden
Question 272 of 398Project Planning, Design and Implementation

A company that issues stocks and bonds to raise funds results in ............[cite: 16]

Adecrease in cash
Bincrease in cash
Cincrease in equity
Dincrease in liabilities
Answer is hidden
Question 273 of 398Project Planning, Design and Implementation

The bond issued without any collateral is called ............[cite: 16]

Apreference share
Bequity share
Cdebenture
Ddebt capital
Answer is hidden
Question 274 of 398Project Planning, Design and Implementation

Debenture is ............[cite: 16]

Aunsecured bond
Bbond without collateral
Csource of capital budgeting
Dall of the above
Answer is hidden
Question 275 of 398Project Planning, Design and Implementation

A debenture ............[cite: 16]

Ais a long-term loan
Bdoes not require security
Cis a short-term loan
Dreceives dividend payments
Answer is hidden
Question 276 of 398Project Planning, Design and Implementation

Which of the following is unsafe share?[cite: 16]

APreference shares
BPrimary shares
CDebentures
DAll of the above
Answer is hidden
Question 277 of 398Project Planning, Design and Implementation

The average cost incurred in supplying a particular benefit over the entire life time of the project is called ............[cite: 16]

Aproject cost
Baverage life cycle cost
Cmaintenance cost
Dall of the above
Answer is hidden
Question 278 of 398Project Planning, Design and Implementation

The profit of the company is shared in form of dividend but has no voting rights in ............[cite: 16]

Aequity share
BPreference share
Cordinary share
Dnone of the above
Answer is hidden
Question 279 of 398Project Planning, Design and Implementation

Point out the false statements ............[cite: 16]

Aa firm can buy its own debentures and shares
Ba company can issue convertible debentures
Ctender assessment
Dcontract assessment
Answer is hidden
Question 280 of 398Project Planning, Design and Implementation

If two parties enter into an agreement for performing or not performing any work, then it is known as ............[cite: 16]

Acontract
Btender
Cprocurement
Dadjudication
Answer is hidden
Question 281 of 398Project Planning, Design and Implementation

The procurement of works, goods or services by the entity itself is called ............[cite: 16]

Aforce account
Bdirect procurement
Cseal quotation
Dnone of the above
Answer is hidden
Question 282 of 398Project Planning, Design and Implementation

For the formation of user's committee, members are selected ............[cite: 16]

Aamong the people of whole district
Bamong the beneficiaries of the project
Cby nomination by the chief district officer of the district
Dnone of the above
Answer is hidden
Question 283 of 398Project Planning, Design and Implementation

The project usually completed by user committee's are ............[cite: 16]

Alabor intensive projects
Bcapital intensive projects
Cboth (a) and (b)
Dnone of the above
Answer is hidden
Question 284 of 398Project Planning, Design and Implementation

The projects can be carried out out by user committee with cost estimate upto ............[cite: 16]

A10 Millions
B20 Millions
C50 Millions
D500 Millions
Answer is hidden
Question 285 of 398Project Planning, Design and Implementation

For procurement of works upto 2 million, buy which of the following method is to be considered?[cite: 16]

Asealed tender
Bby direct negotiation
Cby bidding
Dby direct labor or direct negotiation
Answer is hidden
Question 286 of 398Project Planning, Design and Implementation

The bid validity period for bid having estimated cost upto 100 million is ............[cite: 17]

A45 days
B60 days
C90 days
D105 days
Answer is hidden
Question 287 of 398Project Planning, Design and Implementation

In project management, what percentage of the total project cost is typically estimated for office management expenses?[cite: 17]

A2.5%
B4%
C10%
D12%
Answer is hidden
Question 288 of 398Project Planning, Design and Implementation

Nepal Government handed over the fast-track project to Nepal Army. After handing in, what type of contract was it?[cite: 17]

ABOT
BBOOT
Cbuild and design
Dbuild, design, procurement, subcontracting and all works
Answer is hidden
Question 289 of 398Project Planning, Design and Implementation

The relation between contract and agreement is ............[cite: 17]

Asynonym
Baptonym
Call contract are agreement but all agreement are not contract
Dall agreement are contract but not all contract are agreement
Answer is hidden
Question 290 of 398Project Planning, Design and Implementation

The ultimate method of resolving any dispute with a contractor is ............[cite: 17]

Anegotiation
Bmediation
Carbitration
Dlitigation
Answer is hidden
Question 291 of 398Project Planning, Design and Implementation

The damages caused due to delay in work are termed as ............[cite: 17]

Aliquidated damage
Bunliquidated damage
Cdirect damages
Dtangible damages
Answer is hidden
Question 292 of 398Project Planning, Design and Implementation

Technical proposal during tendering is included in ............[cite: 17]

Asingle stage single envelope system
Bsingle stage double envelope system
Cdouble stage single envelope system
Ddouble stage double envelope system
Answer is hidden
Question 293 of 398Project Planning, Design and Implementation

The aim of ............ is to do whatever possible to avoid any kind of harm or accident.[cite: 13]

Aminimalist
Breasonable care
Cbeyond one's duty
Dnone of the above
Answer is hidden
Question 294 of 398Project Planning, Design and Implementation

It is important to be at work ............ every day and on time unless you are sick or have a family emergency.[cite: 13]

Aappearance
Battendance
Cattitude
Drespect
Answer is hidden
Question 295 of 398Project Planning, Design and Implementation

............ is the rules and standards that govern the decisions and actions of an engineer as a professional.[cite: 13]

ADoctor in Ethics
BDoctor in Ethics
CEthics
DEngineering Ethics
Answer is hidden
Question 296 of 398Project Planning, Design and Implementation

............ can help engineers make correct decisions and become better professionals.[cite: 13]

AStudy of English
BStudy of Math
CStudy of Ethics
DNone of the above
Answer is hidden
Question 297 of 398Project Planning, Design and Implementation

One of the most important issues faced by the world is that ............[cite: 13]

Acomputer ethics
Bconfidentiality
Cenvironmental deterioration
Dconflict of interest
Answer is hidden
Question 298 of 398Project Planning, Design and Implementation

The prime responsibility of any professional is ............[cite: 13]

Aconfidentiality
Bconflict of interest
Cenvironmental ethics
Dcomputer ethics
Answer is hidden
Question 299 of 398Project Planning, Design and Implementation

Which one does fall under computer ethics?[cite: 13]

AComputers can be used for robbery, crime and blackmailing others
BHacking is used to access private information
CLeak of such information of individual leads to harassments in terms of repeated phone calls
DAll of the above
Answer is hidden
Question 300 of 398Project Planning, Design and Implementation

Fundamental principle of professional engineering ethics is ............[cite: 13]

Auploading and advancing engineering profession
Bmaintain high level of ethical conduct
Cboth (a) and (b)
Dnone of the above
Answer is hidden
Question 301 of 398Project Planning, Design and Implementation

Engineering profession needs cooperation with the profession of ............[cite: 13]

Amedical professional
Baccountant
Clawyer
Dall of the above
Answer is hidden
Question 302 of 398Project Planning, Design and Implementation

Professionalism of engineers is lost due to ............[cite: 13]

Ahonesty
Bdignity
Cbribery
Ddiscipline
Answer is hidden
Question 303 of 398Project Planning, Design and Implementation

For the fulfillment of his/her professional duties engineer should ............[cite: 13]

Aparamount the health of the public
Bparamount the safety of the public
Cwelfare of the public
Dall of the above
Answer is hidden
Question 304 of 398Project Planning, Design and Implementation

Engineer shall act in such a manner as to uphold and enhance the honor and dignity of engineering profession and shall act with ............ for bribery, fraud and corruption.[cite: 13]

Atolerance
Ba penchant
Ca predilection
Dzero tolerance
Answer is hidden
Question 305 of 398Project Planning, Design and Implementation

Engineers shall build their professional reputation on the ............ of their services and shall not compete unfairly with others.[cite: 13]

Apublicity
Bbasis
Cmerit
Dreputation
Answer is hidden
Question 306 of 398Project Planning, Design and Implementation

Engineers shall not disclose, without ............ confidential information coming the business affairs of technical process of any present or former or employer, or public body on which they serve.[cite: 13]

Aediting
Bgetting paid
Cremuneration
Dconsent
Answer is hidden
Question 307 of 398Project Planning, Design and Implementation

Which of the following is not a characteristic of a profession?[cite: 13]

Ait enjoys a high level of public trust and confidence
Bit is organized into associations
Cthere are published authoritative performance and ethical standards
DAll of the above are characteristics of a profession
Answer is hidden
Question 308 of 398Project Planning, Design and Implementation

............ skills such as writing, speaking and body language are important work ethics so that you can be clear in your messages to others.[cite: 13]

ACommunication
BCooperation
CHonesty
DIntegrity
Answer is hidden
Question 309 of 398Project Planning, Design and Implementation

You are a person with a high level of ............ if you stand by your values even if others put pressure on you to do something that is wrong or if they make fun of you.[cite: 13]

Acommunication
Bcooperation
Chonesty
Dintegrity
Answer is hidden
Question 310 of 398Project Planning, Design and Implementation

If you don't have ............ you can really get in trouble for lying, cheating or deceiving others.[cite: 13]

Acommunication
Bcooperation
Chonesty
Dintegrity
Answer is hidden
Question 311 of 398Project Planning, Design and Implementation

If you have ............ you will be a trusted person because they will see that you are committed to your company.[cite: 13]

Acommunication
Borganizational skills
Cloyalty
Drespect
Answer is hidden
Question 312 of 398Project Planning, Design and Implementation

Which of the following an engineer should not follow?[cite: 13]

AAct as faithful agent for client
BAccept compensation from more than one party for same service without the consent of all
CIndicate client the adverse consequences if judgment is over ruled
DUndertake only these assignments for which he is qualified
Answer is hidden
Question 313 of 398Project Planning, Design and Implementation

is based on personal belief, values and individual's conscience rather than reasoning.[cite: 13]

AMoral
BEthics
CBoth (a) and (b)
DNone of the above
Answer is hidden
Question 314 of 398Project Planning, Design and Implementation

If you can keep things at work in order and have a neat workplace, then you have great ............[cite: 13]

Aproductivity
Bcooperate
Corganizational skills
Drespect
Answer is hidden
Question 315 of 398Project Planning, Design and Implementation

It is always important to ............ yourself, others and the place where you work because you don't always agree with them.[cite: 13]

Aappearance
Bcooperate
Ccommunicate
Drespect
Answer is hidden
Question 316 of 398Project Planning, Design and Implementation

Some jobs cannot be done alone and some can be done much better and faster if you possess the quality of ............[cite: 13]

Ahonesty
Bcooperation
Cteamwork
Dintegrity
Answer is hidden
Question 317 of 398Project Planning, Design and Implementation

Strong ............ means you have a high sense of moral and ethical behavior that earns respect of others.[cite: 13]

Aresponsibility
Brespect
Cconfidence
Dcharacter
Answer is hidden
Question 318 of 398Project Planning, Design and Implementation

A personality measure of the strength of a person's convictions is called ............[cite: 13]

Alocus of control
Battitude
Cego strength
Dnone of the above
Answer is hidden
Question 319 of 398Project Planning, Design and Implementation

In ............ a professional assumes full responsibilities and if anything wrong happens he/she sees their own responsibility.[cite: 13]

Aminimalist
Breasonable care
Cbeyond one's duty
Dnone of the above
Answer is hidden
Question 320 of 398Project Planning, Design and Implementation

moves beyond the minimal view's concern.[cite: 13]

AMinimalist
BBeyond one's duty
CReasonable care
DNone of the above
Answer is hidden
Question 321 of 398Project Planning, Design and Implementation

Which of the following is not concerned with the authority of engineers?[cite: 14]

AExpress an opinion on engineering matter
BGood behavior with client
CConscious with his profession
DDivulge the confidential matter
Answer is hidden
Question 322 of 398Project Planning, Design and Implementation

Which of the following is not considered a professional quality of an engineer?[cite: 14]

AGood behavior with clients
BHonesty
CBias towards political parties
DStrong technical skills
Answer is hidden
Question 323 of 398Project Planning, Design and Implementation

The environment which has been modified by human activities is called ............[cite: 14]

AAir pollution
BSoil pollution
CSoil erosion
DWater pollution
Answer is hidden
Question 324 of 398Project Planning, Design and Implementation

The environment which has been modified by human activities is called ............[cite: 14]

Anatural environment
Banthropogenic environment
Cmodern environment
Durban environment
Answer is hidden
Question 325 of 398Project Planning, Design and Implementation

Is the effect of undesirable changes in our surroundings that have harmful effects on plants, animals and human beings.[cite: 14]

APollution
BDegradation
CDeforestation
DClimate change
Answer is hidden
Question 326 of 398Project Planning, Design and Implementation

Development that meets the needs of the present without compromising the ability of future generations to meet their own needs.[cite: 14]

ASustainable development
BHuman development
CEconomic development
DSocial development
Answer is hidden
Question 327 of 398Project Planning, Design and Implementation

According to labor act, employers must conduct periodic health and safety inspections and maintain records of these inspections.[cite: 14]

AAt least once in a year
BAt least twice in a year
CAt least thrice in a year
DAt least 4 times in a year
Answer is hidden
Question 328 of 398Project Planning, Design and Implementation

According to Labor Act, the remuneration for over time is ............[cite: 14]

A2 times the regular pay
B1.75 times the regular pay
C1.5 times the regular pay
D1.25 times the regular pay
Answer is hidden
Question 329 of 398Project Planning, Design and Implementation

The government of Nepal has enforced concepts of occupational safety and health through its ............[cite: 14]

ALabor Act 1992
BLabor Act 1994
CLabor Act 1995
DLabor Act 1995
Answer is hidden
Question 330 of 398Project Planning, Design and Implementation

Engineers day is celebrated on ............[cite: 14]

AShrawan 3
BShrawan 4
CAsar 3
DAsar 4
Answer is hidden
Question 331 of 398Project Planning, Design and Implementation

As per labor law, workers are not allowed to work continuously for more than ............[cite: 14]

A3 hours
B5 hours
C8 hours
D12 hours
Answer is hidden
Question 332 of 398Project Planning, Design and Implementation

According to labors act, the maximum working hour for a labor per week should be ............[cite: 14]

A42 hrs
B45 hrs
C48 hrs
D53 hrs
Answer is hidden
Question 333 of 398Project Planning, Design and Implementation

As per labor law, how many hours workers are allowed to work in a day?[cite: 14]

A3 hours
B5 hours
C8 hours
D12 hours
Answer is hidden
Question 334 of 398Project Planning, Design and Implementation

Nepal engineer's association is ............[cite: 14]

Agovernment body to support NEC
Bindependent organization of Nepalese engineers
Cprivate body which works for betterment of engineers
Dnon-government organization
Answer is hidden
Question 335 of 398Project Planning, Design and Implementation

Nepal engineers association was established in ............ B.S.[cite: 14]

A2010
B2019
C2024
D2034
Answer is hidden
Question 336 of 398Project Planning, Design and Implementation

NEA is registered under the ............[cite: 14]

ASocial Service Act
BNEC Act
CCivil Service Act
DCo-operatives Act
Answer is hidden
Question 337 of 398Project Planning, Design and Implementation

The objectives of NEA are ............[cite: 14]

ATo promote development of the engineering science and technology in Nepal.
BTo promote fellowship goodwill and cooperation assistance among the Nepalese engineers and safeguard their rights and interests.
CBy utilizing, to the highest extent possible, the participation of the positional of the national engineering manpower of the country in the national development activities of Nepal, make effort towards ending foreign dependency in this regard
DAll of the above
Answer is hidden
Question 338 of 398Project Planning, Design and Implementation

NEA is governed by an elected executive council of ............ members.[cite: 14]

A25
B18
C21
D17
Answer is hidden
Question 339 of 398Project Planning, Design and Implementation

The number of executive members in NEA's Provincial committee is ............[cite: 14]

A25 and 15
B21 and 15
C15 and 25
D25 and 16
Answer is hidden
Question 340 of 398Project Planning, Design and Implementation

The number of member directly elected for council from Nepal engineering association ............[cite: 14]

A7
B21
C25
D10
Answer is hidden
Question 341 of 398Project Planning, Design and Implementation

The types of membership issued by NEA are ............[cite: 14]

Ageneral membership
Blife time membership
Cboth of the above
Dnone of the above
Answer is hidden
Question 342 of 398Project Planning, Design and Implementation

NEA is ............ of Nepalese engineers.[cite: 14]

Aindependent nonprofit organization
Bprofitable organization
Cbroker organization
Dall of the above
Answer is hidden
Question 343 of 398Project Planning, Design and Implementation

Which is not a professional engineering body?[cite: 14]

ANepal Engineering Association (NEA)
BSociety of Electrical and Electronics Engineers Association (SEEN)
CSociety of Public Health Engineers Nepal (SOPHEN)
DSociety of Consulting Architectural and Engineering Firms (SCAEF)
Answer is hidden
Question 344 of 398Project Planning, Design and Implementation

CAAN, NEC, NTA, etc. are examples of ............[cite: 14]

Aregulatory body
Bcommercial sectors
CNGOs
DINGOs
Answer is hidden
Question 345 of 398Project Planning, Design and Implementation

How many categories of NEA memberships are there?[cite: 14]

A4
B5
C7
D2
Answer is hidden
Question 346 of 398Project Planning, Design and Implementation

What is the tenure of an executive member of NEA?[cite: 14]

A4 year
B2-year
C3 year
D1 year
Answer is hidden
Question 347 of 398Project Planning, Design and Implementation

Nepal engineering council is an autonomous in under NEC act ............

A2056 B.S.
B2055 B.S.
C2054 B.S.
D2060 B.S.
Answer is hidden
Question 348 of 398Project Planning, Design and Implementation

Nepal Engineering Council [NEC] is ............

Agovernment and autonomous body
Bprivate body
Cnon-profit organization
Dgovernment body
Answer is hidden
Question 349 of 398Project Planning, Design and Implementation

Which of the following is not the function of NEC?

APrepare and implement the policy, plan and programmes
BRecognize the academic institutions
COpening the college
DTo prescribe the basic conditions of student admission
Answer is hidden
Question 350 of 398Project Planning, Design and Implementation

Which one is not concerned with the NEC?

AAccreditation of academic certificate
BAppointment of teacher
CAuthority of opening engineering garage
DAll of the above
Answer is hidden
Question 351 of 398Project Planning, Design and Implementation

When was Nepal engineering council established?

A2054 B.S.
B2055 B.S.
C2056 B.S.
D2057 B.S.
Answer is hidden
Question 352 of 398Project Planning, Design and Implementation

NEC contacts the GoN through ministry of ............

Afinance
Bphysical infrastructure and transportation
Chome affairs
Dlocal development
Answer is hidden
Question 353 of 398Project Planning, Design and Implementation

The decisions of NEC are authenticated by ............

Apresident
Bvice president
Cregistrar
Dmember nominated by president
Answer is hidden
Question 354 of 398Project Planning, Design and Implementation

NEC does not approach for ............

Aengineer
Boverseer to engineer
Cminimum degree BE
Dall of the above
Answer is hidden
Question 355 of 398Project Planning, Design and Implementation

The number of section in NEC act 2055 is ............

A18
B28
C38
D48
Answer is hidden
Question 356 of 398Project Planning, Design and Implementation

The academic qualification of the chief of NEC is ............

Amaster's degree in engineering
Bmaster's degree in economics
Cmaster's degree in finance
Dbachelor's degree in engineering in engineering
Answer is hidden
Question 357 of 398Project Planning, Design and Implementation

The general experience required for nomination of chairperson of NEC is ............

A10 yrs
B15 yrs
C20 yrs
D25 yrs
Answer is hidden
Question 358 of 398Project Planning, Design and Implementation

What is the requirement for being chairman of NEC?

ABachelor Degree and Engineering experience of 10 years
BBachelor Degree and Engineering experience of 15 years
CMaster Degree and Engineering experience of 15 years
DMaster Degree and Engineering experience of 10 years
Answer is hidden
Question 359 of 398Project Planning, Design and Implementation

Who appoints the chairman of NEC?

AThe Government of Nepal
BThe President of Nepal
CMinistry of home affairs
DThe supreme court
Answer is hidden
Question 360 of 398Project Planning, Design and Implementation

Who is the first president of NEC?

AEr. Shiv Mangal Giri
BProf. Dr. Padam Bahadur Shahi
CEr. Ram Babusharma
DNone of the above
Answer is hidden
Question 361 of 398Project Planning, Design and Implementation

What is the minimum qualification of vice president of the NEC?

AMasters in Engineering and 15 years' experience
BBachelors in Engineering and 15 years' experience
CMasters in Engineering and 10 years experience
DBachelors in Engineering and 10 years experience
Answer is hidden
Question 362 of 398Project Planning, Design and Implementation

An American engineer willing to work in Nepal may apply for registration under ............[cite: 16]

ACategory A
BCategory B
CCategory C
DCategory D
Answer is hidden
Question 363 of 398Project Planning, Design and Implementation

Which of the following category of engineer is not mention in engineering council rule?[cite: 16]

ACharted engineer
BProfessional engineer
CGeneral engineer
DAll of the above
Answer is hidden
Question 364 of 398Project Planning, Design and Implementation

Book of foreign engineers is maintained in ............[cite: 16]

ANepali
BEnglish
Cboth (a) and (b)
Dnone of the above
Answer is hidden
Question 365 of 398Project Planning, Design and Implementation

NEC publishes the name of registered engineers each year as well as every fourth year. The name of foreigner engineers publishes ............[cite: 16]

Aeach year
Bevery fourth year
Cboth (a) and (b)
Dnone of the above
Answer is hidden
Question 366 of 398Project Planning, Design and Implementation

NEC has classified an engineers in to ............ categories.[cite: 16]

A2
B3
C4
D5
Answer is hidden
Question 367 of 398Project Planning, Design and Implementation

Registration charge of general engineers for students studied in foreign universities is ............[cite: 16]

ARs. 3000
BRs. 4000
CRs. 10000
DRs. 15000
Answer is hidden
Question 368 of 398Project Planning, Design and Implementation

Total number of registration category of engineer in NEC is ............[cite: 16]

A3
B4
C5
D6
Answer is hidden
Question 369 of 398Project Planning, Design and Implementation

The min qualification required for engineer practices in Nepal is ............[cite: 16]

ABE
BBE + register in NEC
CME
DME + register in NEC
Answer is hidden
Question 370 of 398Project Planning, Design and Implementation

The interval of surveillance of colleges registered under NEC is ............[cite: 16]

Aevery 2 years
Bonce in every 3 years
Ctwice in 4 years
Dthrice in every 5 years
Answer is hidden
Question 371 of 398Project Planning, Design and Implementation

In general, Nepal engineering council meeting per year should be held ............[cite: 16]

A2 times
B3 times
C4 times
D5 times
Answer is hidden
Question 372 of 398Project Planning, Design and Implementation

Minimum .......... of the members should be present in a meeting to fulfil the quorum of NEC.[cite: 16]

A0.25
B0.5
C0.75
D1
Answer is hidden
Question 373 of 398Project Planning, Design and Implementation

If a motion submitted to a meeting of council to remove the name from the book on charge of violating professional code of conduct is passed by ............ majority of council, the name of the engineer is removed from the book.[cite: 16]

Atwo third
Bgeneral
Cthree - fourth
Dfull
Answer is hidden
Question 374 of 398Project Planning, Design and Implementation

Which of the following reasons caused desolution of NEC by GON?[cite: 16]

ACommittee of NEC work against the act and regulations
B50% of the member are bankrupt
CCollege recognition is given without fulfilling the criteria of NEC regulations
DFormation of new government of Nepal
Answer is hidden
Question 375 of 398Project Planning, Design and Implementation

The minimum time period allocated by GoN for formation of new council after the dissolution of current NEC like is ............[cite: 16]

A3 months
B6 months
C9 months
D1 year
Answer is hidden
Question 376 of 398Project Planning, Design and Implementation

For temporary affiliation, the supervision of college conducted by NEC for ............[cite: 16]

Aone time in a year
Bonce in two year
Ctwice times in a year
Dthree times a year
Answer is hidden
Question 377 of 398Project Planning, Design and Implementation

For permanent affiliation, the supervision of college conducted by NEC for ............[cite: 16]

Aone time in a year
Bonce in two year
Ctwice times in a year
Dthree times a year
Answer is hidden
Question 378 of 398Project Planning, Design and Implementation

How much % college should score at least in average to get permanent affiliation for new college from NEC?[cite: 16]

A50%
B60%
C70%
D80%
Answer is hidden
Question 379 of 398Engineering Economics & Project Management

A project is considered economically acceptable when its Benefit-Cost (B/C) ratio is:

AB/C < 1
BB/C > 1
CB/C = 0
DB/C = 1
Answer is hidden
Question 380 of 398Engineering Economics & Project Management

Standard deviation is calculated as:

A√Variance
BVariance²
CMean / Variance
DVariance / n
Answer is hidden
Question 381 of 398Engineering Economics & Project Management

The value at which a buyer and seller agree to complete a transaction is called:

ABook Value
BSalvage Value
CMarket Value
DPresent Value
Answer is hidden
Question 382 of 398Engineering Economics & Project Management

Projects A (6-year life) and B (8-year life) are being compared using the repeatability assumption. The analysis period should be:

A6 years
B8 years
C14 years
D24 years
Answer is hidden
Question 383 of 398Engineering Economics & Project Management

The time value of money concept means:

AMoney always loses value
BMoney always gains value
CA unit of money has different worth at different points in time
DInterest rates are always positive
Answer is hidden
Question 384 of 398Engineering Economics & Project Management

Which capital investment evaluation method is considered LEAST reliable and is rarely used?

AAccounting Rate of Return (ARR)
BNet Present Value (NPV)
CInternal Rate of Return (IRR)
DPayback Period
Answer is hidden
Question 385 of 398Engineering Economics & Project Management

The Schedule Performance Index (SPI) formula in Earned Value Management is:

ASPI = PV / EV
BSPI = EV / PV
CSPI = AC / EV
DSPI = EV / AC
Answer is hidden
Question 386 of 398Engineering Economics & Project Management

Cost overrun in a project is calculated as:

AActual Cost − Planned Cost
BPlanned Cost − Actual Cost
CEarned Value − Planned Value
DActual Cost / Planned Cost
Answer is hidden
Question 387 of 398Engineering Economics & Project Management

In engineering drawings, a 'B' grade pencil is primarily used for:

AFine detail linework
BConstruction lines
CDimension lines
DShading and sketching
Answer is hidden
Question 388 of 398Engineering Economics & Project Management

The standard paper size ratio (width to height) for the ISO A-series is:

A1 : √2
B1 : 2
C√2 : 1
D3 : 4
Answer is hidden
Question 389 of 398NEC & Professional Practice

Who has the authority to appoint the Chairman of the Nepal Engineering Council (NEC)?

AThe Prime Minister
BThe Government of Nepal
CThe NEC Council itself
DThe Minister of Physical Infrastructure
Answer is hidden
Question 390 of 398NEC & Professional Practice

Who appoints the Auditor of NEC?

AThe NEC Council
BThe Ministry of Finance
CThe Auditor General
DThe Government of Nepal
Answer is hidden
Question 391 of 398NEC & Professional Practice

What is the minimum number of council meetings NEC must hold per year?

A2
B4
C6
D12
Answer is hidden
Question 392 of 398NEC & Professional Practice

What is the minimum number of engineering licence examinations NEC must conduct per year?

A1
B2
C3
D4
Answer is hidden
Question 393 of 398NEC & Professional Practice

What is the minimum number of female members required in the NEC Council?

A2
B3
C4
D5
Answer is hidden
Question 394 of 398NEC & Professional Practice

The first executive committee of NEC was formed in which year (BS)?

A2054
B2056
C2058
D2060
Answer is hidden
Question 395 of 398NEC & Professional Practice

Under the NEC Act, the penalty for violating Section 2 (unauthorized engineering practice) is:

AUp to Rs. 5,000
BUp to Rs. 10,000
CUp to Rs. 15,000
DUp to Rs. 25,000
Answer is hidden
Question 396 of 398NEC & Professional Practice

What type of organisation is the Nepal Engineering Council (NEC)?

APrivate body
BGovernmental / statutory body
CNon-Governmental Organisation (NGO)
DInternational organisation
Answer is hidden
Question 397 of 398NEC & Professional Practice

Approval of a Bachelor's Engineering degree for NEC registration is granted by:

AThe university granting the degree
BNEC
CThe Ministry of Education
DThe Government of Nepal
Answer is hidden
Question 398 of 398NEC & Professional Practice

The number of engineers registered with NEC is approximately:

A45,000
B65,000
C89,263
D120,000
Answer is hidden