AArc/All MCQs
← Back to AArc
🎯

All Chapters · MCQ Read Mode

Architecture

10 Chapters·938 Total MCQs
Question 1 of 938Ch 1 · Architecture of Nepal: Licchavi, Malla, Shah & Rana Periods

Which historical period is associated with the earliest datable stone and brick architecture in the Kathmandu Valley?

AMalla period
BLicchavi period
CRana period
DShah period
Answer is hidden
Question 2 of 938Ch 1 · Architecture of Nepal: Licchavi, Malla, Shah & Rana Periods

The 'golden age' of Newar tiered pagoda temple and palace (Durbar Square) architecture is most associated with which period?

ALicchavi period
BRana period
CMalla period
DShah period (post-unification only)
Answer is hidden
Question 3 of 938Ch 1 · Architecture of Nepal: Licchavi, Malla, Shah & Rana Periods

Rana-period palace architecture in Nepal is chiefly characterized by:

AExclusive use of traditional carved timber facades
BNeo-Classical/European-influenced design with lime plaster and classical orders
CSimple mud-brick vernacular huts
DReinforced concrete frame construction
Answer is hidden
Question 4 of 938Ch 1 · Architecture of Nepal: Licchavi, Malla, Shah & Rana Periods

The traditional carved timber window type used prominently on the principal/central facade of a Newar building is known as the:

ATiki jhya
BBou jhya
CSano jhya
DGundri jhya
Answer is hidden
Question 5 of 938Ch 1 · Architecture of Nepal: Licchavi, Malla, Shah & Rana Periods

In traditional Newar timber construction, the diagonal carved brackets that support projecting eaves and roof loads are called:

ATorans
BThams
CTunala (struts)
DJhingati
Answer is hidden
Question 6 of 938Ch 1 · Architecture of Nepal: Licchavi, Malla, Shah & Rana Periods

The decorative carved element positioned above a traditional door lintel, often depicting a deity, is called a:

AToran
BJhingati
CDhunge dhara
DGajur
Answer is hidden
Question 7 of 938Ch 1 · Architecture of Nepal: Licchavi, Malla, Shah & Rana Periods

Jhingati refers to:

AA carved timber post
BA type of fired clay roof tile
CA decorative window lattice
DA copper roof finial
Answer is hidden
Question 8 of 938Ch 1 · Architecture of Nepal: Licchavi, Malla, Shah & Rana Periods

The gilded, often ornately worked, finial crowning a tiered pagoda temple roof is called the:

AToran
BGajur
CTunala
DDhoka
Answer is hidden
Question 9 of 938Ch 1 · Architecture of Nepal: Licchavi, Malla, Shah & Rana Periods

Deep relief wood carving on struts, tympanums, and window frames depicting deities and floral/geometric motifs is most characteristic of which building tradition?

ARana-period Neo-Classical palaces
BTraditional Newar timber construction
CModern reinforced concrete architecture
DTerai vernacular bamboo construction
Answer is hidden
Question 10 of 938Ch 1 · Architecture of Nepal: Licchavi, Malla, Shah & Rana Periods

Which sequence correctly orders these periods chronologically (earliest to latest)?

ARana → Shah → Malla → Licchavi
BLicchavi → Malla → Shah → Rana
CMalla → Licchavi → Rana → Shah
DShah → Rana → Licchavi → Malla
Answer is hidden
Question 11 of 938Ch 1 · Traditional Nepalese Architectural Typologies

In a traditional multi-storey Newar residence, the ground floor is typically used for:

AKitchen and attic storage only
BShop, storage, or livestock
CExclusively as a shrine room
DExclusively as a bedroom
Answer is hidden
Question 12 of 938Ch 1 · Traditional Nepalese Architectural Typologies

A tiered pagoda-style temple is characterized by:

AA single flat roof with no tiers
BSuccessively diminishing roof tiers supported by carved struts around a central sanctum
CA tall curvilinear tower with no roof tiers
DA hemispherical dome with no superstructure
Answer is hidden
Question 13 of 938Ch 1 · Traditional Nepalese Architectural Typologies

A Shikhara-style temple is distinguished from a tiered pagoda temple primarily by its:

AUse of only timber construction
BTall, curvilinear or stepped tower-form superstructure over the sanctum
CComplete absence of a sanctum
DBeing exclusively a residential typology
Answer is hidden
Question 14 of 938Ch 1 · Traditional Nepalese Architectural Typologies

A Bahal, as a traditional urban typology, is best described as a:

AA single-storey residential hut
BA Buddhist monastic courtyard complex (vihara) with an axial shrine
CAn open public festival platform only
DA stone water-spout conduit
Answer is hidden
Question 15 of 938Ch 1 · Traditional Nepalese Architectural Typologies

An open, pillared rest shelter built along a road for travelers is traditionally called a:

ADabali
BPati
CDyo Chen
DMath
Answer is hidden
Question 16 of 938Ch 1 · Traditional Nepalese Architectural Typologies

An open public platform/square traditionally used for festivals and chariot processions is called a:

ADabali
BNani
CBahil
DChaitya
Answer is hidden
Question 17 of 938Ch 1 · Traditional Nepalese Architectural Typologies

The basic courtyard spatial unit organizing traditional Newar settlements is the:

AChowk
BGajur
CToran
DJhingati
Answer is hidden
Question 18 of 938Ch 1 · Traditional Nepalese Architectural Typologies

A dhunge dhara is best described as a:

AA carved wooden window
BA traditional stone-spout water conduit, often within a sunken courtyard (hiti)
CA Buddhist votive stone monument
DA monastic residential building
Answer is hidden
Question 19 of 938Ch 1 · Traditional Nepalese Architectural Typologies

A Math, as a traditional typology, primarily functioned as a:

APurely commercial marketplace
BResidential-institutional building for religious teachers/ascetics combining residential and ceremonial use
CPublic rest shelter for travelers only
DRoyal palace exclusively
Answer is hidden
Question 20 of 938Ch 1 · Traditional Nepalese Architectural Typologies

Which of the following is a Buddhist religious monument typology enshrining relics or symbolizing the enlightened mind?

AMandap
BStupa/Chaitya
CNani
DLachi
Answer is hidden
Question 21 of 938Ch 1 · Vernacular Architecture of Nepal's Physiographic Regions

Vernacular houses of the high-altitude Himalayan/trans-Himalayan region typically feature:

ASteeply pitched thatch roofs and large window openings
BFlat or low-slope roofs, thick stone/rammed-earth walls, and small openings
CBamboo frame with wattle-and-daub infill
DRaised plinths for flood protection
Answer is hidden
Question 22 of 938Ch 1 · Vernacular Architecture of Nepal's Physiographic Regions

Raised plinths in Terai vernacular houses primarily serve to:

AProvide additional decorative height
BProtect against seasonal flooding
CReduce construction material cost
DImprove resistance to earthquakes only
Answer is hidden
Question 23 of 938Ch 1 · Vernacular Architecture of Nepal's Physiographic Regions

Sloped roofs (thatch or stone/slate shingle) are characteristic of vernacular houses in which physiographic region?

AHigh-altitude Himalayan region
BMid-hill region
CTerai plains only
DNone of the regions
Answer is hidden
Question 24 of 938Ch 1 · Vernacular Architecture of Nepal's Physiographic Regions

Open verandahs in Tharu vernacular houses of the Terai are primarily provided for:

AInsulation against extreme cold
BVentilation in the hot, humid climate
CStorage of firewood only
DStructural reinforcement of the roof
Answer is hidden
Question 25 of 938Ch 1 · Vernacular Architecture of Nepal's Physiographic Regions

Which ethnic vernacular house typology is particularly noted for decorative exterior wall art/paintings?

ASherpa houses
BTharu houses
CMustang houses
DNewar palace architecture
Answer is hidden
Question 26 of 938Ch 1 · Vernacular Architecture of Nepal's Physiographic Regions

The construction techniques used in vernacular architecture are best described as being passed down through:

AFormal university-level engineering education
BCommunity/craft tradition and inherited local skill
CInternational building codes only
DGovernment-mandated design manuals
Answer is hidden
Question 27 of 938Ch 1 · Vernacular Architecture of Nepal's Physiographic Regions

A key functional reason for combining livestock shelter, storage, and living space within a single vernacular house footprint is:

AAesthetic preference with no functional basis
BReflecting the predominantly agrarian livelihood of the household
CGovernment regulation mandating this layout
DReducing the building's visual scale for tourism
Answer is hidden
Question 28 of 938Ch 1 · Vernacular Architecture of Nepal's Physiographic Regions

Vernacular houses in the Mustang/trans-Himalayan area are aesthetically distinguished by:

ABright multi-coloured tile roofs
BWhitewashed walls with maroon/ochre bands
CExtensive glass curtain-wall facades
DCorrugated metal cladding as the primary finish
Answer is hidden
Question 29 of 938Ch 1 · Vernacular Architecture of Nepal's Physiographic Regions

Vernacular architecture is best understood as primarily responding to:

AInternational architectural design trends
BLocal livelihood, climate, and available materials/skills
CGovernment-mandated zoning ordinances alone
DPurely decorative/artistic motivations with no functional basis
Answer is hidden
Question 30 of 938Ch 1 · Vernacular Architecture of Nepal's Physiographic Regions

Cattle sheltered on the ground floor of high-altitude vernacular houses primarily serves the function of:

AProviding decorative interest to visitors
BContributing warmth that rises to living spaces above, aiding thermal comfort
CMeeting a legal requirement for livestock housing
DReducing the building's overall height
Answer is hidden
Question 31 of 938Ch 1 · Nepalese World Heritage Sites and their Conservation

A World Heritage Site nomination must demonstrate:

AOnly national historical importance
BOutstanding Universal Value (OUV) along with authenticity/integrity and adequate protection
COnly that the site is the tallest structure in the country
DOnly ownership by the national government
Answer is hidden
Question 32 of 938Ch 1 · Nepalese World Heritage Sites and their Conservation

How many monument zones comprise the Kathmandu Valley World Heritage Site?

AThree
BFive
CSeven
DTen
Answer is hidden
Question 33 of 938Ch 1 · Nepalese World Heritage Sites and their Conservation

Which of the following is Nepal's other major inscribed cultural World Heritage Site outside the Kathmandu Valley?

AChitwan National Park
BLumbini
CSagarmatha National Park
DAnnapurna Conservation Area
Answer is hidden
Question 34 of 938Ch 1 · Nepalese World Heritage Sites and their Conservation

Byelaws in a heritage monument zone typically:

AEncourage unrestricted use of modern glass and RCC facades
BRestrict building height, material, and form to protect the site's visual/physical integrity
CApply no restrictions at all within the core zone
DApply only to buildings outside the buffer zone
Answer is hidden
Question 35 of 938Ch 1 · Nepalese World Heritage Sites and their Conservation

The Venice Charter (1964) is significant in conservation practice because it:

AEstablished Nepal's national building code
BProvided internationally recognized principles guiding conservation philosophy and practice
CIs a treaty governing only natural heritage sites
DRegulates zoning ordinances unrelated to heritage
Answer is hidden
Question 36 of 938Ch 1 · Nepalese World Heritage Sites and their Conservation

The Nara Document (1994) is particularly associated with the conservation principle of:

AStructural load calculation methods
BAuthenticity, recognizing cultural diversity in how it is assessed
CBuilding height restriction formulas
DZoning ordinance classification
Answer is hidden
Question 37 of 938Ch 1 · Nepalese World Heritage Sites and their Conservation

In the conservation process, which step involves systematic listing/documentation of heritage assets and their significance?

AInspection
BInventory
CReconstruction
DDegrees of intervention
Answer is hidden
Question 38 of 938Ch 1 · Nepalese World Heritage Sites and their Conservation

Which degree of conservation intervention is generally considered the least preferred/most extensive?

APreventive maintenance
BConsolidation
CRestoration
DReconstruction
Answer is hidden
Question 39 of 938Ch 1 · Nepalese World Heritage Sites and their Conservation

A core conservation principle is that new work introduced during intervention should be:

AMade identical and indistinguishable from the original fabric
BDistinguishable from the original fabric while remaining sympathetic to it
CApplied without any documentation of the original condition
DAvoided entirely under all circumstances
Answer is hidden
Question 40 of 938Ch 1 · Nepalese World Heritage Sites and their Conservation

Documentation, as a step in the conservation process, primarily involves:

AEstimating the project's final construction cost only
BDetailed recording (measured drawings, photographs) of the existing fabric prior to intervention
CMarketing the site to tourists
DDemolishing unstable sections without record
Answer is hidden
Question 41 of 938Ch 1 · Zoning Ordinances and Building Regulations

Floor Area Ratio (FAR) is defined as the ratio of:

ABuilding height to plot width
BTotal permissible built-up floor area to total plot area
CGround coverage to setback distance
DRoad width to building height
Answer is hidden
Question 42 of 938Ch 1 · Zoning Ordinances and Building Regulations

Ground coverage regulates:

AThe maximum height of a building
BThe percentage of the plot that may be covered by the building footprint at ground level
CThe total number of floors permitted regardless of footprint
DOnly the building's setback from the road
Answer is hidden
Question 43 of 938Ch 1 · Zoning Ordinances and Building Regulations

Setback requirements in building regulations primarily ensure:

AMaximum possible ground coverage
BAdequate light, ventilation, privacy, and space for future road widening
CThat FAR is ignored for corner plots
DThat buildings can be constructed directly on the plot boundary
Answer is hidden
Question 44 of 938Ch 1 · Zoning Ordinances and Building Regulations

Right of Way (ROW) refers to:

AThe maximum floor area ratio permitted on a plot
BThe width of a road/access reserved for public passage, including carriageway and utility/footpath strips
CThe height restriction imposed by a light plane
DThe traditional land measurement unit used in the Terai
Answer is hidden
Question 45 of 938Ch 1 · Zoning Ordinances and Building Regulations

A 'light plane' (skyline/daylight plane) regulation in building byelaws is intended to: streets

AMaximize the building's ground coverage
BRestrict building height/massing to ensure adequate daylight/ventilation reaches neighbouring plots and
CDetermine the plot's FAR value
DSpecify only the roofing material to be used
Answer is hidden
Question 46 of 938Ch 1 · Zoning Ordinances and Building Regulations

In the traditional Ropani-Aana-Paisa-Daam land measurement system used in Nepal's hill regions, one ropani equals:

A8 aana
B16 aana
C32 aana
D64 aana
Answer is hidden
Question 47 of 938Ch 1 · Zoning Ordinances and Building Regulations

The Bigha-Kattha-Dhur land measurement system is traditionally used in which region of Nepal?

AHigh Himalayan region
BMid-hill region
CTerai (plains) region
DKathmandu Valley exclusively
Answer is hidden
Question 48 of 938Ch 1 · Zoning Ordinances and Building Regulations

One ropani is approximately equal to how many square metres?

A101.74 m²
B254.36 m²
C508.72 m²
D6772.63 m²
Answer is hidden
Question 49 of 938Ch 1 · Zoning Ordinances and Building Regulations

Zoning/building control parameters such as FAR, ground coverage, and setback typically vary based on:

AThe architect's personal design preference alone
BThe land-use zone (residential/commercial/mixed-use/industrial) and road width
CThe building's roofing material only
DThe nationality of the property owner
Answer is hidden
Question 50 of 938Ch 1 · Zoning Ordinances and Building Regulations

Before construction can proceed, a building permit application must typically demonstrate compliance with:

AOnly the owner's preferred aesthetic style
BAll applicable zoning/building control parameters (FAR, ground coverage, setback, ROW, light plane, etc.)
COnly the structural design, ignoring zoning parameters
DNo specific regulatory parameters at all
Answer is hidden
Question 51 of 938Ch 1 · Building Typologies, Ownership, Legal Rights & Tenure

Apartment ownership, as a building typology/tenure concept, is best described as:

APurely leasehold tenure with no ownership rights
BIndividual unit ownership combined with shared/undivided ownership of common areas and land
CGovernment ownership with private tenancy only
DOwnership restricted exclusively to commercial use
Answer is hidden
Question 52 of 938Ch 1 · Building Typologies, Ownership, Legal Rights & Tenure

Group housing, as a building typology, refers to: control

AA single detached house on its own plot
BA planned residential development of multiple dwelling units on one larger plot under unified layout/design
CAn industrial warehouse complex
DA single high-rise commercial tower
Answer is hidden
Question 53 of 938Ch 1 · Building Typologies, Ownership, Legal Rights & Tenure

A mixed-use building is one that: structure

AServes only a single institutional function
BCombines two or more use types (e.g. ground-floor commercial with upper-floor residential) within a single
CIs used exclusively for industrial manufacturing
DCannot legally include any commercial function
Answer is hidden
Question 54 of 938Ch 1 · Building Typologies, Ownership, Legal Rights & Tenure

Freehold/individual ownership of a property means:

AThe owner has only temporary use rights for a fixed lease period
BThe owner holds outright ownership of both the land and the building
CThe property is jointly owned by an entire neighbourhood with no individual title
DOwnership rights exist only for the building, never the underlying land
Answer is hidden
Question 55 of 938Ch 1 · Building Typologies, Ownership, Legal Rights & Tenure

Leasehold tenure differs from freehold ownership in that the leaseholder: freehold title

AOwns the freehold title outright, forever
BHas the right to use/occupy the property for a defined period under a lease, without owning the underlying
CAutomatically becomes the freehold owner after one year
DHas no legal rights to occupy the property at all
Answer is hidden
Question 56 of 938Ch 1 · Building Typologies, Ownership, Legal Rights & Tenure

Guthi land tenure in the Nepalese context refers to a system where: functions

ALand is owned exclusively by foreign investors
BLand/property is dedicated to a religious, charitable, or community trust, with proceeds supporting associated
CLand can never be used for any religious purpose
DOwnership is transferred annually by lottery
Answer is hidden
Question 57 of 938Ch 1 · Building Typologies, Ownership, Legal Rights & Tenure

Tenancy rights are best described as: agreement

AIdentical to freehold ownership rights
BThe rights of a tenant occupying rented property, distinct from ownership, governed by a tenancy/rental
CRights that automatically confer land ownership after a lease ends
DRights applicable only to institutional buildings
Answer is hidden
Question 58 of 938Ch 1 · Building Typologies, Ownership, Legal Rights & Tenure

Legal registration of ownership (e.g. at the Land Revenue/Survey Office) is important primarily because it:

AIs purely optional with no legal consequence
BEstablishes enforceable property/tenure rights in the Nepalese legal context
COnly applies to industrial buildings
DReplaces the need for any building permit
Answer is hidden
Question 59 of 938Ch 1 · Building Typologies, Ownership, Legal Rights & Tenure

Which of the following is classified as an institutional building typology?

AA private apartment unit
BA school or government office
CA retail shopping mall
DA manufacturing warehouse
Answer is hidden
Question 60 of 938Ch 1 · Building Typologies, Ownership, Legal Rights & Tenure

An apartment owners' association typically governs:

AOnly the interior decoration choices of individual unit owners
BThe management and by-laws relating to shared/common areas and facilities of the apartment building
CThe national zoning ordinances for the entire municipality
DOnly leasehold tenancy agreements for commercial buildings
Answer is hidden
Question 61 of 938Ch 2 · Stone, Brick, Timber, Metals and Alloys

Which stone type is particularly valued for roofing and flooring due to its easy cleavage into thin sheets?

AGranite
BSandstone
CSlate
DLimestone
Answer is hidden
Question 62 of 938Ch 2 · Stone, Brick, Timber, Metals and Alloys

Seasoning of freshly quarried stone primarily serves to:

AIncrease its moisture content permanently
BAllow quarry sap/moisture to dry out, improving durability and workability
CChange the stone's mineral composition
DEliminate the need for any dressing
Answer is hidden
Question 63 of 938Ch 2 · Stone, Brick, Timber, Metals and Alloys

The primary constituent of brick is:

ALimestone
BClay
CGranite
DBitumen
Answer is hidden
Question 64 of 938Ch 2 · Stone, Brick, Timber, Metals and Alloys

Which brick manufacturing step directly precedes burning (kiln firing)?

AGrading
BCooling
CDrying
DTesting
Answer is hidden
Question 65 of 938Ch 2 · Stone, Brick, Timber, Metals and Alloys

The efflorescence test on bricks is conducted to check for:

ACompressive strength only
BThe presence of soluble salts that can cause surface deposits/staining
CThe brick's exact colour shade
DThe brick's fire resistance rating
Answer is hidden
Question 66 of 938Ch 2 · Stone, Brick, Timber, Metals and Alloys

A masonry bonding pattern in which headers and stretchers alternate in every course is known as:

AEnglish bond
BStretcher bond
CHeader bond only
DFlemish bond arranged only in alternate courses
Answer is hidden
Question 67 of 938Ch 2 · Stone, Brick, Timber, Metals and Alloys

Seasoning of timber is primarily undertaken to:

AIncrease its natural moisture content
BReduce moisture content and minimize subsequent shrinkage/warping/decay
CChange its structural grain direction
DEliminate the need for any preservative treatment
Answer is hidden
Question 68 of 938Ch 2 · Stone, Brick, Timber, Metals and Alloys

Which timber preservation method involves treatment with substances such as creosote or chemical salts?

ASeasoning
BPreservation treatment
CDressing
DGrading
Answer is hidden
Question 69 of 938Ch 2 · Stone, Brick, Timber, Metals and Alloys

Steel is primarily valued as a structural material in architecture for its:

ALow tensile strength and high brittleness
BHigh tensile strength and ductility
CComplete resistance to any corrosion without protection
DInability to be used in reinforced concrete
Answer is hidden
Question 70 of 938Ch 2 · Stone, Brick, Timber, Metals and Alloys

Aluminium and its alloys are commonly favoured in architectural construction (e.g. facades, windows, curtain walling) primarily due to their:

AVery high weight and poor corrosion resistance
BLight weight and good corrosion resistance
CInability to be extruded into sections
DExtremely low cost compared to all other metals
Answer is hidden
Question 71 of 938Ch 2 · Lime, Cement, and Concrete

Hydraulic lime, as distinct from fat lime, is characterized by its ability to:

AOnly set in completely dry conditions
BSet even under water, due to the presence of clay impurities
CNever be used in mortar
DBe weaker than fat lime in all applications
Answer is hidden
Question 72 of 938Ch 2 · Lime, Cement, and Concrete

Gypsum is added during cement manufacture primarily to:

AIncrease the cement's colour intensity
BControl the setting time of the cement
CReplace limestone entirely in the mix
DReduce the cement's compressive strength deliberately
Answer is hidden
Question 73 of 938Ch 2 · Lime, Cement, and Concrete

The Vicat apparatus is used in cement testing to determine:

ACompressive strength only
BConsistency and setting time
CFineness of the cement particles only
DThe colour of the cement
Answer is hidden
Question 74 of 938Ch 2 · Lime, Cement, and Concrete

Cement should be stored:

AOn the ground in an open, exposed area
BIn a dry, elevated, well-ventilated location away from moisture
CSubmerged in water to keep it cool
DOnly for a maximum of one day before use
Answer is hidden
Question 75 of 938Ch 2 · Lime, Cement, and Concrete

Well-graded aggregates in a concrete mix (a range of particle sizes) primarily result in:

AIncreased voids and a weaker mix
BA denser, more workable, and economical mix by minimizing voids
CNo effect whatsoever on the concrete's properties
DA mix that cannot be compacted at all
Answer is hidden
Question 76 of 938Ch 2 · Lime, Cement, and Concrete

Compaction of freshly placed concrete is performed primarily to:

AIncrease the water content of the mix
BRemove entrapped air and achieve maximum density and strength
CSpeed up the setting time artificially
DReduce the amount of cement required
Answer is hidden
Question 77 of 938Ch 2 · Lime, Cement, and Concrete

Curing of concrete is essential because it:

AHas no effect on concrete strength
BMaintains adequate moisture/temperature for proper hydration of cement, critical to design strength/durability
CIs only relevant for concrete used in cold climates
DShould be stopped immediately after formwork removal
Answer is hidden
Question 78 of 938Ch 2 · Lime, Cement, and Concrete

The slump test is used to measure which property of fresh (plastic-state) concrete?

ACompressive strength
BWorkability/consistency
CLong-term durability
DPermeability
Answer is hidden
Question 79 of 938Ch 2 · Lime, Cement, and Concrete

Which of the following is classified as a hardened-state property of concrete?

AWorkability
BCohesiveness
CCompressive strength
DSlump value
Answer is hidden
Question 80 of 938Ch 2 · Lime, Cement, and Concrete

Cement plaster and cement paint are examples of cement's use as:

AA structural aggregate only
BA surface finish/protective coating application
CA soil stabilization agent exclusively
DA timber preservative
Answer is hidden
Question 81 of 938Ch 2 · Walls, Openings, Finishing and Cladding Materials

A cavity wall consists of:

AA single solid masonry leaf with no gap
BTwo parallel masonry leaves separated by an air cavity with wall ties
CA non-load-bearing internal timber-stud partition only
DA glass-and-metal curtain wall system
Answer is hidden
Question 82 of 938Ch 2 · Walls, Openings, Finishing and Cladding Materials

A curtain wall system is best described as a: lateral loads

ALoad-bearing masonry wall carrying floor loads
BNon-load-bearing external cladding wall hung from the structural frame, carrying only its own weight and
CPurely internal partition wall
DWall made exclusively of solid brick masonry
Answer is hidden
Question 83 of 938Ch 2 · Walls, Openings, Finishing and Cladding Materials

Which material is particularly favoured for lightweight, corrosion-resistant, slim-profile modern window/glazing frames?

ACast iron
BAluminium
CUntreated mild steel
DSolid masonry
Answer is hidden
Question 84 of 938Ch 2 · Walls, Openings, Finishing and Cladding Materials

A false ceiling is primarily installed to:

AIncrease the structural load-bearing capacity of the roof
BConceal services, improve acoustics, and provide a finished appearance below the structural ceiling
CReplace the need for any structural slab
DServe only as a fire-rated structural element
Answer is hidden
Question 85 of 938Ch 2 · Walls, Openings, Finishing and Cladding Materials

Toughened (tempered) glass is distinguished from ordinary float glass by its:

ALower strength and higher fragility
BGreater strength and safer fragmentation pattern when broken
CComplete opacity to visible light
DInability to be used in any window application
Answer is hidden
Question 86 of 938Ch 2 · Walls, Openings, Finishing and Cladding Materials

Varnish, as a finishing material, is typically applied to provide:

AAn opaque, heavily pigmented coating only
BA clear, transparent protective film
CStructural reinforcement to timber
DFireproofing with no aesthetic function
Answer is hidden
Question 87 of 938Ch 2 · Walls, Openings, Finishing and Cladding Materials

Terrazzo, as a flooring finish, is best described as:

AA type of glass cladding panel
BA composite finish of marble/stone chips set in a cementitious binder and polished
CA timber-based flooring system only
DA type of insulated glazing unit
Answer is hidden
Question 88 of 938Ch 2 · Walls, Openings, Finishing and Cladding Materials

A key advantage of pre-fabricated building components (e.g. precast concrete panels) is:

AThey cannot be used in any modern construction
BFaster construction and improved quality control compared to fully in-situ methods
CThey require no factory manufacturing process
DThey eliminate the need for any site assembly
Answer is hidden
Question 89 of 938Ch 2 · Walls, Openings, Finishing and Cladding Materials

A partition wall is best defined as a wall that is:

AAlways load-bearing and part of the primary structural frame
BNon-load-bearing, used to divide interior spaces
CExclusively made of glass curtain wall systems
DUsed only as an external cladding element
Answer is hidden
Question 90 of 938Ch 2 · Walls, Openings, Finishing and Cladding Materials

Cladding materials applied over a structural wall or frame primarily serve to:

ACarry the building's entire structural/gravity load
BProvide an external protective and decorative skin/finish
CReplace the need for any structural columns
DFunction only as an internal acoustic treatment
Answer is hidden
Question 91 of 938Ch 2 · Foundation Works, Temporary Works and Formwork

A strip foundation is best suited to support:

AA single isolated column point load
BA continuous line load, such as a load-bearing wall
COnly deep, heavily loaded structures on weak soil
DOnly basement retaining walls
Answer is hidden
Question 92 of 938Ch 2 · Foundation Works, Temporary Works and Formwork

A combined foundation is used when:

AOnly a single, well-isolated column needs support
BTwo or more columns require a single shared footing (e.g. due to proximity or a boundary constraint)
CThe entire building footprint requires one continuous slab
DDeep piling is the only viable option
Answer is hidden
Question 93 of 938Ch 2 · Foundation Works, Temporary Works and Formwork

A raft (mat) foundation is generally chosen when: settlement

ASoil bearing capacity is very high and columns are widely spaced
BLoads are very high, soil is weak/variable, or columns are closely spaced, requiring reduced differential
COnly a single lightweight column needs support
DNo foundation is required at all
Answer is hidden
Question 94 of 938Ch 2 · Foundation Works, Temporary Works and Formwork

Deep foundations (e.g. piles) are primarily used when:

AShallow soil strata have adequate bearing capacity for the applied loads
BShallow soil strata lack adequate bearing capacity or loads are very high, requiring transfer to deeper strata
CThe building has no columns
DOnly temporary structures are being built
Answer is hidden
Question 95 of 938Ch 2 · Foundation Works, Temporary Works and Formwork

A retaining wall's primary structural function is to:

ASupport only vertical gravity loads from a roof
BResist lateral earth pressure and maintain a difference in ground level
CServe exclusively as a decorative garden feature
DProvide fire resistance to a building
Answer is hidden
Question 96 of 938Ch 2 · Foundation Works, Temporary Works and Formwork

Shoring, as a temporary work, is used to:

APermanently replace a building's foundation
BProvide temporary support to an existing structure/wall during adjacent excavation or construction
CProvide a permanent working platform at height
DWaterproof a basement wall
Answer is hidden
Question 97 of 938Ch 2 · Foundation Works, Temporary Works and Formwork

Underpinning refers to the process of: below its level

AConstructing new scaffolding around a building
BStrengthening or deepening an existing foundation, often to support increased loads or allow excavation
CPainting the exterior finish of a building
DInstalling a false ceiling below a structural slab
Answer is hidden
Question 98 of 938Ch 2 · Foundation Works, Temporary Works and Formwork

Which formwork material is generally most durable and suited to many repetitive reuses in standard, repeated forms?

ATimber
BPlywood
CSteel
DNone of these can be reused
Answer is hidden
Question 99 of 938Ch 2 · Foundation Works, Temporary Works and Formwork

A key structural requirement of formwork is that it must:

ABe as flexible/deformable as possible under load
BBe strong and rigid enough to resist fresh concrete pressure without excessive deflection
CAllow grout to leak out freely during pouring
DBe permanently bonded to the finished concrete
Answer is hidden
Question 100 of 938Ch 2 · Foundation Works, Temporary Works and Formwork

Basement construction must specifically address which of the following design considerations, beyond typical foundation design?

ARoof tile selection
BLateral earth/water pressure on basement walls, waterproofing, and dewatering during construction
CChoice of interior paint colour
DWindow glazing type
Answer is hidden
Question 101 of 938Ch 2 · Concrete Works and Steel

A one-way or two-way R.C.C. slab is an example of which building element?

AR.C.C. foundation
BR.C.C. floor
CConcrete stair
DConstruction joint
Answer is hidden
Question 102 of 938Ch 2 · Concrete Works and Steel

A concrete frame, in structural terms, refers to:

AOnly the foundation of a building
BThe structural skeleton of interconnected R.C.C. beams and columns carrying loads to the foundation
CA type of temporary formwork
DA decorative window frame
Answer is hidden
Question 103 of 938Ch 2 · Concrete Works and Steel

Concrete block masonry, compared to traditional brick masonry, generally offers:

ASlower construction with highly non-uniform units
BFaster construction and more uniform units
CNo possibility of using mortar
DExclusively decorative, non-structural use
Answer is hidden
Question 104 of 938Ch 2 · Concrete Works and Steel

A construction joint in a concrete pour should ideally be located:

AAt the point of maximum bending moment/shear
BNear mid-span or another location of relatively low shear, where it least affects structural integrity
CAlways at the very top of a column
DRandomly, as location has no structural significance
Answer is hidden
Question 105 of 938Ch 2 · Concrete Works and Steel

Proper treatment of a construction joint surface (roughening, cleaning, bonding agent) is important primarily to:

ASpeed up the concrete's initial setting time
BEnsure adequate bond and structural continuity between the old and new concrete
CReduce the amount of reinforcement required
DEliminate the need for curing
Answer is hidden
Question 106 of 938Ch 2 · Concrete Works and Steel

A structural steel column is primarily designed to resist:

ATransverse bending loads only
BAxial compressive load, with sections chosen to resist buckling
COnly lateral wind loads with no axial load
DTorsional loads exclusively
Answer is hidden
Question 107 of 938Ch 2 · Concrete Works and Steel

A steel girder, as distinct from an ordinary beam, is typically:

ASmaller and used only for minor secondary framing
BA large primary horizontal member supporting secondary beams over greater spans/heavier loads
CUsed only for vertical compression members
DA type of riveted connection only
Answer is hidden
Question 108 of 938Ch 2 · Concrete Works and Steel

A truss achieves efficient long-span structural action primarily by:

AResisting loads purely through bending in each member
BCarrying loads primarily as axial tension/compression in each triangulated member
CUsing only a single solid beam with no triangulation
DRelying entirely on masonry infill panels
Answer is hidden
Question 109 of 938Ch 2 · Concrete Works and Steel

Rivets, as a traditional steel connection method, have largely been superseded in modern practice by:

ANo replacement; rivets remain the only method used
BBolting and welding
COnly adhesive bonding
DOnly timber pegging
Answer is hidden
Question 110 of 938Ch 2 · Concrete Works and Steel

Arc welding, as a steel joining method, works by:

AMechanically interlocking members with a heated pin
BFusing steel members together using heat generated by an electric arc
CBonding members using only adhesive with no heat
DBolting members together with no heat involved
Answer is hidden
Question 111 of 938Ch 2 · Preventive Measures in Buildings and Building Services (MEP)

Fire prevention in buildings is achieved through a combination of:

ADesign, material choice, and construction detailing
BOnly the colour of the exterior paint
COnly the depth of the foundation
DOnly the choice of floor tiles
Answer is hidden
Question 112 of 938Ch 2 · Preventive Measures in Buildings and Building Services (MEP)

A damp-proof course (DPC) is typically located:

AAt the roof level only
BAs a horizontal impervious layer placed above plinth level
COnly within the foundation footing, below ground
DOnly on the external face of window frames
Answer is hidden
Question 113 of 938Ch 2 · Preventive Measures in Buildings and Building Services (MEP)

Efflorescence in masonry is best prevented by:

AUsing bricks/materials high in soluble salts
BUsing bricks/materials low in soluble salts and providing adequate damp-proofing
CAvoiding all curing of concrete
DApplying no protective measures at all
Answer is hidden
Question 114 of 938Ch 2 · Preventive Measures in Buildings and Building Services (MEP)

Corrosion of embedded steel reinforcement in concrete is primarily mitigated by:

AReducing the concrete cover to a minimum
BProviding adequate concrete cover to the reinforcement
CExposing the reinforcement directly to the atmosphere
DUsing only untreated mild steel with no cover
Answer is hidden
Question 115 of 938Ch 2 · Preventive Measures in Buildings and Building Services (MEP)

Galvanic corrosion in metal building components can be avoided by:

ADeliberately placing dissimilar metals in direct contact
BAvoiding direct contact between dissimilar metals or using appropriate isolation/coatings
CIncreasing moisture exposure at metal joints
DUsing only combustible materials nearby
Answer is hidden
Question 116 of 938Ch 2 · Preventive Measures in Buildings and Building Services (MEP)

Which building service category includes HVAC systems and vertical transportation (lifts/escalators)?

AElectrical
BPlumbing
CMechanical
DStructural
Answer is hidden
Question 117 of 938Ch 2 · Preventive Measures in Buildings and Building Services (MEP)

Lifts and escalators in a building should be planned primarily based on:

AThe building's exterior paint colour
BCapacity/traffic analysis and convenient, code-compliant access
CThe structural engineer's personal preference alone
DRandom placement with no analysis
Answer is hidden
Question 118 of 938Ch 2 · Preventive Measures in Buildings and Building Services (MEP)

A septic tank and soak pit system is primarily used for:

ARainwater harvesting for potable water supply
BOn-site sewage treatment/disposal where a municipal sewer connection is unavailable
CSolar photovoltaic power generation
DFire suppression water storage
Answer is hidden
Question 119 of 938Ch 2 · Preventive Measures in Buildings and Building Services (MEP)

Rainwater harvesting, as an integrated building service, primarily involves:

ARemoving all rainwater from a site as quickly as possible with no reuse
BCollecting and storing roof/site rainwater runoff for reuse or groundwater recharge
CGenerating electrical power from falling rain
DPreventing any rainwater from reaching the ground at all
Answer is hidden
Question 120 of 938Ch 2 · Preventive Measures in Buildings and Building Services (MEP)

MEP services in a building project should ideally be planned:

AOnly after the building's construction is fully complete
BEarly, with integrated design coordination alongside the architectural/structural design
CIndependently of the architectural design, with no coordination
DOnly by the client, with no professional design input
Answer is hidden
Question 121 of 938Ch 3 · Section 3.1

Ancient Egyptian architecture relied primarily on which structural system?

ATrue arch and vault
BPost-and-lintel (trabeated) system
CRibbed vault with flying buttress
DReinforced concrete frame
Answer is hidden
Question 122 of 938Ch 3 · Section 3.1

Entasis, a feature of Greek Classical architecture, refers to:

AA type of roof truss
BA subtle convex curvature given to columns for optical correction
CA pointed arch form
DA dome supported on pendentives
Answer is hidden
Question 123 of 938Ch 3 · Section 3.1

Which Classical Greek order is characterized by the simplest, sturdiest column with no base and a plain capital?

ACorinthian
BIonic
CDoric
DComposite
Answer is hidden
Question 124 of 938Ch 3 · Section 3.1

Roman architecture's major structural innovations, compared to Greek architecture, included:

AExclusive reliance on post-and-lintel systems
BThe true arch, vault, and dome, aided by the use of concrete
CThe invention of the pointed arch
DThe flying buttress
Answer is hidden
Question 125 of 938Ch 3 · Section 3.1

The Pantheon in Rome is particularly notable for its:

APointed Gothic arches
BLarge coffered concrete dome
CUse of pendentives over a square base
DFlying buttresses supporting its walls
Answer is hidden
Question 126 of 938Ch 3 · Section 3.1

A pendentive, as used in Byzantine architecture (e.g. Hagia Sophia), is a structural device that enables:

AA pointed arch to be constructed
BA circular dome to be placed over a square base
CA flying buttress to support a wall
DA post-and-lintel system to span greater distances
Answer is hidden
Question 127 of 938Ch 3 · Section 3.1

Romanesque architecture is generally characterized by:

AThin walls, large stained-glass windows, and pointed arches
BThick masonry walls, small window openings, and semicircular (round) arches
CReinforced concrete frames and curtain walls
DExclusively timber post-and-beam construction
Answer is hidden
Question 128 of 938Ch 3 · Section 3.1

The Gothic architectural system of pointed arch, ribbed vault, and flying buttress primarily enabled:

AShorter, heavier buildings with small windows
BTaller structures with thinner walls and larger window openings
CThe elimination of any need for vertical supports
DA return to purely post-and-lintel construction
Answer is hidden
Question 129 of 938Ch 3 · Section 3.1

Renaissance architecture is best characterized by:

AThe invention of the flying buttress
BA revival of classical Greco-Roman orders, proportion, and symmetry
CThe introduction of the pointed Gothic arch
DThe exclusive use of exposed structural steel
Answer is hidden
Question 130 of 938Ch 3 · Section 3.1

Brunelleschi's dome over Florence Cathedral is significant as an example of:

AGothic ribbed-vault technology
BRenaissance engineering achievement in dome construction
CByzantine pendentive design
DAncient Egyptian post-and-lintel construction
Answer is hidden
Question 131 of 938Ch 3 · Eastern Architecture: Buddhist, Hindu, Vaastu Shastra & Mughal

A stupa, as a core Buddhist architectural typology, primarily functions as a:

AMonastic residence for monks
BHemispherical/dome-form monument enshrining relics
CRock-cut colonnaded prayer hall
DPillared assembly hall preceding a sanctum
Answer is hidden
Question 132 of 938Ch 3 · Eastern Architecture: Buddhist, Hindu, Vaastu Shastra & Mughal

A chaitya, in Buddhist architecture, is best described as a:

AMonastic residential courtyard complex
BPrayer hall, often rock-cut, with a stupa at one end and a colonnaded/vaulted nave
CHindu temple sanctum
DMughal charbagh garden
Answer is hidden
Question 133 of 938Ch 3 · Eastern Architecture: Buddhist, Hindu, Vaastu Shastra & Mughal

In Hindu temple architecture, the garbhagriha refers to:

AThe pillared assembly hall
BThe innermost sanctum housing the primary deity idol
CThe superstructure/tower above the sanctum
DThe temple's outer gateway tower
Answer is hidden
Question 134 of 938Ch 3 · Eastern Architecture: Buddhist, Hindu, Vaastu Shastra & Mughal

The Nagara temple style is distinguished by a shikhara that is:

AStepped-pyramidal
BCurvilinear
CEntirely flat with no superstructure
DMade exclusively of timber
Answer is hidden
Question 135 of 938Ch 3 · Eastern Architecture: Buddhist, Hindu, Vaastu Shastra & Mughal

A gopuram is an element specifically associated with which temple architectural style?

ANagara (North Indian)
BDravida (South Indian)
CByzantine
DGothic
Answer is hidden
Question 136 of 938Ch 3 · Eastern Architecture: Buddhist, Hindu, Vaastu Shastra & Mughal

The Vaastu Purusha Mandala is best described as:

AA structural roofing system
BA symbolic grid governing plan layout and orientation in traditional Indian architectural planning
CA type of Mughal garden layout
DA Buddhist prayer hall typology
Answer is hidden
Question 137 of 938Ch 3 · Eastern Architecture: Buddhist, Hindu, Vaastu Shastra & Mughal

Vaastu Shastra, as a traditional planning system, primarily governs:

AOnly the choice of paint colour for a building
BBuilding orientation, site selection, spatial layout, and proportion
COnly the structural steel design of a building
DOnly historical conservation techniques
Answer is hidden
Question 138 of 938Ch 3 · Eastern Architecture: Buddhist, Hindu, Vaastu Shastra & Mughal

A charbagh, characteristic of Mughal architecture, refers to a:

AType of pointed masonry arch
BFour-part quadrilateral garden layout
CRock-cut Buddhist prayer hall
DHindu temple sanctum
Answer is hidden
Question 139 of 938Ch 3 · Eastern Architecture: Buddhist, Hindu, Vaastu Shastra & Mughal

Pietra dura, as used in Mughal architecture (e.g. the Taj Mahal), refers to:

AA structural dome-construction technique
BA decorative inlay technique using semi-precious/coloured stones
CA type of pointed Gothic arch
DA traditional Vaastu planning grid
Answer is hidden
Question 140 of 938Ch 3 · Eastern Architecture: Buddhist, Hindu, Vaastu Shastra & Mughal

Which of the following is a key characteristic architectural element of Mughal architecture?

AFlying buttresses
BBulbous domes and pointed/cusped arches
CPendentives supporting a Byzantine-style dome
DExposed steel trusses
Answer is hidden
Question 141 of 938Ch 3 · Doctrinal Theories: Modern and Post-Modern Movements

The doctrine “form follows function” is associated with which theoretical position?

APost-Modernism
BFunctionalism
CDeconstructivism
DVaastu Shastra
Answer is hidden
Question 142 of 938Ch 3 · Doctrinal Theories: Modern and Post-Modern Movements

The International Style is characterized by:

AExtensive historical ornament and applied decoration
BRejection of ornament, emphasis on volume over mass, and use of machine-age materials
CExclusive use of traditional masonry and timber
DBulbous domes and pointed arches
Answer is hidden
Question 143 of 938Ch 3 · Doctrinal Theories: Modern and Post-Modern Movements

The Bauhaus school is significant in Modern architectural theory primarily for its emphasis on: approach

AReviving Gothic ornamentation
BIntegrating art, craft, and industrial technology/mass-production into a rational, unornamented design
CRestoring Vaastu Shastra principles
DIntroducing the flying buttress
Answer is hidden
Question 144 of 938Ch 3 · Doctrinal Theories: Modern and Post-Modern Movements

Brutalism, as an architectural movement, is most associated with:

AExtensive use of polished marble cladding
BHonest expression of raw, unfinished materials, especially exposed board-marked concrete
CA revival of Renaissance classical proportion
DBulbous domes and cusped arches
Answer is hidden
Question 145 of 938Ch 3 · Doctrinal Theories: Modern and Post-Modern Movements

Frank Lloyd Wright's philosophy of “organic architecture” emphasizes:

AStrict adherence to historical classical orders
BDesigning buildings in harmony with their natural site and occupants
CFragmentation and distortion of structural form
DThe exclusive use of glass curtain walls
Answer is hidden
Question 146 of 938Ch 3 · Doctrinal Theories: Modern and Post-Modern Movements

Post-Modernism, as a reaction to Modernism, is characterized by:

AFurther stripping away of all ornament and historical reference
BThe reintroduction of historical reference, ornament, colour, symbolism, and wit into design
CAn exclusive focus on raw concrete expression
DA total rejection of any architectural theory
Answer is hidden
Question 147 of 938Ch 3 · Doctrinal Theories: Modern and Post-Modern Movements

Robert Venturi's 'Complexity and Contradiction in Architecture' (1966) is best summarized as advocating:

AStrict either-or, single-solution design purity
BAmbiguity and hybrid, 'both-and' design thinking as a counter to Modernist simplicity
CA total rejection of all historical reference
DThe Bauhaus doctrine of pure functionalism
Answer is hidden
Question 148 of 938Ch 3 · Doctrinal Theories: Modern and Post-Modern Movements

Deconstructivism, as an architectural movement, is characterized by: harmony

APerfect rectilinear symmetry and classical proportion
BFragmentation, distortion, and manipulation of a structure's form/skin, challenging notions of structural
CExclusive reliance on traditional vernacular materials
DStrict adherence to Vaastu Shastra orientation principles
Answer is hidden
Question 149 of 938Ch 3 · Doctrinal Theories: Modern and Post-Modern Movements

Critical Regionalism, as a design position, primarily seeks to:

AEliminate all reference to local climate and culture
BIntegrate local climate, culture, and materials into a still-contemporary design language
CExactly replicate historical vernacular buildings with no modern elements
DReject all use of contemporary construction technology
Answer is hidden
Question 150 of 938Ch 3 · Doctrinal Theories: Modern and Post-Modern Movements

Which of the following architects/theorists is most closely associated with the founding of the Bauhaus school?

ARobert Venturi
BWalter Gropius
CFrank Lloyd Wright
DPeter Eisenman
Answer is hidden
Question 151 of 938Ch 3 · Philosophies and Works of Master & Modern Architects

The design philosophy “less is more” is most closely associated with:

AFrank Lloyd Wright
BMies van der Rohe
CMichael Graves
DCharles Correa
Answer is hidden
Question 152 of 938Ch 3 · Philosophies and Works of Master & Modern Architects

Le Corbusier's 'Five Points of Architecture' include which of the following?

AFlying buttresses and pointed arches
BPilotis, free plan, free facade, ribbon windows, and roof garden
CBulbous domes and cusped arches
DPendentives supporting a central dome
Answer is hidden
Question 153 of 938Ch 3 · Philosophies and Works of Master & Modern Architects

Villa Savoye is a representative work of which architect?

AMies van der Rohe
BLe Corbusier
CLouis Kahn
DTadao Ando
Answer is hidden
Question 154 of 938Ch 3 · Philosophies and Works of Master & Modern Architects

Frank Lloyd Wright's philosophy of organic architecture is exemplified by which of his works?

ABarcelona Pavilion
BFallingwater
CVilla Savoye
DSalk Institute
Answer is hidden
Question 155 of 938Ch 3 · Philosophies and Works of Master & Modern Architects

Louis Kahn's concept of 'served and servant spaces' refers to: services)

AA distinction between primary occupied spaces and the spaces/systems that support them (e.g. structure,
BA style of Post-Modern ornamentation
CA traditional Vaastu Shastra planning principle
DA Deconstructivist design technique
Answer is hidden
Question 156 of 938Ch 3 · Philosophies and Works of Master & Modern Architects

Which architect is known for synthesizing traditional Japanese architectural sensibility with Modernist structural expression?

AKenzo Tange
BAlvar Aalto
CRobert Venturi
DPhilip Johnson
Answer is hidden
Question 157 of 938Ch 3 · Philosophies and Works of Master & Modern Architects

Tadao Ando's architecture is particularly noted for its minimalist use of:

AOrnate classical columns and pediments
BExposed concrete, light, water, and geometry
CBulbous Mughal-style domes
DTraditional timber post-and-beam framing exclusively
Answer is hidden
Question 158 of 938Ch 3 · Philosophies and Works of Master & Modern Architects

Charles Correa's architectural philosophy for the Indian subcontinent particularly emphasized:

AStrict adherence to European Bauhaus principles with no climatic adaptation
BClimate-responsive, culturally rooted design, including concepts like open-to-sky space
CThe exclusive use of steel-and-glass International Style facades
DA rejection of all low-rise, high-density housing solutions
Answer is hidden
Question 159 of 938Ch 3 · Philosophies and Works of Master & Modern Architects

The Vanna Venturi House is a representative early work associated with which design theorist/architect?

ARobert Venturi
BMichael Graves
CPeter Eisenman
DZaha Hadid
Answer is hidden
Question 160 of 938Ch 3 · Philosophies and Works of Master & Modern Architects

The Portland Building, incorporating classical historical reference, colour, and symbolism, is a representative work of:

AMies van der Rohe
BMichael Graves
CFrank Lloyd Wright
DLouis Kahn
Answer is hidden
Question 161 of 938Ch 3 · Emerging Concepts of Contemporary Architects

Zaha Hadid's architecture is particularly known for:

AStrict classical symmetry and historical ornament
BFluid, parametric, non-rectilinear forms enabled by digital design/fabrication
CExposed board-marked concrete Brutalism
DTraditional post-and-lintel stone construction
Answer is hidden
Question 162 of 938Ch 3 · Emerging Concepts of Contemporary Architects

High-Tech architecture, as practiced by architects such as Norman Foster and Richard Rogers, is characterized by:

AConcealment of all structural and service elements
BExpressive, often externalized structure and services, combined with advanced engineering
CExclusive reliance on traditional vernacular materials
DA rejection of any sustainability consideration
Answer is hidden
Question 163 of 938Ch 3 · Emerging Concepts of Contemporary Architects

The Centre Pompidou in Paris, with its externalized structure and services, is a work of:

AZaha Hadid alone
BRichard Rogers and Renzo Piano
CFrank Lloyd Wright
DLouis Kahn
Answer is hidden
Question 164 of 938Ch 3 · Emerging Concepts of Contemporary Architects

B.V. Doshi's architectural approach is best characterized as:

AA rejection of any Indian cultural/climatic context
BContextual, climate-responsive Modernism rooted in Indian culture and community
CExclusively High-Tech, exposed-structure design
DPost-Modern classical historical reference
Answer is hidden
Question 165 of 938Ch 3 · Emerging Concepts of Contemporary Architects

Geoffrey Bawa's 'Tropical Modernism' approach is particularly noted for:

ASealed, air-conditioned glass box buildings with no site integration
BIntegration of indoor-outdoor living, local materials, and landscape in a tropical climate
CExclusive use of Gothic pointed arches
DStrict adherence to Vaastu Shastra orientation rules
Answer is hidden
Question 166 of 938Ch 3 · Emerging Concepts of Contemporary Architects

Universal design, as a design concept, aims to create spaces/products that are:

AUsable only by able-bodied adults
BUsable by the widest range of people possible, regardless of age, size, or ability, without adaptation
CDesigned exclusively for a single specific user group
DFocused solely on aesthetic appeal with no functional consideration
Answer is hidden
Question 167 of 938Ch 3 · Emerging Concepts of Contemporary Architects

The distinction between 'space' and 'place' in architectural theory is best described as: experience

AThey are identical concepts with no distinction
BSpace is a neutral, measurable extent, while place is space imbued with meaning, identity, and human
CSpace refers only to interior volume, while place refers only to exterior volume
DPlace is always larger in physical dimension than space
Answer is hidden
Question 168 of 938Ch 3 · Emerging Concepts of Contemporary Architects

Anthropometry, as applied in architectural design, refers to:

AThe study of a building's structural loads
BThe study of human body measurements/proportions applied to space and furniture dimensioning
CThe study of a site's soil bearing capacity
DThe study of historical architectural styles
Answer is hidden
Question 169 of 938Ch 3 · Emerging Concepts of Contemporary Architects

Design 'thumb rules' and universal standards (e.g. standard corridor widths, ceiling heights, ramp gradients) primarily serve to: comfortable design

AReplace the need for any building code compliance
BProvide empirically established dimensional/design guidelines ensuring functional, code-compliant,
CApply only to historical/heritage buildings
DEliminate the need for any anthropometric consideration
Answer is hidden
Question 170 of 938Ch 3 · Emerging Concepts of Contemporary Architects

'Mass and void' as an architectural composition concept refers to the interplay between:

AStructural steel and reinforced concrete
BSolid built form and open/negative space
CHistorical and contemporary design styles
DInterior and exterior lighting design
Answer is hidden
Question 171 of 938Ch 3 · Nepalese Modern and Contemporary Architecture

Nepalese modern architecture's development from the mid-20th century onward was significantly shaped by: Modernist ideas

AA complete rejection of any Rana-era precedent with no continuity at all
BThe influence of Rana-era Neo-Classical precedent alongside subsequently introduced international
CExclusive reliance on ancient Licchavi-period stone construction techniques
DA total absence of any foreign architectural influence
Answer is hidden
Question 172 of 938Ch 3 · Nepalese Modern and Contemporary Architecture

Early Nepalese Modernist buildings often combined reinforced concrete frame construction with:

AA complete rejection of all traditional materials and forms
BRetained or reinterpreted traditional forms, materials (brick, carved timber), and craftsmanship
CExclusive use of imported prefabricated steel systems
DStrict adherence to Gothic architectural detailing
Answer is hidden
Question 173 of 938Ch 3 · Nepalese Modern and Contemporary Architecture

Which major event significantly heightened emphasis on earthquake-resilient design in contemporary Nepalese architecture?

AThe 2015 Gorkha earthquake
BWorld War II
CThe Rana period's end in 1951
DThe founding of UNESCO
Answer is hidden
Question 174 of 938Ch 3 · Nepalese Modern and Contemporary Architecture

A recurring theme among prominent Nepalese architects has been to:

ADirectly and uncritically import international Modernist/Post-Modernist forms with no local adaptation
BDevelop a contemporary architectural language that is contextually and culturally rooted in Nepal
CAbandon all traditional spatial concepts entirely
DFocus exclusively on historical conservation with no new design work
Answer is hidden
Question 175 of 938Ch 3 · Nepalese Modern and Contemporary Architecture

Reinterpretation of traditional spatial concepts by contemporary Nepalese architects commonly involves: technology

AElimination of the courtyard/chowk concept entirely
BThe courtyard/chowk, layered/tiered roof forms, and human-scaled proportion, adapted with contemporary
COnly the use of imported international building typologies
DA rejection of any human-scaled proportion in design
Answer is hidden
Question 176 of 938Ch 3 · Nepalese Modern and Contemporary Architecture

Contemporary Nepalese architecture's engagement with heritage is best described as involving:

AComplete demolition and replacement of all heritage structures
BHeritage conservation and adaptive reuse alongside new contemporary design
CA total absence of any conservation practice
DExclusive focus on Mughal-style architectural forms
Answer is hidden
Question 177 of 938Ch 3 · Nepalese Modern and Contemporary Architecture

Which building types have been particularly significant in expressing Nepalese modern architectural identity?

AOnly private residential bungalows
BGovernment, institutional, and religious/cultural buildings
COnly industrial warehouses
DOnly shopping malls
Answer is hidden
Question 178 of 938Ch 3 · Nepalese Modern and Contemporary Architecture

The renewed critical interest in vernacular and traditional Newar architectural knowledge in contemporary Nepalese practice reflects:

AA rejection of all contemporary design technology
BAn effort to draw on traditional knowledge alongside contemporary design and construction approaches
CA purely nostalgic exercise with no design application
DA mandate that all new buildings must be built entirely in traditional materials
Answer is hidden
Question 179 of 938Ch 3 · Nepalese Modern and Contemporary Architecture

Prominent Nepalese architects have contributed to the development of the architectural profession in Nepal primarily through:

ABuilt works alone, with no involvement in education
BBuilt works across multiple project types as well as significant roles in architectural education
CExclusive focus on international projects outside Nepal
DNo documented contribution to the profession
Answer is hidden
Question 180 of 938Ch 3 · Nepalese Modern and Contemporary Architecture

The ongoing discourse in Nepalese architecture is best characterized as negotiating between: vernacular heritage

AGlobal contemporary design trends/technology and the preservation/reinterpretation of Nepal's traditional and
BOnly two competing foreign architectural styles with no reference to Nepal
CA complete rejection of all traditional heritage
DA complete rejection of all contemporary technology
Answer is hidden
Question 181 of 938Ch 4 · Principles of Composition, Scale/Proportion, and Colour

In architectural composition, an 'axis' is best defined as:

AA random, unorganized arrangement of forms
BAn imaginary line established by two points, about which forms/spaces are arranged in a balanced manner
CA colour scheme using only complementary hues
DA texture applied to a building facade
Answer is hidden
Question 182 of 938Ch 4 · Principles of Composition, Scale/Proportion, and Colour

A 'datum', as a compositional principle, functions primarily as a:

ADecorative colour scheme
BReference line, plane, or volume that organizes a pattern of forms/spaces by their common relation to it
CType of architectural drawing projection
DStudy of social interaction patterns
Answer is hidden
Question 183 of 938Ch 4 · Principles of Composition, Scale/Proportion, and Colour

Hierarchy, in architectural composition, is achieved by:

AMaking all elements identical in size and shape
BDifferentiating the size, shape, or placement of forms/spaces to express their relative importance
CApplying only monochromatic colour schemes
DIgnoring all axis or datum lines
Answer is hidden
Question 184 of 938Ch 4 · Principles of Composition, Scale/Proportion, and Colour

Which compositional principle refers to a unifying movement created through the patterned repetition or alternation of elements?

ASymmetry
BEmphasis
CRhythm
DDatum
Answer is hidden
Question 185 of 938Ch 4 · Principles of Composition, Scale/Proportion, and Colour

The Golden Ratio (Golden Section) and Le Corbusier's Modulor are both examples of:

AColour schemes
BClassical/modern proportional systems guiding harmonious dimensioning
CTypes of architectural projection drawings
DSociographic study methods
Answer is hidden
Question 186 of 938Ch 4 · Principles of Composition, Scale/Proportion, and Colour

'Monumental scale' in architecture refers to a building/element that:

ARelates comfortably to typical human body dimensions
BDeliberately exceeds human dimensions to convey grandeur or importance
CIs always smaller than a typical human being
DHas no relationship to human dimension at all
Answer is hidden
Question 187 of 938Ch 4 · Principles of Composition, Scale/Proportion, and Colour

A monochromatic colour scheme consists of:

AThree evenly spaced hues on the colour wheel
BTints and shades of a single colour
COnly colours directly opposite each other on the colour wheel
DOnly adjacent hues on the colour wheel
Answer is hidden
Question 188 of 938Ch 4 · Principles of Composition, Scale/Proportion, and Colour

A 'shade' of a colour is produced by mixing it with:

AWhite
BBlack
CGrey only
DAnother complementary colour
Answer is hidden
Question 189 of 938Ch 4 · Principles of Composition, Scale/Proportion, and Colour

Texture, as a design element, primarily affects:

AOnly the structural strength of a material
BThe tactile/visual surface quality and perceived character of a material or space
COnly the cost of construction materials
DOnly the fire-resistance rating of a surface
Answer is hidden
Question 190 of 938Ch 4 · Principles of Composition, Scale/Proportion, and Colour

Sociography, as applied in architectural design, is used to inform:

AThe structural design of a foundation
BSpatial layout that supports desired social behaviour/interaction patterns
CThe choice of construction materials for durability
DThe colour scheme of an exterior facade only
Answer is hidden
Question 191 of 938Ch 4 · Theory and Principles of Projection

Orthographic projection represents a three-dimensional object using:

AA single perspective view with converging lines
BMultiple two-dimensional views (plan, elevation, section) via parallel projection lines
COnly an isometric sketch
DOnly a bird's-eye aerial photograph
Answer is hidden
Question 192 of 938Ch 4 · Theory and Principles of Projection

In orthographic building drawings, a 'section' view specifically shows:

AOnly the exterior front face of the building
BA cut view revealing the internal structure/spatial arrangement of the building
COnly the roof plan viewed from above
DOnly a perspective view with a single vanishing point
Answer is hidden
Question 193 of 938Ch 4 · Theory and Principles of Projection

In an isometric projection, the three principal axes are drawn at what angle to each other?

A45°
B90°
C120°
D180°
Answer is hidden
Question 194 of 938Ch 4 · Theory and Principles of Projection

Oblique projection is distinguished by:

AAll three faces being foreshortened equally with no true-shape face
BOne face drawn true-shape/parallel to the picture plane, with receding lines drawn at an angle (often 45°)
CThe use of multiple vanishing points converging on the horizon
DBeing usable only for orthographic plan drawings
Answer is hidden
Question 195 of 938Ch 4 · Theory and Principles of Projection

A perspective drawing simulates visual depth primarily through:

AParallel projection lines with no convergence
BLines converging toward one or more vanishing points on the horizon line
CEqual foreshortening of all three axes
DThe complete absence of any horizon line
Answer is hidden
Question 196 of 938Ch 4 · Theory and Principles of Projection

One-point perspective is typically used when:

AThe object is viewed at an oblique angle with two receding faces
BOne principal face of the object is parallel to the picture plane (e.g. looking straight down a corridor)
CA dramatic view looking sharply upward at a tall building is required
DNo vanishing point is desired at all
Answer is hidden
Question 197 of 938Ch 4 · Theory and Principles of Projection

Two-point perspective is commonly used for exterior building views because:

AIt requires no vanishing points at all
BThe building is typically viewed at an angle, with two sets of lines receding toward two vanishing points
CIt always includes a vanishing point for vertical lines
DIt can only be used for interior spaces
Answer is hidden
Question 198 of 938Ch 4 · Theory and Principles of Projection

Three-point perspective includes a vanishing point for which type of line, in addition to the two horizontal vanishing points?

ADiagonal lines only
BVertical lines
CCurved lines only
DNo additional vanishing point is used
Answer is hidden
Question 199 of 938Ch 4 · Theory and Principles of Projection

A 'worm's-eye view' in architectural representation depicts the building as seen from:

AHigh above, looking down (aerial/bird's-eye view)
BA very low viewpoint, looking upward
CDirectly at normal human eye level only
DA purely orthographic plan view
Answer is hidden
Question 200 of 938Ch 4 · Theory and Principles of Projection

Selecting an appropriate drawing scale (e.g. 1:100 vs. 1:20) primarily depends on:

AThe building's construction cost alone
BThe drawing type (site plan, floor plan, detail) and the required level of information/detail
CThe colour scheme chosen for the presentation
DThe perspective eye level selected
Answer is hidden
Question 201 of 938Ch 4 · Basic Understanding of Architectural Drawings

A master plan primarily shows:

AOnly the interior room layout of a single building
BThe overall layout of a large site/development, including all buildings, open spaces, and infrastructure
COnly a single exterior facade of a building
DOnly a vertical cut through one building
Answer is hidden
Question 202 of 938Ch 4 · Basic Understanding of Architectural Drawings

A site plan, as distinct from a master plan, primarily shows:

AThe entire city's zoning regulations
BA specific building's placement on its own plot, including boundaries, setbacks, and immediate context
COnly the building's internal floor layout
DOnly a perspective sketch of the building's exterior
Answer is hidden
Question 203 of 938Ch 4 · Basic Understanding of Architectural Drawings

A floor plan is typically drawn as a horizontal cut taken at approximately what height above finished floor level?

A0.3 m
B1–1.2 m
C3–4 m
DAt the ceiling level only
Answer is hidden
Question 204 of 938Ch 4 · Basic Understanding of Architectural Drawings

An elevation drawing represents a building's exterior (or interior) face as:

AA perspective view with converging lines and a vanishing point
BA true, to-scale, non-perspective view showing height, openings, and materials
CA horizontal cut view showing room layout
DA three-dimensional isometric sketch only
Answer is hidden
Question 205 of 938Ch 4 · Basic Understanding of Architectural Drawings

A section drawing is obtained by:

AViewing the building from directly above
BMaking a vertical cut through the building to reveal floor-to-floor heights and internal spatial relationships
CPhotographing the building's front facade
DApplying a colour scheme to the floor plan
Answer is hidden
Question 206 of 938Ch 4 · Basic Understanding of Architectural Drawings

A complete architectural drawing set for a building typically includes how many principal elevations?

AOne
BTwo
CTypically four (one per principal facade direction)
DNone; elevations are optional
Answer is hidden
Question 207 of 938Ch 4 · Basic Understanding of Architectural Drawings

Consistency between floor plans, elevations, and sections in a drawing set means that: others

AEach drawing may show entirely different dimensions with no cross-checking required
BDimensions, openings, and levels shown in one drawing must correspond exactly to those shown in the
COnly the floor plan needs to be dimensionally accurate
DElevations and sections are independent of the floor plan and need not match
Answer is hidden
Question 208 of 938Ch 4 · Basic Understanding of Architectural Drawings

Sections are often prepared at right angles to one another primarily to:

AReduce the total number of drawings required
BReveal the internal spatial arrangement and construction from two complementary directions
CAvoid the need for any floor plan
DEliminate the need for elevation drawings
Answer is hidden
Question 209 of 938Ch 4 · Basic Understanding of Architectural Drawings

The relationship between a site plan and a master plan is best described as: larger site/development

AIdentical drawings serving the same purpose at the same scale
BThe site plan situates a single building within its plot, while the master plan situates the entire project within a
CThe site plan is always at a larger scale showing an entire city
DThere is no relationship between the two drawing types
Answer is hidden
Question 210 of 938Ch 4 · Basic Understanding of Architectural Drawings

Which of the following is shown in a floor plan but NOT directly visible in an elevation drawing?

AThe building's overall height
BThe internal room layout and furniture/fixture arrangement
CThe exterior wall materials
DThe roof silhouette
Answer is hidden
Question 211 of 938Ch 4 · Basics of the Architectural Design Process

In basic architectural design vocabulary, 'zoning' refers to:

AThe structural grid of a building
BThe grouping of related functions within a design
CA type of orthographic projection
DThe colour scheme applied to a facade
Answer is hidden
Question 212 of 938Ch 4 · Basics of the Architectural Design Process

A literature review, as an early step in the design process, primarily involves:

ASelecting the final construction materials
BGathering standards, norms, and precedent research relevant to the project type
CDrawing the final detailed floor plans
DApplying paint colour schemes to elevations
Answer is hidden
Question 213 of 938Ch 4 · Basics of the Architectural Design Process

Case study analysis in the design process is used to: transferable lessons

ACopy a precedent building's design exactly with no adaptation
BSystematically examine a built example's site planning, zoning, circulation, and structure to extract
CReplace the need for any literature review
DDetermine only the cost of construction materials
Answer is hidden
Question 214 of 938Ch 4 · Basics of the Architectural Design Process

A bubble diagram is best described as: lines

AA precisely scaled and dimensioned floor plan
BA simplified, non-scaled diagrammatic tool exploring functional organization using bubbles and connecting
CA perspective rendering of the finished building
DA type of structural steel connection detail
Answer is hidden
Question 215 of 938Ch 4 · Basics of the Architectural Design Process

In a bubble diagram, the relative size of a functional space is typically indicated by:

AThe colour of the bubble only
BThe size of the bubble itself
CThe thickness of the building's walls
DThe scale of the orthographic projection used
Answer is hidden
Question 216 of 938Ch 4 · Basics of the Architectural Design Process

Bubble diagrams are primarily useful because they allow a designer to:

AFinalize exact construction dimensions immediately
BTest multiple functional organization options quickly before committing to specific dimensions or geometry
CSkip the literature review and case study steps entirely
DDetermine the final choice of exterior cladding material
Answer is hidden
Question 217 of 938Ch 4 · Basics of the Architectural Design Process

The connecting lines in a bubble diagram typically represent:

AThe building's structural steel members
BRelationships, adjacencies, or circulation patterns between functional spaces
CThe electrical wiring layout
DThe building's construction joints
Answer is hidden
Question 218 of 938Ch 4 · Basics of the Architectural Design Process

Synthesis, as a step following literature review and case study analysis, involves:

ADiscarding all findings and starting the design with no informed basis
BDrawing conclusions from prior research to inform the design brief and initial design decisions
COnly selecting a colour scheme for the project
DPreparing the final construction detail drawings
Answer is hidden
Question 219 of 938Ch 4 · Basics of the Architectural Design Process

'Context', as a basic design vocabulary term, refers to:

AThe building's internal furniture layout only
BThe site and its surroundings, which inform the design response
CA type of perspective projection
DA specific colour scheme
Answer is hidden
Question 220 of 938Ch 4 · Basics of the Architectural Design Process

The conceptual bridge between a design's programme/brief and its initial design concept is most typically provided by:

AA detailed structural calculation
BA bubble diagram exploring functional organization
CA finished perspective rendering
DA cost estimate document
Answer is hidden
Question 221 of 938Ch 4 · Basics of Computer Graphics (CAD)

Computer-Aided Design (CAD), as used in architecture, refers to:

AThe use of hand-drafting tools exclusively
BThe use of computer software to create, modify, analyze, and document a design
CA type of perspective sketching technique
DA traditional masonry construction technique
Answer is hidden
Question 222 of 938Ch 4 · Basics of Computer Graphics (CAD)

CAD drawings are typically composed of which type of entities, organized on layers?

ARaster (pixel-based) images only
BPrecise vector/geometric entities (lines, arcs, circles, polylines)
CPhotographic scans only
DHand-sketched freehand marks only
Answer is hidden
Question 223 of 938Ch 4 · Basics of Computer Graphics (CAD)

3D modeling in architectural design is primarily used to study:

AOnly the cost estimate of the project
BForm, massing, and spatial relationships of the design
COnly the historical style of the building
DOnly the site's soil bearing capacity
Answer is hidden
Question 224 of 938Ch 4 · Basics of Computer Graphics (CAD)

Building Information Modeling (BIM) is best distinguished from ordinary 3D modeling by: disciplinary design

ABeing a purely 2D drafting technique
BBuilding elements carrying associated data (material, cost, specification), enabling coordinated multi-
CHaving no relationship to 3D geometry at all
DBeing used only for rendering, with no design or documentation function
Answer is hidden
Question 225 of 938Ch 4 · Basics of Computer Graphics (CAD)

Rendering, in the context of CAD/3D modeling, refers to:

APreparing a 2D orthographic floor plan
BGenerating a realistic or stylized image from a 3D model by applying materials, textures, and lighting
CAssigning layer names to a CAD drawing
DCalculating structural loads on a building
Answer is hidden
Question 226 of 938Ch 4 · Basics of Computer Graphics (CAD)

A key advantage of CAD over traditional manual drafting is:

ASlower revision speed
BImproved drafting accuracy and faster, easier revision/reproduction of drawings
CThe complete inability to scale drawings accurately
DThe elimination of the need for any layers or organization
Answer is hidden
Question 227 of 938Ch 4 · Basics of Computer Graphics (CAD)

Consistent layer organization and naming/numbering conventions in CAD documentation are especially important for:

ASmall, single-discipline hand sketches only
BLarger or multi-disciplinary projects requiring efficient, error-free coordination
CProjects with no need for any drawing revisions
DPerspective sketches only, not technical drawings
Answer is hidden
Question 228 of 938Ch 4 · Basics of Computer Graphics (CAD)

Which of the following best describes the relationship between 2D drafting and 3D modeling in a typical CAD workflow? representation, and both may be used together

AThey are entirely unrelated, mutually exclusive activities
B2D drafting produces plans/elevations/sections while 3D modeling produces a digital three-dimensional design
C3D modeling has completely replaced the need for any 2D drawings
D2D drafting can only be performed after 3D rendering is complete
Answer is hidden
Question 229 of 938Ch 4 · Basics of Computer Graphics (CAD)

3D modeling and rendering assist the design process primarily by: construction

AEliminating the need for any client presentation
BAiding design communication, client presentation, and early identification of spatial/design issues before
CReplacing the need for structural design entirely
DDetermining the exact market value of a finished property
Answer is hidden
Question 230 of 938Ch 4 · Basics of Computer Graphics (CAD)

Solid, surface, and mesh modeling are all examples of techniques used in:

A2D orthographic drafting only
B3D modeling
CColour scheme selection
DBubble diagram preparation
Answer is hidden
Question 231 of 938Ch 4 · Small Design Projects

Basic two-dimensional design exercises in early studio work primarily aim to:

AFinalize the structural design of a building
BBuild foundational skill in composition principles before progressing to three-dimensional work
CReplace the need for any case study research
DDetermine the final construction budget
Answer is hidden
Question 232 of 938Ch 4 · Small Design Projects

Basic volume composition exercises exploring 'mass and void' primarily involve:

ASelecting a colour scheme for a facade
BThe addition, subtraction, and arrangement of simple three-dimensional forms
CPreparing a detailed cost estimate
DConducting a soil bearing capacity test
Answer is hidden
Question 233 of 938Ch 4 · Small Design Projects

A key design consideration for a guard house, given its typical function, is:

AMaximizing floor area for large public gatherings
BVisibility/sightlines for security monitoring, alongside a small footprint and weather protection
CProviding an elaborate multi-storey design
DEliminating any weather protection to save cost
Answer is hidden
Question 234 of 938Ch 4 · Small Design Projects

Which design consideration is particularly important for a bus stop shelter?

AComplex multi-room zoning
BVisibility/legibility from approaching traffic and durability against heavy public use
CNorth-facing consistent studio lighting
DAn efficient kitchen-to-dining service flow
Answer is hidden
Question 235 of 938Ch 4 · Small Design Projects

For an artist's studio, a particularly important lighting design consideration is:

AMaximizing direct, harsh sunlight and glare
BConsistent natural light, often oriented for north light to avoid harsh direct sun/glare
CEliminating all natural light in favour of artificial lighting only
DProviding no windows at all
Answer is hidden
Question 236 of 938Ch 4 · Small Design Projects

In residential design, 'zoning' of private, semi-private, and public spaces refers to: their function/privacy needs

AApplying a single colour to the entire house
BOrganizing spaces such as bedrooms (private), living/dining (semi-private), and entry (public) according to
CDetermining the site's legal zoning ordinance classification only
DSelecting the structural grid spacing for columns
Answer is hidden
Question 237 of 938Ch 4 · Small Design Projects

A key design consideration for a café/restaurant is:

AEliminating the need for any kitchen space
BAn efficient kitchen-to-dining service flow, along with seating layout and frontage visibility
CProviding only private, enclosed dining with no visibility from outside
DIgnoring food-service sanitation requirements
Answer is hidden
Question 238 of 938Ch 4 · Small Design Projects

Classroom module design for a primary school should particularly address:

AOnly the exterior paint colour of the building
BDaylighting, ventilation, and acoustics appropriate to the learning environment
CMaximizing classroom size with no consideration of daylighting
DEliminating any need for safe circulation or play areas
Answer is hidden
Question 239 of 938Ch 4 · Small Design Projects

Even for a small-scale design project (e.g. a guard house or bus stop), the general design process should: sequence, at reduced scope

ABe skipped entirely due to the project's small size
BStill follow the programme → case study/literature → bubble diagram → concept → developed drawings
COnly involve preparing a final rendering with no prior design steps
DApply only to residential projects, not public/small structures
Answer is hidden
Question 240 of 938Ch 4 · Small Design Projects

Regardless of a small project's limited scale, which design considerations remain relevant?

ANone; small projects require no design considerations at all
BSite context, climate-responsiveness, and appropriate structural/material choice
COnly the choice of interior furniture
DOnly the project's construction budget
Answer is hidden
Question 241 of 938Ch 5 · Advanced Understanding of Architectural Drawings

A detailed master plan, compared to a basic master plan, additionally incorporates: information

AOnly the building's interior furniture layout
BDetailed infrastructure layout, development phasing, detailed landscape design, and precise level/contour
COnly a single exterior elevation drawing
DOnly the colour scheme of the facades
Answer is hidden
Question 242 of 938Ch 5 · Advanced Understanding of Architectural Drawings

Spot levels and finished floor levels are typically shown on which advanced-stage drawing?

AA basic bubble diagram
BA detailed site plan
CA colour scheme rendering
DA structural steel connection detail only
Answer is hidden
Question 243 of 938Ch 5 · Advanced Understanding of Architectural Drawings

In a detailed floor plan, 'door/window schedule references' serve to:

AReplace the need for any dimensioning
BCross-reference each opening to a detailed schedule specifying its type, size, and material
CIndicate only the paint colour of the walls
DShow the structural foundation depth
Answer is hidden
Question 244 of 938Ch 5 · Advanced Understanding of Architectural Drawings

Which of the following is typically shown with precise level dimensioning on a detailed elevation drawing?

ARoom furniture layout
BPlinth, sill, lintel, parapet, and ridge levels
CThe structural grid used in the foundation plan
DThe door/window schedule numbers only
Answer is hidden
Question 245 of 938Ch 5 · Advanced Understanding of Architectural Drawings

A detailed section drawing, at an advanced level, typically represents the building:

AOnly from the roof plan view
BFrom foundation to roof, with full floor-to-floor and structural depth dimensioning
COnly as a perspective sketch with a single vanishing point
DWith no reference to material finishes
Answer is hidden
Question 246 of 938Ch 5 · Advanced Understanding of Architectural Drawings

A consistent line-weight hierarchy in architectural drawings typically uses:

AIdentical line weights for all elements regardless of function
BHeavier lines for cut/sectioned elements and lighter lines for elevation/background elements
COnly dashed lines throughout the drawing
DColour alone, with no variation in line weight
Answer is hidden
Question 247 of 938Ch 5 · Advanced Understanding of Architectural Drawings

Hatching/poché conventions in section drawings are used to:

AIndicate the building's structural load calculations
BRepresent different materials consistently and legibly in a cut/section view
CReplace the need for any written specifications
DShow only the colour scheme of a facade
Answer is hidden
Question 248 of 938Ch 5 · Advanced Understanding of Architectural Drawings

A complete, cross-referenced sheet numbering/index system in a drawing set primarily helps to:

AEliminate the need for any dimensioning
BEnsure drawings can be located, cross-checked, and coordinated efficiently across a large set
CReplace the need for elevations or sections
DDetermine the final construction cost
Answer is hidden
Question 249 of 938Ch 5 · Advanced Understanding of Architectural Drawings

Detailed architectural drawings must remain coordinated with structural and service documentation primarily to:

AAllow the architect to ignore engineering input entirely
BEnsure there is no contradiction between architectural intent and actual buildability
CReduce the total number of drawings required
DEliminate the need for a specification document
Answer is hidden
Question 250 of 938Ch 5 · Advanced Understanding of Architectural Drawings

Compared to a basic floor plan (Chapter 4), a detailed/advanced floor plan additionally includes:

ANo additional information at all
BFull dimensioning, finish notations, and structural grid/column references
COnly a simplified bubble diagram
DOnly the building's exterior perspective view
Answer is hidden
Question 251 of 938Ch 5 · Architectural Design Process (Advanced)

At an advanced design level, the term 'context' is interpreted to include:

AOnly the immediate physical site boundary
BBroader urban, cultural, and historical layers beyond immediate site conditions
COnly the building's interior furniture arrangement
DOnly the client's personal preferences
Answer is hidden
Question 252 of 938Ch 5 · Architectural Design Process (Advanced)

Which of the following is an example of a tangible design aspect?

ASense of place
BStructural material and dimension
CCultural symbolism
DEmotional atmosphere
Answer is hidden
Question 253 of 938Ch 5 · Architectural Design Process (Advanced)

Intangible aspects of design are best described as:

APrecisely measurable structural properties
BNon-measurable, experiential qualities such as sense of place, symbolism, and atmosphere
COnly the building's cost estimate
DOnly the technical thermal performance of materials
Answer is hidden
Question 254 of 938Ch 5 · Architectural Design Process (Advanced)

Advanced case study analysis, compared to basic case study review (Chapter 4), additionally involves: achieving its intent

AIgnoring the precedent's design theory entirely
BCritical examination of the precedent's design theory, structural/environmental strategy, and success/failure in
COnly measuring the precedent building's floor area
DReplacing the need for any literature review
Answer is hidden
Question 255 of 938Ch 5 · Architectural Design Process (Advanced)

A 'parti,' as used in concept formulation, refers to:

AA structural steel connection type
BA clear, central design idea synthesizing programme, site response, and theoretical position
CA type of construction material
DA municipal building permit document
Answer is hidden
Question 256 of 938Ch 5 · Architectural Design Process (Advanced)

Design synthesis is best described as the process of:

ASelecting only a colour scheme for the final presentation
BIntegrating programme, context, structure, services, and design theory into a coherent, buildable proposal
CPreparing a cost estimate with no design input
DChoosing furniture for a completed building
Answer is hidden
Question 257 of 938Ch 5 · Architectural Design Process (Advanced)

Universal Design standards, applied concretely in advanced studio work, include:

AOnly decorative colour schemes with no functional purpose
BAccessible ramp gradients, appropriately sized accessible corridors/doorways, and accessible toilet layouts
COnly structural steel connection details
DOnly municipal permit application forms
Answer is hidden
Question 258 of 938Ch 5 · Architectural Design Process (Advanced)

The primary goal of Universal Design standards is to ensure a design is:

AUsable only by able-bodied adult users
BUsable by people of all ages and abilities without the need for special adaptation or segregated facilities
CReserved exclusively for institutional buildings
DFocused solely on aesthetic appearance with no functional consideration
Answer is hidden
Question 259 of 938Ch 5 · Architectural Design Process (Advanced)

Tactile and visual wayfinding cues, as a Universal Design element, primarily assist:

AOnly visually impaired users, with no benefit to any other user group
BUsers navigating a building, including those with visual or cognitive impairments
COnly the structural engineer during construction
DOnly the building's exterior aesthetic appearance
Answer is hidden
Question 260 of 938Ch 5 · Architectural Design Process (Advanced)

Design synthesis at the advanced studio level should incorporate which of the following from earlier architectural theory (Chapter 3)?

ANo theoretical or aesthetic principles at all
BAesthetic/theoretical principles such as visual appropriateness and social milieu
COnly ancient Egyptian post-and-lintel construction techniques
DOnly Mughal-style bulbous domes
Answer is hidden
Question 261 of 938Ch 5 · Advanced Computer Graphics

SketchUp is primarily valued in architectural workflows for its:

APhotorealistic rendering engine capabilities exclusively
BIntuitive interface for 3D massing and conceptual modeling
CFunction as a raster image editor
DRole as a municipal permit submission platform
Answer is hidden
Question 262 of 938Ch 5 · Advanced Computer Graphics

Photoshop, in an architectural visualization workflow, is primarily used for:

A3D BIM modeling and clash detection
BRaster image editing, render post-production, and presentation graphics
CReal-time walkthrough animation
DStructural load calculation
Answer is hidden
Question 263 of 938Ch 5 · Advanced Computer Graphics

V-Ray is best described as a:

AReal-time rendering engine built exclusively into Lumion
BPhotorealistic rendering engine simulating physically accurate lighting, materials, and reflections
CBuilding Information Modeling (BIM) platform
D2D drafting-only software with no 3D capability
Answer is hidden
Question 264 of 938Ch 5 · Advanced Computer Graphics

Lumion is particularly known for: animations

ABeing a purely 2D drafting tool
BReal-time rendering optimized for fast, high-quality architectural visualization such as walkthroughs and
CStructural steel connection detailing
DMunicipal building permit documentation
Answer is hidden
Question 265 of 938Ch 5 · Advanced Computer Graphics

Revit is best classified as a:

APurely 2D CAD drafting tool with no 3D capability
BBuilding Information Modeling (BIM) platform integrating 3D modeling with data-rich building elements
CRaster image editing application
DA rendering plugin only, with no modeling function
Answer is hidden
Question 266 of 938Ch 5 · Advanced Computer Graphics

Clash detection, as an application of advanced 3D/BIM modeling, is used to:

ASelect an appropriate colour scheme for a facade
BIdentify coordination conflicts between different building systems/disciplines within the model
CGenerate a photorealistic rendering with no coordination function
DReplace the need for any 2D construction drawings
Answer is hidden
Question 267 of 938Ch 5 · Advanced Computer Graphics

Advanced rendering for design communication typically incorporates:

AOnly flat, untextured geometric shapes with no lighting
BAccurate material properties, lighting studies, context/entourage, and atmospheric effects
COnly orthographic line drawings with no colour
DOnly structural calculations with no visual output
Answer is hidden
Question 268 of 938Ch 5 · Advanced Computer Graphics

Advanced 2D drawings prepared for construction documentation, compared to basic studio drawings, typically include:

ANo annotation or material call-outs at all
BDetailed annotation, layered material/finish call-outs, and coordinated multi-sheet referencing
COnly a single, non-dimensioned sketch
DOnly a perspective rendering with no technical information
Answer is hidden
Question 269 of 938Ch 5 · Advanced Computer Graphics

Which software combination would typically be used to model a building in 3D, generate a photorealistic render, and then post-process the resulting image?

AOnly Revit, used for all three purposes with no other tool
BSketchUp/Revit for modeling, V-Ray for rendering, and Photoshop for post-production
COnly Photoshop, used for all three purposes
DOnly a municipal drawing template
Answer is hidden
Question 270 of 938Ch 5 · Advanced Computer Graphics

Real-time rendering software such as Lumion is particularly advantageous for producing:

AOnly static structural calculation reports
BFast walkthroughs and animations for design communication
COnly 2D dimensioned construction drawings
DOnly municipal permit application forms
Answer is hidden
Question 271 of 938Ch 5 · Municipal Set of Architectural Drawings

A municipal (permit) drawing set is primarily submitted to:

AA private client for final design approval only
BThe local municipality/authority to obtain building permit approval prior to construction
CA construction contractor for pricing purposes only
DAn international heritage conservation body
Answer is hidden
Question 272 of 938Ch 5 · Municipal Set of Architectural Drawings

Which drawing type in the municipal set typically demonstrates compliance with FAR and ground coverage byelaws?

AElectrical drawings
BArchitectural drawings (site plan, floor plans, elevations, sections)
CSanitation drawings only
DOnly the structural drawings
Answer is hidden
Question 273 of 938Ch 5 · Municipal Set of Architectural Drawings

Structural drawings within a municipal submission set typically include:

AOnly the exterior paint colour scheme
BFoundation layout, column/beam layout, and reinforcement details
COnly the plumbing fixture locations
DOnly the electrical load schedule
Answer is hidden
Question 274 of 938Ch 5 · Municipal Set of Architectural Drawings

Sanitation drawings in a municipal submission set would typically show:

AThe building's structural column grid
BWater supply layout, drainage/sewerage layout, and plumbing fixture locations
COnly the electrical distribution board location
DOnly the site's landscape planting plan
Answer is hidden
Question 275 of 938Ch 5 · Municipal Set of Architectural Drawings

An electrical drawing in a municipal submission set typically includes:

AOnly the building's foundation reinforcement layout
BWiring routes, points/outlets, distribution board location, and a load schedule
COnly the water supply pipe routing
DOnly the site's boundary dimensions
Answer is hidden
Question 276 of 938Ch 5 · Municipal Set of Architectural Drawings

The supporting report accompanying a municipal drawing submission typically includes:

AOnly a set of unrelated photographs of the site
BA structural design basis/summary, an area statement, and a general project description
COnly the client's personal contact information
DOnly a list of construction materials suppliers
Answer is hidden
Question 277 of 938Ch 5 · Municipal Set of Architectural Drawings

An 'area statement' within the supporting report primarily serves to:

ACalculate the building's final construction cost
BDemonstrate compliance with FAR/ground coverage requirements through area calculations
CList the electrical load schedule only
DDescribe only the building's historical significance
Answer is hidden
Question 278 of 938Ch 5 · Municipal Set of Architectural Drawings

If significant deviations from an approved municipal drawing set occur during construction, what is typically required?

ANo action is required; deviations are always automatically acceptable
BA revised/amended permit submission reflecting the changes
CImmediate demolition of the entire structure
DOnly a verbal notification to the contractor
Answer is hidden
Question 279 of 938Ch 5 · Municipal Set of Architectural Drawings

The municipal authority reviews a submitted drawing set primarily against:

AOnly the architect's personal design preferences
BApplicable byelaws, building codes, and structural safety standards
COnly the interior furniture layout chosen by the client
DOnly the choice of landscape planting species
Answer is hidden
Question 280 of 938Ch 5 · Municipal Set of Architectural Drawings

Which of the following best describes the overall purpose of assembling a complete municipal drawing set (architectural + structural + sanitation + electrical + report)? before granting a building permit

ATo create a purely artistic presentation with no regulatory function
BTo provide the reviewing authority with sufficient coordinated information to assess code/byelaw compliance
CTo replace the need for any construction detail drawings later
DTo determine only the project's final sale price
Answer is hidden
Question 281 of 938Ch 5 · Construction Detail Drawing

A working drawing is best described as: information

AA rough conceptual sketch with no dimensions
BA construction-ready drawing at a large scale providing precise dimensions, materials, and assembly
CA small-scale master plan showing an entire development
DA colour rendering intended only for client presentation
Answer is hidden
Question 282 of 938Ch 5 · Construction Detail Drawing

Which of the following is an example of an 'elemental detail' commonly required in construction detail drawings?

AA master plan of an entire town
BA wall section showing DPC, insulation, and finishes
CA colour scheme rendering for client presentation
DA bubble diagram of functional relationships
Answer is hidden
Question 283 of 938Ch 5 · Construction Detail Drawing

A staircase detail drawing would typically specify:

AOnly the overall building's site plan boundary
BRiser, tread, handrail, and balustrade dimensions/construction
COnly the electrical load schedule for the building
DOnly the exterior facade colour scheme
Answer is hidden
Question 284 of 938Ch 5 · Construction Detail Drawing

Working drawings should cross-reference which of the following where proprietary components are used?

AOnly the architect's personal notes with no formal reference
BThe relevant specification clause and manufacturer's technical data
COnly the site's zoning ordinance classification
DOnly the project's overall cost estimate
Answer is hidden
Question 285 of 938Ch 5 · Construction Detail Drawing

Graphical representation of supportive services in a construction detail drawing typically includes:

AOnly the building's colour scheme
BElectrical conduit routes, plumbing pipe runs, and HVAC ductwork
COnly the perspective rendering of the facade
DOnly the historical style reference of the design
Answer is hidden
Question 286 of 938Ch 5 · Construction Detail Drawing

Standard graphic symbols/line types for different service types in a drawing set primarily serve to:

AMake all services indistinguishable from architectural elements
BAllow each service type to be distinguished consistently and at a glance across the drawing set
CReplace the need for any written specification
DDetermine the final construction cost of the project
Answer is hidden
Question 287 of 938Ch 5 · Construction Detail Drawing

Coordination at the construction detail level (e.g. checking that a duct does not clash with a structural beam) is important primarily to:

AIncrease the total number of on-site changes required
BAvoid costly on-site rework resulting from unresolved clashes
CEliminate the need for any structural design
DReduce the building's overall floor area
Answer is hidden
Question 288 of 938Ch 5 · Construction Detail Drawing

A door/window jamb-head-sill detail specifically addresses:

AThe overall site drainage layout
BThe construction/junction detailing around a door or window opening
CThe electrical distribution board location
DThe building's overall master plan
Answer is hidden
Question 289 of 938Ch 5 · Construction Detail Drawing

A roof eave/parapet/flashing detail is primarily concerned with:

AInterior room furniture layout
BWeatherproofing and construction detailing at the roof edge/junction
CThe building's electrical load schedule
DThe site's zoning ordinance compliance
Answer is hidden
Question 290 of 938Ch 5 · Construction Detail Drawing

Working drawings must specify tolerances primarily because: and assembled

AConstruction elements are always built with zero possible variation
BSome acceptable variation in dimension/fit must be defined to ensure elements can be practically constructed
CTolerances are only relevant to electrical drawings
DTolerances eliminate the need for any dimensioning at all
Answer is hidden
Question 291 of 938Ch 5 · Complex Design Projects

Advanced volumetric composition for complex design projects primarily involves: circulation hierarchies

AA single simple mass with no programmatic variation
BThe arrangement of multiple interlocking masses and voids integrating varied programmatic zones and
COnly a two-dimensional floor plan with no volumetric consideration
DIgnoring structural system integration entirely
Answer is hidden
Question 292 of 938Ch 5 · Complex Design Projects

A key design consideration for a high school, given larger student populations, is:

AEliminating the need for any assembly hall
BClear circulation hierarchy and adequate safety/egress provisions
CIgnoring daylighting/acoustics in classroom design
DA single-room design with no zoning at all
Answer is hidden
Question 293 of 938Ch 5 · Complex Design Projects

Efficient net-to-gross floor area ratio and flexible tenant/floor-plate planning are particularly important design considerations for which project type?

AA museum
BA commercial building
CA sports center
DA community center
Answer is hidden
Question 294 of 938Ch 5 · Complex Design Projects

Controlled environmental conditions (light, humidity, temperature) are a particularly critical design consideration for which project type?

AA bus stop
BA museum, for exhibit/artifact preservation
CA guard house
DA residential bungalow
Answer is hidden
Question 295 of 938Ch 5 · Complex Design Projects

Daylighting design in a museum must specifically avoid:

AAny natural light at all under all circumstances
BUV/heat damage to exhibits while still providing appropriate illumination
CProviding any illumination to gallery spaces
DThe use of any artificial lighting whatsoever
Answer is hidden
Question 296 of 938Ch 5 · Complex Design Projects

A community center's design should particularly emphasize:

AA single rigid-use hall for one specific user group only
BMulti-purpose flexible halls and accessible design supporting varied user-group programming
CThe complete exclusion of any indoor-outdoor activity spaces
DA design usable only by one narrow age group
Answer is hidden
Question 297 of 938Ch 5 · Complex Design Projects

Large-span structural systems are a particularly critical design consideration for which complex project type?

AA small residential house
BA sports center, to accommodate large unobstructed playing areas
CA guard house
DA bus stop shelter
Answer is hidden
Question 298 of 938Ch 5 · Complex Design Projects

Integration of architectural form with structural system in complex projects (e.g. a sports hall) should ideally occur:

AOnly after construction has already begun
BAt the concept design stage itself, rather than as a later add-on
CNever; structure and architecture should remain entirely separate
DOnly in the working drawing/detail stage
Answer is hidden
Question 299 of 938Ch 5 · Complex Design Projects

Successful complex design projects are expected to resolve the advanced design process (concept, synthesis, Universal Design) at a level of scale/complexity that is:

AIdentical to, and no more demanding than, the basic small projects of Chapter 4.6
BSignificantly greater than the basic small projects covered earlier in the studio sequence
CIrrelevant, since complex projects require no design process at all
DLimited only to a single small room
Answer is hidden
Question 300 of 938Ch 5 · Complex Design Projects

Spectator seating sightlines are a particularly important design consideration for:

AA museum's gallery sequencing
BA sports center
CA guard house
DA primary school classroom
Answer is hidden
Question 301 of 938Ch 6 · Fundamentals: Stress/Strain, Torsion/Flexure, Beam & Frame Analysis

The centroid (centre of gravity) of a structural cross-section is significant because it:

ADetermines the material's colour
BLocates the neutral axis of the section, essential to bending analysis
CHas no relevance to structural design
DOnly applies to circular sections
Answer is hidden
Question 302 of 938Ch 6 · Fundamentals: Stress/Strain, Torsion/Flexure, Beam & Frame Analysis

A cross-section with material distributed farther from its neutral axis (e.g. an I-section) has:

ALower moment of inertia and lower bending stiffness
BHigher moment of inertia and greater bending stiffness for the same material quantity
CNo moment of inertia at all
DThe same bending stiffness as a solid rectangular section of equal area regardless of shape
Answer is hidden
Question 303 of 938Ch 6 · Fundamentals: Stress/Strain, Torsion/Flexure, Beam & Frame Analysis

Strain, as a mechanical property, is best defined as:

AThe internal force per unit area within a material
BThe deformation (change in dimension) per unit original dimension resulting from applied stress
CA twisting moment applied to a member
DThe bending moment at mid-span of a beam
Answer is hidden
Question 304 of 938Ch 6 · Fundamentals: Stress/Strain, Torsion/Flexure, Beam & Frame Analysis

Hooke's Law describes the relationship between:

ABending moment and shear force
BStress and strain, within the elastic limit
CCentre of gravity and moment of inertia
DTorsion and flexure only
Answer is hidden
Question 305 of 938Ch 6 · Fundamentals: Stress/Strain, Torsion/Flexure, Beam & Frame Analysis

In the theory of torsion, the shear stress induced by a twisting moment (torque) in a circular section is:

AUniform across the entire cross-section
BMaximum at the outer surface and varies across the cross-section
CZero everywhere in the section
DOnly present at the centroid of the section
Answer is hidden
Question 306 of 938Ch 6 · Fundamentals: Stress/Strain, Torsion/Flexure, Beam & Frame Analysis

According to the theory of flexure, at the neutral axis of a beam subjected to pure bending, the bending stress is:

AMaximum tensile
BMaximum compressive
CZero
DEqual to the applied bending moment
Answer is hidden
Question 307 of 938Ch 6 · Fundamentals: Stress/Strain, Torsion/Flexure, Beam & Frame Analysis

For a simply supported beam under a uniformly distributed load, the maximum bending moment typically occurs:

AAt the supports
BAt mid-span
CAt the extreme ends only
DBending moment is zero throughout
Answer is hidden
Question 308 of 938Ch 6 · Fundamentals: Stress/Strain, Torsion/Flexure, Beam & Frame Analysis

Shear force in a simply supported beam under a uniformly distributed load is typically maximum:

AAt mid-span
BNear the supports
CNowhere; shear force is constant throughout
DOnly at the neutral axis
Answer is hidden
Question 309 of 938Ch 6 · Fundamentals: Stress/Strain, Torsion/Flexure, Beam & Frame Analysis

Deflection of a structural member must be limited primarily to avoid:

AIncreasing the member's moment of inertia
BVisible sagging, cracking of finishes, and other serviceability problems
CAny change in the material's stress-strain relationship
DReducing the applied bending moment
Answer is hidden
Question 310 of 938Ch 6 · Fundamentals: Stress/Strain, Torsion/Flexure, Beam & Frame Analysis

Bending moment and shear force diagrams (BMD/SFD) are primarily used to: for design/sizing

ASelect a colour scheme for the building
BGraphically represent how internal bending moment and shear force vary along a member, forming the basis
CCalculate only the building's total floor area
DDetermine the site's zoning classification
Answer is hidden
Question 311 of 938Ch 6 · Steel and Basic R.C.C. Structural Design

In truss design, individual triangulated members are assumed to carry primarily:

ABending moment only
BPure axial (tension or compression) force
CTorsional force only
DShear force distributed uniformly along their length
Answer is hidden
Question 312 of 938Ch 6 · Steel and Basic R.C.C. Structural Design

A steel compression member in a truss is typically governed by which design criterion?

ATensile yield strength only
BBuckling
CShear stress only
DTorsional stiffness only
Answer is hidden
Question 313 of 938Ch 6 · Steel and Basic R.C.C. Structural Design

An R.C.C. beam's main longitudinal reinforcement is primarily sized to resist:

AAxial compressive load only
BThe bending moment (flexure) acting on the beam
CTorsional moment exclusively
DOnly the beam's self-weight, ignoring applied loads
Answer is hidden
Question 314 of 938Ch 6 · Steel and Basic R.C.C. Structural Design

A one-way R.C.C. slab is characterized by a length-to-breadth ratio that is:

ALess than 2, with reinforcement running in both directions equally
BGreater than 2, with main reinforcement running in the shorter (spanning) direction
CExactly equal to 1 in all cases
DIrrelevant to the slab's structural behaviour
Answer is hidden
Question 315 of 938Ch 6 · Steel and Basic R.C.C. Structural Design

A two-way R.C.C. slab differs from a one-way slab in that it:

ASpans in only one direction, like a one-way slab
BSpans in both orthogonal directions, with reinforcement provided in both directions
CRequires no reinforcement in either direction
DCan only be used for isolated column footings
Answer is hidden
Question 316 of 938Ch 6 · Steel and Basic R.C.C. Structural Design

R.C.C. columns are primarily designed to resist:

AOnly shear force with no axial load
BAxial compressive load, often combined with bending moment
COnly torsional moment
DOnly the weight of the roof, ignoring floor loads
Answer is hidden
Question 317 of 938Ch 6 · Steel and Basic R.C.C. Structural Design

Lateral ties or spirals in an R.C.C. column primarily serve to:

AResist the primary axial compressive load directly
BConfine the concrete core and restrain longitudinal reinforcement bars against buckling
CReplace the need for any longitudinal reinforcement
DDetermine the column's exterior finish
Answer is hidden
Question 318 of 938Ch 6 · Steel and Basic R.C.C. Structural Design

An isolated column footing's plan area is primarily sized to ensure:

AThe footing's own self-weight is maximized
BThe soil pressure beneath the footing does not exceed the safe bearing capacity
CThe footing requires no reinforcement at all
DThe footing matches the exact plan shape of the column above with no enlargement
Answer is hidden
Question 319 of 938Ch 6 · Steel and Basic R.C.C. Structural Design

Reinforcement detailing information such as development/lap length and bend/hook details is essential to ensure:

AThe reinforcement bars are purely decorative
BThe reinforcement is adequately anchored and performs its intended structural function
CThe concrete requires no curing
DThe building's colour scheme is finalized
Answer is hidden
Question 320 of 938Ch 6 · Steel and Basic R.C.C. Structural Design

Minimum concrete cover to reinforcement is specified primarily to:

AReduce the structural strength of the member intentionally
BProtect the reinforcement from corrosion and provide adequate fire resistance
CEliminate the need for any curing of the concrete
DIncrease the member's susceptibility to buckling
Answer is hidden
Question 321 of 938Ch 6 · Surveying, Estimating, Costing and Specification

The primary purpose of surveying is to: layout

ADetermine only the cost of a construction project
BDetermine the relative position of points on/near the earth's surface for mapping, planning, and construction
CSelect the appropriate colour scheme for a building
DCalculate only the electrical load of a building
Answer is hidden
Question 322 of 938Ch 6 · Surveying, Estimating, Costing and Specification

A cadastral survey is specifically concerned with:

ANatural and artificial features and relief of the land
BProperty boundaries
CRoute alignment for a road or canal
DOnly the vertical elevation of points
Answer is hidden
Question 323 of 938Ch 6 · Surveying, Estimating, Costing and Specification

Levelling, as a surveying operation, is primarily used to determine:

AHorizontal property boundaries only
BThe relative height (elevation) of points, relative to a benchmark
CThe angular bearing between two points
DThe total area of an irregular plot of land
Answer is hidden
Question 324 of 938Ch 6 · Surveying, Estimating, Costing and Specification

Simpson's rule, in surveying, is used to calculate:

AThe volume of cut and fill only
BThe area of an irregular boundary from field measurements
CThe cost per unit of a construction item
DThe bearing capacity of soil
Answer is hidden
Question 325 of 938Ch 6 · Surveying, Estimating, Costing and Specification

The prismoidal method in earthwork calculation is used to determine:

AThe area of a rectangular plot only
BThe volume of cut and fill (earthwork)
CThe rate analysis for a construction item
DThe specification for a finishing material
Answer is hidden
Question 326 of 938Ch 6 · Surveying, Estimating, Costing and Specification

An approximate/preliminary estimate (using the plinth area or cubic content method) is primarily used for:

AFinal, precise contract payment certification
BEarly-stage budgeting before detailed design is complete
CDetailed item-wise reinforcement detailing
DSpecifying the exact finishing material colour
Answer is hidden
Question 327 of 938Ch 6 · Surveying, Estimating, Costing and Specification

Rate analysis for a construction item systematically accounts for:

AOnly the labour cost, ignoring all other factors
BMaterial, labour, equipment/machinery, overhead, and profit costs
COnly the client's personal budget preference
DOnly the site's zoning classification
Answer is hidden
Question 328 of 938Ch 6 · Surveying, Estimating, Costing and Specification

A Bill of Quantities (BOQ) is primarily used for:

ADetermining the building's structural design loads
BTendering, contract administration, and payment certification
CSelecting the site's soil investigation method
DPreparing a bubble diagram for concept design
Answer is hidden
Question 329 of 938Ch 6 · Surveying, Estimating, Costing and Specification

A general specification, as distinct from a detailed/particular specification, provides:

AAn item-by-item description with exact quantities for each component
BA broad description of materials/workmanship standards for the project as a whole, without exact quantities
CNo information about materials at all
DOnly the project's final cost
Answer is hidden
Question 330 of 938Ch 6 · Surveying, Estimating, Costing and Specification

A key purpose of well-prepared specifications, alongside describing quality/workmanship, is to:

AEliminate the need for any construction drawings
BServe as a reference for quality control/inspection and dispute resolution during construction
CReplace the need for a cost estimate entirely
DDetermine only the site's legal ownership status
Answer is hidden
Question 331 of 938Ch 6 · Basic Concepts of Climatology

A solar chart (sun-path diagram) is primarily used in architectural design to: latitude

ACalculate a building's structural load
BAnalyse shading/solar access by plotting the sun's altitude and azimuth across the year/day for a given
CDetermine the site's soil bearing capacity
DSelect the exterior paint colour scheme
Answer is hidden
Question 332 of 938Ch 6 · Basic Concepts of Climatology

Solar altitude refers to:

AThe horizontal angle of the sun measured from true north
BThe vertical angle of the sun above the horizon
CThe orientation angle of a wall relative to true north
DThe reflectivity of a building surface
Answer is hidden
Question 333 of 938Ch 6 · Basic Concepts of Climatology

Wall azimuth, used together with solar azimuth, helps determine:

AThe structural load on a wall
BThe angle of incidence of sunlight on a given facade
CThe moment of inertia of a beam
DThe rate analysis for a construction item
Answer is hidden
Question 334 of 938Ch 6 · Basic Concepts of Climatology

Shadow angles derived from solar geometry are primarily used to design:

AStructural steel connections
BShading devices (overhangs, fins) that block unwanted solar gain while admitting daylight
CThe building's electrical load schedule
DThe site's drainage layout
Answer is hidden
Question 335 of 938Ch 6 · Basic Concepts of Climatology

A dark, rough building surface generally has:

AHigher reflectivity and lower absorptivity
BHigher absorptivity, absorbing more solar radiation as heat
CNo absorptivity or reflectivity at all
DThe same thermal behaviour as a light, glossy surface
Answer is hidden
Question 336 of 938Ch 6 · Basic Concepts of Climatology

Heat transfer through a solid building wall, from the warmer to cooler face, primarily occurs by:

ARadiation only, with no conduction involved
BConduction
CEvaporation
DOnly convection, with no conduction at all
Answer is hidden
Question 337 of 938Ch 6 · Basic Concepts of Climatology

Emissivity, as a thermal property of a surface, refers to its:

AStructural load-bearing capacity
BEffectiveness in emitting thermal (infrared) radiation, relative to an ideal black body
CAbility to reflect visible light only
DResistance to moisture absorption
Answer is hidden
Question 338 of 938Ch 6 · Basic Concepts of Climatology

Which of the following is a thermal control technique using heavy materials to moderate indoor temperature swings?

ACross-ventilation
BThermal mass
CReflective surface finishes only
DShading devices only
Answer is hidden
Question 339 of 938Ch 6 · Basic Concepts of Climatology

Cross-ventilation and stack ventilation, as thermal control techniques, primarily function to:

AIncrease a building's solar heat gain
BRemove excess heat from indoor spaces through air movement
CReplace the need for any shading devices under all circumstances
DReduce the building's daylighting levels only
Answer is hidden
Question 340 of 938Ch 6 · Basic Concepts of Climatology

Appropriate building orientation and form, as a thermal control technique, is primarily used to:

AMaximize unwanted solar exposure on all facades equally
BMinimize unwanted solar exposure while allowing beneficial daylighting/passive heating where appropriate
CEliminate the need for any structural design
DDetermine the site's legal zoning classification
Answer is hidden
Question 341 of 938Ch 6 · Lighting and Acoustics

Daylight factor, as a daylighting design metric, expresses:

AThe total electrical lighting load of a building
BInterior illuminance as a percentage of simultaneous outdoor illuminance under an overcast sky
CThe reverberation time of a hall
DThe colour rendering index of a light source
Answer is hidden
Question 342 of 938Ch 6 · Lighting and Acoustics

Illuminance, as a lighting design quantity, is measured in:

ADecibels
BLux
CDegrees Celsius
DPascals
Answer is hidden
Question 343 of 938Ch 6 · Lighting and Acoustics

The lumen method, as a basic artificial lighting calculation approach, relates: average illuminance

AOnly the building's structural load to its foundation design
BThe number and output of luminaires, room dimensions, and utilization/maintenance factors to resulting
COnly the reverberation time of a room to its volume
DOnly the site's solar azimuth to its wall orientation
Answer is hidden
Question 344 of 938Ch 6 · Lighting and Acoustics

Glare control in lighting design primarily addresses:

AThe building's structural strength
BExcessive brightness contrast or direct view of light sources, which can cause visual discomfort
CThe reverberation time of an adjacent hall
DThe thermal insulation value of a wall
Answer is hidden
Question 345 of 938Ch 6 · Lighting and Acoustics

Colour rendering, as a lighting quality consideration, refers to:

AHow accurately a light source reveals the true colours of objects
BThe total wattage consumed by a luminaire
CThe physical colour of the light fixture itself
DThe reverberation time of the space
Answer is hidden
Question 346 of 938Ch 6 · Lighting and Acoustics

Reverberation time in a hall should generally be:

AIdentical for every type of hall regardless of use
BTuned to the hall's function — shorter for speech clarity, longer acceptable for music
CAs long as possible in all cases
DIrrelevant to the hall's acoustic design
Answer is hidden
Question 347 of 938Ch 6 · Lighting and Acoustics

Sound absorption, as an acoustic design strategy, primarily involves:

AIncreasing the mass of partition walls to block sound transmission between rooms
BUsing absorptive materials/finishes to reduce reverberation and control reflected sound within a space
CSealing all air gaps to prevent airborne sound transmission between spaces
DConstructing a floating floor to prevent impact sound transmission
Answer is hidden
Question 348 of 938Ch 6 · Lighting and Acoustics

Sound insulation, as distinct from sound absorption, primarily aims to:

AReduce reverberation time within a single room
BPrevent the transmission of sound between separate spaces
CIncrease the reflectivity of interior wall surfaces
DImprove the daylight factor of a room
Answer is hidden
Question 349 of 938Ch 6 · Lighting and Acoustics

Echo or flutter echo in a hall is typically caused by:

AExcessive sound absorption throughout the space
BParallel reflective surfaces causing repeated sound reflections
CAdequate reverberation time tuned to the hall's use
DA well-designed, evenly distributed sound field
Answer is hidden
Question 350 of 938Ch 6 · Lighting and Acoustics

Even sound distribution, avoiding dead spots or sound focusing, is an important factor in:

AStructural steel connection design
BGood acoustic design of a hall
CSolar shading device design
DRate analysis for construction estimating
Answer is hidden
Question 351 of 938Ch 6 · Passive Methods of Energy Conservation

Passive design for energy conservation begins primarily with:

AInstalling the largest possible mechanical HVAC system
BUnderstanding the local climate and responding through orientation, form, envelope, and site planning
CIgnoring solar exposure and wind pattern entirely
DApplying an identical design solution regardless of climatic region
Answer is hidden
Question 352 of 938Ch 6 · Passive Methods of Energy Conservation

In a high-altitude mountain climate, a compact building form with a minimized exposed surface area is favoured primarily to:

AMaximize heat loss to the cold exterior
BReduce heat loss by minimizing the building's exposed surface area relative to its volume
CIncrease the building's exposure to wind-driven rain
DProvide the largest possible window openings on all facades
Answer is hidden
Question 353 of 938Ch 6 · Passive Methods of Energy Conservation

Thick thermal-mass walls with small window openings are a passive design strategy particularly suited to which climatic region?

ATerai (hot, humid plains)
BMountain (cold, high-altitude)
COnly coastal regions
DRegions with no climatic variation at all
Answer is hidden
Question 354 of 938Ch 6 · Passive Methods of Energy Conservation

In the Terai region's hot, humid climate, a key passive design strategy is:

AMinimizing all ventilation to retain heat
BMaximizing cross/stack ventilation for cooling and air quality
CUsing thick, heavy thermal-mass walls with small openings, as in mountain regions
DEliminating all roof overhangs
Answer is hidden
Question 355 of 938Ch 6 · Passive Methods of Energy Conservation

Raised plinths in Terai vernacular/passive design serve which combined purpose?

AOnly decorative height with no functional benefit
BFlood protection and improved airflow beneath the floor
CMaximizing exposure to cold winter winds
DReducing the building's total floor area
Answer is hidden
Question 356 of 938Ch 6 · Passive Methods of Energy Conservation

Appropriately pitched roofs in mountain-region passive design are particularly important for:

AMaximizing solar heat absorption on the roof surface only
BShedding snow load effectively
CEliminating the need for any wall insulation
DReducing the building's south-facing solar exposure
Answer is hidden
Question 357 of 938Ch 6 · Passive Methods of Energy Conservation

In the hill region, a key passive design consideration is balancing solar access with:

AComplete elimination of all rainfall protection
BRain protection, through adequate roof overhangs
CMaximizing exposed thermal mass with no insulation
DEliminating any use of verandahs or covered outdoor space
Answer is hidden
Question 358 of 938Ch 6 · Passive Methods of Energy Conservation

Passive design solutions are generally prioritized before active mechanical systems primarily because they:

AAlways cost more to install than mechanical systems
BReduce or eliminate ongoing energy consumption and operating cost while often improving comfort/resilience
CProvide no benefit to occupant comfort at all
DAre only applicable to industrial buildings
Answer is hidden
Question 359 of 938Ch 6 · Passive Methods of Energy Conservation

An effective passive design response is best characterized as one that:

AAddresses only orientation, while ignoring shading and ventilation entirely
BIntegrates orientation, form, envelope, shading, and ventilation strategies together
CRelies exclusively on a single strategy such as insulation, with no other consideration
DIs identical regardless of the specific climatic region
Answer is hidden
Question 360 of 938Ch 6 · Passive Methods of Energy Conservation

Wide verandahs and deep roof overhangs are a passive design solution particularly associated with which climatic region, addressing both shading and rain protection?

AMountain (high-altitude, cold)
BTerai (hot, humid plains)
CRegions with no rainfall at all
DOnly regions with no solar exposure
Answer is hidden
Question 361 of 938Ch 7 · Planning Concepts and Theoretical Models of Planning

Urban morphology is best defined as the study of:

AOnly a city's population growth rate
BA city's physical form (street pattern, plot/block structure, building form, open space) and its evolution
COnly a city's legal/regulatory framework
DOnly a city's climatic conditions
Answer is hidden
Question 362 of 938Ch 7 · Planning Concepts and Theoretical Models of Planning

Ribbon (linear) development, as a city growth process, is characterized by:

AGrowth radiating outward evenly in all directions from a core
BGrowth occurring along transport corridors
CGrowth occurring only within a fixed satellite town boundary
DNo relationship to any transport infrastructure
Answer is hidden
Question 363 of 938Ch 7 · Planning Concepts and Theoretical Models of Planning

Sir Patrick Geddes' planning approach is best summarized by the principle of:

ADesigning first, then surveying afterward
BThorough survey and analysis before any planning proposal ('diagnosis before treatment')
CIgnoring all regional context in favour of a purely local design
DApplying identical plans to every city regardless of context
Answer is hidden
Question 364 of 938Ch 7 · Planning Concepts and Theoretical Models of Planning

The term 'conurbation' was coined by which planning theorist to describe a continuous urban area formed by merging towns/cities?

ASir Ebenezer Howard
BSir Patrick Geddes
CC.A. Perry
DLewis Mumford
Answer is hidden
Question 365 of 938Ch 7 · Planning Concepts and Theoretical Models of Planning

Ebenezer Howard's Garden City concept proposed:

AUnlimited-size cities with no surrounding greenbelt
BSelf-contained satellite towns of limited size, surrounded by a permanent agricultural greenbelt
CPurely industrial towns with no residential provision
DCities with no relationship between town and country living
Answer is hidden
Question 366 of 938Ch 7 · Planning Concepts and Theoretical Models of Planning

C.A. Perry's Neighbourhood Unit concept sized a residential planning unit around:

AThe driving-distance catchment of a shopping mall
BThe walking-distance catchment of an elementary school
CThe entire metropolitan region's population
DA fixed area with no relationship to any local facility
Answer is hidden
Question 367 of 938Ch 7 · Planning Concepts and Theoretical Models of Planning

A key design feature of the Neighbourhood Unit concept is:

AMaximizing through-traffic on internal residential roads
BInternal roads that discourage through-traffic, keeping the neighbourhood safe and cohesive
CThe complete absence of any local school or facility
DA design that ignores walking distance entirely
Answer is hidden
Question 368 of 938Ch 7 · Planning Concepts and Theoretical Models of Planning

Lewis Mumford's planning philosophy is particularly associated with:

AUncritical support for unchecked metropolitan growth
BRegionalism, integrating city and countryside, and a critique of unchecked metropolitan growth
CThe Garden City model exclusively
DThe Survey-Analysis-Plan method exclusively
Answer is hidden
Question 369 of 938Ch 7 · Planning Concepts and Theoretical Models of Planning

Organic (incremental) city growth is best described as:

AGrowth strictly following a pre-established master plan from inception
BUnplanned growth evolving over time along existing routes
CGrowth that only occurs in satellite towns
DGrowth exclusively driven by a greenbelt policy
Answer is hidden
Question 370 of 938Ch 7 · Planning Concepts and Theoretical Models of Planning

Satellite town development, as a planned growth strategy, involves:

AExpanding the existing city core indefinitely with no new nodes
BCreating planned peripheral growth nodes separate from (but related to) the main city
CEliminating all agricultural land surrounding a city
DConcentrating all growth exclusively within the historic city centre
Answer is hidden
Question 371 of 938Ch 7 · Urbanization, Development Plans and Planning Practices in Nepal

Rapid urbanization in Nepal in recent decades has been particularly driven by:

AA decline in rural-to-urban migration
BRural-to-urban migration, economic opportunity concentration in urban centres, and municipal reclassification
CA complete absence of any economic activity in urban centres
DStrict enforcement preventing any settlement growth
Answer is hidden
Question 372 of 938Ch 7 · Urbanization, Development Plans and Planning Practices in Nepal

A key challenge resulting from Nepal's urbanization pace is:

AUrban infrastructure/service provision consistently outpacing settlement growth
BUrbanization often outpacing planned infrastructure/service provision
CA complete absence of any pressure on land or housing
DNo challenges at all; growth has been fully planned
Answer is hidden
Question 373 of 938Ch 7 · Urbanization, Development Plans and Planning Practices in Nepal

In the hierarchy of development plans, which level sets the highest-level national development goals within which subordinate plans must align?

ALocal development plan
BNational plan
CZonal development plan
DStructure plan
Answer is hidden
Question 374 of 938Ch 7 · Urbanization, Development Plans and Planning Practices in Nepal

A master plan for a city is best described as:

AOnly a detailed neighbourhood-level plan
BA comprehensive, long-term plan guiding the city's overall physical growth, land use, and infrastructure
CA plan applicable only to a single zone within the city
DA plan with no relationship to land use at all
Answer is hidden
Question 375 of 938Ch 7 · Urbanization, Development Plans and Planning Practices in Nepal

A structure plan, compared to a master plan, is typically: directions

AMore detailed and covers only a single building
BA broader, more strategic framework indicating major land use zones, transport corridors, and growth
CIdentical in every respect to a master plan
DApplicable only at the national level
Answer is hidden
Question 376 of 938Ch 7 · Urbanization, Development Plans and Planning Practices in Nepal

A zonal development plan is best described as:

AA national-level plan covering the entire country
BA more detailed plan prepared for a specific zone/area within a city
CA plan applicable only to rural agricultural land
DA plan with no relationship to the master/structure plan
Answer is hidden
Question 377 of 938Ch 7 · Urbanization, Development Plans and Planning Practices in Nepal

The most detailed level of the development plan hierarchy, guiding development at the local/neighbourhood level, is the:

ANational plan
BRegional plan
CLocal development plan
DMaster plan
Answer is hidden
Question 378 of 938Ch 7 · Urbanization, Development Plans and Planning Practices in Nepal

Land use planning primarily involves:

AIgnoring all use categories and allowing unrestricted development
BAllocating land within a settlement to appropriate use categories based on suitability, demand, and policy
COnly planning the location of a single building type
DOnly regulating the colour of building facades
Answer is hidden
Question 379 of 938Ch 7 · Urbanization, Development Plans and Planning Practices in Nepal

Effective land use planning in the Nepalese context increasingly needs to account for:

AOnly the aesthetic preferences of individual property owners
BDisaster risk (seismic, flood) and heritage/conservation zone constraints
CNo external constraints of any kind
DOnly the availability of imported construction materials
Answer is hidden
Question 380 of 938Ch 7 · Urbanization, Development Plans and Planning Practices in Nepal

Which of the following correctly orders the plan hierarchy from broadest to most locally detailed?

ALocal development plan → zonal development plan → master plan → national plan
BNational plan → regional plan → master/structure plan → zonal development plan → local development plan
CZonal development plan → national plan → local development plan → regional plan
DMaster plan → national plan → regional plan → zonal development plan
Answer is hidden
Question 381 of 938Ch 7 · Demography/Population Studies

The mean of a data set is calculated as:

AThe value occurring most frequently
BThe sum of all values divided by the number of values
CThe middle value when data is arranged in order
DThe difference between the highest and lowest values
Answer is hidden
Question 382 of 938Ch 7 · Demography/Population Studies

The mode of a data set refers to:

AThe arithmetic average of the data
BThe value that occurs most frequently within the data set
CThe middle value when the data is ordered
DA measure of the data's overall dispersion
Answer is hidden
Question 383 of 938Ch 7 · Demography/Population Studies

The median of an ordered data set is:

AAlways equal to the mean
BThe middle value (or average of the two middle values for an even-numbered set)
CThe most frequently occurring value
DA measure of variation/dispersion
Answer is hidden
Question 384 of 938Ch 7 · Demography/Population Studies

Standard deviation is a statistical measure of:

AThe most frequently occurring value in a data set
BThe amount of variation/dispersion of data values from the mean
CThe total sum of all data values
DThe exact middle value of an ordered data set
Answer is hidden
Question 385 of 938Ch 7 · Demography/Population Studies

The arithmetic increase method of population projection assumes:

AA constant percentage growth rate
BA constant absolute (numerical) increase in population per period
CNo growth in population at all
DA rate of growth that changes unpredictably with no pattern
Answer is hidden
Question 386 of 938Ch 7 · Demography/Population Studies

The geometric increase method of population projection assumes:

AA constant absolute numerical increase per period
BA constant percentage growth rate applied to a compounding population base
CZero population growth
DAn arbitrary, unexplained growth pattern
Answer is hidden
Question 387 of 938Ch 7 · Demography/Population Studies

The incremental increase method of population projection is distinguished by its ability to:

AAssume growth is always zero
BAccount for a changing rate of growth over time, rather than assuming a fixed rate
COnly apply to data sets with a single data point
DIgnore all historical census data
Answer is hidden
Question 388 of 938Ch 7 · Demography/Population Studies

Population projections directly inform demand forecasts for which of the following?

AOnly the colour scheme of future buildings
BHousing units, water supply, sanitation, schools, healthcare, and transportation capacity
COnly the historical style of future architecture
DOnly the site's soil bearing capacity
Answer is hidden
Question 389 of 938Ch 7 · Demography/Population Studies

Accurate demographic/population studies in planning are important primarily because they help avoid: infrastructure/facilities

AOnly the risk of excessive government spending on unrelated projects
BBoth under-provision (overcrowding/inadequate service) and over-provision (wasted resources) of
CThe need for any land use planning at all
DOnly issues related to building aesthetics
Answer is hidden
Question 390 of 938Ch 7 · Demography/Population Studies

Growth rate, as used in population projection, is typically expressed as:

AAn absolute total population figure with no rate component
BAn annual percentage rate of population change
CA fixed value that never varies between different regions
DA measure of a data set's standard deviation
Answer is hidden
Question 391 of 938Ch 7 · Land Development

Guided Land Development (GLD) is characterized by:

AFull land acquisition by the authority before any development
BThe authority guiding road/utility/plot layout while landowners develop their own plots within this framework
CThe complete absence of any government involvement in land layout
DConstruction of fully built public housing units by the government
Answer is hidden
Question 392 of 938Ch 7 · Land Development

A Site and Services scheme primarily involves: housing incrementally

AThe government constructing complete, finished housing units for beneficiaries
BThe authority providing serviced plots with basic infrastructure, with beneficiaries constructing their own
CNo infrastructure provision of any kind
DExclusively commercial land development with no residential component
Answer is hidden
Question 393 of 938Ch 7 · Land Development

Land Pooling (Land Readjustment), as a land development tool, involves: back to owners

APermanent confiscation of all landowner plots with no redistribution
BPooling individual landowner plots, replanning with infrastructure, and redistributing smaller serviced plots
CConstruction of housing exclusively by private developers with no landowner involvement
DApplying only to already fully serviced urban land
Answer is hidden
Question 394 of 938Ch 7 · Land Development

In a Land Pooling scheme, a portion of the pooled land is typically retained by the authority primarily to:

AReward the largest landowner with additional plots
BRecover infrastructure development costs and provide public open space/facilities
CPrevent any landowner from receiving a plot back
DConvert the land to agricultural use exclusively
Answer is hidden
Question 395 of 938Ch 7 · Land Development

A squatter settlement is best defined as:

AA fully planned and legally titled residential development
BAn unauthorized occupation of land (often public or hazard-prone) lacking secure tenure
CA government-built public housing project with secure tenure
DA commercial zone with no residential use
Answer is hidden
Question 396 of 938Ch 7 · Land Development

Which land development tool has been particularly prominent in Nepal's urbanizing areas, especially the Kathmandu Valley?

ASite and Services
BLand Pooling
CGuided Land Development only
DFull government land acquisition and public housing construction
Answer is hidden
Question 397 of 938Ch 7 · Land Development

In-situ upgrading, as an approach to addressing existing slum areas, involves:

ADemolishing the settlement entirely with no resident involvement
BImproving infrastructure and services within the existing settlement location
CRelocating all residents regardless of site suitability
DIgnoring the settlement entirely with no intervention
Answer is hidden
Question 398 of 938Ch 7 · Land Development

Resettlement, as an approach to addressing squatter settlements, is typically applied when:

AThe existing site is safe and suitable for continued occupation
BThe existing site is hazardous or otherwise unsuitable for continued occupation
CNo infrastructure improvement is ever needed
DThe settlement is already fully legally titled
Answer is hidden
Question 399 of 938Ch 7 · Land Development

Site and Services and GLD approaches, compared to fully built public housing, generally offer:

AA higher upfront cost with no flexibility for beneficiaries
BA lower-cost, more incremental alternative allowing beneficiaries to invest according to their means over time
CNo infrastructure provision at all
DIdentical construction timelines and costs to fully built public housing
Answer is hidden
Question 400 of 938Ch 7 · Land Development

Tenure regularization, as part of addressing informal settlements, primarily involves:

ADemolishing all informal structures immediately
BFormalizing/securing the legal land tenure rights of existing occupants
CEliminating the need for any infrastructure improvement
DConverting all residential land to commercial use
Answer is hidden
Question 401 of 938Ch 7 · Basic Concepts, Principles and Elements of Urban Design

In Kevin Lynch's 'Image of the City,' 'paths' refer to:

ALinear boundaries separating two areas
BChannels of movement (streets, walkways, transit lines) along which people move through the city
CMedium-to-large recognizable districts
DDistinct external point references for orientation
Answer is hidden
Question 402 of 938Ch 7 · Basic Concepts, Principles and Elements of Urban Design

'Edges,' in Kevin Lynch's framework, are best described as:

AFocal junction points of intense activity
BLinear boundaries/breaks in continuity that separate one area from another (e.g. a river or wall)
CDistinct memorable landmarks used for orientation
DMovement channels used by pedestrians and vehicles
Answer is hidden
Question 403 of 938Ch 7 · Basic Concepts, Principles and Elements of Urban Design

'Districts,' as an element of the Image of the City, are characterized by:

ABeing purely linear movement channels
BA recognizable, common identifying character that an observer mentally enters 'inside of'
CBeing single, small point landmarks
DHaving no relationship to the observer's perception of the city at all
Answer is hidden
Question 404 of 938Ch 7 · Basic Concepts, Principles and Elements of Urban Design

'Nodes,' in Lynch's framework, are best described as:

APurely decorative building facades
BStrategic focal points/junctions of intense activity that an observer can enter
CLinear boundaries separating two districts
DExternal point references with no associated activity
Answer is hidden
Question 405 of 938Ch 7 · Basic Concepts, Principles and Elements of Urban Design

'Landmarks,' as an urban image element, are distinguished by being:

AAreas the observer enters and moves through
BDistinct, memorable point references external to the observer, used for orientation
CLinear movement channels used for daily commuting
DBoundaries that separate two adjacent districts
Answer is hidden
Question 406 of 938Ch 7 · Basic Concepts, Principles and Elements of Urban Design

A 'sense of enclosure' in urban design is typically achieved through:

ARandomly scattered, unrelated building heights with no consistency
BConsistent building lines and heights defining the edges of a street or public space
CThe complete absence of any street network
DEliminating all public open space
Answer is hidden
Question 407 of 938Ch 7 · Basic Concepts, Principles and Elements of Urban Design

Place Making, as an approach to public space, is best characterized as:

AA purely top-down design process with no community involvement
BA collaborative, community-centred approach capitalizing on local assets, inspiration, and potential
CAn approach focused exclusively on vehicular traffic engineering
DA process that ignores how people actually use a space
Answer is hidden
Question 408 of 938Ch 7 · Basic Concepts, Principles and Elements of Urban Design

A key methodological emphasis of Place Making is:

AIgnoring how people actually use a given space
BObserving how people actually use a space and involving the community actively in the design process
CRelying exclusively on large, singular, top-down design gestures
DEliminating all incremental or adaptable interventions
Answer is hidden
Question 409 of 938Ch 7 · Basic Concepts, Principles and Elements of Urban Design

The ultimate goal of Place Making, as commonly articulated, is to:

AMaximize commercial rental income from a public space with no other consideration
BCreate good public spaces that promote people's health, happiness, and wellbeing
CEliminate all public access to a space
DReplace all public spaces with private development
Answer is hidden
Question 410 of 938Ch 7 · Basic Concepts, Principles and Elements of Urban Design

Connectivity and walkability, as key urban design principles, primarily support:

AIncreased vehicular speed with no pedestrian consideration
BA well-connected, easily navigable urban environment supporting pedestrian movement
CThe complete elimination of any street network
DA design approach focused solely on building facades with no regard for movement
Answer is hidden
Question 411 of 938Ch 7 · Regulatory Frameworks

Planning legislation in Nepal primarily establishes: enforcement

AOnly the aesthetic preferences of individual architects
BThe legal basis for preparing and enforcing development plans, land use zoning, and building permit/byelaw
CNo relationship to land use zoning at all
DOnly historical heritage conservation guidelines
Answer is hidden
Question 412 of 938Ch 7 · Regulatory Frameworks

A key element typically addressed by planning legislation is:

AThe mandate and powers of planning authorities
BOnly the colour scheme of building facades
COnly the historical style of new buildings
DOnly the personal preferences of individual property owners
Answer is hidden
Question 413 of 938Ch 7 · Regulatory Frameworks

A 'policy,' as a regulatory instrument, is best described as:

AA formally mandatory technical requirement with no flexibility
BA statement of government intent/direction guiding subsequent legislation, plans, and programmes
CA generally accepted benchmark value with no government backing
DA specific structural safety calculation method
Answer is hidden
Question 414 of 938Ch 7 · Regulatory Frameworks

'Norms,' as used in planning/design regulation, are best distinguished from formal standards by being:

AAlways more rigid and legally binding than standards
BGenerally accepted benchmark values/practices, often less rigid/binding than a formal standard
CIdentical in every respect to a formal standard
DApplicable only to national-level legislation
Answer is hidden
Question 415 of 938Ch 7 · Regulatory Frameworks

A 'standard,' as a regulatory instrument, typically refers to: safety requirements)

AA vague statement of government intent with no specific requirement
BA formally specified, typically mandatory technical requirement (e.g. minimum room dimensions, structural
CA general benchmark value with no compliance obligation
DOnly an informal community preference with no legal weight
Answer is hidden
Question 416 of 938Ch 7 · Regulatory Frameworks

In practice, national policy and legislation typically provide: requirements

AThe specific, project-level technical requirements for every individual building
BThe overall direction and legal basis, while local byelaws/norms/standards provide project-specific
CNo relevant framework for local planning practice at all
DRequirements that directly override all local municipal byelaws with no local application
Answer is hidden
Question 417 of 938Ch 7 · Regulatory Frameworks

Architects and planners in Nepal need to remain current with evolving legislation/policy particularly in relation to:

AOnly historical stylistic trends with no regulatory relevance
BPost-earthquake building code updates and evolving urban development policies
COnly international design award criteria
DOnly foreign building codes with no relevance to Nepal
Answer is hidden
Question 418 of 938Ch 7 · Regulatory Frameworks

Enforcement mechanisms within planning legislation typically include:

ANo consequences at all for unauthorized construction
BPenalties for unauthorized construction or land use violations
COnly voluntary guidelines with no compliance mechanism
DRewards for violating established land use zoning
Answer is hidden
Question 419 of 938Ch 7 · Regulatory Frameworks

Which of the following best illustrates the relationship between policy, norms, and standards? mandatory technical requirements

AThey are entirely unrelated regulatory concepts with no hierarchy
BPolicy sets overall intent/direction, norms provide benchmark reference practices, and standards set
CStandards are always less specific than policies
DNorms are always more legally binding than standards
Answer is hidden
Question 420 of 938Ch 7 · Regulatory Frameworks

Compliance with the layered regulatory framework (legislation, policy, norms, standards) in a Nepalese architectural project is important primarily because it: priorities

AHas no bearing on the legality of a proposed development
BEnsures the proposed development is legally compliant and appropriately responsive to national and local
COnly affects projects located outside of Nepal
DIs entirely optional with no consequence for non-compliance
Answer is hidden
Question 421 of 938Ch 8 · Site Analysis and Relationship of Natural Systems Components

Micro-climate, as a site analysis component, refers to:

AThe general regional climate pattern
BLocalized climatic variation at the site scale, influenced by topography, vegetation, and built form
COnly the site's legal zoning classification
DOnly the site's soil bearing capacity
Answer is hidden
Question 422 of 938Ch 8 · Site Analysis and Relationship of Natural Systems Components

Ecology, as a component of site analysis, is primarily concerned with:

AThe site's legal ownership status
BThe site's living systems — existing vegetation, habitat, and species — and their interrelationships
COnly the site's structural bearing capacity
DOnly the site's visual landmarks
Answer is hidden
Question 423 of 938Ch 8 · Site Analysis and Relationship of Natural Systems Components

Which site analysis component specifically addresses groundwater level and subsurface hazards?

AVisual character
BSoils and subsurface conditions
CLand use
DMacro-climate
Answer is hidden
Question 424 of 938Ch 8 · Site Analysis and Relationship of Natural Systems Components

A site's physiographic character refers to:

AIts legal zoning classification only
BIts landform character (slope, elevation, drainage pattern) within its broader physiographic setting
COnly its visual landmarks
DOnly its existing vegetation species
Answer is hidden
Question 425 of 938Ch 8 · Site Analysis and Relationship of Natural Systems Components

Visual character, as a site analysis component, includes consideration of:

AOnly the site's soil type
BViews into and out of the site, visual landmarks, and scenic quality
COnly the site's legal ownership records
DOnly the site's groundwater level
Answer is hidden
Question 426 of 938Ch 8 · Site Analysis and Relationship of Natural Systems Components

Site parameters relevant to design typically include:

AOnly the colour of neighbouring buildings
BSize, shape, orientation, boundary configuration, access points, and legal/zoning constraints
COnly the site's historical ownership records
DOnly the client's personal preferences
Answer is hidden
Question 427 of 938Ch 8 · Site Analysis and Relationship of Natural Systems Components

A site's geometric properties, such as its aspect ratio and frontage width, primarily influence:

AThe site's legal ownership status
BBuildable form, massing options, and circulation layout
COnly the site's ecological habitat value
DOnly the regional macro-climate
Answer is hidden
Question 428 of 938Ch 8 · Site Analysis and Relationship of Natural Systems Components

Contextual mapping, as part of site analysis, primarily documents: patterns

AOnly the site's internal soil composition
BThe site's surroundings — adjacent land uses, building heights/character, infrastructure, and movement
COnly the client's construction budget
DOnly the building's proposed interior layout
Answer is hidden
Question 429 of 938Ch 8 · Site Analysis and Relationship of Natural Systems Components

Macro-climate, as distinguished from micro-climate, refers to:

ALocalized site-scale climatic variation only
BThe general regional climate (temperature range, rainfall, seasonal pattern) within which the site sits
COnly the shading pattern created by a single tree on site
DOnly the wind pattern between two adjacent buildings
Answer is hidden
Question 430 of 938Ch 8 · Site Analysis and Relationship of Natural Systems Components

Understanding existing and permitted land use of a site and its surrounding parcels primarily helps to:

ADetermine only the site's soil bearing capacity
BInform a compatible design response and appropriate use allocation
CReplace the need for any climatic analysis
DDetermine only the building's colour scheme
Answer is hidden
Question 431 of 938Ch 8 · Soil's Bearing Capacity and Topography

Which soil type is generally characterized by high bearing capacity and good drainage, suitable for foundations?

AClayey soil
BGravel/coarse-grained soil
CSilty soil with poor drainage
DLoose, uncompacted sandy soil
Answer is hidden
Question 432 of 938Ch 8 · Soil's Bearing Capacity and Topography

Clayey soil is particularly noted for its tendency toward:

AExcellent, consistently high drainage under all conditions
BShrink-swell behaviour with moisture change
CBeing the strongest and most stable soil type in all conditions
DComplete absence of any settlement risk
Answer is hidden
Question 433 of 938Ch 8 · Soil's Bearing Capacity and Topography

The Standard Penetration Test (SPT) is an example of:

AA laboratory test on an undisturbed soil sample
BAn in-situ (field) test used to characterize subsurface soil conditions
CA method of improving bearing capacity through compaction
DA method of representing topography using contour lines
Answer is hidden
Question 434 of 938Ch 8 · Soil's Bearing Capacity and Topography

Bearing capacity, as a soil property, refers to:

AThe soil's colour and texture only
BThe soil's capacity to safely support an applied load without excessive settlement or shear failure
CThe soil's chemical composition only
DThe depth of groundwater beneath the site
Answer is hidden
Question 435 of 938Ch 8 · Soil's Bearing Capacity and Topography

Soil stabilization, as a method of improving bearing capacity, typically involves:

ARemoving all soil with no replacement
BAdding materials such as lime or cement to improve the soil's strength
COnly mechanical compaction with no chemical treatment
DConstructing only a raft foundation with no ground improvement
Answer is hidden
Question 436 of 938Ch 8 · Soil's Bearing Capacity and Topography

When natural soil bearing capacity is inadequate and ground improvement is not economical, which foundation strategy can bypass the weak strata entirely?

AA shallow strip foundation with no ground improvement
BA deep foundation system (piles)
CSimply increasing the footing's plan area with no other change
DIgnoring the soil condition and proceeding with a standard shallow foundation
Answer is hidden
Question 437 of 938Ch 8 · Soil's Bearing Capacity and Topography

Topography, as a site planning concept, describes:

AThe site's legal ownership boundary only
BThe shape and features of the land surface (elevation, slope, relief)
COnly the site's soil chemical composition
DOnly the site's building height regulations
Answer is hidden
Question 438 of 938Ch 8 · Soil's Bearing Capacity and Topography

On a contour map, closely spaced contour lines indicate:

AA gentle, nearly flat slope
BA steep slope
CA perfectly level site with no elevation change
DThe presence of a water body only
Answer is hidden
Question 439 of 938Ch 8 · Soil's Bearing Capacity and Topography

On a contour map, a 'V' shape in the contour lines pointing uphill (toward higher elevation) typically indicates:

AA ridge
BA valley
CA perfectly flat plateau
DA building footprint
Answer is hidden
Question 440 of 938Ch 8 · Soil's Bearing Capacity and Topography

Widely spaced contour lines on a topographic map generally indicate:

AA very steep slope
BA gentle slope
CThe exact location of a soil boring
DThe site's bearing capacity value
Answer is hidden
Question 441 of 938Ch 8 · Synthesis and Interpretation of Site Data

A design response achieving programme 'fit' for a site is best characterized as one that:

AIgnores the site's climate, ecology, and topography entirely
BRespects and responds to the site's climate, ecology, soil, topography, and context
CApplies an identical generic solution regardless of site conditions
DIs based solely on the client's aesthetic preference with no site data input
Answer is hidden
Question 442 of 938Ch 8 · Synthesis and Interpretation of Site Data

Grading, as a site works activity, primarily involves:

AOnly the design of interior room layouts
BReshaping the ground surface (cut and/or fill) to achieve required levels and drainage falls
COnly the preparation of a bill of quantities
DOnly the selection of exterior cladding materials
Answer is hidden
Question 443 of 938Ch 8 · Synthesis and Interpretation of Site Data

A key consideration in grading design is to:

AMaximize net cut/fill volume regardless of cost or site disruption
BBalance earthwork, minimizing net cut/fill where possible, while respecting existing topography
CIgnore existing topography entirely
DEliminate the need for any drainage consideration
Answer is hidden
Question 444 of 938Ch 8 · Synthesis and Interpretation of Site Data

Site layout and setting out primarily involves: coordinates/benchmarks

ASelecting the interior furniture layout for a building
BPrecisely establishing the position of building corners/grid lines on the ground using survey
CPreparing only a colour rendering for client presentation
DDetermining only the project's overall cost estimate
Answer is hidden
Question 445 of 938Ch 8 · Synthesis and Interpretation of Site Data

Excavation for foundation formation level must give particular attention to:

AThe building's interior colour scheme
BSafe slope angles/shoring to prevent collapse of the excavated face
COnly the site's electrical load schedule
DOnly the choice of window glazing type
Answer is hidden
Question 446 of 938Ch 8 · Synthesis and Interpretation of Site Data

Trenching, as distinct from general excavation, specifically refers to excavation for:

ALarge, open building basements only
BLinear elements such as foundations and service pipes/cables
COnly landscaping planting beds
DOnly roof construction
Answer is hidden
Question 447 of 938Ch 8 · Synthesis and Interpretation of Site Data

Drainage layout planning for a site primarily addresses:

AOnly the site's electrical distribution system
BSurface water management — grading falls, collection points, storm drains/swales, and disposal/retention
COnly the interior lighting design
DOnly the choice of exterior paint colour
Answer is hidden
Question 448 of 938Ch 8 · Synthesis and Interpretation of Site Data

A primary objective of proper drainage layout is to:

ADirect water accumulation directly against building foundations
BPrevent water accumulation against foundations and control runoff appropriately
CEliminate the need for any grading at all
DIncrease erosion on the site by concentrating flow
Answer is hidden
Question 449 of 938Ch 8 · Synthesis and Interpretation of Site Data

The synthesis of site data with the project's functional programme (as covered in this section) directly parallels which earlier design process concept?

AThe general architectural design process (bubble diagrams, concept formulation) from Chapters 4 and 5
BOnly the municipal drawing submission process
COnly the choice of construction materials for cladding
DOnly the calculation of a building's electrical load
Answer is hidden
Question 450 of 938Ch 8 · Synthesis and Interpretation of Site Data

Establishing appropriate shoring for a trench depends particularly on:

AOnly the colour of the surrounding buildings
BThe trench's depth-to-width ratio and the surrounding soil conditions
COnly the trench's proximity to a public road
DOnly the client's budget with no reference to safety
Answer is hidden
Question 451 of 938Ch 8 · Hard and Soft Landscape Elements and their Application

Which of the following is classified as a soft landscape element?

AConcrete unit pavers
BVegetation (trees, shrubs, groundcover)
CA retaining wall
DA bench or litter bin
Answer is hidden
Question 452 of 938Ch 8 · Hard and Soft Landscape Elements and their Application

Landforms, as a soft landscape element, can be shaped (mounding, terracing, berms) to:

AOnly serve a purely decorative function with no other purpose
BCreate spatial definition, control views, manage drainage, or provide buffering
CReplace the need for any surface material selection
DEliminate the need for any vegetation on site
Answer is hidden
Question 453 of 938Ch 8 · Hard and Soft Landscape Elements and their Application

Water features in landscape design (ponds, fountains, streams) serve which combination of purposes?

AAesthetic purposes only, with no other function
BAesthetic, microclimatic (cooling), and ecological (habitat) purposes
CStructural load-bearing purposes only
DPurely regulatory/legal purposes with no design function
Answer is hidden
Question 454 of 938Ch 8 · Hard and Soft Landscape Elements and their Application

Which of the following is a hard landscape element?

AGroundcover planting
BPaving (stone, brick, or concrete unit pavers)
CA pond or reflecting pool
DA tree selected for shade
Answer is hidden
Question 455 of 938Ch 8 · Hard and Soft Landscape Elements and their Application

Outdoor fittings in a landscape design typically include:

AOnly structural foundation elements
BSite furniture (benches, bollards, litter bins), lighting, and signage
COnly vegetation species selection
DOnly landform shaping (mounding/terracing)
Answer is hidden
Question 456 of 938Ch 8 · Hard and Soft Landscape Elements and their Application

A pergola or gazebo, as a landscape design element, is best classified as:

AA soft landscape element
BA hard landscape construction/structure providing spatial definition or shelter
CA type of vegetation
DA type of water feature
Answer is hidden
Question 457 of 938Ch 8 · Hard and Soft Landscape Elements and their Application

A key principle in balancing hard and soft landscape elements is to: benefit

AUse only hard elements throughout the entire site with no vegetation
BFavour hard elements in high-use areas (for durability) while retaining soft elements for ecological/aesthetic
CUse only soft elements even in areas of intense pedestrian traffic
DIgnore maintenance requirements entirely when selecting materials
Answer is hidden
Question 458 of 938Ch 8 · Hard and Soft Landscape Elements and their Application

Selecting climate- and context-appropriate plant species and materials is important primarily to ensure:

AMaximum short-term visual impact with no regard for long-term performance
BLong-term sustainability and a reduced maintenance burden
CCompliance only with the client's personal colour preference
DThat no local materials are used under any circumstances
Answer is hidden
Question 459 of 938Ch 8 · Hard and Soft Landscape Elements and their Application

Surface materials in hard landscaping are selected based on which combination of factors?

AOnly their initial purchase cost, with no other consideration
BDurability, permeability, texture, and visual character
COnly their compatibility with a specific plant species
DOnly their structural load-bearing capacity for a building's roof
Answer is hidden
Question 460 of 938Ch 8 · Hard and Soft Landscape Elements and their Application

Retaining walls, as hard landscape structures, are primarily used to:

AOnly provide a decorative surface finish with no structural function
BResist lateral earth pressure and maintain a difference in ground level within a landscape design
COnly provide a source of shade equivalent to a tree
DReplace the need for any grading design
Answer is hidden
Question 461 of 938Ch 8 · Open Spaces

Plazas/squares, as a type of open space, primarily serve as:

APurely private residential courtyards with no public access
BCivic gathering spaces, often adjacent to significant public buildings
COnly dedicated children's playgrounds
DOnly ecological habitat corridors
Answer is hidden
Question 462 of 938Ch 8 · Open Spaces

Green corridors/greenways, as an open space typology, are particularly valued for providing:

AOnly a location for individual private gardens
BConnectivity for pedestrians/cyclists and ecological continuity
COnly a location for large commercial buildings
DNo relationship to pedestrian movement at all
Answer is hidden
Question 463 of 938Ch 8 · Open Spaces

Historically, in traditional Nepalese urban form, open spaces such as the chowk or dabali served:

AA single, purely recreational function with no other purpose
BCombined civic, ceremonial, commercial, and social functions integrated into the settlement fabric
CNo function at all, being purely decorative voids
DOnly a function related to modern vehicular traffic management
Answer is hidden
Question 464 of 938Ch 8 · Open Spaces

Historical open spaces were often carefully proportioned and enclosed by surrounding built form primarily to:

AEliminate any sense of place or identity
BCreate a strong sense of place and defined civic identity
CMaximize vehicular traffic flow through the space
DPrevent any social or civic use of the space
Answer is hidden
Question 465 of 938Ch 8 · Open Spaces

A 'pocket park,' as a contemporary urban open space typology, is best described as:

AA very large regional park covering hundreds of hectares
BA small, infill urban green space
CA purely private residential garden with no public access
DA type of underground parking structure
Answer is hidden
Question 466 of 938Ch 8 · Open Spaces

Rooftop/podium open space, as a contemporary typology, is particularly relevant in:

ARural agricultural areas with abundant open land
BDense urban contexts with limited ground-level land
CContexts with no vertical building development at all
DOnly single-storey residential developments
Answer is hidden
Question 467 of 938Ch 8 · Open Spaces

Contemporary open space design increasingly emphasizes which of the following considerations?

AExclusively vehicular access with no pedestrian consideration
BAccessibility/inclusivity, ecological function, and adaptable/flexible programming
CA single fixed use with no possibility of adaptation
DElimination of all ecological/stormwater function
Answer is hidden
Question 468 of 938Ch 8 · Open Spaces

A multi-functional plaza, as a contemporary open space typology, is characterized by:

AServing only a single, narrowly defined civic function
BCombining civic, commercial, and recreational uses within one space
CBeing accessible only to a single private institution
DHaving no relationship to surrounding buildings
Answer is hidden
Question 469 of 938Ch 8 · Open Spaces

Open spaces such as public parks contribute to which of the following, beyond their social/recreational role?

ANo additional benefit beyond recreation
BUrban ecology and microclimate moderation
COnly an increase in vehicular traffic congestion
DOnly a decrease in a city's overall land value
Answer is hidden
Question 470 of 938Ch 8 · Open Spaces

Institutional/private open space (e.g. school grounds, residential courtyards) is best described as:

AOpen space with unrestricted public access at all times
BOpen space associated with a specific institution or private property, serving that user group's needs
CA type of public civic plaza open to the entire city
DA type of regional greenway corridor
Answer is hidden
Question 471 of 938Ch 8 · Miscellaneous: Landscape Typologies and Environment/Ecology

A key design consideration for a roof garden, given its location, is:

AIgnoring waterproofing and drainage entirely
BWaterproofing/drainage design and adequate structural load capacity
CMaximizing heavy, non-lightweight growing medium regardless of structural implications
DEliminating the need for any plant selection consideration
Answer is hidden
Question 472 of 938Ch 8 · Miscellaneous: Landscape Typologies and Environment/Ecology

An atrium, as a landscape/architectural typology, is best described as:

AAn exterior-only roadside plantation
BAn enclosed (often glazed) internal courtyard/void space, frequently landscaped
CA children's outdoor play area exclusively
DA type of underground parking structure
Answer is hidden
Question 473 of 938Ch 8 · Miscellaneous: Landscape Typologies and Environment/Ecology

Roadside plantations/avenues primarily provide which combination of benefits?

AOnly structural support for adjacent buildings
BShade, visual/acoustic buffering, aesthetic character, and pedestrian comfort
COnly a source of urban stormwater pollution
DOnly a barrier preventing any pedestrian movement
Answer is hidden
Question 474 of 938Ch 8 · Miscellaneous: Landscape Typologies and Environment/Ecology

Indoor landscape elements (potted plants, green walls) within a building primarily contribute to:

AOnly a decrease in the building's structural stability
BImproved air quality, aesthetics, and occupant wellbeing
COnly an increase in the building's energy consumption with no benefit
DElimination of the need for any exterior landscaping
Answer is hidden
Question 475 of 938Ch 8 · Miscellaneous: Landscape Typologies and Environment/Ecology

A children's play area design should particularly incorporate:

AOnly adult-scaled equipment with no consideration for age-appropriateness
BAge-appropriate equipment, impact-absorbing safety surfacing, and clear supervision sightlines
CNo shade provision under any circumstances
DEquipment with no consideration for safety surfacing at all
Answer is hidden
Question 476 of 938Ch 8 · Miscellaneous: Landscape Typologies and Environment/Ecology

Understanding 'ecosystem services' in the context of architectural/site design refers to: environment/ecology

AOnly the financial services available near the site
BNatural benefits such as clean air/water provision and temperature regulation provided by the surrounding
COnly the building's mechanical HVAC service systems
DOnly the legal permitting services required for construction
Answer is hidden
Question 477 of 938Ch 8 · Miscellaneous: Landscape Typologies and Environment/Ecology

Which of the following is an example of a design decision that contributes positively to ecological function?

AMaximizing impervious paved surface with no permeability
BUsing native/climate-appropriate planting and permeable surfaces
CEliminating all vegetation from the site
DIgnoring stormwater management entirely
Answer is hidden
Question 478 of 938Ch 8 · Miscellaneous: Landscape Typologies and Environment/Ecology

The urban 'heat island effect,' a negative ecological impact of concern in architectural/site design, refers to: absorbing surfaces

AA cooling effect unique to rural areas
BElevated temperatures in urban areas compared to surrounding rural areas, often due to extensive hard, heat-
CA phenomenon only related to underwater ecosystems
DA benefit provided exclusively by roof gardens with no downside
Answer is hidden
Question 479 of 938Ch 8 · Miscellaneous: Landscape Typologies and Environment/Ecology

Ecological and environmental considerations in architectural design should ideally be integrated:

AOnly as an afterthought applied to landscaping at project completion
BFrom the earliest design stages, including site analysis
COnly after construction has already been completed
DOnly in projects with no landscape component at all
Answer is hidden
Question 480 of 938Ch 8 · Miscellaneous: Landscape Typologies and Environment/Ecology

Green walls, as a form of indoor/vertical landscape, are primarily used to:

AReduce a building's structural stability intentionally
BImprove air quality and aesthetics while integrating planting into limited floor area
CEliminate the need for any children's play area design
DReplace the building's primary structural wall system entirely
Answer is hidden
Question 481 of 938Ch 9 · Architecture, Built Environment and the Society

Architecture's relationship with society is best described as:

APurely one-directional, with society having no influence on architecture
BBoth a product of society and a producer/shaper of society
CEntirely unrelated to social structure or values
DRelevant only to religious buildings, not other typologies
Answer is hidden
Question 482 of 938Ch 9 · Architecture, Built Environment and the Society

Cultural and religious values are frequently encoded into architecture through:

ASpatial hierarchy, orientation, symbolism, and typology
BOnly the choice of construction material with no other expression
CA complete absence of any symbolic architectural elements
DOnly modern buildings, never traditional ones
Answer is hidden
Question 483 of 938Ch 9 · Architecture, Built Environment and the Society

Shared courtyards and community halls are examples of architectural spaces that primarily reinforce:

AIndividual privacy with no social function
BCollective identity and social interaction within a community
COnly commercial/economic transactions
DOnly religious ritual, with no other social function
Answer is hidden
Question 484 of 938Ch 9 · Architecture, Built Environment and the Society

Historically, in some traditional contexts, spatial arrangement and permitted building typology/height have reflected:

AOnly the prevailing climate conditions
BCaste or social hierarchy
COnly available construction technology
DOnly the personal preference of the architect
Answer is hidden
Question 485 of 938Ch 9 · Architecture, Built Environment and the Society

The relationship between technology and architecture is best described as: technological innovation

APurely one-directional, with technology having no influence from architectural ambition
BAvailable technology both enables/constrains architectural expression, while architectural ambition can drive
CEntirely unrelated; technology has no bearing on architectural form
DRelevant only to ancient architecture, not contemporary practice
Answer is hidden
Question 486 of 938Ch 9 · Architecture, Built Environment and the Society

The 'built environment' is best defined as: social life unfolds

AOnly a single individual building
BThe cumulative, human-made physical surroundings (buildings, infrastructure, public space) within which
COnly undeveloped natural landscape with no human modification
DOnly the interior spaces of a single institutional building
Answer is hidden
Question 487 of 938Ch 9 · Architecture, Built Environment and the Society

The quality and design of the built environment directly affects which of the following social outcomes?

AOnly the aesthetic preferences of visiting tourists
BPublic health, safety, economic opportunity, and social cohesion
CNo measurable social outcomes at all
DOnly the personal wealth of the architect
Answer is hidden
Question 488 of 938Ch 9 · Architecture, Built Environment and the Society

Architects' professional and ethical responsibility, as discussed in this section, extends to:

AOnly the individual building/client's immediate requirements, with no broader consideration
BBroader societal impacts of their work, beyond just the individual client's immediate requirements
COnly the structural safety of a single building, with no social dimension
DNo responsibility beyond meeting the minimum legal building code
Answer is hidden
Question 489 of 938Ch 9 · Architecture, Built Environment and the Society

Sacred and ritual spaces, along with orientation toward significant directions, in architecture primarily express:

APurely structural engineering requirements with no symbolic meaning
BReligious belief and practice
COnly the prevailing construction technology of the period
DOnly commercial marketing considerations
Answer is hidden
Question 490 of 938Ch 9 · Architecture, Built Environment and the Society

Architecture functioning as a 'producer' of society means that it:

AHas no influence on how people live or interact
BShapes how people live, interact, and form community through the spaces it creates
COnly reflects existing social conditions with no active influence
DIs entirely determined by available construction materials alone
Answer is hidden
Question 491 of 938Ch 9 · Architect as a Profession

An architect's professional responsibility, as a licensed professional, extends to:

AOnly technical competence, with no ethical or public safety consideration
BPublic safety, ethical conduct, environmental stewardship, and service to both client and public interest
COnly maximizing the client's financial return with no other consideration
DOnly the aesthetic appearance of the completed building
Answer is hidden
Question 492 of 938Ch 9 · Architect as a Profession

An architect is expected to exercise independent professional judgement, meaning: client's immediate preference

AThe architect must always follow the client's preference exactly, regardless of code compliance
BStandards (safety, code compliance, ethics) should be maintained even where they may not align with a
CThe architect has no responsibility to consider structural safety at all
DProfessional judgement is irrelevant once a contract is signed
Answer is hidden
Question 493 of 938Ch 9 · Architect as a Profession

In the architect-client relationship, the architect primarily acts as: professional judgement

AAn entity with no responsibility to the client's requirements at all
BThe client's professional agent, translating requirements into a built design while maintaining independent
CA subordinate with no independent judgement or standards to uphold
DA party with no direct communication with the client
Answer is hidden
Question 494 of 938Ch 9 · Architect as a Profession

In the architect-contractor relationship, the contractor is primarily responsible for:

AApproving the overall design concept independently of the architect
BActual construction execution, means/methods, and site safety
CSetting the project's overall design intent with no architect involvement
DOnly providing design consultancy services
Answer is hidden
Question 495 of 938Ch 9 · Architect as a Profession

Coordination between an architect and fellow professionals (structural, MEP consultants) requires: conflicts

ANo communication at all between disciplines
BClear communication, mutual respect for each discipline's expertise, and a collaborative approach to resolving
CThe architect overriding all other disciplines' professional judgement
DComplete independence with no coordination between disciplines
Answer is hidden
Question 496 of 938Ch 9 · Architect as a Profession

A common area of potential conflict in architectural practice is: whatsoever

AComplete agreement at all times between cost, design quality, and code compliance with no tension
BCost overruns/budget pressure versus design quality/scope
CThe total absence of any client-architect interaction
DArchitects never needing to communicate with contractors
Answer is hidden
Question 497 of 938Ch 9 · Architect as a Profession

Disputes over design changes/variations during construction are best managed through:

AIgnoring the dispute entirely with no resolution process
BClear contractual agreements and transparent communication
CAllowing the contractor to make all decisions independently with no architect involvement
DEliminating all communication between project parties
Answer is hidden
Question 498 of 938Ch 9 · Architect as a Profession

Professional codes of conduct in architectural practice primarily serve to:

AHave no practical relevance to actual practice
BProvide guidance for anticipating and resolving potential conflicts constructively
CReplace the need for any contractual agreement
DApply only to relationships with fellow professionals, not clients
Answer is hidden
Question 499 of 938Ch 9 · Architect as a Profession

If a client requests a design modification that would compromise structural safety or code compliance, the architect's professional responsibility is to: preference

AComply with the client's request without question
BMaintain professional standards and not compromise on safety/code compliance, even against client
CResign from the project immediately with no further discussion
DDelegate the decision entirely to the contractor
Answer is hidden
Question 500 of 938Ch 9 · Architect as a Profession

The architect's oversight role during construction primarily involves:

APerforming the actual physical construction work personally
BEnsuring construction conformity with the approved design and specification
CIgnoring all aspects of construction execution
DOnly overseeing the contractor's internal company management
Answer is hidden
Question 501 of 938Ch 9 · Sociological and Anthropological Aspects in Architecture

A sociological perspective on architecture primarily examines:

AOnly the structural engineering properties of a building
BHow social structures, institutions, and group behaviour shape and are shaped by the built environment
COnly the historical style of a building's facade
DOnly the cost of construction materials
Answer is hidden
Question 502 of 938Ch 9 · Sociological and Anthropological Aspects in Architecture

An anthropological perspective on architecture is particularly concerned with:

AOnly the building's mechanical HVAC system
BDeeper cultural meanings, rituals, and lived human experience associated with built form
COnly the site's soil bearing capacity
DOnly the project's cost estimate
Answer is hidden
Question 503 of 938Ch 9 · Sociological and Anthropological Aspects in Architecture

Both sociological and anthropological perspectives emphasize that architecture: human/social/cultural dimension is essential

ACan be fully understood through purely technical/functional criteria alone
BCannot be fully understood or appropriately designed through technical/functional criteria alone; the
CHas no relationship to human social life whatsoever
DShould ignore all cultural context in favour of a universal, context-free design approach
Answer is hidden
Question 504 of 938Ch 9 · Sociological and Anthropological Aspects in Architecture

A community's 'social philosophy of life' refers to:

AOnly the community's preferred building material
BThe community's underlying values regarding family, privacy, community, work, spirituality, and daily ritual
COnly the community's legal zoning classification
DOnly the community's structural engineering standards
Answer is hidden
Question 505 of 938Ch 9 · Sociological and Anthropological Aspects in Architecture

Designing without understanding a community's social philosophy of life risks producing buildings that are:

ATechnically sound and culturally perfectly appropriate in every case
BTechnically sound but socially/culturally inappropriate, potentially disrupting intended patterns of life
CImpossible to construct under any circumstances
DAutomatically compliant with all building codes
Answer is hidden
Question 506 of 938Ch 9 · Sociological and Anthropological Aspects in Architecture

Architecture informed by genuine sociological/anthropological understanding can help support which of the following? patterns

AOnly an increase in construction cost with no other benefit
BStrengthening community bonds, respecting privacy needs, and accommodating extended-family living
CThe complete elimination of any cultural or ritual consideration
DOnly a generic, context-free design with no local relevance
Answer is hidden
Question 507 of 938Ch 9 · Sociological and Anthropological Aspects in Architecture

Which of the following is a concrete architectural decision impacted by sociological/anthropological understanding?

AThe choice of structural steel grade only
BSpatial zoning (private/semi-private/public) and room adjacency/hierarchy
COnly the electrical load schedule
DOnly the site's legal ownership documentation
Answer is hidden
Question 508 of 938Ch 9 · Sociological and Anthropological Aspects in Architecture

Provision for extended family or communal living in a dwelling's design reflects consideration of:

AOnly the building's structural load calculations
BThe community's social philosophy of life and family/kinship patterns
COnly the site's topographic contours
DOnly the building's electrical wiring layout
Answer is hidden
Question 509 of 938Ch 9 · Sociological and Anthropological Aspects in Architecture

Orientation and placement of spaces reflecting cultural or ritual significance is an example of:

AA purely structural engineering decision with no cultural basis
BAn architectural decision impacted by anthropological/sociological understanding
CA decision entirely unrelated to a community's social philosophy of life
DA decision that has no bearing on building construction
Answer is hidden
Question 510 of 938Ch 9 · Sociological and Anthropological Aspects in Architecture

The importance of social philosophy of life in architecture is best summarized as:

AIrrelevant to good architectural design
BProfoundly shaping what a community or individual needs and expects from their built environment
COnly relevant to religious buildings, not residential design
DOnly relevant in historical architecture, not contemporary practice
Answer is hidden
Question 511 of 938Ch 9 · Business Enterprise and its Types

A sole proprietorship, as a type of business enterprise, is characterized by:

AOwnership shared among many public shareholders
BA business owned and operated by a single individual bearing full personal liability
CMember ownership serving common economic/social needs
DLimited liability for a defined group of shareholders
Answer is hidden
Question 512 of 938Ch 9 · Business Enterprise and its Types

A private limited company, as distinct from a public limited company, is characterized by:

AShares openly traded to the general public
BLimited liability for shareholders, with ownership restricted to a defined group and not publicly traded
CFull personal liability for a single owner
DMember-based ownership serving common social needs
Answer is hidden
Question 513 of 938Ch 9 · Business Enterprise and its Types

A cooperative, as a business enterprise type, is best described as: members

AA business owned by a single individual with full personal liability
BA member-owned and member-operated enterprise serving the common economic/social needs of its
CA publicly traded company with shares available to any investor
DA partnership between exactly two individuals only
Answer is hidden
Question 514 of 938Ch 9 · Business Enterprise and its Types

Property rights establish:

AOnly the aesthetic style of a building
BWho holds legal ownership, use, and disposal rights over land/property
COnly the structural design requirements for a building
DOnly the electrical load schedule for a project
Answer is hidden
Question 515 of 938Ch 9 · Business Enterprise and its Types

Inheritance practices directly affect which of the following over time?

AOnly the colour scheme chosen for new buildings
BLand parcel size/subdivision patterns, and consequently the scale/form of buildings that can be built
COnly the site's soil bearing capacity
DOnly the client's personal aesthetic preference
Answer is hidden
Question 516 of 938Ch 9 · Business Enterprise and its Types

Nepal's family structure has generally shifted from:

ANuclear family structures toward joint/extended family living
BPredominantly joint/extended family arrangements toward more nuclear family structures
CNo change at all in family structure over recent decades
DExtended family structures becoming universally larger with no urbanization influence
Answer is hidden
Question 517 of 938Ch 9 · Business Enterprise and its Types

Which factor has contributed to the shift toward nuclear family structures in Nepal?

AA complete absence of any urbanization
BUrbanization and migration (including labour migration abroad)
CA ban on all forms of family living arrangements
DOnly a change in national building codes with no social driver
Answer is hidden
Question 518 of 938Ch 9 · Business Enterprise and its Types

The shift toward nuclear family structures has influenced architectural design by:

AEliminating the need for any residential housing design
BIncreasing demand for smaller nuclear-family housing units and independent apartment/flat living
CRequiring only very large multi-generational dwelling footprints for every household
DHaving no measurable influence on housing typology at all
Answer is hidden
Question 519 of 938Ch 9 · Business Enterprise and its Types

Property/inheritance subdivision of ancestral land in urbanizing areas of Nepal has generally contributed to:

ALarger, unified plot sizes for every household
BSmaller individual plot sizes, shaping the scale/typology of new residential construction
CNo change at all in plot size or residential typology
DA complete elimination of residential construction in urban areas
Answer is hidden
Question 520 of 938Ch 9 · Business Enterprise and its Types

A partnership, as a business enterprise type, involves:

AA single owner with sole responsibility for all business decisions
BTwo or more individuals sharing management responsibility, profits, and liability per a partnership agreement
CShares traded openly to the general public
DMember ownership organized around common social needs only, with no profit motive
Answer is hidden
Question 521 of 938Ch 9 · Regulatory Controls

The National Building Code (mandatory architectural code) primarily establishes:

AVoluntary suggestions with no compliance requirement
BMandatory minimum technical requirements for building design/construction that all buildings must meet
COnly aesthetic guidelines with no technical requirement
DRequirements applicable only to government buildings, not private construction
Answer is hidden
Question 522 of 938Ch 9 · Regulatory Controls

Emphasis on the National Building Code's mandatory provisions has been particularly heightened in Nepal due to:

AA decline in construction activity nationwide
BThe country's recognized seismic vulnerability
CA complete absence of any building-related regulation historically
DOnly international tourism considerations
Answer is hidden
Question 523 of 938Ch 9 · Regulatory Controls

The Town Planning Act provides the legal basis for:

AOnly individual building permit approval, with no relationship to broader planning
BPreparing, approving, and enforcing town/urban plans, land use zoning, and related planning controls
COnly company registration requirements
DOnly apartment ownership and common area management
Answer is hidden
Question 524 of 938Ch 9 · Regulatory Controls

The Shelter Policy, as a national policy framework, is particularly focused on:

AOnly luxury housing development for high-income populations
BAddressing housing needs, particularly for vulnerable/low-income populations
COnly commercial building construction, with no residential focus
DOnly company registration for construction firms
Answer is hidden
Question 525 of 938Ch 9 · Regulatory Controls

The Housing and Apartment Act of Nepal specifically governs:

AOnly single-family detached house construction
BApartment/condominium ownership, common area management, and related housing development matters
COnly rural agricultural land tenure
DOnly the national building code's structural safety provisions
Answer is hidden
Question 526 of 938Ch 9 · Regulatory Controls

The Company Act and Registration requirements are relevant to an architect primarily when:

ADesigning a single residential building with no business formation involved
BEstablishing or operating a professional architectural/engineering consultancy firm
COnly when working exclusively as an individual employee with no firm involvement
DOnly when designing government buildings
Answer is hidden
Question 527 of 938Ch 9 · Regulatory Controls

The Procurement Act is particularly relevant to architectural/consultancy services when:

AThe project is entirely privately funded with no government involvement
BThe services relate to government-funded/public works projects, governing tendering and contract award
CThe architect is working purely as an individual freelancer with no firm
DOnly when designing a private single-family residence
Answer is hidden
Question 528 of 938Ch 9 · Regulatory Controls

The Consultancy Development Act provides the regulatory framework for: architectural/engineering consultancies

AOnly individual building permit approval
BThe establishment, registration, and operation of professional consultancy firms, including
COnly apartment ownership and common area management
DOnly national building code technical compliance
Answer is hidden
Question 529 of 938Ch 9 · Regulatory Controls

An architect practicing in Nepal must operate within a regulatory framework that typically includes: Housing and Apartment Act

AOnly a single, standalone regulation with no other applicable law
BThe National Building Code, Town Planning Act-derived zoning/planning controls, and (where relevant) the
CNo applicable regulatory framework at all
DOnly international building codes, with no relevance to Nepalese law
Answer is hidden
Question 530 of 938Ch 9 · Regulatory Controls

For architects establishing a professional practice/firm intending to pursue public-sector project work, which combination of regulatory instruments is particularly relevant?

AOnly the Housing and Apartment Act, with no other relevant law
BThe Company Act, Consultancy Development Act, and Procurement Act
COnly the Shelter Policy, with no other relevant instrument
DNo regulatory instrument is relevant to establishing a professional firm
Answer is hidden
Question 531 of 938Ch 9 · Property Assessment Methods for Land and Building

Property valuation is best defined as the process of:

AOnly determining a property's structural safety rating
BEstimating the fair present value of land/building for a defined purpose
COnly preparing a building's construction drawings
DOnly registering a company for legal operation
Answer is hidden
Question 532 of 938Ch 9 · Property Assessment Methods for Land and Building

The Nepal Rastra Bank's role in property valuation guidelines is specifically related to:

ARegulating the country's building codes for structural safety
BProperty valuation as it relates to using property as loan collateral within the banking/financial system
CApproving individual building permits at the municipal level
DRegistering architectural consultancy firms
Answer is hidden
Question 533 of 938Ch 9 · Property Assessment Methods for Land and Building

The market comparison (sales comparison) valuation method estimates value by: differences

ACalculating only the cost of reconstructing the building new
BComparing the subject property to recent comparable sales of similar properties, adjusted for relevant
CConverting future rental income into a present value
DIgnoring all data from comparable property sales
Answer is hidden
Question 534 of 938Ch 9 · Property Assessment Methods for Land and Building

The cost method (depreciated replacement cost) of valuation estimates value based on:

AOnly comparable market sales data
BThe cost of reconstructing the building new, less accumulated depreciation, plus land value
COnly the property's rental income potential
DOnly the property's legal ownership documentation
Answer is hidden
Question 535 of 938Ch 9 · Property Assessment Methods for Land and Building

The income (capitalization) method of valuation is particularly relevant for:

AVacant, undeveloped agricultural land with no income potential
BCommercial/rental properties with income-generating potential
CProperties with no rental income of any kind
DOnly residential properties occupied by the owner
Answer is hidden
Question 536 of 938Ch 9 · Property Assessment Methods for Land and Building

Which of the following is a factor commonly considered in property valuation?

AOnly the property owner's personal name
BLocation, accessibility, plot size/shape, and building age/condition
COnly the colour of the property's exterior paint
DOnly the number of previous owners the property has had
Answer is hidden
Question 537 of 938Ch 9 · Property Assessment Methods for Land and Building

Nepal Rastra Bank valuation guidelines for loan collateral aim primarily to:

AEncourage inconsistent, arbitrary valuation practices across institutions
BEnsure consistent, conservative valuation practice that protects the financial soundness of lending institutions
CEliminate the need for any property valuation before lending
DApply only to commercial properties, not residential collateral
Answer is hidden
Question 538 of 938Ch 9 · Property Assessment Methods for Land and Building

Depreciation, as considered in the cost method of valuation, accounts for:

AAn increase in a building's value over time with no consideration of age
BA reduction in value due to the building's age, wear, and obsolescence
COnly the land's market value, with no relevance to the building
DOnly the cost of the original construction materials at today's prices
Answer is hidden
Question 539 of 938Ch 9 · Property Assessment Methods for Land and Building

A capitalization rate, used in the income method of valuation, is applied to:

AConvert the property's expected future income into a present value estimate
BCalculate only the cost of new construction materials
CDetermine the property's structural safety rating
DDetermine the plot's legal zoning classification
Answer is hidden
Question 540 of 938Ch 9 · Property Assessment Methods for Land and Building

Zoning and land use restrictions applicable to a property are relevant to its valuation because they:

AHave no bearing on the property's value at all
BAffect the permissible use/development potential of the property, and therefore its value
COnly affect the property's structural design, not its value
DApply only to properties located outside of Nepal
Answer is hidden
Question 541 of 938Ch 10 · Engineering Drawings and Their Concepts

The area of an A0 drawing sheet is:

A0.25 m²
B1 m²
C2 m²
D0.5 m²
Answer is hidden
Question 542 of 938Ch 10 · Engineering Drawings and Their Concepts

The size of an A4 sheet is:

A148 × 210 mm
B297 × 420 mm
C420 × 594 mm
D210 × 297 mm
Answer is hidden
Question 543 of 938Ch 10 · Engineering Drawings and Their Concepts

The title block of a drawing sheet is normally placed at the:

ACentre of the sheet
BTop-right corner
CTop-left corner
DBottom-right corner
Answer is hidden
Question 544 of 938Ch 10 · Engineering Drawings and Their Concepts

In the unidirectional system of dimensioning, dimension figures are:

ARead from the right side only
BAll read from the bottom of the sheet
CPlaced inside the object always
DParallel to the dimension lines
Answer is hidden
Question 545 of 938Ch 10 · Engineering Drawings and Their Concepts

A drawing made to a scale of 1 : 50 has a representative fraction of:

A50
B5/1
C1/50
D1/5
Answer is hidden
Question 546 of 938Ch 10 · Engineering Drawings and Their Concepts

A scale that can show three units such as metre, decimetre and centimetre is a:

AScale of chords
BComparative scale
CPlain scale
DDiagonal scale
Answer is hidden
Question 547 of 938Ch 10 · Engineering Drawings and Their Concepts

In first-angle projection, the top view is placed:

ABelow the front view
BBehind the front view
CAbove the front view
DTo the left of the front view
Answer is hidden
Question 548 of 938Ch 10 · Engineering Drawings and Their Concepts

The true shape of an inclined surface is obtained from a/an:

APerspective view
BIsometric view
CAuxiliary view
DFront view
Answer is hidden
Question 549 of 938Ch 10 · Engineering Drawings and Their Concepts

In isometric projection, lengths along the isometric axes are reduced to about:

A50% of true length
B82% of true length
C70.7% of true length
D100% of true length
Answer is hidden
Question 550 of 938Ch 10 · Engineering Drawings and Their Concepts

The angle between any two isometric axes is:

A30°
B120°
C90°
D45°
Answer is hidden
Question 551 of 938Ch 10 · Engineering Drawings and Their Concepts

In cabinet oblique projection, the receding lines are drawn:

ATo full scale
BConverging to a vanishing point
CTo half scale
DTo isometric scale
Answer is hidden
Question 552 of 938Ch 10 · Engineering Drawings and Their Concepts

Which of the following is NOT sectioned (hatched) when cut along its axis?

ACasting body
BHub of a pulley
CShaft
DFlange of a coupling
Answer is hidden
Question 553 of 938Ch 10 · Engineering Economics

Rs 10,000 is deposited at 10% compound interest per year. Its value after 2 years is:

ARs 12,210
BRs 12,000
CRs 12,100
DRs 11,000
Answer is hidden
Question 554 of 938Ch 10 · Engineering Economics

The effective annual interest rate for 12% per year compounded monthly is about:

A12%
B1%
C12.68%
D13.5%
Answer is hidden
Question 555 of 938Ch 10 · Engineering Economics

The factor used to find the equal annual payment needed to repay a present loan is the:

ACompound amount factor (F/P)
BCapital recovery factor (A/P)
CSinking fund factor (A/F)
DPresent worth factor (P/F)
Answer is hidden
Question 556 of 938Ch 10 · Engineering Economics

The present worth of a perpetual annual income of Rs 1,000 at 10% interest is:

AInfinite
BRs 100
CRs 1,000
DRs 10,000
Answer is hidden
Question 557 of 938Ch 10 · Engineering Economics

A project is economically acceptable by the NPV method when:

ANPV ≥ 0 at the MARR
BNPV is negative
CIRR is less than MARR
DNPV equals the initial investment
Answer is hidden
Question 558 of 938Ch 10 · Engineering Economics

The internal rate of return is the discount rate at which:

ANPV is maximum
BNPV equals zero
CB/C ratio equals zero
DPayback is minimum
Answer is hidden
Question 559 of 938Ch 10 · Engineering Economics

Compared with the simple payback period, the discounted payback period:

AIs always shorter
BConsiders cash flows after payback
CConsiders the time value of money
DIgnores all cash flows
Answer is hidden
Question 560 of 938Ch 10 · Engineering Economics

MARR is best described as:

AThe inflation rate only
BThe minimum acceptable rate of return set by the investor
CThe rate at which NPV is maximum
DThe maximum rate charged by banks
Answer is hidden
Question 561 of 938Ch 10 · Engineering Economics

For comparing alternatives with unequal lives, the most convenient method is:

AAnnual worth (equivalent uniform annual) method
BComparing first costs only
CSimple payback
DComparing total undiscounted costs
Answer is hidden
Question 562 of 938Ch 10 · Engineering Economics

A machine costs Rs 60,000 with salvage Rs 10,000 after 5 years. Straight-line annual depreciation is:

ARs 12,000
BRs 50,000
CRs 10,000
DRs 14,000
Answer is hidden
Question 563 of 938Ch 10 · Engineering Economics

The standard rate of Value Added Tax in Nepal is:

A15%
B10%
C13%
D18%
Answer is hidden
Question 564 of 938Ch 10 · Engineering Economics

Under Nepal's Income Tax Act 2058, depreciation of assets is calculated using:

ASinking fund method
BPool-based declining balance method
COnly straight-line method
DUnits-of-production method only
Answer is hidden
Question 565 of 938Ch 10 · Project Planning and Scheduling

A project is best defined as:

AA permanent organisation
BAny repetitive production activity
CA continuous routine operation
DA temporary endeavour undertaken to create a unique product, service or result
Answer is hidden
Question 566 of 938Ch 10 · Project Planning and Scheduling

The phase of the project life cycle in which the feasibility study is carried out is:

AExecution phase
BInitiation/concept phase
CMonitoring phase
DClosure phase
Answer is hidden
Question 567 of 938Ch 10 · Project Planning and Scheduling

The hierarchical decomposition of the total project scope into work packages is called:

ALogical framework
BGantt chart
CCritical path
DWork Breakdown Structure (WBS)
Answer is hidden
Question 568 of 938Ch 10 · Project Planning and Scheduling

A major limitation of a bar (Gantt) chart is that it:

ADoes not clearly show interdependencies between activities
BCannot show activity durations
CIs difficult to understand
DCannot show a time scale
Answer is hidden
Question 569 of 938Ch 10 · Project Planning and Scheduling

In an activity-on-arrow network, a dummy activity:

AHas zero duration and shows logical dependency only
BConsumes resources
CIs always on the critical path
DHas the longest duration
Answer is hidden
Question 570 of 938Ch 10 · Project Planning and Scheduling

The critical path of a project network is the:

APath with maximum float
BShortest path through the network
CLongest path, with zero total float
DPath with the most activities
Answer is hidden
Question 571 of 938Ch 10 · Project Planning and Scheduling

An activity has ES = 5, EF = 9, LS = 8, LF = 12. Its total float is:

A0
B7
C3
D4
Answer is hidden
Question 572 of 938Ch 10 · Project Planning and Scheduling

In PERT, with to = 2, tm = 5 and tp = 14 days, the expected time is:

A21 days
B5 days
C6 days
D7 days
Answer is hidden
Question 573 of 938Ch 10 · Project Planning and Scheduling

PERT is most suitable for:

AMass production lines
BRepetitive construction with known durations
CResearch and development projects with uncertain durations
DRoutine maintenance only
Answer is hidden
Question 574 of 938Ch 10 · Project Planning and Scheduling

While crashing a project, the activity crashed first is the critical activity with the:

ALowest cost slope
BLongest duration
CMaximum float
DHighest cost slope
Answer is hidden
Question 575 of 938Ch 10 · Project Planning and Scheduling

Rescheduling activities within their available float without changing the project completion date is called:

AFast-tracking
BResource smoothing
CCrashing
DResource levelling
Answer is hidden
Question 576 of 938Ch 10 · Project Planning and Scheduling

In earned value management, a cost performance index (CPI) of 0.8 means the project is:

AAhead of schedule
BOver budget
CUnder budget
DExactly on budget
Answer is hidden
Question 577 of 938Ch 10 · Project Management

The number of communication channels among 6 stakeholders is:

A30
B36
C6
D15
Answer is hidden
Question 578 of 938Ch 10 · Project Management

Buying insurance against a project risk is an example of risk:

AAvoidance
BTransfer
CMitigation
DAcceptance
Answer is hidden
Question 579 of 938Ch 10 · Project Management

Changing the project plan to eliminate a threat entirely is risk:

AAcceptance
BAvoidance
CTransfer
DExploitation
Answer is hidden
Question 580 of 938Ch 10 · Project Management

A reserve kept for identified risks ('known unknowns') is the:

AManagement reserve
BRetention money
CSinking fund
DContingency reserve
Answer is hidden
Question 581 of 938Ch 10 · Project Management

A quantitative risk analysis technique that uses repeated random sampling of uncertain variables is:

AChecklist analysis
BMonte Carlo simulation
CSWOT analysis
DBrainstorming
Answer is hidden
Question 582 of 938Ch 10 · Project Management

In a BOT arrangement, the private party:

AOnly designs the project
BBuilds, operates for a concession period and then transfers the facility
COnly supplies labour
DBuys the project from government permanently
Answer is hidden
Question 583 of 938Ch 10 · Project Management

Project finance on a non-recourse basis means lenders are repaid mainly from:

AGovernment taxes
BThe sponsor's other assets
CThe project's own cash flows
DPersonal guarantees of engineers
Answer is hidden
Question 584 of 938Ch 10 · Project Management

Public procurement in Nepal is governed by the:

ALabour Act 2074
BCompany Act 2063 only
CPublic Procurement Act 2063
DContract Act 2025
Answer is hidden
Question 585 of 938Ch 10 · Project Management

The security submitted with a bid, forfeited if the bidder withdraws the bid during its validity, is the:

ABid security
BAdvance payment guarantee
CRetention money
DPerformance security
Answer is hidden
Question 586 of 938Ch 10 · Project Management

A contract in which payment is made on the basis of measured quantities of work and quoted unit rates is a/an:

ACost-plus contract
BTurnkey contract
CLump-sum contract
DItem-rate (unit-rate) contract
Answer is hidden
Question 587 of 938Ch 10 · Project Management

A contract in which one contractor is responsible for design, procurement, construction and commissioning is a:

APercentage-rate contract
BLabour contract
CItem-rate contract
DTurnkey (EPC) contract
Answer is hidden
Question 588 of 938Ch 10 · Project Management

A pre-agreed amount payable by the contractor for delay in completion is called:

ALiquidated damages
BMobilisation advance
CVariation
DRetention money
Answer is hidden
Question 589 of 938Ch 10 · Engineering Professional Practice

According to engineering codes of ethics, an engineer's foremost obligation is to:

AObey all instructions of the client
BMaximise the employer's profit
CHold paramount the safety, health and welfare of the public
DComplete work at minimum cost
Answer is hidden
Question 590 of 938Ch 10 · Engineering Professional Practice

An engineer asked to design work outside his/her area of expertise should:

AAsk a junior to do it
BAccept to gain experience
CSign the drawings anyway
DDecline or engage a competent specialist
Answer is hidden
Question 591 of 938Ch 10 · Engineering Professional Practice

The ethical theory that seeks the greatest good for the greatest number is:

AVirtue ethics
BUtilitarianism
CEgoism
DDeontology
Answer is hidden
Question 592 of 938Ch 10 · Engineering Professional Practice

An engineer who has a financial interest in a supplier recommended to a client should:

AReject all other suppliers
BDisclose the conflict of interest to the client
CKeep it secret
DAccept a commission from the supplier
Answer is hidden
Question 593 of 938Ch 10 · Engineering Professional Practice

Signing and sealing drawings not prepared or supervised by oneself is:

AA normal professional courtesy
BUnethical
CAcceptable if paid
DRequired by law
Answer is hidden
Question 594 of 938Ch 10 · Engineering Professional Practice

Whistle-blowing is generally justified when:

AIt brings personal benefit
BThe engineer dislikes the manager
CSerious public harm is involved and internal channels have been exhausted
DNo evidence is available
Answer is hidden
Question 595 of 938Ch 10 · Engineering Professional Practice

The seismic design provisions for buildings in Nepal are contained in:

ANepal National Building Code (NBC 105)
BLabour Act
CPublic Procurement Act
DElectricity Act
Answer is hidden
Question 596 of 938Ch 10 · Engineering Professional Practice

The law that sets out environmental assessment requirements (IEE/EIA) for projects in Nepal is the:

AArbitration Act 2055
BNepal Engineering Council Act 2055
CEnvironment Protection Act 2076
DCompany Act 2063
Answer is hidden
Question 597 of 938Ch 10 · Engineering Professional Practice

The Nepal Engineers' Association was established in:

A2055 BS (1998 AD)
B2019 BS (1962 AD)
C2046 BS (1990 AD)
D2072 BS (2015 AD)
Answer is hidden
Question 598 of 938Ch 10 · Engineering Professional Practice

The Nepal Engineers' Association is best described as:

AA voluntary professional association of engineers
BA government ministry
CA contractors' federation
DThe statutory regulatory body that registers engineers
Answer is hidden
Question 599 of 938Ch 10 · Engineering Professional Practice

In the hierarchy of controls for occupational safety, the last line of defence is:

AEngineering controls
BElimination
CPersonal protective equipment
DSubstitution
Answer is hidden
Question 600 of 938Ch 10 · Engineering Professional Practice

A leading cause of fatal accidents on construction sites is:

ANoise exposure
BFalls from height
CPoor lighting in offices
DEye strain
Answer is hidden
Question 601 of 938Ch 10 · Engineering Regulatory Body: Nepal Engineering Council

The Nepal Engineering Council was established under the:

APublic Procurement Act 2063
BNepal Engineering Council Act 2055 (1998)
CCompany Act 2063
DBuilding Act 2055
Answer is hidden
Question 602 of 938Ch 10 · Engineering Regulatory Body: Nepal Engineering Council

The Nepal Engineering Council Regulations were issued in:

A2074 BS
B2055 BS
C2063 BS
D2057 BS
Answer is hidden
Question 603 of 938Ch 10 · Engineering Regulatory Body: Nepal Engineering Council

The Nepal Engineering Council is best described as:

AA trade union
BA voluntary association of engineers
CA statutory body regulating the engineering profession
DA private consulting firm
Answer is hidden
Question 604 of 938Ch 10 · Engineering Regulatory Body: Nepal Engineering Council

A person who wants to practise as an engineer in Nepal must:

AOnly hold a trade licence
BRegister with the Company Registrar
CBe registered with the Nepal Engineering Council
DOnly be a member of NEA
Answer is hidden
Question 605 of 938Ch 10 · Engineering Regulatory Body: Nepal Engineering Council

Recognition of engineering educational programmes and institutions in Nepal is a function of the:

ADepartment of Industry
BNepal Engineering Council
CPublic Procurement Monitoring Office
DNepal Engineers' Association
Answer is hidden
Question 606 of 938Ch 10 · Engineering Regulatory Body: Nepal Engineering Council

A disciplinary action the Nepal Engineering Council can take for serious professional misconduct is:

ACancellation of the engineer's registration
BRevoking citizenship
CConfiscation of property
DImprisonment without trial
Answer is hidden
Question 607 of 938Ch 10 · Engineering Regulatory Body: Nepal Engineering Council

The official who maintains the register of engineers at NEC is the:

AChief Justice
BRegistrar
CAuditor General
DCompany Registrar
Answer is hidden
Question 608 of 938Ch 10 · Engineering Regulatory Body: Nepal Engineering Council

According to the NEC code of conduct, an engineer should:

ASign drawings prepared by others without checking
BAccept any work offered
CShare confidential client data freely
DUndertake only work within his/her competence
Answer is hidden
Question 609 of 938Ch 10 · Engineering Regulatory Body: Nepal Engineering Council

Obtaining work by paying a bribe is:

AA violation of the code of conduct
BAllowed if disclosed later
CAcceptable in competitive markets
DRequired for public contracts
Answer is hidden
Question 610 of 938Ch 10 · Engineering Regulatory Body: Nepal Engineering Council

Which statement about NEC and NEA is correct?

ABoth are voluntary
BNEC registration is compulsory to practise; NEA membership is voluntary
CBoth are government ministries
DNEA registration is compulsory; NEC membership is voluntary
Answer is hidden
Question 611 of 938Ch 10 · Project Planning, Design and Implementation

The approval of design, drawing before the construction of a building in the city area of Nepal is done by ............

Avillage development committee
Bdistrict development committee
Cmunicipality
Dnone of the above
Answer is hidden
Question 612 of 938Ch 10 · Project Planning, Design and Implementation

The width of the standard A-series drawing paper such as A₄, A₃, A₂, ...... is ............

A1/3 times the length of the paper
B1/√2 times the length of the paper
C1/2 times the length of the paper
D1/√3 times the length of the paper
Answer is hidden
Question 613 of 938Ch 10 · Project Planning, Design and Implementation

The area of A₀ size paper is ............[cite: 15]

A0.25 m²
B0.5 m²
C0.75 m²
D1 m²
Answer is hidden
Question 614 of 938Ch 10 · Project Planning, Design and Implementation

The standard size of drawing board of designation D₁ is (in mm) ............[cite: 15]

A1000 × 700 × 25
B100 × 75 × 25
C1500 × 750 × 25
D1500 × 700 × 25
Answer is hidden
Question 615 of 938Ch 10 · Project Planning, Design and Implementation

Paper is designated by which letter?[cite: 15]

AA
BB
CC
DD
Answer is hidden
Question 616 of 938Ch 10 · Project Planning, Design and Implementation

Title block gives information about ............[cite: 15]

Atitle of the drawing
Bscale used for the drawing
Cserial number of the drawing
Dall of the above
Answer is hidden
Question 617 of 938Ch 10 · Project Planning, Design and Implementation

Which of the following is not included in title block of drawing sheet?[cite: 15]

ASheet number
BScale
CMethod of projection
DSize of sheet
Answer is hidden
Question 618 of 938Ch 10 · Project Planning, Design and Implementation

As per BIS, the size of title block in drawing sheet is ............[cite: 15]

A25 mm × 10 mm
B100 mm × 25 mm
C65 mm × 185 mm
D185 mm × 65 mm
Answer is hidden
Question 619 of 938Ch 10 · Project Planning, Design and Implementation

The length: width in case of an arrow head is ............[cite: 15]

A1:1
B2:1
C3:1
D4:1
Answer is hidden
Question 620 of 938Ch 10 · Project Planning, Design and Implementation

What is the inclination of inclined lettering?[cite: 15]

A75 degree
B65 degree
C45 degree
D85 degree
Answer is hidden
Question 621 of 938Ch 10 · Project Planning, Design and Implementation

The aspect ratio of a letter refers to the ratio of its ............[cite: 15]

Aheight to its width
Bwidth to height
Clength to width
Dwidth to length
Answer is hidden
Question 622 of 938Ch 10 · Project Planning, Design and Implementation

The size of the letter means the ............ of the letter.[cite: 15]

Athickness
Bheight
Clength
Dwidth
Answer is hidden
Question 623 of 938Ch 10 · Project Planning, Design and Implementation

The dimension system is unidirectional if ............[cite: 15]

Adimensions in the drawing sheet can be read from anywhere on the drawing sheet
Bdimensions in the drawing sheet can be read from the bottom edge of the drawing sheet
Cdimensions in the drawing sheet can be read from the bottom and right-hand edge of the drawing sheet
Ddimensions cannot be read
Answer is hidden
Question 624 of 938Ch 10 · Project Planning, Design and Implementation

In aligned system of dimensioning, the dimensions may be read from ............[cite: 15]

Abottom or right hand edges
Bbottom or left hand edges
Conly from bottom
Donly from left side
Answer is hidden
Question 625 of 938Ch 10 · Project Planning, Design and Implementation

Maps are drawn in which scale?[cite: 15]

AEnlarging
BReducing
CBalanced
DAll of the above
Answer is hidden
Question 626 of 938Ch 10 · Project Planning, Design and Implementation

A full scale technical drawing will have a scale factor of ............

A1:1
B1:2
C2:1
D1:4
Answer is hidden
Question 627 of 938Ch 10 · Project Planning, Design and Implementation

Which of the following represent reducing scale?

A1:1
B1:25
C2:1
D10:1
Answer is hidden
Question 628 of 938Ch 10 · Project Planning, Design and Implementation

Which of the following is enlarging scale?

A1:5
B1:2
C5:1
D1:2
Answer is hidden
Question 629 of 938Ch 10 · Project Planning, Design and Implementation

Given representative factor as 4/50 and maximum length is 100 cm. Find the length of scale.

A8 cm
B10 cm
C9.7 cm
D12 cm
Answer is hidden
Question 630 of 938Ch 10 · Project Planning, Design and Implementation

A line of 1 meter is shown by 1 cm on a scale; its representative factor (RF) is ............[cite: 16]

A1
B100
C1/100
D1/50
Answer is hidden
Question 631 of 938Ch 10 · Project Planning, Design and Implementation

Freehand sketching can be done only when one has ............[cite: 16]

Aproper proficiency
Bgood practice
Cgood intuition
Dall of the above
Answer is hidden
Question 632 of 938Ch 10 · Project Planning, Design and Implementation

The techniques for free hand sketch to drawing circle is ............[cite: 16]

Afixing a fixed point and are
Bfixing the perimeter
Cfixing the radius only
Dnone of the above
Answer is hidden
Question 633 of 938Ch 10 · Project Planning, Design and Implementation

The type of line that projects from an object for the express purpose of locating a dimension is a ............[cite: 16]

Avisible line
Bhidden line
Cextension line
Ddimension line
Answer is hidden
Question 634 of 938Ch 10 · Project Planning, Design and Implementation

Which the following is represented by a dotted line?[cite: 16]

AHidden edges
BProjection line
CVisible outlines
DHatching line
Answer is hidden
Question 635 of 938Ch 10 · Project Planning, Design and Implementation

Which of the following line is used for dimension lines?[cite: 16]

AContinuous thick
BContinuous thin
CChain thin
DShort zig-zag line
Answer is hidden
Question 636 of 938Ch 10 · Project Planning, Design and Implementation

Which of the following line is used for visible outlines?[cite: 16]

AContinuous thick
BContinuous thin
CChain thin
DShort zig-zag line
Answer is hidden
Question 637 of 938Ch 10 · Project Planning, Design and Implementation

The hidden line are drawn as ............[cite: 16]

Adashed narrow lines
Bdashed wide lines
Clong-dashed dotted wide line
Dlong-dashed double dotted wide line
Answer is hidden
Question 638 of 938Ch 10 · Project Planning, Design and Implementation

The hidden line represent ............[cite: 16]

Afeatures that can be seen in the current view
Bextension line or leader line
Cfeatures that cannot be seen in the current view
Daxis of symmetrical parts
Answer is hidden
Question 639 of 938Ch 10 · Project Planning, Design and Implementation

Which of the following lines are used to show that the object is cut and then viewed?[cite: 16]

AHidden lines
BLeader lines
CCentre lines
DHatching lines
Answer is hidden
Question 640 of 938Ch 10 · Project Planning, Design and Implementation

T square is used alone to draw ............[cite: 16]

Avertical line
Binclined line
Chorizontal line
Dnone of the above
Answer is hidden
Question 641 of 938Ch 10 · Project Planning, Design and Implementation

French curves are used to draw ............[cite: 16]

Aregular curves
Bcircle
Cirregular curves
Dnone of the above
Answer is hidden
Question 642 of 938Ch 10 · Project Planning, Design and Implementation

The hardness of pencil lead increases as the numeral letter H ............[cite: 16]

Aincreases
Bremains constant
Cdecreases
Dnone of the above
Answer is hidden
Question 643 of 938Ch 10 · Project Planning, Design and Implementation

Which of the following is not a pencil?[cite: 16]

AHB
B2B
Cdrafter
Dnone of the above
Answer is hidden
Question 644 of 938Ch 10 · Project Planning, Design and Implementation

What is additional 3rd view on orthographic projection in general for simple objects?

AFront view
BTop view
CSide view
DView at 45° perpendiculars to horizontal plane
Answer is hidden
Question 645 of 938Ch 10 · Project Planning, Design and Implementation

The isometric projection of a circle is a ............[cite: 14]

Acircle
Bellipse
Chyperbola
Dparabola
Answer is hidden
Question 646 of 938Ch 10 · Project Planning, Design and Implementation

A technical drawing of an object that shows the relationship or order of assembly of various parts is known as ............[cite: 14]

Aorthographic projection
Bexploded view drawing
Ccompacted view drawing
Daxonometric drawing
Answer is hidden
Question 647 of 938Ch 10 · Project Planning, Design and Implementation

All the axonometric projections are single-plane ............ projection.[cite: 14]

Aorthographic
Bperspective
Cisometric
Doblique
Answer is hidden
Question 648 of 938Ch 10 · Project Planning, Design and Implementation

............ type of axonometric drawing has equal foreshortening along two axis directions and a different amount on the third axis.[cite: 14]

ADiametric
BMulti view
CIsometric
DTrimetric
Answer is hidden
Question 649 of 938Ch 10 · Project Planning, Design and Implementation

The principle views associated with orthographic projection are ............[cite: 14]

Afront view
Bright side view
Ctop view
Dall of the above
Answer is hidden
Question 650 of 938Ch 10 · Project Planning, Design and Implementation

The principle reason for using an auxiliary view is ............[cite: 14]

Ato eliminate hidden lines
Bto create a true projection plane from an inclined plane in one of the primary views
Cto show cylinders as ellipses
Dto locate center marks
Answer is hidden
Question 651 of 938Ch 10 · Project Planning, Design and Implementation

............ is the plane upon which the top view is projected.[cite: 14]

AHorizontal
BFrontal
CProfile
DBase
Answer is hidden
Question 652 of 938Ch 10 · Project Planning, Design and Implementation

The isometric projection of a sphere is a ............[cite: 14]

Acircle
Bellipse
Chyperbola
Dparabola
Answer is hidden
Question 653 of 938Ch 10 · Project Planning, Design and Implementation

In isometric drawing ............[cite: 14]

Aall axes are equally inclined
Btwo axes are equally inclined
Cnone of the axes are equally inclined
Dnone of the above
Answer is hidden
Question 654 of 938Ch 10 · Project Planning, Design and Implementation

The value of the ratio of isometric projection length to true length is ............[cite: 14]

A0.141
B0.372
C0.815
D0.642
Answer is hidden
Question 655 of 938Ch 10 · Project Planning, Design and Implementation

What type of sketch shows the front in true shape?[cite: 14]

AIsometric
BPerspective
COblique
DAxonometric
Answer is hidden
Question 656 of 938Ch 10 · Project Planning, Design and Implementation

If an isometric drawing is made use of an isometric scale, then the drawings are called ............[cite: 14]

Aisometric projection
Bisometric view
Cperspective projection
Dorthographic view
Answer is hidden
Question 657 of 938Ch 10 · Project Planning, Design and Implementation

When using an isometric view, you line up the drawing along three axis that are separated by ............ from each other.[cite: 14]

A180-degree
B90-degree
C120-degree
D60-degree
Answer is hidden
Question 658 of 938Ch 10 · Project Planning, Design and Implementation

The development of cylinder is a ............[cite: 14]

Arectangle
Bcircle
Cellipse
Dnone of the above
Answer is hidden
Question 659 of 938Ch 10 · Project Planning, Design and Implementation

The following is the method for development of a right regular prism.[cite: 14]

AParallel line method
BRadial line method
CTriangulation method
DApproximate method
Answer is hidden
Question 660 of 938Ch 10 · Project Planning, Design and Implementation

The solid which is generated by the revolution of a right-angle triangle about one of its perpendicular sides which remains fixed is called ............[cite: 14]

Aa prism
Ba pyramid
Ca cylinder
Da cone
Answer is hidden
Question 661 of 938Ch 10 · Project Planning, Design and Implementation

When a pyramid or cone is cut by a cutting plane parallel to its base, the remaining portion thus obtained after removing the top portion is called ............[cite: 14]

Aa prism
Bfrustum
Ca cylinder
Da cone
Answer is hidden
Question 662 of 938Ch 10 · Project Planning, Design and Implementation

The side view of an object is drawn in ............ faces.[cite: 14]

Avertical plane
Bhorizontal plane
Cprofile plane
Dany of the above
Answer is hidden
Question 663 of 938Ch 10 · Project Planning, Design and Implementation

A tetrahedron has four equal ............ faces.[cite: 14]

Asquare
Brectangular
Ctriangular
Dnone of the above
Answer is hidden
Question 664 of 938Ch 10 · Project Planning, Design and Implementation

Hatching lines are drawn at ............ degree to reference line.[cite: 14]

A30
B45
C60
D90
Answer is hidden
Question 665 of 938Ch 10 · Project Planning, Design and Implementation

In a cash flow series ............

Auniform gradient signifies that an income or disbursement changes by the same amount in each interest period
Beither an increase or decrease in the amount of a cash flow is called the gradient
Cthe gradient in the cash flow may be positive or negative
Dall of the above
Answer is hidden
Question 666 of 938Ch 10 · Project Planning, Design and Implementation

Which item comes under financial activities in cash flow?

ARedemption of preference share
BIssue of preference share
CInterest paid
DAll of the above
Answer is hidden
Question 667 of 938Ch 10 · Project Planning, Design and Implementation

Cash flow example from a financing activity is ............

Apayment of dividends
Breceipt of dividend on investment
Ccash received from customers
Dpurchase of fixed asset
Answer is hidden
Question 668 of 938Ch 10 · Project Planning, Design and Implementation

The statement of cash flow clarifies cash flows according to ............

Aoperating and non-operating flows
Binflow and outflow
Cinvesting and non-operating flows
Doperating, investing, and financing activities
Answer is hidden
Question 669 of 938Ch 10 · Project Planning, Design and Implementation

Cash flow example from an investing activity is ............

Aissue of debenture
Brepayment of long-term loan
Cpurchase of raw materials for cash
Dsale of investment by non-financial enterprise
Answer is hidden
Question 670 of 938Ch 10 · Project Planning, Design and Implementation

Heterogeneous cash flows can be made comparable by ............

Adiscounting technique
Bcompounding technique
Ceither (a) or (b)
Dnone of the above
Answer is hidden
Question 671 of 938Ch 10 · Project Planning, Design and Implementation

Time value of money supports the comparison of cash flows recorded at different time period by ............

Adiscounting all cash flows to a common point of time
Bcompounding all cash flows to a common point of time
Cusing either (a) or (b)
Dnone of the above
Answer is hidden
Question 672 of 938Ch 10 · Project Planning, Design and Implementation

What is the element of total cost?

AMaterial and labor cost
BLabor and fuel cost
CFuel and machine cost
DAll of the above
Answer is hidden
Question 673 of 938Ch 10 · Project Planning, Design and Implementation

Statement of cash flows includes ............

Afinancing activities
Boperating activities
Cinvesting activities
Dall of the above
Answer is hidden
Question 674 of 938Ch 10 · Project Planning, Design and Implementation

Material cost is concerned with ............

Adirect cost
Bindirect cost
Cboth (a) and (b)
Dnone of the above
Answer is hidden
Question 675 of 938Ch 10 · Project Planning, Design and Implementation

In cash flows, when a company invests in fixed assets and short-term financial investments results in ............

Aincreased liabilities
Bincreased equity
Cincreased cash
Ddecreased cash
Answer is hidden
Question 676 of 938Ch 10 · Project Planning, Design and Implementation

If desired rate of return is minimum by actual rate of return, then it is classified as ............

Afuture cash flows
Bpresent cash flow
Cpositive cash flows
Dnegative cash flows
Answer is hidden
Question 677 of 938Ch 10 · Project Planning, Design and Implementation

The given symbol in a drawing represents ............

Aperspective projection
Bthird angle projection
Cfirst angle projection
Doblique projection
Answer is hidden
Question 678 of 938Ch 10 · Project Planning, Design and Implementation

The side view of given orthographic projection is ............

Aa
Bb
Cc
Dd
Answer is hidden
Question 679 of 938Ch 10 · Project Planning, Design and Implementation

The top view of given figure is ............

Aa
Bb
Cc
Dd
Answer is hidden
Question 680 of 938Ch 10 · Project Planning, Design and Implementation

In cash flow diagram, which of the following is true?

ATime 1 is considered to be the end of time period 1
BA vertical arrow pointing up indicates a positive cash flow
CAn arrow pointing downward indicates a negative cash flow
DAll of the above
Answer is hidden
Question 681 of 938Ch 10 · Project Planning, Design and Implementation

Payback period is counted only after ............

Atendering for the project
Bstarting of the construction of the project
Ccompletion of the construction of the project
Dcommissioning of the project
Answer is hidden
Question 682 of 938Ch 10 · Project Planning, Design and Implementation

Time value of money indicates that ............

Aa unit of money obtained today is worth more than a unit of money obtained in future
Ba unit of money obtained today is worth less than a unit of money obtained in future
Cthere is no difference in the value of money obtained today and tomorrow
Dnone of the above
Answer is hidden
Question 683 of 938Ch 10 · Project Planning, Design and Implementation

Pick up the correct statement from the following:

AThe change in the amount of money over a given time period is called 'time value of money', a most important concept in engineering economy
BThe manifestation of the time value of money is termed as interest
CInterest on borrowing = Present amount owed - Original loan
DAll of the above
Answer is hidden
Question 684 of 938Ch 10 · Project Planning, Design and Implementation

If the nominal rate of interest is 10% per annum and there is quarterly compounding, the effective rate of interest will be ............

A10% per annum
B10.10% per annum
C10.25% per annum
D10.38% per annum
Answer is hidden
Question 685 of 938Ch 10 · Project Planning, Design and Implementation

How long will it take money to double itself if invested at 5% compounded annually?

A13.7 years
B14.7 years
C14.2 years
D15.3 years
Answer is hidden
Question 686 of 938Ch 10 · Project Planning, Design and Implementation

Equal payment series sinking fund factor is ............

A(A/F, i, n)
B(F/P, i, n)
C(A/P, i, n)
D(P/A, i, n)
Answer is hidden
Question 687 of 938Ch 10 · Project Planning, Design and Implementation

In a project equal investment is done on regular basis for replacement of the property, then it is called ............

Afuture investment
Bcapital recovery
Csinking fund
Dall of the above
Answer is hidden
Question 688 of 938Ch 10 · Project Planning, Design and Implementation

Sinking fund is ............

Athe fund for rebuilding a structure when its economic life is over
Braised to meet maintenance costs
CNPV = 0
Dall of the above
Answer is hidden
Question 689 of 938Ch 10 · Project Planning, Design and Implementation

The term (1 + i)ⁿ is called ............

Asingle payment discount amount factor
Bsingle payment compound amount factor
Cannual compound amount factor
Dnone of the above
Answer is hidden
Question 690 of 938Ch 10 · Project Planning, Design and Implementation

What is the expression for the capital recovery amount?

AP [i(1+i)ⁿ / ((1+i)ⁿ - 1)]
BP [(1+i)ⁿ / ((1+i)ⁿ - 1)]
CP [i(1-i)ⁿ / ((1-i)ⁿ - 1)]
DP [(1-i)ⁿ / ((1-i)ⁿ - 1)]
Answer is hidden
Question 691 of 938Ch 10 · Project Planning, Design and Implementation

If a is the base amount expenditure, b is the increase in the operation cost each year over a period of n years, the total cost of maintenance is ............

Aa + (n-1)b
Ba + x (n-1)b
Ca x (n-1)b
DDiscounted payback
Answer is hidden
Question 692 of 938Ch 10 · Project Planning, Design and Implementation

Which method is not mostly adopted for selection of project?

APayback
BDiscounted payback
CIRR
DB/C
Answer is hidden
Question 693 of 938Ch 10 · Project Planning, Design and Implementation

The cash flow is either increasing or decreasing with equal amount every period, the type of series is ............

Auniform payment series
Bgeometric payment series
Clinear gradient series
Dirregular payment series
Answer is hidden
Question 694 of 938Ch 10 · Project Planning, Design and Implementation

The additional money received from selling one specified level of output is ............

Anormal cost
Bmarginal revenue
Caverage revenue
Dequivalent revenue
Answer is hidden
Question 695 of 938Ch 10 · Project Planning, Design and Implementation

If production is less than breakeven point, the product will be ............

Alesser than consumption
Bequal to consumption
Cgreater than consumption
Dall of the above
Answer is hidden
Question 696 of 938Ch 10 · Project Planning, Design and Implementation

The actual profitability of any project is best analyzed from .........

AIRR
BDiscounted payback period
CARR
Dnone of the above
Answer is hidden
Question 697 of 938Ch 10 · Project Planning, Design and Implementation

The decision rule for project acceptance is that .........

Aif IRR > 0
Bif IRR > MARR
Cif IRR < MARR
Dif IRR = 0
Answer is hidden
Question 698 of 938Ch 10 · Project Planning, Design and Implementation

Which of the following factors does not depend on the time value of money?

AB/C ratio
BAccounting rate of return
CNPV
DIRR
Answer is hidden
Question 699 of 938Ch 10 · Project Planning, Design and Implementation

If a seller recovers his capital along with accumulated compensating interest not in one single lump-sum payment but in periodical equal payments, over time ............

Acapital recovery annuity is availed
Bpresent worth annuity is availed
Csinking fund annuity is availed
Dfuture worth annuity is availed
Answer is hidden
Question 700 of 938Ch 10 · Project Planning, Design and Implementation

Depreciation is charged on ............

Afixed assets
Bcurrent assets
Cboth fixed and current assets
Dnone of the above
Answer is hidden
Question 701 of 938Ch 10 · Project Planning, Design and Implementation

Which of the following asset generally assumed not to depreciate?

AMachinery
BBuilding
CLand
DAll of the above
Answer is hidden
Question 702 of 938Ch 10 · Project Planning, Design and Implementation

Under the diminishing balance method, the amount of depreciation is calculated on ............[cite: 15]

Athe written-down value of the asset
Bthe market value of the asset
Cthe original cost of the asset
Dthe expected realizable value of the asset
Answer is hidden
Question 703 of 938Ch 10 · Project Planning, Design and Implementation

If the percentage fall in quantity demanded is more than the percentage rise in price charged, ............[cite: 15]

Athe revenue will rise
Bthe revenue will fall
Cis not related with discount rate
Dnone of the above
Answer is hidden
Question 704 of 938Ch 10 · Project Planning, Design and Implementation

The estimated value of depreciable assets after its useful life is called ............[cite: 15]

Aactual value
Breplacement value
Cdisposal (residual) value
Dcurrent value
Answer is hidden
Question 705 of 938Ch 10 · Project Planning, Design and Implementation

If there is no inflation during a period, then the money cash flow would be equal to ............[cite: 15]

Apresent value
Breal cash flow
Creal cash flow + present value
Dreal cash flow - present value
Answer is hidden
Question 706 of 938Ch 10 · Project Planning, Design and Implementation

What is the limit of annual income for an unmarried individual upto which only 1% income tax is levied?[cite: 15]

A5 lakhs
B6 lakhs
C5.5 lakhs
D7 lakhs
Answer is hidden
Question 707 of 938Ch 10 · Project Planning, Design and Implementation

IRR is calculated ............[cite: 15]

Awhen NPV is less than zero
Bwhen NPV more than zero
Cwhen NPV equal to 0
Dwhen NPV equal to MARR
Answer is hidden
Question 708 of 938Ch 10 · Project Planning, Design and Implementation

The time value of money is primarily related to .........[cite: 15]

Atime and money
Btime and interest
Cmoney and valise
Dinterest and inflation
Answer is hidden
Question 709 of 938Ch 10 · Project Planning, Design and Implementation

Salvage value is defined as ............[cite: 15]

Avalue of dismantled materials at the end of its utility period
Bestimated value of a built-up property at the end of its useful life without being dismantled
Cvalue of the property shown in the account book in that particular year
Dpresent value of a property considering it to be replaced at the current market rates
Answer is hidden
Question 710 of 938Ch 10 · Project Planning, Design and Implementation

The minimum value of benefit-cost ratio for the selection of any project should be ............[cite: 15]

Aless than one
Bone
Cgreater than one
Dnone of the above
Answer is hidden
Question 711 of 938Ch 10 · Project Planning, Design and Implementation

The benefit cost ratio is ............[cite: 15]

Adirectly proportional to discount rate
Binversely proportional to discount rate
Cno array relation with discount rate
Dall of the above
Answer is hidden
Question 712 of 938Ch 10 · Project Planning, Design and Implementation

The project contractor relies on the cost of the estimate ............[cite: 15]

Afor submission of a competitive bid for a lump-sum contract
Bfor a unit price contract
Cfor preparation of a definitive estimate to help negotiate contract
Dall of the above
Answer is hidden
Question 713 of 938Ch 10 · Project Planning, Design and Implementation

Both architect and engineer make use of the cost estimate of the project ............[cite: 15]

Afor site selection
Bfor designing of the project
Cfor choosing alternatives
Dall of the above
Answer is hidden
Question 714 of 938Ch 10 · Project Planning, Design and Implementation

The most unpredictable cost of a project is ............[cite: 15]

Aenvironment management cost
Bunderground construction cost
Ctransportation cost
Dsocial management cost
Answer is hidden
Question 715 of 938Ch 10 · Project Planning, Design and Implementation

The ratio of current assets to current liabilities is known as ............[cite: 15]

Aliquidity ratio
Bcurrent ratio
Cacid-test (or quick) ratio
Ddebts ratio
Answer is hidden
Question 716 of 938Ch 10 · Project Planning, Design and Implementation

The more critical (or severe) test of the firm's liquidity can be judged by ............[cite: 15]

Aliquidity ratio
Bcurrent ratio
Cacid-test (or quick) ratio
Ddebts ratio
Answer is hidden
Question 717 of 938Ch 10 · Project Planning, Design and Implementation

Current assets less inventories divided by current liabilities is known as ............[cite: 15]

Aliquidity ratio
Bcurrent ratio
Cacid-test (or quick) ratio
Ddebts ratio
Answer is hidden
Question 718 of 938Ch 10 · Project Planning, Design and Implementation

The purchase value of assets over its serviceable life is categorized as ............[cite: 15]

Aappreciated liabilities
Bappreciated assets
Cdepreciation
Dappreciation
Answer is hidden
Question 719 of 938Ch 10 · Project Planning, Design and Implementation

Excessive spending power of consumers that pulls prices up is called ............[cite: 15]

Ademand-pull inflation
Bcost-pull inflation
Ccost-push inflation
Dcost-push inflation
Answer is hidden
Question 720 of 938Ch 10 · Project Planning, Design and Implementation

Book value means ............[cite: 15]

Aexpected sale price
Bcurrent market price if purchased now
Cvalue as shown in the books of account
Doriginal acquisition price
Answer is hidden
Question 721 of 938Ch 10 · Project Planning, Design and Implementation

Pokhara Regional International Airport is an example of ............[cite: 13]

Aloan projects
Bgrant projects
Cprivate sector projects
Dprocess oriented projects
Answer is hidden
Question 722 of 938Ch 10 · Project Planning, Design and Implementation

The process each manager follows during the life of a project is known as ............[cite: 13]

Aproject management
Bmanager life cycle
Cproject management life cycle
Dall of the mentioned
Answer is hidden
Question 723 of 938Ch 10 · Project Planning, Design and Implementation

The type of projects in which investment in project is repaid by the government to donors agencies is called ............[cite: 13]

Aprivate sector projects
Bgovernment sector projects
Cgrant projects
Dloan projects
Answer is hidden
Question 724 of 938Ch 10 · Project Planning, Design and Implementation

Who typically offers financial resources to fund a project?[cite: 13]

ADonor
BSponsor
CProject manager
DStakeholder
Answer is hidden
Question 725 of 938Ch 10 · Project Planning, Design and Implementation

If part of contract work is assigned to another party, it is called ............[cite: 13]

Asub-contracting
Bjoint venture
Cboth (a) and (b)
Dnone of the above
Answer is hidden
Question 726 of 938Ch 10 · Project Planning, Design and Implementation

Which of the following is not a phase of project management?[cite: 13]

AProject planning
BProject scheduling
CProject controlling
DProject being
Answer is hidden
Question 727 of 938Ch 10 · Project Planning, Design and Implementation

The project scope statement furnishes the basis for ............[cite: 13]

Aa way to provide updated information to the accounting department
Bprovides links to the client's functional management groups
Callowing the project to move to the next phase
Dall of the above
Answer is hidden
Question 728 of 938Ch 10 · Project Planning, Design and Implementation

The main principle of an organization, is ............[cite: 13]

Aunity of command and coherency
Beffective control at all level
Cdelegation of authority
Dall of the above
Answer is hidden
Question 729 of 938Ch 10 · Project Planning, Design and Implementation

The main advantage of line organization is ............[cite: 13]

Aeffective command and control
Bdefined responsibilities at all levels
Cability to quick decision at all level
Dall of the above
Answer is hidden
Question 730 of 938Ch 10 · Project Planning, Design and Implementation

Ensuring that performance meets established standards that worker's activities occur as planned and that the organization process is called ............[cite: 13]

Acontrolling
Bplanning
Cleading
Dorganizing
Answer is hidden
Question 731 of 938Ch 10 · Project Planning, Design and Implementation

In which of the following project phases is the project schedule developed?[cite: 13]

AConceptual
BPlanning
CImplementation
DDesign
Answer is hidden
Question 732 of 938Ch 10 · Project Planning, Design and Implementation

The process of communication contains four major parts. Which part is the vehicle or method used to convey the message?[cite: 13]

ACommunicator
BMessage
CMedium
DRecipient
Answer is hidden
Question 733 of 938Ch 10 · Project Planning, Design and Implementation

In bar charts, which colour is used to show the actual progress?[cite: 13]

ARed
BBlack
CBlue
DGreen
Answer is hidden
Question 734 of 938Ch 10 · Project Planning, Design and Implementation

Which method of project planning was invented first?[cite: 13]

ABar chart
BMilestone chart
CCPM
DPERT
Answer is hidden
Question 735 of 938Ch 10 · Project Planning, Design and Implementation

CPM is based on ............[cite: 13]

Aprobabilistic
Bdeterministic
Cboth (a) and (b)
Dany of (a) or (b)
Answer is hidden
Question 736 of 938Ch 10 · Project Planning, Design and Implementation

CPM is the ............[cite: 13]

Aactivity oriented
Bevent oriented
Ctarget oriented
Dtime oriented
Answer is hidden
Question 737 of 938Ch 10 · Project Planning, Design and Implementation

What is a critical path?[cite: 13]

AIt is a path that operates from the starting node to the end node.
BIt is a mixture of all the paths
CIt is the longest path
DIt is the shortest path
Answer is hidden
Question 738 of 938Ch 10 · Project Planning, Design and Implementation

What happens when a project is scheduled by CPM?[cite: 13]

AA project is divided into various activities
BRequired time for each activity is established
CA sequence of various activities is made according to their importance
DAll of the above
Answer is hidden
Question 739 of 938Ch 10 · Project Planning, Design and Implementation

When was CPM method introduced?[cite: 13]

A1880
B1900
C1957
D1958
Answer is hidden
Question 740 of 938Ch 10 · Project Planning, Design and Implementation

For an activity in a CPM analysis, the early finish time is 13 and the late finish time is 13. Which of the following statements is true?[cite: 13]

AThe early start is 6
BThe duration of the activity is 13
CThe slack of this activity is 13
DThe activity is on the critical path
Answer is hidden
Question 741 of 938Ch 10 · Project Planning, Design and Implementation

Completion of an activity on CPM network diagram, is generally known ............

Aevent
Bnode
Cconnector
Dall of the above
Answer is hidden
Question 742 of 938Ch 10 · Project Planning, Design and Implementation

In an AOA (activity on arrow) diagram, what does the arrow represent?

Aevent
Bactivity
Cslack
Dall of the above
Answer is hidden
Question 743 of 938Ch 10 · Project Planning, Design and Implementation

Which of the following is true about dummy?

AIt doesn't consume resources
BIt doesn't have head and tail event
CIt can be added anywhere in the network
DIt simplifies the network
Answer is hidden
Question 744 of 938Ch 10 · Project Planning, Design and Implementation

Dummy is used for ............

Agrammatical purpose
Blogical purpose
Cboth (a) and (b)
Dnone of the above
Answer is hidden
Question 745 of 938Ch 10 · Project Planning, Design and Implementation

Which one of the following is captured in the Work Breakdown Structure (WBS)?

AThe life cycle phases
BThe logical order of tasks
CThe scope of the project
DProject costs
Answer is hidden
Question 746 of 938Ch 10 · Project Planning, Design and Implementation

In project crashing, rent and overheads are treated as ............

Asignificant cost
Binsignificant costs
Cdirect costs
Dindirect costs
Answer is hidden
Question 747 of 938Ch 10 · Project Planning, Design and Implementation

Project crashing is the method for ............

Ashortening the project duration by reducing the time of one or more critical activities
Badding resources at critical points
Cdoing technical analysis of the finished work for review
Dadding duration to each activity
Answer is hidden
Question 748 of 938Ch 10 · Project Planning, Design and Implementation

The time with which direct cost does not reduce with the increase in time is known as ............

Acrash time
Bnormal time
Coptimistic time
Dstandard time
Answer is hidden
Question 749 of 938Ch 10 · Project Planning, Design and Implementation

The time corresponding to minimum total project cost is ............

Acrash time
Bbetween normal time and crash time
Coptimistic time
Dnormal time
Answer is hidden
Question 750 of 938Ch 10 · Project Planning, Design and Implementation

Which of the following is a project scheduling method that can be applied to software development?

APERT
BCPM
CCMM
DBoth PERT and CPM
Answer is hidden
Question 751 of 938Ch 10 · Project Planning, Design and Implementation

PERT (Project Evaluation and Review Technique) analysis is based on ............

Aoptimistic time, pessimistic time and most likely time
Bpessimistic time, optional time, maximum time
Coptimistic time, efficient time, most likely time
Dminimax time, optimistic time and harmonic time
Answer is hidden
Question 752 of 938Ch 10 · Project Planning, Design and Implementation

The full form of PERT is ............

Aprogram evaluation and rate technology
Bprogram evaluation and robot technique
Cprogram evaluation and robot technology
Dprogram evaluation and review technique
Answer is hidden
Question 753 of 938Ch 10 · Project Planning, Design and Implementation

What is PERT analysis based on?

AOptimistic time
BPessimistic time
CMost likely time
DAll of the above
Answer is hidden
Question 754 of 938Ch 10 · Project Planning, Design and Implementation

In PERT (Project Evaluation and Review Technique) method expected time (Te) is ............

ATo + Tp + 4Tm / 6
BTo + Tp + 2Tm / 6
CTo + 4Tp + Tm / 6
DTm + 4Tp + To / 6
Answer is hidden
Question 755 of 938Ch 10 · Project Planning, Design and Implementation

If PERT network consists of 5 activities with standard deviation of 5, 6, 7, 8, and 9. Then, the standard deviation of the entire project is ............

A255
B7
C√255
D49
Answer is hidden
Question 756 of 938Ch 10 · Project Planning, Design and Implementation

The shortest possible time in which an activity can be achieved under ideal circumstances is known as ............

Aexpected time estimate
Boptimistic time estimate
Cpessimistic time estimate
Dthe most likely time estimate
Answer is hidden
Question 757 of 938Ch 10 · Project Planning, Design and Implementation

The relation between jobs of a particular type and various durations they have consumed completion is expressed by curve ............

Anormal distribution curve
Bfrequency distribution
Cdistribution curve
Dnone of the above
Answer is hidden
Question 758 of 938Ch 10 · Project Planning, Design and Implementation

The optimistic, most likely and pessimistic time estimates of an activity are 6, 8, 10 days, what are the expected time and standard deviation?

A8, 0.5
B8, 2
C6, 0.67
D8, 0.67
Answer is hidden
Question 759 of 938Ch 10 · Project Planning, Design and Implementation

According to the time estimates made by the PERT planners, the maximum time that would be needed to complete an activity is called as ............

Athe most likely time estimate
Boptimistic time estimate
Cexpected time estimate
Dpessimistic time estimate
Answer is hidden
Question 760 of 938Ch 10 · Project Planning, Design and Implementation

Which of the options is not a notable challenge while scheduling a project?

ADeadlines exist
BIndependent activities
CToo many workers may be required
DCostly delay
Answer is hidden
Question 761 of 938Ch 10 · Project Planning, Design and Implementation

In which phase of the project most of the money and manpower are required?[cite: 14]

Ainitiation phase
Bplanning phase
Cexecution phase
Dclosing phase
Answer is hidden
Question 762 of 938Ch 10 · Project Planning, Design and Implementation

Which is the first stage in a project formulation?[cite: 14]

APlanning
BSetting objectives
CControlling
DEvaluating
Answer is hidden
Question 763 of 938Ch 10 · Project Planning, Design and Implementation

Which of the following involves continuous betterment in planning and detailing with time?[cite: 14]

AProject enhancement
BProgressive elaboration
CProgressive rehabilitation
DContinuous improvement
Answer is hidden
Question 764 of 938Ch 10 · Project Planning, Design and Implementation

in resource levelling which of the following is constraint?[cite: 14]

ATime
BMoney
CResources
DBoth time and money
Answer is hidden
Question 765 of 938Ch 10 · Project Planning, Design and Implementation

Which term describes the utilization of resources in a project without altering the project duration?[cite: 14]

AResource smoothing
BResource leveling
CCritical path method
DFast tracking
Answer is hidden
Question 766 of 938Ch 10 · Project Planning, Design and Implementation

Resource smoothing is ............[cite: 14]

Aan optimization and economical utilization of resources
Ban adjustment of resources without affecting project duration
Ca gradual increase in resources
Da gradual decrease in resources
Answer is hidden
Question 767 of 938Ch 10 · Project Planning, Design and Implementation

Cost variance (CV) is which of the following equations?[cite: 14]

ACV - BCWP - ACWP
BCV = BCWP - ACWP
CCV = BCWS
DBoth (a) and (c)
Answer is hidden
Question 768 of 938Ch 10 · Project Planning, Design and Implementation

A technique for performing quantitative analysis of progress is known as ............[cite: 14]

ABCWS
BEVA
CBAC
DCBSE
Answer is hidden
Question 769 of 938Ch 10 · Project Planning, Design and Implementation

A schedule performance index (SPI) of 0.76 means ............[cite: 14]

Ayou are over budget
Byou are ahead of schedule
Cyou are only progressing at 76 percent of the rate originally planned
Dyou are only progressing at 24 percent of the rate originally planned
Answer is hidden
Question 770 of 938Ch 10 · Project Planning, Design and Implementation

A cost performance index (CPI) of 0.89 means ............[cite: 14]

Aat this time, we expect the total project to cost 89 percent more than planned
Bwhen the project is completed we will have spent 89 percent more than planned
Cthe project is only progressing at 89 percent of the rate planned
Dthe project is only getting 89 cents out of every dollar invested
Answer is hidden
Question 771 of 938Ch 10 · Project Planning, Design and Implementation

Capital budgeting is ............[cite: 14]

Areversible
Bunimportant
Cirreversible
Dall of the above
Answer is hidden
Question 772 of 938Ch 10 · Project Planning, Design and Implementation

In which of the following cases project is in better shape?[cite: 14]

ABoth CPI and SPI are less than 1
BWhen CPI is more than 1 and SPI is less than one
CWhen CPI is less than one and SPI is more than one
DWhen both CPI and SPI are more than one
Answer is hidden
Question 773 of 938Ch 10 · Project Planning, Design and Implementation

The budgeted cost for all the activities in a project with the help of Earned Value Method is ............[cite: 14]

Aactual cost
Bbudget at completion
Cbudget for completion
Destimate at completion
Answer is hidden
Question 774 of 938Ch 10 · Project Planning, Design and Implementation

Cost budgeting can be best described by which of the following?[cite: 14]

AThe process of developing the future trends along with the assessment of probabilities, uncertainties, and inflation that could occur during the project
BDefinitive
COrder of magnitude
DConceptual
Answer is hidden
Question 775 of 938Ch 10 · Project Planning, Design and Implementation

The technique for establishing and maintaining priorities among the various jobs of a project, is known ............[cite: 14]

Aevent flow scheduling technique
Bcritical ratio scheduling
Cslotting technique for scheduling
Dshort interval scheduling
Answer is hidden
Question 776 of 938Ch 10 · Project Planning, Design and Implementation

The flow of information through MIS is ............[cite: 14]

Aneed dependent
Borganization dependent
Cinformation dependent
Dmanagement dependent
Answer is hidden
Question 777 of 938Ch 10 · Project Planning, Design and Implementation

The information of MIS comes from the ............[cite: 14]

Ainternal source
Bexternal source
Cboth internal and external source
Dnone of the above
Answer is hidden
Question 778 of 938Ch 10 · Project Planning, Design and Implementation

Which of the following is NOT an objective of MIS?[cite: 14]

AFacilitate the decisions-making process
BProvide requisite information at each level of management
CSupport decision-making
DRecruit people for system
Answer is hidden
Question 779 of 938Ch 10 · Project Planning, Design and Implementation

The back bone of any organization is ............[cite: 14]

Ainformation
Bemployee
Cmanagement
Dcapital
Answer is hidden
Question 780 of 938Ch 10 · Project Planning, Design and Implementation

Feasibility study determines ............[cite: 14]

Awhether the project is possible with resources
Bcomparing the project with world class manufacturing norms
Ccalculate the cost crashing each unit
Dadd duration to each unit
Answer is hidden
Question 781 of 938Ch 10 · Project Planning, Design and Implementation

In project management when does planning take place?

ABefore the project
BDuring the project execution
CAt the start of the project
DAfter the project
Answer is hidden
Question 782 of 938Ch 10 · Project Planning, Design and Implementation

What process involves deciding how to approach and plan the risk management activities for the project?

APerforming qualitative risk analysis
BPlanning risk management
CPerforming quantitative risk analysis
DIdentifying risks
Answer is hidden
Question 783 of 938Ch 10 · Project Planning, Design and Implementation

Which of the following is not considered as a risk in project management?

ASpecification delays
BProduct competition
CTesting
DStaff turnover
Answer is hidden
Question 784 of 938Ch 10 · Project Planning, Design and Implementation

Risk event graph is having following on X axis ............[cite: 15]

AGantt chart
Bwork break down structure
Cproject life cycle
Dsplitting
Answer is hidden
Question 785 of 938Ch 10 · Project Planning, Design and Implementation

Project performance consists of ............[cite: 15]

Atime
Bcost
Cquality
Dall of the above
Answer is hidden
Question 786 of 938Ch 10 · Project Planning, Design and Implementation

For a financial institution the most important study of a project to be taken for risks management is ............[cite: 15]

Aappraisal
Benvironmental and social
Ctechnical
Dfinancial and economical
Answer is hidden
Question 787 of 938Ch 10 · Project Planning, Design and Implementation

Project Manager must ensure that it develops appropriate trade offs as ............[cite: 15]

Atime, cost and performance
Bmoney, cost and return on investment
Cmen, materials and machines
Dtime, value and performance
Answer is hidden
Question 788 of 938Ch 10 · Project Planning, Design and Implementation

Which stage of project management life cycle requires the maximum time of completion ............[cite: 15]

Aconceptualization
Bplanning
Cexecution
Destimation
Answer is hidden
Question 789 of 938Ch 10 · Project Planning, Design and Implementation

To be successful in a functional organization, the PM must rely on ............[cite: 15]

Areferent power
Bformal authority
Cinformal power structure
Dboth (a) and (c)
Answer is hidden
Question 790 of 938Ch 10 · Project Planning, Design and Implementation

If employee does wrong in work, employer have to take responsibility of it, this is known ............[cite: 15]

Ajoint liability
Bvicarious liability
Cconcurrent liability
Dall of the above
Answer is hidden
Question 791 of 938Ch 10 · Project Planning, Design and Implementation

In a payback period method of project evaluation and appraisal the project with ............ equal to cut off period will be accepted.[cite: 15]

Amore than
Bless than
Cpositive
Dnegative
Answer is hidden
Question 792 of 938Ch 10 · Project Planning, Design and Implementation

Real rate of return is equal to ............[cite: 15]

ANominal rate + Inflation rate
BNominal rate * Inflation rate
CNominal rate - Inflation rate
DNominal rate / Inflation rate
Answer is hidden
Question 793 of 938Ch 10 · Project Planning, Design and Implementation

The most successful project manager usually ............[cite: 15]

Aworks their way up from assistants in the project office to full-fledged project managers.
Bsupplementing that experience with formal education
Ccomes right from Harvard's MBA program into managing large projects.
Dis considered the technical expert of their field
Answer is hidden
Question 794 of 938Ch 10 · Project Planning, Design and Implementation

Risk management is one of the most important jobs for a ............[cite: 15]

Aclient
Binvestor
Cproduction team
Dproject manager
Answer is hidden
Question 795 of 938Ch 10 · Project Planning, Design and Implementation

Risk management is responsibility of the ............[cite: 15]

Acustomer
Binvestor
Cdeveloper
Dproject team
Answer is hidden
Question 796 of 938Ch 10 · Project Planning, Design and Implementation

Newspaper, magazine, radio, television are examples of ............[cite: 15]

Astoring information
Bretrieving information
Ccommunication information
Dacquiring information
Answer is hidden
Question 797 of 938Ch 10 · Project Planning, Design and Implementation

Outsourced projects are susceptible to conflicts as ............[cite: 15]

Apeople get less pay in these projects and work is more
Bmore work pressure and less time horizon
Cthese projects are away from home location
Dpeople are unaccustomed to working together and have different values
Answer is hidden
Question 798 of 938Ch 10 · Project Planning, Design and Implementation

Conflict occurrence in projects is ............[cite: 15]

Aunavoidable
Bdepend on type of project
Cavoidable
Ddepends on culture
Answer is hidden
Question 799 of 938Ch 10 · Project Planning, Design and Implementation

What assesses the risk and your plans for risk mitigation and revise these when you learn more about the risk?[cite: 15]

ARisk planning
BRisk identification
CRisk monitoring
DRisk analysis
Answer is hidden
Question 800 of 938Ch 10 · Project Planning, Design and Implementation

Which of the following risk is the failure of a purchased component to perform as expected?[cite: 15]

AProduct risk
BProject risk
CBusiness risk
DProgramming risk
Answer is hidden
Question 801 of 938Ch 10 · Project Planning, Design and Implementation

Which of the following risks are derived from the organizational environment where the software is being developed?[cite: 15]

APeople risks
BTechnology risks
CEstimation risks
DOrganizational risks
Answer is hidden
Question 802 of 938Ch 10 · Project Planning, Design and Implementation

Which risk is connected to the circumstance outside the project that may influence the scope of work and the performance of the organization?[cite: 15]

AOperational risk
BFinancial risk
CStrategic risk
DContextual risk
Answer is hidden
Question 803 of 938Ch 10 · Project Planning, Design and Implementation

Which of the following is not the part of risk control?[cite: 15]

AExecution of the risk response-strategy
BMonitoring of triggering events
CInitiating contingency plans
DNot watching for new risks
Answer is hidden
Question 804 of 938Ch 10 · Project Planning, Design and Implementation

Which of the following strategies means that the impact of the risk will be reduced?[cite: 15]

AAvoidance strategies
BMinimization strategies
CContingency plans
DAll of the above
Answer is hidden
Question 805 of 938Ch 10 · Project Planning, Design and Implementation

When do you perform risk identification?[cite: 15]

AAt the beginning of a project
BDuring project planning
CDuring the whole lifetime of a project
DDuring project execution
Answer is hidden
Question 806 of 938Ch 10 · Project Planning, Design and Implementation

The project manager has the most authority in the ............ type of organization.[cite: 16]

Aproject expediter
Bmatrix
Cprojectized organization
Dfunctional
Answer is hidden
Question 807 of 938Ch 10 · Project Planning, Design and Implementation

The successful project managers spend most of their time ............[cite: 16]

Aplanning with their personnel
Bplanning with the top management
Ccommunication with the project team
Dstudying project results
Answer is hidden
Question 808 of 938Ch 10 · Project Planning, Design and Implementation

Which of the following is not project management goal?[cite: 16]

AKeeping overall costs within budget
BDelivering the software to the customer at the agreed time
CMaintaining a happy and well-functioning development team
DAvoiding customer complaints
Answer is hidden
Question 809 of 938Ch 10 · Project Planning, Design and Implementation

The decision to request an increase the resources for a project is the responsibility of the ............[cite: 16]

Afunctional manager
Bproject manager
Cdirector of project management
Dcustomer
Answer is hidden
Question 810 of 938Ch 10 · Project Planning, Design and Implementation

Net present value of a machine is ............[cite: 16]

APV of cash inflows less cost of investment
BPV of cash inflows + cost of investment
CPV of net profit after tax less cost of investment
DPV of cash inflows less average cost of investment
Answer is hidden
Question 811 of 938Ch 10 · Project Planning, Design and Implementation

Capital structure of a company related with ............[cite: 16]

Ashareholders' funds
Blong term debts, preference share capital and equity capital
Cdebentures and loans
Dtotal assets less liabilities
Answer is hidden
Question 812 of 938Ch 10 · Project Planning, Design and Implementation

A company that issues stocks and bonds to raise funds results in ............[cite: 16]

Adecrease in cash
Bincrease in cash
Cincrease in equity
Dincrease in liabilities
Answer is hidden
Question 813 of 938Ch 10 · Project Planning, Design and Implementation

The bond issued without any collateral is called ............[cite: 16]

Apreference share
Bequity share
Cdebenture
Ddebt capital
Answer is hidden
Question 814 of 938Ch 10 · Project Planning, Design and Implementation

Debenture is ............[cite: 16]

Aunsecured bond
Bbond without collateral
Csource of capital budgeting
Dall of the above
Answer is hidden
Question 815 of 938Ch 10 · Project Planning, Design and Implementation

A debenture ............[cite: 16]

Ais a long-term loan
Bdoes not require security
Cis a short-term loan
Dreceives dividend payments
Answer is hidden
Question 816 of 938Ch 10 · Project Planning, Design and Implementation

Which of the following is unsafe share?[cite: 16]

APreference shares
BPrimary shares
CDebentures
DAll of the above
Answer is hidden
Question 817 of 938Ch 10 · Project Planning, Design and Implementation

The average cost incurred in supplying a particular benefit over the entire life time of the project is called ............[cite: 16]

Aproject cost
Baverage life cycle cost
Cmaintenance cost
Dall of the above
Answer is hidden
Question 818 of 938Ch 10 · Project Planning, Design and Implementation

The profit of the company is shared in form of dividend but has no voting rights in ............[cite: 16]

Aequity share
BPreference share
Cordinary share
Dnone of the above
Answer is hidden
Question 819 of 938Ch 10 · Project Planning, Design and Implementation

Point out the false statements ............[cite: 16]

Aa firm can buy its own debentures and shares
Ba company can issue convertible debentures
Ctender assessment
Dcontract assessment
Answer is hidden
Question 820 of 938Ch 10 · Project Planning, Design and Implementation

If two parties enter into an agreement for performing or not performing any work, then it is known as ............[cite: 16]

Acontract
Btender
Cprocurement
Dadjudication
Answer is hidden
Question 821 of 938Ch 10 · Project Planning, Design and Implementation

The procurement of works, goods or services by the entity itself is called ............[cite: 16]

Aforce account
Bdirect procurement
Cseal quotation
Dnone of the above
Answer is hidden
Question 822 of 938Ch 10 · Project Planning, Design and Implementation

For the formation of user's committee, members are selected ............[cite: 16]

Aamong the people of whole district
Bamong the beneficiaries of the project
Cby nomination by the chief district officer of the district
Dnone of the above
Answer is hidden
Question 823 of 938Ch 10 · Project Planning, Design and Implementation

The project usually completed by user committee's are ............[cite: 16]

Alabor intensive projects
Bcapital intensive projects
Cboth (a) and (b)
Dnone of the above
Answer is hidden
Question 824 of 938Ch 10 · Project Planning, Design and Implementation

The projects can be carried out out by user committee with cost estimate upto ............[cite: 16]

A10 Millions
B20 Millions
C50 Millions
D500 Millions
Answer is hidden
Question 825 of 938Ch 10 · Project Planning, Design and Implementation

For procurement of works upto 2 million, buy which of the following method is to be considered?[cite: 16]

Asealed tender
Bby direct negotiation
Cby bidding
Dby direct labor or direct negotiation
Answer is hidden
Question 826 of 938Ch 10 · Project Planning, Design and Implementation

The bid validity period for bid having estimated cost upto 100 million is ............[cite: 17]

A45 days
B60 days
C90 days
D105 days
Answer is hidden
Question 827 of 938Ch 10 · Project Planning, Design and Implementation

In project management, what percentage of the total project cost is typically estimated for office management expenses?[cite: 17]

A2.5%
B4%
C10%
D12%
Answer is hidden
Question 828 of 938Ch 10 · Project Planning, Design and Implementation

Nepal Government handed over the fast-track project to Nepal Army. After handing in, what type of contract was it?[cite: 17]

ABOT
BBOOT
Cbuild and design
Dbuild, design, procurement, subcontracting and all works
Answer is hidden
Question 829 of 938Ch 10 · Project Planning, Design and Implementation

The relation between contract and agreement is ............[cite: 17]

Asynonym
Baptonym
Call contract are agreement but all agreement are not contract
Dall agreement are contract but not all contract are agreement
Answer is hidden
Question 830 of 938Ch 10 · Project Planning, Design and Implementation

The ultimate method of resolving any dispute with a contractor is ............[cite: 17]

Anegotiation
Bmediation
Carbitration
Dlitigation
Answer is hidden
Question 831 of 938Ch 10 · Project Planning, Design and Implementation

The damages caused due to delay in work are termed as ............[cite: 17]

Aliquidated damage
Bunliquidated damage
Cdirect damages
Dtangible damages
Answer is hidden
Question 832 of 938Ch 10 · Project Planning, Design and Implementation

Technical proposal during tendering is included in ............[cite: 17]

Asingle stage single envelope system
Bsingle stage double envelope system
Cdouble stage single envelope system
Ddouble stage double envelope system
Answer is hidden
Question 833 of 938Ch 10 · Project Planning, Design and Implementation

The aim of ............ is to do whatever possible to avoid any kind of harm or accident.[cite: 13]

Aminimalist
Breasonable care
Cbeyond one's duty
Dnone of the above
Answer is hidden
Question 834 of 938Ch 10 · Project Planning, Design and Implementation

It is important to be at work ............ every day and on time unless you are sick or have a family emergency.[cite: 13]

Aappearance
Battendance
Cattitude
Drespect
Answer is hidden
Question 835 of 938Ch 10 · Project Planning, Design and Implementation

............ is the rules and standards that govern the decisions and actions of an engineer as a professional.[cite: 13]

ADoctor in Ethics
BDoctor in Ethics
CEthics
DEngineering Ethics
Answer is hidden
Question 836 of 938Ch 10 · Project Planning, Design and Implementation

............ can help engineers make correct decisions and become better professionals.[cite: 13]

AStudy of English
BStudy of Math
CStudy of Ethics
DNone of the above
Answer is hidden
Question 837 of 938Ch 10 · Project Planning, Design and Implementation

One of the most important issues faced by the world is that ............[cite: 13]

Acomputer ethics
Bconfidentiality
Cenvironmental deterioration
Dconflict of interest
Answer is hidden
Question 838 of 938Ch 10 · Project Planning, Design and Implementation

The prime responsibility of any professional is ............[cite: 13]

Aconfidentiality
Bconflict of interest
Cenvironmental ethics
Dcomputer ethics
Answer is hidden
Question 839 of 938Ch 10 · Project Planning, Design and Implementation

Which one does fall under computer ethics?[cite: 13]

AComputers can be used for robbery, crime and blackmailing others
BHacking is used to access private information
CLeak of such information of individual leads to harassments in terms of repeated phone calls
DAll of the above
Answer is hidden
Question 840 of 938Ch 10 · Project Planning, Design and Implementation

Fundamental principle of professional engineering ethics is ............[cite: 13]

Auploading and advancing engineering profession
Bmaintain high level of ethical conduct
Cboth (a) and (b)
Dnone of the above
Answer is hidden
Question 841 of 938Ch 10 · Project Planning, Design and Implementation

Engineering profession needs cooperation with the profession of ............[cite: 13]

Amedical professional
Baccountant
Clawyer
Dall of the above
Answer is hidden
Question 842 of 938Ch 10 · Project Planning, Design and Implementation

Professionalism of engineers is lost due to ............[cite: 13]

Ahonesty
Bdignity
Cbribery
Ddiscipline
Answer is hidden
Question 843 of 938Ch 10 · Project Planning, Design and Implementation

For the fulfillment of his/her professional duties engineer should ............[cite: 13]

Aparamount the health of the public
Bparamount the safety of the public
Cwelfare of the public
Dall of the above
Answer is hidden
Question 844 of 938Ch 10 · Project Planning, Design and Implementation

Engineer shall act in such a manner as to uphold and enhance the honor and dignity of engineering profession and shall act with ............ for bribery, fraud and corruption.[cite: 13]

Atolerance
Ba penchant
Ca predilection
Dzero tolerance
Answer is hidden
Question 845 of 938Ch 10 · Project Planning, Design and Implementation

Engineers shall build their professional reputation on the ............ of their services and shall not compete unfairly with others.[cite: 13]

Apublicity
Bbasis
Cmerit
Dreputation
Answer is hidden
Question 846 of 938Ch 10 · Project Planning, Design and Implementation

Engineers shall not disclose, without ............ confidential information coming the business affairs of technical process of any present or former or employer, or public body on which they serve.[cite: 13]

Aediting
Bgetting paid
Cremuneration
Dconsent
Answer is hidden
Question 847 of 938Ch 10 · Project Planning, Design and Implementation

Which of the following is not a characteristic of a profession?[cite: 13]

Ait enjoys a high level of public trust and confidence
Bit is organized into associations
Cthere are published authoritative performance and ethical standards
DAll of the above are characteristics of a profession
Answer is hidden
Question 848 of 938Ch 10 · Project Planning, Design and Implementation

............ skills such as writing, speaking and body language are important work ethics so that you can be clear in your messages to others.[cite: 13]

ACommunication
BCooperation
CHonesty
DIntegrity
Answer is hidden
Question 849 of 938Ch 10 · Project Planning, Design and Implementation

You are a person with a high level of ............ if you stand by your values even if others put pressure on you to do something that is wrong or if they make fun of you.[cite: 13]

Acommunication
Bcooperation
Chonesty
Dintegrity
Answer is hidden
Question 850 of 938Ch 10 · Project Planning, Design and Implementation

If you don't have ............ you can really get in trouble for lying, cheating or deceiving others.[cite: 13]

Acommunication
Bcooperation
Chonesty
Dintegrity
Answer is hidden
Question 851 of 938Ch 10 · Project Planning, Design and Implementation

If you have ............ you will be a trusted person because they will see that you are committed to your company.[cite: 13]

Acommunication
Borganizational skills
Cloyalty
Drespect
Answer is hidden
Question 852 of 938Ch 10 · Project Planning, Design and Implementation

Which of the following an engineer should not follow?[cite: 13]

AAct as faithful agent for client
BAccept compensation from more than one party for same service without the consent of all
CIndicate client the adverse consequences if judgment is over ruled
DUndertake only these assignments for which he is qualified
Answer is hidden
Question 853 of 938Ch 10 · Project Planning, Design and Implementation

is based on personal belief, values and individual's conscience rather than reasoning.[cite: 13]

AMoral
BEthics
CBoth (a) and (b)
DNone of the above
Answer is hidden
Question 854 of 938Ch 10 · Project Planning, Design and Implementation

If you can keep things at work in order and have a neat workplace, then you have great ............[cite: 13]

Aproductivity
Bcooperate
Corganizational skills
Drespect
Answer is hidden
Question 855 of 938Ch 10 · Project Planning, Design and Implementation

It is always important to ............ yourself, others and the place where you work because you don't always agree with them.[cite: 13]

Aappearance
Bcooperate
Ccommunicate
Drespect
Answer is hidden
Question 856 of 938Ch 10 · Project Planning, Design and Implementation

Some jobs cannot be done alone and some can be done much better and faster if you possess the quality of ............[cite: 13]

Ahonesty
Bcooperation
Cteamwork
Dintegrity
Answer is hidden
Question 857 of 938Ch 10 · Project Planning, Design and Implementation

Strong ............ means you have a high sense of moral and ethical behavior that earns respect of others.[cite: 13]

Aresponsibility
Brespect
Cconfidence
Dcharacter
Answer is hidden
Question 858 of 938Ch 10 · Project Planning, Design and Implementation

A personality measure of the strength of a person's convictions is called ............[cite: 13]

Alocus of control
Battitude
Cego strength
Dnone of the above
Answer is hidden
Question 859 of 938Ch 10 · Project Planning, Design and Implementation

In ............ a professional assumes full responsibilities and if anything wrong happens he/she sees their own responsibility.[cite: 13]

Aminimalist
Breasonable care
Cbeyond one's duty
Dnone of the above
Answer is hidden
Question 860 of 938Ch 10 · Project Planning, Design and Implementation

moves beyond the minimal view's concern.[cite: 13]

AMinimalist
BBeyond one's duty
CReasonable care
DNone of the above
Answer is hidden
Question 861 of 938Ch 10 · Project Planning, Design and Implementation

Which of the following is not concerned with the authority of engineers?[cite: 14]

AExpress an opinion on engineering matter
BGood behavior with client
CConscious with his profession
DDivulge the confidential matter
Answer is hidden
Question 862 of 938Ch 10 · Project Planning, Design and Implementation

Which of the following is not considered a professional quality of an engineer?[cite: 14]

AGood behavior with clients
BHonesty
CBias towards political parties
DStrong technical skills
Answer is hidden
Question 863 of 938Ch 10 · Project Planning, Design and Implementation

The environment which has been modified by human activities is called ............[cite: 14]

AAir pollution
BSoil pollution
CSoil erosion
DWater pollution
Answer is hidden
Question 864 of 938Ch 10 · Project Planning, Design and Implementation

The environment which has been modified by human activities is called ............[cite: 14]

Anatural environment
Banthropogenic environment
Cmodern environment
Durban environment
Answer is hidden
Question 865 of 938Ch 10 · Project Planning, Design and Implementation

Is the effect of undesirable changes in our surroundings that have harmful effects on plants, animals and human beings.[cite: 14]

APollution
BDegradation
CDeforestation
DClimate change
Answer is hidden
Question 866 of 938Ch 10 · Project Planning, Design and Implementation

Development that meets the needs of the present without compromising the ability of future generations to meet their own needs.[cite: 14]

ASustainable development
BHuman development
CEconomic development
DSocial development
Answer is hidden
Question 867 of 938Ch 10 · Project Planning, Design and Implementation

According to labor act, employers must conduct periodic health and safety inspections and maintain records of these inspections.[cite: 14]

AAt least once in a year
BAt least twice in a year
CAt least thrice in a year
DAt least 4 times in a year
Answer is hidden
Question 868 of 938Ch 10 · Project Planning, Design and Implementation

According to Labor Act, the remuneration for over time is ............[cite: 14]

A2 times the regular pay
B1.75 times the regular pay
C1.5 times the regular pay
D1.25 times the regular pay
Answer is hidden
Question 869 of 938Ch 10 · Project Planning, Design and Implementation

The government of Nepal has enforced concepts of occupational safety and health through its ............[cite: 14]

ALabor Act 1992
BLabor Act 1994
CLabor Act 1995
DLabor Act 1995
Answer is hidden
Question 870 of 938Ch 10 · Project Planning, Design and Implementation

Engineers day is celebrated on ............[cite: 14]

AShrawan 3
BShrawan 4
CAsar 3
DAsar 4
Answer is hidden
Question 871 of 938Ch 10 · Project Planning, Design and Implementation

As per labor law, workers are not allowed to work continuously for more than ............[cite: 14]

A3 hours
B5 hours
C8 hours
D12 hours
Answer is hidden
Question 872 of 938Ch 10 · Project Planning, Design and Implementation

According to labors act, the maximum working hour for a labor per week should be ............[cite: 14]

A42 hrs
B45 hrs
C48 hrs
D53 hrs
Answer is hidden
Question 873 of 938Ch 10 · Project Planning, Design and Implementation

As per labor law, how many hours workers are allowed to work in a day?[cite: 14]

A3 hours
B5 hours
C8 hours
D12 hours
Answer is hidden
Question 874 of 938Ch 10 · Project Planning, Design and Implementation

Nepal engineer's association is ............[cite: 14]

Agovernment body to support NEC
Bindependent organization of Nepalese engineers
Cprivate body which works for betterment of engineers
Dnon-government organization
Answer is hidden
Question 875 of 938Ch 10 · Project Planning, Design and Implementation

Nepal engineers association was established in ............ B.S.[cite: 14]

A2010
B2019
C2024
D2034
Answer is hidden
Question 876 of 938Ch 10 · Project Planning, Design and Implementation

NEA is registered under the ............[cite: 14]

ASocial Service Act
BNEC Act
CCivil Service Act
DCo-operatives Act
Answer is hidden
Question 877 of 938Ch 10 · Project Planning, Design and Implementation

The objectives of NEA are ............[cite: 14]

ATo promote development of the engineering science and technology in Nepal.
BTo promote fellowship goodwill and cooperation assistance among the Nepalese engineers and safeguard their rights and interests.
CBy utilizing, to the highest extent possible, the participation of the positional of the national engineering manpower of the country in the national development activities of Nepal, make effort towards ending foreign dependency in this regard
DAll of the above
Answer is hidden
Question 878 of 938Ch 10 · Project Planning, Design and Implementation

NEA is governed by an elected executive council of ............ members.[cite: 14]

A25
B18
C21
D17
Answer is hidden
Question 879 of 938Ch 10 · Project Planning, Design and Implementation

The number of executive members in NEA's Provincial committee is ............[cite: 14]

A25 and 15
B21 and 15
C15 and 25
D25 and 16
Answer is hidden
Question 880 of 938Ch 10 · Project Planning, Design and Implementation

The number of member directly elected for council from Nepal engineering association ............[cite: 14]

A7
B21
C25
D10
Answer is hidden
Question 881 of 938Ch 10 · Project Planning, Design and Implementation

The types of membership issued by NEA are ............[cite: 14]

Ageneral membership
Blife time membership
Cboth of the above
Dnone of the above
Answer is hidden
Question 882 of 938Ch 10 · Project Planning, Design and Implementation

NEA is ............ of Nepalese engineers.[cite: 14]

Aindependent nonprofit organization
Bprofitable organization
Cbroker organization
Dall of the above
Answer is hidden
Question 883 of 938Ch 10 · Project Planning, Design and Implementation

Which is not a professional engineering body?[cite: 14]

ANepal Engineering Association (NEA)
BSociety of Electrical and Electronics Engineers Association (SEEN)
CSociety of Public Health Engineers Nepal (SOPHEN)
DSociety of Consulting Architectural and Engineering Firms (SCAEF)
Answer is hidden
Question 884 of 938Ch 10 · Project Planning, Design and Implementation

CAAN, NEC, NTA, etc. are examples of ............[cite: 14]

Aregulatory body
Bcommercial sectors
CNGOs
DINGOs
Answer is hidden
Question 885 of 938Ch 10 · Project Planning, Design and Implementation

How many categories of NEA memberships are there?[cite: 14]

A4
B5
C7
D2
Answer is hidden
Question 886 of 938Ch 10 · Project Planning, Design and Implementation

What is the tenure of an executive member of NEA?[cite: 14]

A4 year
B2-year
C3 year
D1 year
Answer is hidden
Question 887 of 938Ch 10 · Project Planning, Design and Implementation

Nepal engineering council is an autonomous in under NEC act ............

A2056 B.S.
B2055 B.S.
C2054 B.S.
D2060 B.S.
Answer is hidden
Question 888 of 938Ch 10 · Project Planning, Design and Implementation

Nepal Engineering Council [NEC] is ............

Agovernment and autonomous body
Bprivate body
Cnon-profit organization
Dgovernment body
Answer is hidden
Question 889 of 938Ch 10 · Project Planning, Design and Implementation

Which of the following is not the function of NEC?

APrepare and implement the policy, plan and programmes
BRecognize the academic institutions
COpening the college
DTo prescribe the basic conditions of student admission
Answer is hidden
Question 890 of 938Ch 10 · Project Planning, Design and Implementation

Which one is not concerned with the NEC?

AAccreditation of academic certificate
BAppointment of teacher
CAuthority of opening engineering garage
DAll of the above
Answer is hidden
Question 891 of 938Ch 10 · Project Planning, Design and Implementation

When was Nepal engineering council established?

A2054 B.S.
B2055 B.S.
C2056 B.S.
D2057 B.S.
Answer is hidden
Question 892 of 938Ch 10 · Project Planning, Design and Implementation

NEC contacts the GoN through ministry of ............

Afinance
Bphysical infrastructure and transportation
Chome affairs
Dlocal development
Answer is hidden
Question 893 of 938Ch 10 · Project Planning, Design and Implementation

The decisions of NEC are authenticated by ............

Apresident
Bvice president
Cregistrar
Dmember nominated by president
Answer is hidden
Question 894 of 938Ch 10 · Project Planning, Design and Implementation

NEC does not approach for ............

Aengineer
Boverseer to engineer
Cminimum degree BE
Dall of the above
Answer is hidden
Question 895 of 938Ch 10 · Project Planning, Design and Implementation

The number of section in NEC act 2055 is ............

A18
B28
C38
D48
Answer is hidden
Question 896 of 938Ch 10 · Project Planning, Design and Implementation

The academic qualification of the chief of NEC is ............

Amaster's degree in engineering
Bmaster's degree in economics
Cmaster's degree in finance
Dbachelor's degree in engineering in engineering
Answer is hidden
Question 897 of 938Ch 10 · Project Planning, Design and Implementation

The general experience required for nomination of chairperson of NEC is ............

A10 yrs
B15 yrs
C20 yrs
D25 yrs
Answer is hidden
Question 898 of 938Ch 10 · Project Planning, Design and Implementation

What is the requirement for being chairman of NEC?

ABachelor Degree and Engineering experience of 10 years
BBachelor Degree and Engineering experience of 15 years
CMaster Degree and Engineering experience of 15 years
DMaster Degree and Engineering experience of 10 years
Answer is hidden
Question 899 of 938Ch 10 · Project Planning, Design and Implementation

Who appoints the chairman of NEC?

AThe Government of Nepal
BThe President of Nepal
CMinistry of home affairs
DThe supreme court
Answer is hidden
Question 900 of 938Ch 10 · Project Planning, Design and Implementation

Who is the first president of NEC?

AEr. Shiv Mangal Giri
BProf. Dr. Padam Bahadur Shahi
CEr. Ram Babusharma
DNone of the above
Answer is hidden
Question 901 of 938Ch 10 · Project Planning, Design and Implementation

What is the minimum qualification of vice president of the NEC?

AMasters in Engineering and 15 years' experience
BBachelors in Engineering and 15 years' experience
CMasters in Engineering and 10 years experience
DBachelors in Engineering and 10 years experience
Answer is hidden
Question 902 of 938Ch 10 · Project Planning, Design and Implementation

An American engineer willing to work in Nepal may apply for registration under ............[cite: 16]

ACategory A
BCategory B
CCategory C
DCategory D
Answer is hidden
Question 903 of 938Ch 10 · Project Planning, Design and Implementation

Which of the following category of engineer is not mention in engineering council rule?[cite: 16]

ACharted engineer
BProfessional engineer
CGeneral engineer
DAll of the above
Answer is hidden
Question 904 of 938Ch 10 · Project Planning, Design and Implementation

Book of foreign engineers is maintained in ............[cite: 16]

ANepali
BEnglish
Cboth (a) and (b)
Dnone of the above
Answer is hidden
Question 905 of 938Ch 10 · Project Planning, Design and Implementation

NEC publishes the name of registered engineers each year as well as every fourth year. The name of foreigner engineers publishes ............[cite: 16]

Aeach year
Bevery fourth year
Cboth (a) and (b)
Dnone of the above
Answer is hidden
Question 906 of 938Ch 10 · Project Planning, Design and Implementation

NEC has classified an engineers in to ............ categories.[cite: 16]

A2
B3
C4
D5
Answer is hidden
Question 907 of 938Ch 10 · Project Planning, Design and Implementation

Registration charge of general engineers for students studied in foreign universities is ............[cite: 16]

ARs. 3000
BRs. 4000
CRs. 10000
DRs. 15000
Answer is hidden
Question 908 of 938Ch 10 · Project Planning, Design and Implementation

Total number of registration category of engineer in NEC is ............[cite: 16]

A3
B4
C5
D6
Answer is hidden
Question 909 of 938Ch 10 · Project Planning, Design and Implementation

The min qualification required for engineer practices in Nepal is ............[cite: 16]

ABE
BBE + register in NEC
CME
DME + register in NEC
Answer is hidden
Question 910 of 938Ch 10 · Project Planning, Design and Implementation

The interval of surveillance of colleges registered under NEC is ............[cite: 16]

Aevery 2 years
Bonce in every 3 years
Ctwice in 4 years
Dthrice in every 5 years
Answer is hidden
Question 911 of 938Ch 10 · Project Planning, Design and Implementation

In general, Nepal engineering council meeting per year should be held ............[cite: 16]

A2 times
B3 times
C4 times
D5 times
Answer is hidden
Question 912 of 938Ch 10 · Project Planning, Design and Implementation

Minimum .......... of the members should be present in a meeting to fulfil the quorum of NEC.[cite: 16]

A0.25
B0.5
C0.75
D1
Answer is hidden
Question 913 of 938Ch 10 · Project Planning, Design and Implementation

If a motion submitted to a meeting of council to remove the name from the book on charge of violating professional code of conduct is passed by ............ majority of council, the name of the engineer is removed from the book.[cite: 16]

Atwo third
Bgeneral
Cthree - fourth
Dfull
Answer is hidden
Question 914 of 938Ch 10 · Project Planning, Design and Implementation

Which of the following reasons caused desolution of NEC by GON?[cite: 16]

ACommittee of NEC work against the act and regulations
B50% of the member are bankrupt
CCollege recognition is given without fulfilling the criteria of NEC regulations
DFormation of new government of Nepal
Answer is hidden
Question 915 of 938Ch 10 · Project Planning, Design and Implementation

The minimum time period allocated by GoN for formation of new council after the dissolution of current NEC like is ............[cite: 16]

A3 months
B6 months
C9 months
D1 year
Answer is hidden
Question 916 of 938Ch 10 · Project Planning, Design and Implementation

For temporary affiliation, the supervision of college conducted by NEC for ............[cite: 16]

Aone time in a year
Bonce in two year
Ctwice times in a year
Dthree times a year
Answer is hidden
Question 917 of 938Ch 10 · Project Planning, Design and Implementation

For permanent affiliation, the supervision of college conducted by NEC for ............[cite: 16]

Aone time in a year
Bonce in two year
Ctwice times in a year
Dthree times a year
Answer is hidden
Question 918 of 938Ch 10 · Project Planning, Design and Implementation

How much % college should score at least in average to get permanent affiliation for new college from NEC?[cite: 16]

A50%
B60%
C70%
D80%
Answer is hidden
Question 919 of 938Ch 10 · Engineering Economics & Project Management

A project is considered economically acceptable when its Benefit-Cost (B/C) ratio is:

AB/C < 1
BB/C > 1
CB/C = 0
DB/C = 1
Answer is hidden
Question 920 of 938Ch 10 · Engineering Economics & Project Management

Standard deviation is calculated as:

A√Variance
BVariance²
CMean / Variance
DVariance / n
Answer is hidden
Question 921 of 938Ch 10 · Engineering Economics & Project Management

The value at which a buyer and seller agree to complete a transaction is called:

ABook Value
BSalvage Value
CMarket Value
DPresent Value
Answer is hidden
Question 922 of 938Ch 10 · Engineering Economics & Project Management

Projects A (6-year life) and B (8-year life) are being compared using the repeatability assumption. The analysis period should be:

A6 years
B8 years
C14 years
D24 years
Answer is hidden
Question 923 of 938Ch 10 · Engineering Economics & Project Management

The time value of money concept means:

AMoney always loses value
BMoney always gains value
CA unit of money has different worth at different points in time
DInterest rates are always positive
Answer is hidden
Question 924 of 938Ch 10 · Engineering Economics & Project Management

Which capital investment evaluation method is considered LEAST reliable and is rarely used?

AAccounting Rate of Return (ARR)
BNet Present Value (NPV)
CInternal Rate of Return (IRR)
DPayback Period
Answer is hidden
Question 925 of 938Ch 10 · Engineering Economics & Project Management

The Schedule Performance Index (SPI) formula in Earned Value Management is:

ASPI = PV / EV
BSPI = EV / PV
CSPI = AC / EV
DSPI = EV / AC
Answer is hidden
Question 926 of 938Ch 10 · Engineering Economics & Project Management

Cost overrun in a project is calculated as:

AActual Cost − Planned Cost
BPlanned Cost − Actual Cost
CEarned Value − Planned Value
DActual Cost / Planned Cost
Answer is hidden
Question 927 of 938Ch 10 · Engineering Economics & Project Management

In engineering drawings, a 'B' grade pencil is primarily used for:

AFine detail linework
BConstruction lines
CDimension lines
DShading and sketching
Answer is hidden
Question 928 of 938Ch 10 · Engineering Economics & Project Management

The standard paper size ratio (width to height) for the ISO A-series is:

A1 : √2
B1 : 2
C√2 : 1
D3 : 4
Answer is hidden
Question 929 of 938Ch 10 · NEC & Professional Practice

Who has the authority to appoint the Chairman of the Nepal Engineering Council (NEC)?

AThe Prime Minister
BThe Government of Nepal
CThe NEC Council itself
DThe Minister of Physical Infrastructure
Answer is hidden
Question 930 of 938Ch 10 · NEC & Professional Practice

Who appoints the Auditor of NEC?

AThe NEC Council
BThe Ministry of Finance
CThe Auditor General
DThe Government of Nepal
Answer is hidden
Question 931 of 938Ch 10 · NEC & Professional Practice

What is the minimum number of council meetings NEC must hold per year?

A2
B4
C6
D12
Answer is hidden
Question 932 of 938Ch 10 · NEC & Professional Practice

What is the minimum number of engineering licence examinations NEC must conduct per year?

A1
B2
C3
D4
Answer is hidden
Question 933 of 938Ch 10 · NEC & Professional Practice

What is the minimum number of female members required in the NEC Council?

A2
B3
C4
D5
Answer is hidden
Question 934 of 938Ch 10 · NEC & Professional Practice

The first executive committee of NEC was formed in which year (BS)?

A2054
B2056
C2058
D2060
Answer is hidden
Question 935 of 938Ch 10 · NEC & Professional Practice

Under the NEC Act, the penalty for violating Section 2 (unauthorized engineering practice) is:

AUp to Rs. 5,000
BUp to Rs. 10,000
CUp to Rs. 15,000
DUp to Rs. 25,000
Answer is hidden
Question 936 of 938Ch 10 · NEC & Professional Practice

What type of organisation is the Nepal Engineering Council (NEC)?

APrivate body
BGovernmental / statutory body
CNon-Governmental Organisation (NGO)
DInternational organisation
Answer is hidden
Question 937 of 938Ch 10 · NEC & Professional Practice

Approval of a Bachelor's Engineering degree for NEC registration is granted by:

AThe university granting the degree
BNEC
CThe Ministry of Education
DThe Government of Nepal
Answer is hidden
Question 938 of 938Ch 10 · NEC & Professional Practice

The number of engineers registered with NEC is approximately:

A45,000
B65,000
C89,263
D120,000
Answer is hidden